Records from 2006 to 2026. Most recent: inspection, 22 April 2026.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 22 April 2026
Resolved
Each survival craft required on a vessel by this part must meet one of the following: For a life float-Approved under approval series 160.027. One life float had a deteriorating net and another needed new fasteners to attach the netting material to the life float. Repair life floats using approved repair kit to the satisfaction of the MI.
46 CFR 180.64
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 April 2026
Resolution: MI confirmed repair of netting on life float and replacement of zip ties with rope on the other. Pictures included.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 22 April 2026
Resolved
Each vessel that operates on the high seas must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. The battery was expired on the EPIRB. Vessel is restricted to operating within 3 NM of the coastline until replaced and registered with NOAA.
46 CFR 180.64
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 27 April 2026
Resolution: Vessel bought new EPIRB and registered it with NOAA. Pictures uploaded
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 22 April 2026
Resolved
A fire hose with a nozzle must be attached to each fire hydrant at all times. #1 fire station hose had a pinhole leak near the connection to the fire hydrant. Replace fire hose to the satisfaction of the MI.
46 CFR 181.320 (a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 May 2026
Resolved 27 April 2026
Resolution: Vessel replaced fire hose with new one. Pictured uploaded
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 April 2026
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards. The cable insulation is deteriorating on the connector from the battery bank to the starboard main engine. Replace cable to the satisfaction of the MI.
46 CFR 183.200 (b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 May 2026
Resolved 27 April 2026
Resolution: Vessel covered battery cable with instulated heat wrap sheathing. Pictures uploaded
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 April 2026
Resolved
Flexible hose shall be fabricated with an inner tube and a cover of synthetic rubber or other suitable material reinforced with wire braid. The outer rubber was deteriorating on the fuel supply line to the centerline generator. Replace fuel line to the satisfaction of the MI.
46 CFR 182.20-40 (a)(2)(ii)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 May 2026
Resolved 14 May 2026
Resolution: Vessel replaced fuel line to centerline generator. Photos in documents tab
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 22 April 2026
Resolved
The Certificate of Inspection (COI) must be posted under glass or other suitable transparent material, such that all pages are visible, in a conspicuous place on the vessel where observation by passengers is likely. Vessel did not have COI posted. Post COI to the satisfaction of the MI.
46 CFR 176.302
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 May 2026
Resolved 27 April 2026
Resolution: Vessel posted updated COI. Pictures uploaded
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 April 2026
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Distribution panels located in the engine room, vestibule to accommodation space and main deck all have open knockouts. Seal knockouts to the satisfaction of the MI.
46 CFR 183.01-15 (a)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 May 2026
Resolved 27 April 2026
Resolution: Vessel sealed all knockouts in distribution panels. Pictures uploaded
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 22 April 2026
Resolved
In systems and applications where flexible hoses are permitted to be clamped: Double hose clamping is required where practicable. MI observed single hose clamps used through machinery space. Add additional hose clamps to the satisfaction of the MI.
46 CFR 182.410
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 May 2026
Resolved 14 May 2026
Resolution: Vessel added additional hose clamps throughout engine room. Photos in documents tab
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 1 May 2024
Resolved
An interconnected detection and alarm system must: Be installed such that the actuation of alarm in one area results in both audible & visual alarms in all areas required by 46CFR181.405(c) or 118.400(d) to be protected by the interconnected detection & alarm system. The interconnected detection system located on the bridge was inoperable. Repair to full operation to the satisfaction of the attending marine inspector prior to the carriage of passengers.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2024
Resolved 3 May 2024
Resolution: Received evidence of satisfactory operation of the bridge's fire detection system.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 1 May 2024
Resolved
Electrical equipment on a vessel must be installed & maintained to protect passengers, crew, other persons,
& the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, & electrical shock. 3 flood lights located at 01 deck were missing appropriate light fixtures & were not capped. Install proper flood lights to the fixtures.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 May 2024
Resolution: Received satisfactory evidence that flood lights been installed.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 1 May 2024
Resolved
