← All vessels
VENDETTA 2
Passenger (Inspected) · Passenger Ship class · Built 1970s · USCG Southwest District (CGD-SW) · Other hulls named VENDETTA 2
VENDETTA 2 is a 1973 passenger vessel (inspected). The Coast Guard has recorded 97 inspections since 1984, most recently in April 2026, along with 253 deficiencies, 3 operational controls, 1 with no removal date recorded and 1 casualty investigation in 2016.
Records from 1984 to 2026. Most recent: inspection, 29 April 2026.
- Built
- 1973
- Last inspected
- 29 April 2026
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 253 recorded · 0 without a recorded resolution
- Controls
- 1 with no removal date recorded
- Casualties
- 1 investigation · 2016
Identity
550686
WDL6167
47635
Flag
UNITED STATES
368148070
Maury page id
psix-47635
Inspections, by type
…with no type recorded13
Years with a record
35 calendar years (1984–2026)
The 97 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)57.9 ft × 19.0 ft × 7.7 ft
Registered tonnagegross 62 / net 43
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJACK O WISE · HERMOSA BEACH, CA, UNITED STATES · built 1973
Hull materialWood
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portSAN DIEGO, CA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 13 May 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it62 - Regulatory (Subpart C or D), Gross Ton
43 - Regulatory (Subpart C or D), Net Ton
43 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDL6167MMSI 368148070 · active · compulsorily equipped · granted 5 June 2020, expires 5 June 2030
WDH6777MMSI 367641510 · expired · compulsorily equipped · granted 23 September 2014, cancelled 7 December 2024
WYV5106MMSI 366942780 · expired · compulsorily equipped · granted 24 April 2004, cancelled 9 August 2014
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 97
29 April 2026
Deficiency Check · Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8358318
17 December 2025
Hull Examination · Internal Structural Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8284746
27 September 2025
In-Service Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8245636
12 May 2025
COI Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8135297
16 April 2025
Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8113008
21 October 2024
In-Service Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8023100
13 February 2024
Annual Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7865691
8 December 2023
Internal Structural Exam · Drydock Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7836767
23 May 2023
In-Service Inspection · Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7694690
23 May 2023
In-Service Inspection · Administrative Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7702175
21 June 2022
Hull Examination · Deficiency Check · Internal Structural Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7483325
12 January 2022
Deficiency Check · Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7375063
12 February 2020
Examination of Repairs · Simplified Stability Test · Construction Oversight · Annual Inspection · Drydock Exam · Internal Structural Exam · Initial Certification
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6908139
25 August 2017
Administrative Inspection
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6254896
7 February 2017
Administrative Inspection · Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6083540
28 August 2016
Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 5994752
27 August 2016
Damage Survey
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 5984985
24 May 2016
DAPI Audit · Deficiency Check · COI Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 5868450
24 August 2015
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 5221675
22 August 2011
Administrative Inspection
Administrative · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 4124351
17 August 2011
DAPI Audit · Deficiency Check
Physical examination · USCG Southwest District (dp) · USCG Southwest District (CGD-SW) · Activity 4134006
18 July 2011
Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 4085952
2 February 2011
Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 4020314
1 October 2010
Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 3873959
10 February 2010
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 3677721
22 April 2009
Deficiency Check · Plan Review "T" Boat · Examination of Repairs · Construction Oversight · Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 3457849
18 February 2009
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 3419005
6 March 2008
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 3158434
9 March 2007
Annual Inspection · Administrative Inspection · Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 2884780
5 December 2005
COI Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 2546514
28 June 2005
Examination of Repairs · Hull Examination · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 2406798
2 March 2005
Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 2309774
9 February 2005
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 2289234
15 December 2003
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 1971165
18 June 2003
Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 1825584
3 June 2003
Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 1809869
12 December 2002
Periodic Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 1717745
22 April 2002
Annual Inspection
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 1606935
21 June 2001
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1068623
25 May 2001
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1063623
7 May 2001
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1393677
22 February 2001
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1389331
28 February 2000
Re-Inspection · Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1399298
3 December 1999
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1421765
6 April 1999
Deficiency Check · Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1442810
1 April 1999
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1365130
10 March 1999
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1384062
12 February 1999
Plan Review "T" Boat
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1472016
30 December 1998
Plan Review "T" Boat
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 808766
17 December 1997
COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1406229
24 June 1997
Examination of Repairs
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1368280
2 June 1997
Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 162547
4 April 1997
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1407867
27 January 1997
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1106901
16 December 1996
Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1411389
21 August 1996
Drydock Extension
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1086620
9 January 1996
Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1367633
23 November 1995
Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 5365
12 September 1995
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 880797
25 May 1995
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1182485
3 March 1995
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1403920
5 January 1995
COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1355089
23 November 1994
Drydock Extension
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1175325
1 March 1994
Deficiency Check · Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1410952
25 October 1993
Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1410865
14 October 1993
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 845019
21 September 1993
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 843424
11 May 1993
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 837031
2 March 1993
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1153488
26 January 1993
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 828162
6 January 1993
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 828735
3 January 1992
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 951788
10 December 1991
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1262263
9 September 1991
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1308562
14 March 1991
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1230146
6 February 1991
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 904047
16 January 1991
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 903546
25 September 1990
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1234104
20 August 1990
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1234199
16 April 1990
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 913129
4 January 1990
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1229874
30 May 1989
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1195517
10 April 1989
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1204662
22 March 1989
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1208432
3 January 1989
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1042025
6 June 1988
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 887518
10 January 1988
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1327743
26 May 1987
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1334131
13 April 1987
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1002563
23 February 1987
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1003639
21 January 1987
Re-Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1317379
4 June 1986
Credit Drydock
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 989306
10 March 1986
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 991929
6 February 1986
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 997391
7 January 1986
COI Inspection · Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 995970
9 January 1985
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1286209
4 December 1984
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 976939
Deficiency record · 253
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 29 April 2026
Resolved
FCC radiotelephony permit expired 2025.
