Records from 1981 to 2002. Most recent: inspection, 19 December 2002.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 29
19 December 2002
COI Inspection · Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1717618
1 October 1999
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1041057
3 September 1998
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 222820
3 September 1998
Re-Inspection · Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 797450
8 April 1998
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1441412
24 September 1997
Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1425982
28 August 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 13898
28 August 1997
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 215950
19 September 1996
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 832034
15 August 1996
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1090020
11 July 1996
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1089144
4 January 1996
Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1187159
12 December 1995
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 51873
30 January 1995
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1139696
5 February 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 117772
4 February 1994
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 120148
28 January 1994
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1165398
7 December 1993
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1438129
14 February 1993
Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1166596
6 July 1989
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1345135
2 June 1989
Deficiency Check · Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 887586
20 January 1987
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1317811
6 November 1986
Re-Inspection
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1014301
18 July 1986
Deficiency Check
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 997537
9 December 1985
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 988328
28 October 1985
COI Inspection · Credit Drydock
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 993160
21 May 1984
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1281492
16 May 1983
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 964153
21 December 1981
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 970264
Construction/Loadline
Issued 3 September 1998
Resolved
FREE UP FORWARD PEAK TANK REACH ROD VALVE.
Condition: Unknown
Due 17 September 1998
Resolved 6 November 1998
Engineering
Issued 3 September 1998
Resolved
RENEW RETURN FUEL LINE ON PORT MAIN ENGINE AND SHIPS SERVICE GENERATOR.
Condition: Unknown
Due 17 September 1998
Resolved 6 November 1998
Documentation
Issued 24 September 1997
Resolved
Prove to a CG Marine Inspector compliance with a Drug Testing Program as required by 46 CFR Part 16, to be completed to the satisfaction of attending Marine Inspector NLT 24 OCT 97.
Condition: Unknown
Due 24 September 1997
Resolved 24 September 1997
Lifesaving
Issued 24 September 1997
Resolved
Install 406 type 1 epirb to the satisfaction of Coast Guard Inspector or restrict route to within Territorial Sea
Condition: Unknown
Due 24 September 1997
Resolved 24 September 1997
Engineering
Issued 15 August 1996
Resolved
RENEW THE FUEL TANK VENT LINE FLAME SCREEN.
Condition: Unknown
Due 15 September 1996
Resolved 30 September 1996
Lifesaving
Issued 15 August 1996
Resolved
PROVIDE A BRIGHTLY COLORED AND PROPERLY STENCILED FLARE CONTAINER.
Condition: Unknown
Due 15 September 1996
Resolved 30 September 1996
Lifesaving
Issued 15 August 1996
Resolved
PRIOR TO CARRYING PASSENGERS, PROVIDE SIX HAND HELD RED DISTRESS SIGNALS.
Condition: Unknown
Due 22 August 1996
Resolved 22 August 1996
Documentation
Issued 15 August 1996
Resolved
PRIOR TO OPERATING MORE THAN 1000 FEET FROM LAND, PROVIDE A VALID FCC RADIOTELEPHONY CERTIFICATE.
Condition: Unknown
Due 15 September 1996
Resolved 30 September 1996
Electrical
Issued 15 August 1996
Resolved
RENEW THE BREAKER BOX PANEL COVER ON THE PORT AFT ENGINE ROOM BULKHEAD.
Condition: Unknown
Due 15 September 1996
Resolved 30 September 1996
Electrical
Issued 15 August 1996
Resolved
DEAD END OR REINSTALL THE ELECTRICAL CABLES TO THE STARBOARD ALTERNATOR.
Condition: Unknown
Due 15 September 1996
Resolved 30 September 1996
Unknown
Issued 15 August 1996
Resolved
PRIOR TO PLACING VESSEL IN SERVICE, REMOVE ALL OIL FROM ENGINE ROOM BILGES.
Condition: Unknown
Due 19 September 1996
Resolved 30 September 1996
Construction/Loadline
Issued 11 July 1996
Resolved
CROP TO SOUND METAL AND RENEW WASTED & HOLED AREA OF PORT SIDE SHELL AND MAIN DECK INWAY OF STEM.
Condition: Unknown
Due 22 August 1996
Resolved 22 August 1996
Construction/Loadline
Issued 11 July 1996
Resolved
RENEW WASTED FORE PEAK VENT AS ORIGINAL.
Condition: Unknown
Due 22 August 1996
Resolved 22 August 1996
Construction/Loadline
Issued 11 July 1996
Resolved
PROVIDE PROPER MEANS OF SECURING TIRES TO VESSELS VICE METHOD NOW PULLING UP THE MAIN DECK._x001C_ _x001C_
Condition: Unknown
Due 11 August 1996
Resolved 30 September 1996
Construction/Loadline
Issued 11 July 1996
Resolved
CROP TO SOUND STEEL AND RENEW WASTED AND HOLED AREA OF STBD SIDE BOW. INSERT TO BE MINIMUM OF 18" X 18".
Condition: Unknown
Due 22 August 1996
Resolved 22 August 1996
Construction/Loadline
Issued 11 July 1996
Resolved
CROP AND RENEW WASTED DECK INWAY OF LAZARETTE HATCH STARBOARD SIDE.
Condition: Unknown
Due 11 August 1996
Resolved 30 September 1996
Construction/Loadline
Issued 11 July 1996
Resolved
RENEW WASTED AND BUCKLED MEMBERS IN THE FORE PEAK: STBD SIDE BRACKETS, TRANSVERSE BULKHEAD STIFFNER, PORT SIDESHELL LONGS STBD SIDESHELL LONGS.