Each lighting fixture globe, lens, or diffuser must have a guard or be made of high strength material, except in an accommodation space, radio room, galley, or similar space where it is not subject to damage. The light located at the 01 deck (behind the bridge bulwark) is missing the required guard. Install the appropriate guard for the light fixture.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 May 2024
Resolved 3 May 2024
Resolution: Received satisfactory evidence that the light guard has been installed at the 01 deck.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 2 May 2023
Resolved
At all inspections special attention shall be paid to insure that no fire hazards exist and that guards or protective devices are provided in all hazardous places. Centerline generator was missing guard on aft end. Install guard on center generator. 46 CFR 176.25-10(b)
"OLD-T"
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2023
Resolved 17 May 2023
Resolution: Vessel provided photo of installed guard.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 2 May 2023
Resolved
A vessel must carry either a first-aid kit that meets the requirements in 46 CFR 199.175(b)(10) or a kit with equivalent contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight container that is marked “First-Aid Kit”. A first-aid kit must be easily visible and readily available to the crew. Observed missing first aid contents and broken kit. Provide new first aid kit. 46 CFR 184.710
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 May 2023
Resolved 17 May 2023
Resolution: Vessel provided photo of new first aid kit.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 2 May 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to prevent electrical ignition of flammable vapors. Generator windings on both generators are saturated with oil. Clean windings to the satisfaction of attending marine inspector. 46 CFR 183.200(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2023
Resolved 17 May 2023
Resolution: Vessel provided photo of cleaned windings.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 2 May 2023
Resolved
Lighting fixtures shall be constructed in accordance with the requirements of Underwriters' Laboratories,
Inc. Standard for Marine Type Electric Lighting Fixtures. Sewage space light lens is broken. Replace lens to the satisfaction of attending marine inspector. 46 CFR 183.10-25(l)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 May 2023
Resolved 17 May 2023
Resolution: Vessel provided photo of new fixture.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 3 May 2022
Resolved
Vessels anchor light and forward mast light were wired incorrectly. Repair anchor light and FWD mast light so they operate on the correct switch. 33 CFR 83.20
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 May 2022
Resolved 10 May 2022
Resolution: Vessel operator turned on wrong switch. Anchor and forward mast light work properly.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 3 May 2022
Resolved
Vessels life jackets had old vessels name on them and were visible. Cross out old vessels name on life jackets so they cant be read. 46 CFR 180.25-15
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 May 2022
Resolved 10 May 2022
Resolution: Vessel blocked out old vessels name on all PFD's.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 3 May 2022
Resolved
Vessel had power strip and missing outlet cover on Bridge. Remove power strip or hardwire an outlet and add outlet cover to missing cover. 46 CFR 176.25-50
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 May 2022
Resolved 3 May 2023
Resolution: Verified complete.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 3 May 2022
Resolved
Portable air pump in engine room used to fill air tank was not mounted. Remove or mount portable air pump. 46 CFR 176.25-50
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 May 2022
Resolved 10 May 2022
Resolution: Operatro mounted portable air pump.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 3 May 2022
Resolved
Port side fire station handle for valve on fire hydrant was deteriorated. Replace valve handle. 46 CFR 181.15-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 May 2022
Resolved 10 May 2022
Resolution: Operator replaced handle
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 3 May 2022
Resolved
Hertz gauge was inoperable on vessels starboard
generator. Repair or replace hertz gauge on generator. 46 CFR 183.10-5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 May 2022
Resolved 3 May 2023
Resolution: Witnessed operational Hertz meter.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 May 2022
Resolved
Starboard engine throttle cable was tied with using
string from a pipe. Permanently mount cable. 46 CFR 176.25-50
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 May 2022
Resolved 10 May 2022
Resolution: Throttle cable was secured properly.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 29 April 2021
Resolved
Overboard through hull spool piece on port hull in lazarette has corroded all the way through. Make necessary repairs to corroded piping. 46 CFR 176.610(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2021
Resolved 10 May 2021
05 - Radio Communications › N/A - No Subsystem › Main installation
Issued 29 April 2021
Resolved
VHF-DSC radio does not have its own separate circuit and breaker. Send email to [email withheld] describing planned installation including radio amperage, wiring type, gauge, length, and breaker amperage prior to new installation. 46 CFR "Old T" 183.05-25
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2021
Resolved 3 May 2023
Resolution: verified installed breaker.