05 - Radio Communications › N/A - No Subsystem › Performance standards for radio equipment
Issued 29 April 2026
Resolved
VHF radio did not have gps position and mmsi number integrated into system.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 29 April 2026
Resolved
Monthly EPIRB testing not recorded.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 29 April 2026
Resolved
Life ring line attached to light needs to be replaced. Life ring name is missing on life ring located outside operating station.
11 - Life Saving Appliances › N/A - No Subsystem › Means of recovery of life saving appliances
Issued 29 April 2026
Resolved
Vessel's man overboard ladder was found to be a rope type. Provide vessel with a ridged metal ladder that fits vessel railings, and is rated to carry the weight of a crew member and a helpless victim. Correct within 30 days.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 May 2025
Resolved
The discharge ends of fuel tank vent pipes must be fitted with removable 30 × 30 mesh. flame screens or flame arresters.
Flame screen damages replace as new.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 12 May 2025
Resolved
A vessel not required to have a power driven fire pump by 181.300 must have at least three 2 1/2 gallon buckets, with an attached lanyard satisfactory to the cognizant OCMI.
All of vessels fire buckets had a capacity of 5 gallons. Drill holes to 2 1/2 gallons and attach lanyard that reaches water when on bow.
09 - Working and Living Conditions › 092 - Working Conditions › Danger areas
Issued 12 May 2025
Resolved
An exposed hazard, such as gears or rotating machinery, must be properly protected by a cover, guard, or rail. Portside engine missing guard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 May 2025
Resolved
Batteries must be mounted in trays lined with, or constructed of, a material that is resistant to damage by the electrolyte.
Batteries need to be stored in battery boxes.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 May 2025
Resolved
Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or
originating in electrical equipment, and electrical shock;
Each power terminal in engine room and generator room should be covered to minimize risk.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 16 April 2025
Resolved
Vessel became past due for its Annual Inspection on 18 February 2025. Complete an Annual Inspection with a USCG Marine Inspector prior to carrying passengers.
Cite: 46 CFR 176.502
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 13 February 2024
Resolved
Provide a cap after normally closed valve for open piping on both main engine salt water fitting.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 February 2024
Resolved
Provide vessel with alcohol test strips.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 12 January 2022
Resolved
The stability letter must be posted under suitable transparent material such that all pages are visible at the operating station. -- Not posted as required.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 January 2022
Resolved
Electrical equipment on a vessel must be installed to protect passengers and crew from electrical hazards including fire caused by or originating in electrical equipment. -- Extension cords, daisy-chaining, and powerstrips found on bridge and aft deck area behind bridge. Submit proposal for USCG approval for permanent installation of freezer and other non-temporary electrical equipment. NOTE: electrical equipment exposed to weather must be weathertight per 46CFR183.210(b).
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 January 2022
Resolved
Each life jacket kept in a stowage container must be readily available. -- Difficult to access starboard forward under-seat life jackets in main salon.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 12 January 2022
Resolved
A durable placard must be posted next to all radiotelephone installations with the emergency broadcast instructions and information specific to the individual vessel. -- Not posted as required.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 31 March 2017
Resolved
Prior to operating, vessel must be drydocked for completion of hull exam, inscluding satisfactory completion of worklist issued on 07FEB17.
Engineering › Steering Gear System › Bracket/Clamp
Issued 7 February 2017
Resolved
Rebuild steering foundation/assembly.
Construction/Loadline › Hull › Side Shell
Issued 7 February 2017
Resolved
E/R: on stbd side, remove sewage tank and all paint from stbd sideshell (as marked) to allow full assessment of interior plywood sideshell decay.
Construction/Loadline › Hull › Side Shell
Issued 7 February 2017
Resolved
E/R: on port side, remove all paint from sideshell to allow full assessment of interior plywood sideshell decay.
Construction/Loadline › Hull › Hull Plating
Issued 7 February 2017
Resolved
E/R: Remove overhead (deck) on port side, fore to aft.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 7 February 2017
Resolved
Gen Compartment: Remove port & stbd fuel tanks for repair or replacement.
Construction/Loadline › Hull › Transverse Frame
Issued 7 February 2017
Resolved
E/R: Replace rotted deck beams port side aft.
Construction/Loadline › Hull › Side Shell
Issued 7 February 2017
Resolved
Gen Compartment: Remove false sideshell port & stbd.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 7 February 2017
Resolved
FPK: Remove expanding foam from collision bulkhead seam to allow assessment and proper repair.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 7 February 2017
Resolved
FPK: Prove collision bulkhead is watertight with USCG MI in attendance.
Construction/Loadline › Hull › Side Shell
Issued 7 February 2017
Resolved
FPK: Remove wood as necessary to determine extent/nature of cracked/delaminated stbd sideshell.
Navigation › Collision/Grounding Avoidance › Navigation Bridge Visibility
Issued 7 February 2017
Resolved
Bridge: Replace port & stbd windows due to deteriorated condition of plexiglass.
Engineering › Sea-water System (primary cooling) › Sea Chest
Issued 7 February 2017
Resolved
Fuel Tank Compt: Remove Pedro hose on genset thru-hull fitting (cooling water) and install thru-hull valve at hull.
Construction/Loadline › Hull › Bottom Plating
Issued 7 February 2017
Resolved
Hull bottom: Renew FRP overlay just aft of transducer on port side.
Construction/Loadline › Hull › Side Shell
Issued 7 February 2017
Resolved
Stbd side bow sheer/rub rail: remove paint/FRP for further assessmant and submit repair proposal.
Construction/Loadline › Hull › Side Shell
Issued 7 February 2017
Resolved
Laz: Make port side shell repairs to address decayed plywood.
