Records from 2016 to 2026. Most recent: inspection, 29 April 2026.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 29 April 2026
Resolved
FCC radiotelephony permit expired 2025.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2026
Resolved 12 May 2026
Resolution: Marine inspector received photograph from owner of a renewed FCC license.
05 - Radio Communications › N/A - No Subsystem › Performance standards for radio equipment
Issued 29 April 2026
Resolved
VHF radio did not have gps position and mmsi number integrated into system.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2026
Resolved 12 May 2026
Resolution: Marine inspector received a photograph of the radio with mmsi and gps position installed.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 29 April 2026
Resolved
Monthly EPIRB testing not recorded.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2026
Resolved 12 May 2026
Resolution: Marine inspector received photograph from owner of logbook with monthly logbook test recorded.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 29 April 2026
Resolved
Life ring line attached to light needs to be replaced. Life ring name is missing on life ring located outside operating station.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2026
Resolved 12 May 2026
Resolution: Marine inspector received a photograph of life ring equipped with required items.
11 - Life Saving Appliances › N/A - No Subsystem › Means of recovery of life saving appliances
Issued 29 April 2026
Resolved
Vessel's man overboard ladder was found to be a rope type. Provide vessel with a ridged metal ladder that fits vessel railings, and is rated to carry the weight of a crew member and a helpless victim. Correct within 30 days.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 May 2026
Resolved 26 May 2026
Resolution: Marine inspector received photograph of new MOB ladder.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 12 May 2025
Resolved
The discharge ends of fuel tank vent pipes must be fitted with removable 30 × 30 mesh. flame screens or flame arresters.
Flame screen damages replace as new.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 12 May 2025
Resolved 4 July 2025
Resolution: New flame screens were purchased and installed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 12 May 2025
Resolved
A vessel not required to have a power driven fire pump by 181.300 must have at least three 2 1/2 gallon buckets, with an attached lanyard satisfactory to the cognizant OCMI.
All of vessels fire buckets had a capacity of 5 gallons. Drill holes to 2 1/2 gallons and attach lanyard that reaches water when on bow.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 12 May 2025
Resolved 4 July 2025
Resolution: Holes drilled in fire buckets at 2.5 gals.
09 - Working and Living Conditions › 092 - Working Conditions › Danger areas
Issued 12 May 2025
Resolved
An exposed hazard, such as gears or rotating machinery, must be properly protected by a cover, guard, or rail. Portside engine missing guard.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2025
Resolved 17 December 2025
Resolution: missing guard replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 May 2025
Resolved
Batteries must be mounted in trays lined with, or constructed of, a material that is resistant to damage by the electrolyte.
Batteries need to be stored in battery boxes.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 May 2025
Resolved 4 July 2025
Resolution: Batteries placed in battery boxes.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 May 2025
Resolved
Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or
originating in electrical equipment, and electrical shock;
Each power terminal in engine room and generator room should be covered to minimize risk.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2025
Resolved 4 July 2025
Resolution: terminal coveres installed.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 16 April 2025
Resolved
Vessel became past due for its Annual Inspection on 18 February 2025. Complete an Annual Inspection with a USCG Marine Inspector prior to carrying passengers.
Cite: 46 CFR 176.502
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 May 2025
Resolution: COI inspection was complete May 2025
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 13 February 2024
Resolved
Provide a cap after normally closed valve for open piping on both main engine salt water fitting.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 February 2024
Resolved 13 February 2024
Resolution: Caps were installed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 13 February 2024
Resolved
Provide vessel with alcohol test strips.
Action required: 60 - Rectify deficiencies prior to movement
Due 13 February 2024
Resolved 13 February 2024
Resolution: Test trips were provided.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 12 January 2022
Resolved
The stability letter must be posted under suitable transparent material such that all pages are visible at the operating station. -- Not posted as required.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 February 2022
Resolved 7 February 2022
Resolution: POC provided proof of mounted stability letter.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 12 January 2022
Resolved
Electrical equipment on a vessel must be installed to protect passengers and crew from electrical hazards including fire caused by or originating in electrical equipment. -- Extension cords, daisy-chaining, and powerstrips found on bridge and aft deck area behind bridge. Submit proposal for USCG approval for permanent installation of freezer and other non-temporary electrical equipment. NOTE: electrical equipment exposed to weather must be weathertight per 46CFR183.210(b).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 February 2022
Resolved 2 March 2022
Resolution: POC provided proof of sealed junction box for Freezer.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 January 2022
Resolved
Each life jacket kept in a stowage container must be readily available. -- Difficult to access starboard forward under-seat life jackets in main salon.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 January 2022
Resolved 7 February 2022
Resolution: POC Installed pull handles on stowage compartment for ease of access.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 12 January 2022
Resolved
A durable placard must be posted next to all radiotelephone installations with the emergency broadcast instructions and information specific to the individual vessel. -- Not posted as required.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 February 2022
Resolved 7 February 2022
Resolution: POC installed emergency radio call placard at radio station.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 31 March 2017
Resolved
Prior to operating, vessel must be drydocked for completion of hull exam, inscluding satisfactory completion of worklist issued on 07FEB17.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2017
Resolved 16 March 2020
Resolution: Currently in DDX with new owner.
Engineering › Steering Gear System › Bracket/Clamp
Issued 7 February 2017
Resolved
Rebuild steering foundation/assembly.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 8 October 2020
Resolution: Inspected SAT by attending MI's.
Construction/Loadline › Hull › Side Shell
Issued 7 February 2017
Resolved
E/R: on stbd side, remove sewage tank and all paint from stbd sideshell (as marked) to allow full assessment of interior plywood sideshell decay.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 3 March 2020
Resolution: Sewage tank removed, structure found SAT.