Condition: Unknown
Due 22 August 1996
Resolved 22 August 1996
Construction/Loadline
Issued 11 July 1996
Resolved
GAUGE COLLISION BULKHEAD AND PROVIDE A COPY OF WRITTEN REPORT TO [name withheld].
Condition: Unknown
Due 22 August 1996
Resolved 22 August 1996
Construction/Loadline
Issued 11 July 1996
Resolved
RENEW WASTED AND HOLED AREA OF CABIN TOP.
Condition: Unknown
Due 22 August 1996
Resolved 22 August 1996
Construction/Loadline
Issued 11 July 1996
Resolved
CROP AND RENEW AS ORIGINAL, WASTED LAZARETTE HATCH COAMING.
Condition: Unknown
Due 11 July 1996
Resolved 30 September 1996
Construction/Loadline
Issued 11 July 1996
Resolved
CROP AND RENEW BUCKLED UNDER DECK BRACKETS IN LAZARETTE, STBD SIDE AND TRANSOM.
Condition: Unknown
Due 11 August 1996
Resolved 30 September 1996
Construction/Loadline
Issued 11 July 1996
Resolved
CROP AND RENEW AS ORIGINAL GOUGED AND INSET AREAS PORT SIDESHELL APPROXIMATELY 18" ABOVE THE WATERLINE.
Condition: Unknown
Due 22 August 1996
Resolved 22 August 1996
Construction/Loadline
Issued 11 July 1996
Resolved
MAKE AREA OF SIDESHELL INWAY OF INSET AREA PORT SIDE AVAILABLE FOR INTERIOREXAM.
Condition: Unknown
Due 22 August 1996
Resolved 22 August 1996
Unknown
Issued 30 January 1995
Resolved
PROVE PROPER OPERATION OF DECK WASHDOWN PUMP.
Condition: Unknown
Due 6 February 1995
Resolved 22 February 1995
Engineering
Issued 30 January 1995
Resolved
INSTALL CORROSION RESISTANT 30X30 WIRE MESH ON FUEL TANK VENT.
Condition: Unknown
Due 6 February 1995
Resolved 22 February 1995
Electrical
Issued 30 January 1995
Resolved
SECURE WIRE TO ANCHOR WINDLASS IN FOREPEAK.
Condition: Unknown
Due 6 February 1995
Resolved 22 February 1995
Engineering
Issued 30 January 1995
Resolved
REMOVE COCKS FROM ALL FUEL STRAINER FLAME SCREENS IN ENGINE COMPARTMENT ANDINSTALL CAPS OR PLUGS.
Condition: Unknown
Due 6 February 1995
Resolved 22 February 1995
Engineering
Issued 30 January 1995
Resolved
REPLACE ALTERNATOR BELT ON STARBOARD MAIN ENGINE.
Condition: Unknown
Due 6 February 1995
Resolved 22 February 1995
Construction/Loadline
Issued 30 January 1995
Resolved
ON OR BEFORE NEXT DRYDOCK (31DEC95), REPLACE WASTED SUPPORT BRACKET ON AFT BULKHEAD IN FOREPEAK.
Condition: Unknown
Due 22 February 1995
Resolved 22 February 1995
Electrical
Issued 30 January 1995
Resolved
SECURE LOOSE WIRES ON GENERATOR IN ENGINE COMPARTMENT.
Condition: Unknown
Due 6 February 1995
Resolved 22 February 1995
Electrical
Issued 30 January 1995
Resolved
REPAIR GENERATOR EXHAUST LEAK IN STEERING COMPARTMENT.
Condition: Unknown
Due 6 February 1995
Resolved 22 February 1995
Electrical
Issued 30 January 1995
Resolved
SECURE LOOSE WIRES ON ENGINE COMPARTMENT FORWARD BULKHEAD.
Condition: Unknown
Due 6 February 1995
Resolved 22 February 1995
Construction/Loadline
Issued 30 January 1995
Resolved
REPAIR 1/2" HOLE IN MAIN DECK AFT IN WAY OF PLASTIC CEMENT PATCH.
Condition: Unknown
Due 6 February 1995
Resolved 22 February 1995
Lifesaving
Issued 21 May 1984
Resolved
ATTACH WATERLIGHTS AND REPLACE DETERIORATED LINE ON RING BUOYS.
Condition: Unknown
Due 21 May 1984
Resolved 21 May 1984
Accommodation/Occupational Safety
Issued 21 May 1984
Resolved
PROVIDE DECK RAILING AT STERN OF VSL OF AT LEAST 36" HIGH WITH SPACING BETWEEN COURCES NOT GRATER THAN 12" APART. 46 CFR 177.35-1
Condition: Unknown
Due 21 May 1984
Resolved 21 May 1984
Lifesaving
Issued 21 May 1984
Resolved
PROVIDE FOR EACH LIFE FLOAT A PAINTER & A FLOAT FREE LINK OR SECURE THE GROUP IF LF'S BY A SINGLE PAINTER & FLOAT FREE LINK
Condition: Unknown
Due 21 May 1984
Resolved 21 May 1984
Lifesaving
Issued 21 May 1984
Resolved
REPLACE DETERIORATED LIFELINES AND REPLACE MISSING WATER LIGHTS ON LIFE FLOATS
Condition: Unknown
Due 21 May 1984
Resolved 21 May 1984
Unknown
Issued 21 May 1984
Resolved
MAKE VSL READY FOR 1ST REINSPECTION UNDER THE CURRENT COI, NLT 21JUN84
Condition: Unknown
Due 21 May 1984
Resolved 21 May 1984