Engineering › Bilge Water Management System › Pump
Issued 27 August 2016
Resolved
Prior to operating with passengers, prove proper operation of primary bilge pump.
Lifesaving › Lifefloat › Float-free Link
Issued 15 June 2016
Resolved
Vessel is limited to 50 total persons pending proper installation of life float or other suitable primary life saving device.
Engineering › Fuel Oil Service System › Piping
Issued 15 June 2016
Resolved
Make repairs to port fuel tank supply line and clean diesel fuel from bilge.
Communications › Radio Communications › EPIRB
Issued 24 May 2016
Resolved
Prior to carrying psgrs >3NM, replace expired Hydro release unit.
Communications › Radio Communications › Radiotelephone Transceiver (2-4 MHz)
Issued 24 May 2016
Resolved
Prior to ops >20NM, prove proper operation of SSB radio and enter MMSI number into unit.
Lifesaving › Rescue Boat › Boarding Ladder
Issued 24 May 2016
Resolved
Repair boarding ladder
Engineering › Steering Gear System › Rudder Bearing
Issued 24 May 2016
Resolved
Tighten port rudder post packing
Engineering › Steering Gear System › Bracket/Clamp
Issued 24 May 2016
Resolved
Secure steering support arm at port sideshell
Electrical › Electrical Distribution System (service) › Panelboard
Issued 24 May 2016
Resolved
Secure front panel on shoretie switch
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 24 May 2016
Resolved
Secure shoretie breaker switch escutcheon
Engineering › Fuel Oil Service System › Hose
Issued 24 May 2016
Resolved
Gen Rm: Install chafing gear on fuel line
Electrical › Electrical Distribution System (service) › Panelboard
Issued 24 May 2016
Resolved
Gen Compt: Install blanks to cover empty sockets in 120V breaker panel.
Documentation › Markings/Placards › Capacity Marking
Issued 24 May 2016
Resolved
Label 120V breaker panel and shoretie switch box in gen compt.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 24 May 2016
Resolved
Provide 03 Type I adult L/Js with approved PMLs and vessel name.
Engineering › Steering Gear System › Bracket/Clamp
Issued 24 August 2015
Resolved
Prior to carrying passengers, repair steering ram support structure (re-fasten to side shell and transom).
Electrical › Electrical Distribution System (service) › Wiring
Issued 24 August 2015
Resolved
Prior to carrying passengers, repair damaged 12V electrical wiring (crop, splice, cover).
Electrical › Lighting (emergency) › Lighting Fixture
Issued 24 August 2015
Resolved
Prove proper operation of e-lighting prior to carrying passengers overnight.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 24 August 2015
Resolved
Vessel limited to 50 total persons until additional (04) Type I PFDs provided.
Lifesaving › Lifejacket/PFD (Type I) › Lights
Issued 24 August 2015
Resolved
Prior to ops >20NM, provid 07 CG-approved personal marker lights for PFDs
Electrical › Electrical Distribution System (service) › Wiring
Issued 24 August 2015
Resolved
E/R: hard-wire power supply cable for secondary bilge pump.
Electrical › Electrical Distribution System (service) › Wiring
Issued 24 August 2015
Resolved
E/R: remove dead-end wiring on aft bulkhead.
Electrical › Electrical Distribution System (service) › Wiring
Issued 24 August 2015
Resolved
Bridge console: remove dead-end wire and junction box.
Engineering › Bilge Water Management System › Strainer
Issued 24 August 2015
Resolved
Replace bilge suction strainer in lazarette (must be 3x diameter of piping).
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 24 August 2015
Resolved
Construct wooden enclosures/guards to protect essential wiring and hydraulic lines iwo port side aft upper bunks in passenger berthing (two bunks)
Stability › Watertight Integrity › General
Issued 24 August 2015
Resolved
Make collision bulkhead watertight.
Stability › Weathertight Integrity › General
Issued 24 August 2015
Resolved
46 CFR 171.124(b) & (c): Install hinges or captive chain to prevent loss of berthing escape hatch, and install closure device that is operable from both sides.
Stability › Weathertight Integrity › General
Issued 24 August 2015
Resolved
46 CFR 171.124(b): Install hinges or captive chain to prevent loss of E/R hatch cover to sea.
Documentation › Logs/Records › Drug Test Records
Issued 17 August 2011
Resolved
Supervisors have no proof of 1 hr of Employee Assistance Program (EAP) training as required by 46 CFR 16.401.
Documentation › Logs/Records › Drug Test Records
Issued 17 August 2011
Resolved
Crewmembers not properly trained prior to assuming safety sensitive positions regarding company's drug and alcohol policy in accordance with 46 CFR 16.401.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 10 February 2010
Resolved
Provide blank breaker where missing in distribution panel located in generator space.
Communications › Audible Communications › Bell
Issued 9 February 2010
Resolved
Provide adequate bell
Stability › Watertight Integrity › General
Issued 30 April 2009
Resolved
Fish hold: make hatch covers on shaft boxes watertight.
Construction/Loadline › Hull › Hull Plating
Issued 30 April 2009
Resolved
Port & stbd E/R sideshell (inner): scrape & treat as marked - address leaks from overhead.
Engineering › Steering Gear System › Linkage
Issued 30 April 2009
Resolved
Secure/replace fasteners on tiller ass'y port & stbd
Stability › Watertight Integrity › General
Issued 30 April 2009
Resolved
Make stbd exhaust penetration at aft E/R bulkhead watertight.
Construction/Loadline › Hull › Side Shell
Issued 30 April 2009
Resolved
Remove porepeak platform to allow full assessment of decay iwo stem. Do not treat prior to inspection by USCG Marien Inspector.
Lifesaving › Embarkation Appliances/Stations › Accessability
Issued 6 March 2008
Resolved
Provide rescue platform.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 6 March 2008
Resolved
Replace MDG (generator) high pressure fuel line @ fuel pump.