Construction/Loadline › Hull › Side Shell
Issued 7 February 2017
Resolved
E/R: on port side, remove all paint from sideshell to allow full assessment of interior plywood sideshell decay.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 3 March 2020
Resolution: Assessed.
Construction/Loadline › Hull › Hull Plating
Issued 7 February 2017
Resolved
E/R: Remove overhead (deck) on port side, fore to aft.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 26 March 2020
Resolution: Deck/frames renewed.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 7 February 2017
Resolved
Gen Compartment: Remove port & stbd fuel tanks for repair or replacement.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 8 October 2020
Resolution: Inspected SAT by attending MI's.
Construction/Loadline › Hull › Transverse Frame
Issued 7 February 2017
Resolved
E/R: Replace rotted deck beams port side aft.
Condition: Improper/Lack of Maintenance
Due 7 March 2017
Resolved 26 March 2020
Resolution: Beams repaired/replaced.
Construction/Loadline › Hull › Side Shell
Issued 7 February 2017
Resolved
Gen Compartment: Remove false sideshell port & stbd.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 3 March 2020
Resolution: Sideshell inspected, additional worklist item issued.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 7 February 2017
Resolved
FPK: Remove expanding foam from collision bulkhead seam to allow assessment and proper repair.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 16 March 2020
Resolution: Combined with new worklist item.
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 7 February 2017
Resolved
FPK: Prove collision bulkhead is watertight with USCG MI in attendance.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 8 October 2020
Resolution: Inspected SAT by attending MI's.
Construction/Loadline › Hull › Side Shell
Issued 7 February 2017
Resolved
FPK: Remove wood as necessary to determine extent/nature of cracked/delaminated stbd sideshell.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 8 May 2020
Resolution: Repaired SAT.
Navigation › Collision/Grounding Avoidance › Navigation Bridge Visibility
Issued 7 February 2017
Resolved
Bridge: Replace port & stbd windows due to deteriorated condition of plexiglass.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 8 May 2020
Resolution: Windows replaced.
Engineering › Sea-water System (primary cooling) › Sea Chest
Issued 7 February 2017
Resolved
Fuel Tank Compt: Remove Pedro hose on genset thru-hull fitting (cooling water) and install thru-hull valve at hull.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 8 October 2020
Resolution: Inspected SAT by attending MI's.
Construction/Loadline › Hull › Bottom Plating
Issued 7 February 2017
Resolved
Hull bottom: Renew FRP overlay just aft of transducer on port side.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 16 March 2020
Resolution: Repaired.
Construction/Loadline › Hull › Side Shell
Issued 7 February 2017
Resolved
Stbd side bow sheer/rub rail: remove paint/FRP for further assessmant and submit repair proposal.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 16 March 2020
Resolution: Assessed with repairs.
Construction/Loadline › Hull › Side Shell
Issued 7 February 2017
Resolved
Laz: Make port side shell repairs to address decayed plywood.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 8 May 2020
Resolution: Repaired SAT.
Engineering › Bilge Water Management System › Pump
Issued 27 August 2016
Resolved
Prior to operating with passengers, prove proper operation of primary bilge pump.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 August 2016
Resolved 1 September 2016
Lifesaving › Lifefloat › Float-free Link
Issued 15 June 2016
Resolved
Vessel is limited to 50 total persons pending proper installation of life float or other suitable primary life saving device.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 15 June 2016
Resolved 21 July 2016
Engineering › Fuel Oil Service System › Piping
Issued 15 June 2016
Resolved
Make repairs to port fuel tank supply line and clean diesel fuel from bilge.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 June 2016
Resolved 15 June 2016
Communications › Radio Communications › EPIRB
Issued 24 May 2016
Resolved
Prior to carrying psgrs >3NM, replace expired Hydro release unit.
Condition: Invalid
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 24 May 2016
Communications › Radio Communications › Radiotelephone Transceiver (2-4 MHz)
Issued 24 May 2016
Resolved
Prior to ops >20NM, prove proper operation of SSB radio and enter MMSI number into unit.
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 21 July 2016
Lifesaving › Rescue Boat › Boarding Ladder
Issued 24 May 2016
Resolved
Repair boarding ladder
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 15 June 2016
Engineering › Steering Gear System › Rudder Bearing
Issued 24 May 2016
Resolved
Tighten port rudder post packing
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 15 June 2016
Engineering › Steering Gear System › Bracket/Clamp
Issued 24 May 2016
Resolved
Secure steering support arm at port sideshell
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 15 June 2016
Electrical › Electrical Distribution System (service) › Panelboard
Issued 24 May 2016
Resolved
Secure front panel on shoretie switch
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 15 June 2016
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 24 May 2016
Resolved
Secure shoretie breaker switch escutcheon
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 15 June 2016
Engineering › Fuel Oil Service System › Hose
Issued 24 May 2016
Resolved
Gen Rm: Install chafing gear on fuel line
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 15 June 2016
Electrical › Electrical Distribution System (service) › Panelboard
Issued 24 May 2016
Resolved
Gen Compt: Install blanks to cover empty sockets in 120V breaker panel.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 15 June 2016
Documentation › Markings/Placards › Capacity Marking
Issued 24 May 2016
Resolved
Label 120V breaker panel and shoretie switch box in gen compt.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 May 2016
Resolved 24 May 2016
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 24 May 2016
Resolved
Provide 03 Type I adult L/Js with approved PMLs and vessel name.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 May 2016
Resolved 24 May 2016