09 - Working and Living Conditions › 091 - Living Conditions › Pipes, wires (insulation)
Issued 29 April 2021
Resolved
2 outlets on bridge have open grounds. Investigate and make repairs to outlets. 46 CFR "OLD T" 183.10-20(o)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2021
Resolved 10 May 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 29 April 2021
Resolved
Ammeter, voltmeter, and frequency meter on main switchboard are inoperative. Repair/ replace meters on switchboard OR install ammeter, voltmeter, and frequency meter on centerline generator. 46 CFR "Old T" 183.10-5(g)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2021
Resolved 10 May 2021
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 29 April 2021
Resolved
Replace zip ties used on grab lines and painter lines on life floats with a more suitable and easy to break method.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2021
Resolved 10 May 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 29 April 2021
Resolved
Each child life jacket must be stowed and marked appropriately. Replace stenciling for child life jackets stowage locations. 46 CFR 180.78(a)(5)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2021
Resolved 10 May 2021
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 29 April 2021
Resolved
Make permanent repairs to leaking fire main on upper deck fire station. 46 CFR 176.810 (a)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2021
Resolved 10 May 2021
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 30 April 2019
Resolved
Audible bilge alarm at operation station was inoperable.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 May 2019
Resolved 30 April 2019
Resolution: Repaired equipment
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 30 April 2019
Resolved
Missing spanner wrench at each fire station
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2019
Resolved 30 April 2019
Resolution: Recieved pictures via email of items needed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 April 2019
Resolved
Wire connectors on port and starboard mains starter wiring was not of the captive type and several wires were not closed off and left as dead ends.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2019
Resolved 30 April 2019
Resolution: Placed caps on all live wires on mains.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 30 April 2019
Resolved
Vessel on an oceans route shall have lights on all lifejackets.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2019
Resolved 30 April 2019
Resolution: Received photos via email showing corrected deficiency.
Stability › Watertight Integrity › General
Issued 5 April 2018
Resolved
AM03: Install metallic fittings and valves where PVC pipe passes thru aft bulkhead of #2 void space.
Initially issued "Prior to Credit Drydock" but owner appealed.
26APR2018: Granted appeal and issued 835 with the following verbiage, "Plastic piping is installed without metallic fittings or valves from aft bulkhead of #2 void space, passing through four bulkheads, and ending in the lazarette. Install metallic fittings and valves where plastic piping passes through bulkheads, or replace with metallic piping. Deficiency to be rectified by 01 APRIL 2019."
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 1 April 2019
Resolved 23 July 2019
Resolution: Received email from O/O that the PVC through fittings were removed, closed off and double welded.
Engineering › Bilge Water Management System › Valve
Issued 29 March 2017
Resolved
Make bilge valve in forepeak operational from weather deck. 46CFR182.25-5(d)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 April 2017
Resolved 28 April 2017
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 29 March 2017
Resolved
Provide adequate smoke detection in accomodation space. 46CFR177.25-1
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 12 April 2017
Resolved 31 March 2017
Navigation › Piloting/Steering › Marine Charts
Issued 29 March 2017
Resolved
Provide updated charts for operational area. 46CFR184.420
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 12 April 2017
Resolved 31 March 2017
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 29 March 2017
Resolved
Provide first aid kit meeting requirements of 46CFR160.041. 46CFR184.710
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 12 April 2017
Resolved 31 March 2017
Electrical › Electric Generation Source (service) › Generator
Issued 26 May 2016
Resolved
Owner/operator is installing a second new gen set, must not operate this gen set until plans are approved and CGMI attends vessel to conduct final installation and test verification inspection.
Action required: 705 - Other - as specified
Resolved 12 July 2016
Resolution: Attended vessel to make final instalation checks.
Stability › Incline Test › General
Issued 26 May 2016
Resolved
Must submit stability calculations to MSC for approval due to additional gen set being installed.
Due 26 June 2016
Resolved 29 June 2016
Resolution: Recieved email and updated stability memo from MSC
Engineering › Generator (propulsion/auxiliary-electric) › Winding
Issued 28 April 2016
Resolved
Gen-Set winding are oil soaked, which is an electrical and fire hazard. Housing is loose, and secured with a ratchet strap. Repair/replace in kind to like new condition. PTCP.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 28 April 2016
Resolved 26 May 2016
Resolution: Gen set was cleaned by third party and windings fixed.