Engineering › Bilge Water Management System › Piping
Issued 6 March 2008
Resolved
Replace flex hose @ wash down pump with metallic or schedule 80 PVC.
Engineering › Fuel Oil Service System › Hose
Issued 6 March 2008
Resolved
Replace fuel jumper line in E/R @ port fuel filter.
Engineering › Sea-water System (primary cooling) › Pump
Issued 6 March 2008
Resolved
Install suitable flow indicator for port/STBD MDE per 46 CFR 182.425(b)(5).
Engineering › Sea-water System (primary cooling) › Piping
Issued 6 March 2008
Resolved
Replace MDE (generator) wet exhaust pedro.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 6 March 2008
Resolved
Update Coast pilot & CG light list.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 6 March 2008
Resolved
Post all pages of COI in sight of passengers
Lifesaving › Lifefloat › Lifeline
Issued 6 March 2008
Resolved
Install USCG approved or prove weak links sized for current L/F installed. Missing identification tag.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 6 March 2008
Resolved
Repaint exposed side of ring buoy.
Construction/Loadline › Structures › Machinery Space Opening
Issued 6 March 2008
Resolved
46 CFR 171.124 (b) and (c): bow hatch cover escape must be operable from both sides; E/R hatch & bow hatch must have securing devices.
Electrical › Electrical Distribution System (emergency) › Cable
Issued 6 March 2008
Resolved
Replace laz high water alarm with 14 GW per 46 CFR 183.340(c).
Electrical › Electric Supply System (service) › Cable
Issued 6 March 2008
Resolved
Install conduit for generator wiring bundle for the control panel.
Engineering › Bilge Water Management System › Hose
Issued 6 March 2008
Resolved
Replace bait tank pedro @ intake.
Electrical › Lighting (emergency) › Lighting Branch Circuit
Issued 6 March 2008
Resolved
46 CFR 183.432: Install emergency lighting in berthing area (auto actuating) prior to carrying overnight passengers
Electrical › Electric Generation Source (service) › Panelboard
Issued 6 March 2008
Resolved
Generator panel: replace volt meter and label switch functions.
Fire Fighting › Ventilation Systems › Ducts
Issued 6 March 2008
Resolved
Provide E/R vent closure device and stencil all closure.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 9 March 2007
Resolved
Complete annual inspection prior to sailing with passengers.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 9 March 2007
Resolved
Provide blanks in breaker box located in the generator room.
Electrical › Electrical Distribution System (service) › Cable
Issued 9 March 2007
Resolved
Secure supply e-cable for bait pump in the gen comp.
Electrical › Electric Supply System (service) › Cable
Issued 9 March 2007
Resolved
Secure generator cable to the breaker box.
Electrical › Electrical Distribution System (service) › Switch
Issued 9 March 2007
Resolved
Replace electrical receptacles ( 1 in the pilot house and 1 in the accommodation).
Lifesaving › Hand Flares › Expired
Issued 9 March 2007
Resolved
Provide 2 orange smokes.
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 9 March 2007
Resolved
Label "crew only" on access ladder to the pilot house.
Documentation › Logs/Records › Drug Test Records
Issued 9 March 2007
Resolved
Provide summary of reemployment drug testing program.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 5 December 2005
Resolved
Install circuit breaker box cover IWO the generator room.
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 5 December 2005
Resolved
Secure store freezer to the deck IWO the generator room.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 5 December 2005
Resolved
Install cable IWO railing to ensure the opening is less than 12."
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 5 December 2005
Resolved
Plug limber hole IWO the engine mount to prevent excess engine sludge from getting in to the main bilge.
Engineering › Diesel Engine (propulsion-direct drive) › Bearing
Issued 28 June 2005
Resolved
Adjust port rudder packing to eliminate excessive flow.
Engineering › Steering Gear System › Bracket/Clamp
Issued 28 June 2005
Resolved
Refasten/secure port rudder bracket @ bulkhead to eliminate play.
Engineering › Fuel Oil Service System › Filter
Issued 28 June 2005
Resolved
Tighten petcock on port RACOR flame impingement bowl.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 8 February 2005
Resolved
Provide outlet cover for junction box in galley.
Fire Fighting › Portable CO2 Fire Extinguisher › Number
Issued 8 February 2005
Resolved
Provide BII portable fire extinguisher for galley space.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 8 February 2005
Resolved
Provide/renew logbook for crew training, (man overboard, fire, etc.).
Operations/Management › Pollution › Control of Garbage
Issued 8 February 2005
Resolved
Clean trash from around lifefloat storage areas.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 8 February 2005
Resolved
Repair stern light and re-position IAW established navigation rules.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 8 February 2005
Resolved
Repair anchor light.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 8 February 2005
Resolved
Repair mast light.
Electrical › Electric Supply System (service) › Battery Installation
Issued 8 February 2005
Resolved
Clean outboard terminal on battery in generator space starboard side.
Engineering › Sea-water System (primary cooling) › Piping
Issued 8 February 2005
Resolved
Repair coolant leak on aft end of starboard main engine.
Engineering › Sea-water System (primary cooling) › Piping
Issued 8 February 2005
Resolved
Repair water leak on port main engine exhaust at aft bulkhead.
Fire Fighting › Ventilation Systems
Issued 15 December 2003
Resolved
Provide suitable means to secure engine room ventilation and prove proper operation. Current arrangement has canvas cover attached at top of vent and rolled down over vent and attached at sides and bottom by velcro. Adhesive holding velcro strip to vent is not working. LEGACY COMPONENT DESC: Ducts
Engineering › Fuel Oil Storage/Transfer System
Issued 15 December 2003
Resolved
Provide and install 30 X 30 mesh flame screen for port F/O tank vent. LEGACY COMPONENT DESC: Vent Pipe
Fire Fighting › Fixed Gas Fire Extinguishing System
Issued 15 December 2003
Resolved
Provide means to secure screws for electrical cut-out circuit on fixed F/E bottle in engine room. LEGACY COMPONENT DESC: Operating Controls
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 15 December 2003
Resolved
Repair water leak on port exhaust line in engine room on aft portion of exhaust hose connection. LEGACY COMPONENT DESC: Piping (exhaust)
Engineering › Steering Gear System
Issued 15 December 2003
Resolved
Tighten rudder packing on port rudder. LEGACY COMPONENT DESC: Rudder Bearing
Operations/Management › Lifesaving
Issued 15 December 2003
Resolved
Provide means to retrieve a person back on board vessel from the water. LEGACY COMPONENT DESC: Op Readiness/Maintenance/Inspection
Fire Fighting › Structural Fire Protection - General
Issued 3 June 2003
Resolved
Make cable penetration through aft engine room bulkhead vapor tight. LEGACY COMPONENT DESC: Structural Bulkhead Construction
Construction/Loadline › Structures
Issued 3 June 2003
Resolved
Install metallic valves for PVC pipe penetration through aft engine room bulkhead for head raw water supply line. LEGACY COMPONENT DESC: Transverse Bulkhead
Lifesaving › Lifejacket/PFD (General)
Issued 12 December 2002
Resolved
PFD Donning placard not posted. Placard purchased and posted prior to the completion of the inspection.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 22 April 2002
Resolved
Renew outdated medication in the first aid kit.
Lifesaving
Issued 22 April 2002
Resolved
Renew outdated hydrostatic release for the 406 EPIRB. Vessel restricted to 3 miles until corrected.
Operations/Management › Navigation Safety
Issued 22 April 2002
Resolved
Provide current NAV rules.
Engineering › Bilge Water Management System › Piping
Issued 22 April 2002
Resolved
Prove proper operation of the installed bilge system.
Electrical › Electrical Distribution System (service)
Issued 22 April 2002
Resolved
Replace all non-approved electrical wiring with Coast Guard approved marine grade cable.
Engineering › Bilge Water Management System
Issued 22 April 2002
Resolved
Remove oil from the engine room bilge.
Accommodation/Occupational Safety › Occupational Safety
Issued 22 April 2002
Resolved
Provide functional smoke detector in the bunkroom.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 22 April 2002
Resolved
Prove proper operation of all NAV lights.
Accommodation/Occupational Safety › Sleeping Accommodations
Issued 22 April 2002
Resolved
Properly mark FWD escape hatch from bunk room.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 22 April 2002
Resolved
Prove proper operation of ring buoy light.
Engineering › Fuel Oil Service System › Valve, Control
Issued 22 April 2002
Resolved
Prove proper operation of the port emergency fuel shut off valve.
Construction/Loadline
Issued 7 May 2001
Resolved
ADD SUPPORTS AND REPAIR OR REPLACE DECK SUPPORT BEAM, CENTERLINE AFT IN FUEL TANK COMPARTMENT. COMPLETE TO THE SATISFACTION OF THE ATTENDING MARINEINSPECTOR OR VIA FAX OF PICTURES TO THIS OFFICE.
Engineering
Issued 7 May 2001
Resolved
ADD MACHINERY GUARD TO STARBOARD MAIN ENGINE IAW 46 CFR 177.960. COMPLETE TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR OR VIA FAX OF PICTURES TO THIS OFFICE.
Accommodation/Occupational Safety
Issued 28 February 2000
Resolved
INSTALL HAND RAILS FOR ACCOMMODATION SPACE LADDER.
Construction/Loadline
Issued 28 February 2000
Resolved
MAKE LAZARETTE HATCH WATERTIGHT OR RENEW._x001C_ _x001C_ _x001C_ _x001C_
Construction/Loadline
Issued 28 February 2000
Resolved
INSTALL BILGE ALARMS IN FORWARD PEAK COMPARTMENT AS REQUIRED BY 46 CFR 182.530.
Documentation
Issued 28 February 2000
Resolved
CONDUCT CREW TRAINING AS REQUIRED BY 46 CFR 185.520 & 185.524.
Engineering
Issued 28 February 2000
Resolved
RENEW NEWLY INSTALLED F/O LINE IN WAY OF GENERATOR SPACE ALONG PORT SIDE. FLARELESS FITTINGS ARE NOT ALLOWED PER 46 CFR 182.455(A)(2).
Documentation
Issued 28 February 2000
Resolved
POST EAP INFORMATION FOR CREW PER 46 CFR 16.401
Fire Fighting
Issued 28 February 2000
Resolved
SERVICE ENGINEROOM FIXED FIRE EXTINGUISHING SYSTEM & GENERATOR FIRE EXTINGUISHER.
Engineering
Issued 28 February 2000
Resolved
REPAIR AS NEW BONDING WIRE TO PORT F/O TANK.
Engineering
Issued 28 February 2000
Resolved
REPAIR AS NEW F/O LEAKS ON THE PORT MAIN ENGINE AND THE GENERATOR.
Engineering
Issued 28 February 2000
Resolved
REPLACE F/O HOSE ON STBD MAIN ENGINE.
Construction/Loadline
Issued 6 April 1999
Resolved
Repair as new indicator light for high level bilge alarm.
Fire Fighting
Issued 6 April 1999
Resolved
Post operating instructions for installed fixed fire extinguishing system.
Lifesaving
Issued 6 April 1999
Resolved
Povide and label proper storage area for all life jackets.
Construction/Loadline
Issued 6 April 1999
Resolved
Replace installed PVC bilge piping in engine room with approved mettalic piping.
Engineering
Issued 6 April 1999
Resolved
Properly label location and operation of fuel shut off valves.
Lifesaving
Issued 6 April 1999
Resolved
Install two additional waterlights for life floats. Currently two installed for four life floats.
Lifesaving
Issued 6 April 1999
Resolved
Provide EPIRB testing and lifesaving equipment inspection log.
Lifesaving
Issued 6 April 1999
Resolved
Provide 15 additional Coast Guard approved Type I lifejackets with lights._x001C_
Lifesaving
Issued 6 April 1999
Resolved
Properly log and document crew training and drills.
Fire Fighting
Issued 6 April 1999
Resolved
Label location of manual activation handle for fixed fire extinguishing system.
Engineering
Issued 6 April 1999
Resolved
Repair fuel leak on auxilary generator fuel supply line from filter to generator._x001C_
Accommodation/Occupational Safety
Issued 6 April 1999
Resolved
Properly label emergency escape out or bunk room.
Fire Fighting
Issued 6 April 1999
Resolved
Install a positive means of closing off engine room ventilation.
Construction/Loadline
Issued 6 April 1999
Resolved
Make engine room bulkheads fume tight.
Engineering
Issued 6 April 1999
Resolved
Repair as new oil pressure gauge in pilot house for starboard propulsion engine.
Construction/Loadline
Issued 6 April 1999
Resolved
Repair as new hand bilge pump.
Unknown
Issued 17 December 1997
Resolved
Replace grab lines for #3 life float.
Unknown
Issued 17 December 1997
Resolved
Replace the lines to the life ring.
Unknown
Issued 17 December 1997
Resolved
Provide up-dated charts and nautical publications as per 46 CFR 184.420
Navigation
Issued 16 December 1996
Resolved
Show proper operation of all running lights.
Lifesaving
Issued 16 December 1996
Resolved
Provide one new waterlight for lifefloat for a total of four waterlight.
Lifesaving
Issued 16 December 1996
Resolved
Re-seal all four lifefloats.
Lifesaving
Issued 16 December 1996
Resolved
Provide two Coast Guard approved type one lifejackets prior to carring morethan 51 total persons.
Engineering
Issued 16 December 1996
Resolved
Provide belt guards for the port main engine.
Accommodation/Occupational Safety
Issued 3 March 1995
Resolved
SEAL WOODEN RAILING IN AREAS WHERE WOOD IS DELAMINATED
Construction/Loadline
Issued 3 March 1995
Resolved
COMPLETE FRP REPAIRS TO HULL PRIOR TO COMPLETION OF CREDIT DRY DOCK
Accommodation/Occupational Safety
Issued 3 March 1995
Resolved
REPAIR WOODEN BOW RAILING:_x001C_ 1) REFASTEN PORT RAILING TO FIRST STANCHION,_x001C_ 2) RENEW IN KIND STARBOARD RAILING (APPROX 18");_x001C_ COMPLETE PRIOR TO CARRYING PASSENGERS
Construction/Loadline
Issued 3 March 1995
Resolved
SCRAPE AND TREAT WOOD IN THE FOLLOWING LOCATIONS:_x001C_ 1) OVERHEAD IN ENGINE ROOM AROUND EXHAUST STACKS_x001C_ 2) LONGITUDINALS IN GENERATOR ROOM, CENTER OF COMPARTMENT AT BILGE
Engineering
Issued 3 March 1995
Resolved
REINSTALL PROPELLERS FOR INSPECTION PRIOR TO LAUNCHING
Construction/Loadline
Issued 3 March 1995
Resolved
CLEAN OR RENEW GASKET ON WATERTIGHT SCUTTLE AT FOREPEAK
Engineering
Issued 1 March 1994
Resolved
Repair hole in starboard exhaust stack.
Lifesaving
Issued 1 March 1994
Resolved
Change the number of childs PFD's listed on storage box to six.
Lifesaving
Issued 1 March 1994
Resolved
Replace all lifelines (pennants) on all lifefloats. No passengers are to be carried until completed.
Lifesaving
Issued 1 March 1994
Resolved
Arrange painters, water light lines, and separate lifefloats from each other in accordance with 46 CFR 180.20-1(a)(7) to allow proper deployment.
Documentation
Issued 25 October 1993
Resolved
CONDUCT STABILITY TEST PRIOR TO CARRYING PASSENGER OR PROVIDE STABILITY CALCULATIONS SHOWING ADDITION OF COMPRESSOR, WATER TANKS AND HOT WATER HEATER.
Electrical
Issued 25 October 1993
Resolved
PROVIDE WIRING DIAGRAM SHOWING INSTALLATION OF SHOWER PUMP AND HOT WATER HEATER. INCLUDE WIRE SIZE AND MANUFACTURER.
Electrical
Issued 25 October 1993
Resolved
PROVIDE MANUFACTURER AND UL LISTING OF SHOWER PUMP AND HOT WATER HEATER.
Accommodation/Occupational Safety
Issued 25 October 1993
Resolved
PROVIDE PIPING DETAIL OF AIR COMPRESSOR PIPING. INDICATE PIPING SIZE, MANUFACTURER, BULKHEAD/DECK PENETRATIONS.
Accommodation/Occupational Safety
Issued 25 October 1993
Resolved
PROVIDE MANUFACTURER INFORMATION ON AIR COMPRESSOR FAND WIRING INSTALLATIONDIAGRAM. INCLUDE MANUFACTURER, UL LISTING, WIRE SIZE AND WIRE MAN'F.
Construction/Loadline
Issued 25 October 1993
Resolved
PROVIDE DIAGRAM SHOWING ALL FIXED AND PORTABLE BALLAST. DIAGRAM TO INDICATELOCATION, TYPE AND APPROXIMATE WEIGHT.
Accommodation/Occupational Safety
Issued 25 October 1993
Resolved
PROVIDE PIPING DETAIL OF WATER TANK PIPING TO SHOWER OUTLET. INCLUDE PIPE TYPE AND SHOW ALL BULKHEAD/DECK PENETRATIONS.
Navigation
Issued 11 May 1993
Resolved
REPLACE PORT AND STBD RUDDERS.
Construction/Loadline
Issued 11 May 1993
Resolved
PROVIDE PERMANENT SECURING DEVICE AND RETAINING DEVICE FOR HATCH COVER TO LAZARETTE.
Navigation
Issued 11 May 1993
Resolved
PROPERLY SECURE RUDDER BRACKETS IN LAZARETTE.
Construction/Loadline
Issued 11 May 1993
Resolved
REPAIR LINE CUTS TO PORT AND STARBOARD CHINE.
Construction/Loadline
Issued 11 May 1993
Resolved
TREAT FURRING ON STBD INBOARD ENGINE BED.
Lifesaving
Issued 11 May 1993
Resolved
REPAIR / REPLACE BROKEN LADDER RUNG TO LADDER IN E/R.
Construction/Loadline
Issued 11 May 1993
Resolved
REPAIR DAMAGED WORM SHOE FROM CENTER KEEL FWD, AS MARKED. FASTEN/ RECAULK WORM SHOE WHERE NEEDED.
Electrical
Issued 11 May 1993
Resolved
REPAIR ELECTRICAL BONDING WIRE IN LAZARETTE.
Engineering
Issued 11 May 1993
Resolved
RECONDITION PORT AND STBD PROPS.
Navigation
Issued 6 January 1993
Resolved
PROVIDE MAST HEAD AND STERN LIGHT. VSL IS LIMITED TO DAY LIGHT OPERATIONS.
Electrical
Issued 6 January 1993
Resolved
REPLACE MISSING LIGHT BULBS AND PROVE OPERATION OF 12V EMERGENCY LIGHTING SYSTEM. PASSENGERS AR RESTRICTED FROM BELOW DECK PASSENGER SPACES.
Lifesaving
Issued 6 January 1993
Resolved
REPLACE WASTED LINE TO TOP LIFE FLOAT. VSL IS RESTRICTED TO CARRYING 33 TOTAL PERSONS.
Lifesaving
Issued 6 January 1993
Resolved
PROPERLY MARY EMERGENCY ESCAPE HATCH.
Documentation
Issued 6 January 1993
Resolved
PROVIDE MARPLO V PLACARD.
Navigation
Issued 6 January 1993
Resolved
PROVIDE COMPASS DEVIATION CARD.
Electrical
Issued 6 January 1993
Resolved
PROVIDE ELECTRICAL JUNCTION BOX COVER FOR JUNCTION BOX IN COMPARTMENT AFT OF E/R.
Electrical
Issued 6 January 1993
Resolved
PROVIDE LIGHT FIXTURE WITH GLASS GLOBE IN ENGINE ROOM.
Lifesaving
Issued 6 January 1993
Resolved
REPAINT, STENCIL, AND REPAIR HOLES IN LIFE FLOATS.
Construction/Loadline
Issued 3 January 1992
Resolved
PROVIDE SECURING DEVICE FOR FWD HATCH COVER.
Documentation
Issued 3 January 1992
Resolved
PROVIDE WASTE MANAGEMENT PLAN.
Documentation
Issued 3 January 1992
Resolved
PROVIDE DESIGNATION OF SENIOR DECKHAND.
Engineering
Issued 3 January 1992
Resolved
PROVIDE BELT GUARD FOR STBD ENGINE.
Accommodation/Occupational Safety
Issued 3 January 1992
Resolved
SECURE MICROWAVE.
Documentation
Issued 3 January 1992
Resolved
PROVIDE NAME OF VESSEL AND HOME PORT ON STERN OF VESSEL.
Lifesaving
Issued 3 January 1992
Resolved
PROVIDE 3 RED PARACHUTE FLARES. VESSEL IS RESTRICTED TO DOCK UNTIL THIS ITEM IS COMPLETE.
Fire Fighting
Issued 10 December 1991
Resolved
SERVICE ALL PORTABLE FIRE EXTINGUISHERS.
Navigation
Issued 10 December 1991
Resolved
INSERT LEADING EDGE OF PORT RUDDER IN WAY OF CRACK. INSERT IN KIND AND ORIGINAL QUALITY.
Construction/Loadline
Issued 10 December 1991
Resolved
MAKE PROPER REPAIRS TO HULL FWD STBD SIDE ENSURE CORRECT REPLACEMENT OF FIBERGLASS COVER.
Accommodation/Occupational Safety
Issued 10 December 1991
Resolved
CLEAN ALL VENT SCREENS.
Electrical
Issued 16 January 1991
Resolved
REPLACE MISSING LIGHT BULBS IN FORWARD CABIN.
Navigation
Issued 16 January 1991
Resolved
PROVIDE THE VESSEL WITH A COMPASS DEVIATION CARD.
Fire Fighting
Issued 16 January 1991
Resolved
REPLACE THE BATTERY IN THE SMOKE DETECTOR IN THE FORWARD CABIN.
Electrical
Issued 16 January 1991
Resolved
PLACE BLANKS IN THE PANEL BOX IN THE ENGINEROOM ELECTRICAL PANEL.
Lifesaving
Issued 16 January 1991
Resolved
REPLACE WORN GRAB LINE ON LIFE FLOAT.
Construction/Loadline
Issued 20 August 1990
Resolved
RESECURE ANCHOR LOCKER HATCH.
Accommodation/Occupational Safety
Issued 20 August 1990
Resolved
PROPERLY SUPPORT DECK IN WAY OF THE BASE OF THE LADDER IN THE BERTHING COMPARTMENT.
Electrical
Issued 20 August 1990
Resolved
INSTALL GUARDS ON FLUORESCENT LIGHTING IN ENGINEROOM.
Navigation
Issued 20 August 1990
Resolved
SUBMIT PROPOSAL TO REMOUNT RUDDER POST SUPPORTS PORT AND STBD PRIOR TO REMOVING AFT DIESEL TANK.
Documentation
Issued 20 August 1990
Resolved
CONDUCT STABILITY TEST AFTER REMOVAL OF AFT DIESEL TANK.
Electrical
Issued 20 August 1990
Resolved
REMOVE "HOUSEHOLD" LIGHT SWITCH AND PLUG-IN WALL SOCKET MOUNTED ON THE FORWARD BULKHEAD OF THE ENGINEROOM AND REPLACE WITH UL APPROVED FOR MARINE USE VAPOR TIGHT FIXTURES.
Construction/Loadline
Issued 20 August 1990
Resolved
MAKE AFT ENGINEROOM BULKHEAD WATER TIGHT IN WAY OF PIPING PENETRATIONS.
Construction/Loadline
Issued 20 August 1990
Resolved
SCRAPE AND TREAT 1ST STRINGER OUTBOARD OF KEEL STBD SIDE IN WAY OF AFT GENERATOR MOUNT.
Engineering
Issued 20 August 1990
Resolved
REMOVE LEAKING DIESEL TANK FROM LAZARETTE.
Navigation
Issued 4 January 1990
Resolved
FIRMLY ATTACH HYDRAULIC RAM BRACKET IN PORT AFT CORNER OF LAZARETTE.
Construction/Loadline
Issued 4 January 1990
Resolved
PROVIDE CLOSURE FOR LAZARETTE VENT.
Lifesaving
Issued 4 January 1990
Resolved
PROVIDE 7 ADDITIONAL ADULT PFD'S. UNTIL THIS ITEM IS COMPLETED, VESSEL IS LIMITED TO THE CARRIAGE OF 42 PASSENGERS.
Construction/Loadline
Issued 4 January 1990
Resolved
CLEAN AND TREAT FURRING ON OVERHEAD IN ENGINEROOM.
Lifesaving
Issued 3 January 1989
Resolved
REPLACE WATERLIGHT FOR 1 OF 4 LIFEFLOATS.
Construction/Loadline
Issued 3 January 1989
Resolved
MAKE THE AFT E/R BKHD WATERTIGHT.VSL LIMITED TO 49 PASSENGERS UNTIL CORRECTED.
Engineering
Issued 6 June 1988
Resolved
REPLACE PORT FWD SHAFT CUTLASS BEARING.
Navigation
Issued 6 June 1988
Resolved
REPACK PORT AND STBD RUDDERS.
Navigation
Issued 6 June 1988
Resolved
DRAIN AND REPAIR PORT RUDDER WHICH IS CRACKED AND FULL OF WATER.
Construction/Loadline
Issued 6 June 1988
Resolved
REFLOAT VESSEL TO REMOVE DOCKING BLOCKS IN-WAY OF WORM DAMAGE ON KEEL. REMOVE DAMAGED WOOD, BURN AREA, AND FEATHER NEW WOOD IN. REGLASS AREA TO PROTECT THE WOOD.
Construction/Loadline
Issued 6 June 1988
Resolved
INSTALL KEEL COOLER VALVES ON AUX GENERATOR AND PROVIDE SHUT-OFF WRENCH FORMAIN ENGINE'S KEEL COOLERS.
Construction/Loadline
Issued 10 January 1988
Resolved
PROVIDE KEEPER FOR ACCESS HATCH TO ENGINEROOM.
Engineering
Issued 10 January 1988
Resolved
REPLACE FUEL VENT PIPING.
Construction/Loadline
Issued 10 January 1988
Resolved
PROVIDE KEELCOOLER ISOLATION VALVE.
Lifesaving
Issued 10 January 1988
Resolved
PROVIDE (15) ADULT PFD'S
Construction/Loadline
Issued 21 January 1987
Resolved
MAKE PERMANENT REPAIRS TO FURRED WOOD IN ENGINEROOM AFT OVERHEAD USING SOUND MARINE PRACTICES.
Engineering
Issued 21 January 1987
Resolved
MAKE PERMANENT REPAIRS TO EMERGENCY FUEL SHUTOFFS WITH ENCLOSED UNITS.
Electrical
Issued 21 January 1987
Resolved
INSTALL LIGHT GUARD OVER STBD MAIN ENGINE.
Lifesaving
Issued 21 January 1987
Resolved
VESSEL IS RESTRICTED TO 30 ADULT PASSENGERS AND 0 CHILD PASSENGERS UNTIL 27 ADULT AND 6 CHILD PFDS ARE PROVIDED.
Navigation
Issued 21 January 1987
Resolved
REPLACE BATTERY TO EPIRB. VESSEL IS RESTRICTED FROM OCEAN ROUTE UNTIL COMPLETED.
Navigation
Issued 21 January 1987
Resolved
INSTALL STERN LIGHT AS PER RULE 23 INTERNATIONAL RULES OF THE ROAD.
Engineering
Issued 7 January 1986
Resolved
REPAIR HAND HELD BILGE PUMP AND PROVE OPERATION
Lifesaving
Issued 7 January 1986
Resolved
PROVIDE 14 ADULT PFD'S WITH APPROVED WATERLIGHTS, PROPER STENCIL, AND REFLECTIVE TAPE.
Construction/Loadline
Issued 4 December 1984
Resolved
REPLACE OR REPAIR ALL NON-METALIC BILGE PIPING TO METAL TYPE.
Electrical
Issued 4 December 1984
Resolved
REMOVE OR REPAIR WIRE TO LIGHT IN ENGINEROOM.
Navigation
Issued 4 December 1984
Resolved
REPAIR PORT RUDDER.
Casualty record · 1
28 August 2016Routine · role: Involved in a Marine Casualty · activity 5994752
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Recorded names · 1
PRINCESS (2016). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.