MAURY USCG vessel records Sign in
← All vessels

POLLUX

POLLUX is a 1973 freight ship. The Coast Guard has recorded 133 inspections since 1986, most recently in May 2024, along with 117 deficiencies — 1 with no resolution recorded —, 1 operational control and 3 casualty investigations between 2012 and 2018.

Records from 1986 to 2024. Most recent: inspection, 15 May 2024.

Built
1973
Last inspected
15 May 2024
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

7319632 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
UNITED STATES
—
Maury page id
psix-47637

Inspections, by type

…with no type recorded25
Years with a record 36 calendar years (1986–2024)
The 133 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Ro-Ro Cargo Ship class in Maury's sources begin in 1981.

Documentation record

Registered dimensions (L × B × D)892.2 ft × 105.8 ft × 59.1 ft
Registered tonnagegross 48,524 / net 30,576
ITC dimensions (L × B × D)Not recorded
ITC tonnagegross 49,267 / net 18,314
BuilderA.G. WESER · BREMEN, GERMANY · built 1973
Hull materialSteel
PropulsionSteam Turbine
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNORFOLK, VA
Trade endorsementsRegistry
DocumentationValid · issued 13 February 2026 · expires 28 February 2027
Service, as the file records itFreight Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it48524 - Regulatory (Subpart C or D), Gross Ton
49267 - Convention (Subpart B), Gross Ton
55355 - Displacement, Gross Ton
30576 - Regulatory (Subpart C or D), Net Ton
18314 - Convention (Subpart B), Net Ton
32295 - Dead Weight, Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 133

15 May 2024 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7961283
20 July 2023 Periodic Inspection · Deficiency Check · Administrative Inspection · ACP Periodic Oversight
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7748300
19 April 2023 In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7704634
20 January 2023 MTSA/ISPS Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7633927
17 August 2022 Annual Inspection · ACP Annual Oversight
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7534646
7 July 2022 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7519000
18 May 2022 In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7453007
11 May 2022 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7448637
29 September 2021 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7352091
27 September 2021 Annual Inspection · Deficiency Check · MTSA/ISPS Verification · ACP Annual Oversight
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7321820
23 June 2021 TPO Audit
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7234163
3 September 2020 Annual Inspection · ACP COI Oversight
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7049387
30 April 2020 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6946177
13 January 2020 Administrative Inspection · Examination of Repairs · ACP Drydock Oversight
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6888162
18 December 2019 Load Line/Change of Employment · In-Service Inspection · Permit to Proceed · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6873623
23 August 2019 ACP Additional Oversight – Risk Assessment · In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6795138
17 June 2019 Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 6716996
31 May 2019 Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6688957
1 May 2019 ACP Additional Oversight – Risk Assessment
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6658923
25 September 2018 ACP Annual Oversight · Annual Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6543545
11 May 2018 Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6411008
27 January 2018 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6345756
26 January 2018 Examination of Repairs · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6344538
19 January 2018 In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6339522
7 November 2017 ACP Periodic Oversight · Periodic Inspection · Ballast Water Examination · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6302388
10 March 2017 MTSA/ISPS Verification · ACP Annual Oversight · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6097773
17 January 2017 Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6477173
9 September 2016 Deficiency Check · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5994232
2 September 2015 ACP Annual Oversight · Annual Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5226165
27 August 2014 Administrative Inspection · Examination of Repairs · In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4966835
15 August 2014 Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4955521
22 May 2014 Drydock Exam · Welding Related Inspections Qualification Testing · ACP COI Oversight · Administrative Inspection · Internal Structural Exam · Hull Examination · Plan Review (Other than "T")
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4865104
15 May 2014 Deficiency Check · Administrative Inspection · ACP Periodic Oversight
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4858411
13 December 2011 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4207360
24 January 2011 MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3931727
23 April 2009 ACP COI Oversight · COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3458788
19 February 2009 In-Service Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3430423
10 April 2008 ACP Annual Oversight · Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3181084
10 March 2008 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3157266
11 April 2007 Deficiency Check · ACP Annual Oversight · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2858638
12 May 2006 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2647334
24 April 2006 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2632321
6 January 2006 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2562198
5 July 2005 ACP COI Oversight · MTSA/ISPS Verification
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2414907
4 March 2005 Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 2303597
1 November 2004 ACP COI Oversight · MTSA/ISPS Verification
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2232239
20 June 2004 MTSA/ISPS Verification
Physical examination · Commandant (CG-CVC) · Activity 2104757
26 April 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2071178
30 January 2004 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1997496
21 January 2004 ACP COI Oversight · Deficiency Check
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1989284
22 October 2003 ACP COI Oversight
Administrative · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1933488
13 March 2003 Annual Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1756334
9 October 2002 Cargo Tank Internal · Internal Structural Exam · Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1695568
24 September 2001 Annual Inspection · ACP COI Oversight
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1473311
24 October 2000 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1055403
11 July 2000 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1420347
16 December 1999 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 812570
23 November 1999 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 811529
2 November 1999 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1126007
13 October 1999 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 789279
6 October 1999 Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1466078
23 August 1998 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 797551
6 August 1998 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1131363
3 June 1998 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1402662
30 December 1997 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 782568
21 November 1997 Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1386139
9 July 1997 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 778381
30 June 1997 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1113838
21 May 1997 Re-Inspection · Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1433189
2 October 1996 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1402326
27 August 1996 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1090288
14 August 1996 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1089394
13 June 1996 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1359152
29 May 1996 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1470415
24 May 1996 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1430196
26 February 1996 Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1425693
20 December 1995 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1181096
14 December 1995 Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 460462
30 October 1995 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1427130
21 September 1995 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1387849
11 August 1995 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1398327
1 August 1995 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1187072
30 June 1995 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1431542
8 June 1995 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1409301
16 March 1995 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1367322
3 December 1994 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1180972
8 September 1994 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 861977
14 June 1994 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1463832
3 June 1994 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1412614
10 May 1994 Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1382765
3 September 1993 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1385133
31 August 1993 Type not recorded
No type recorded · Commandant (CG-CVC) · Activity 1135588
25 May 1993 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1389660
12 March 1993 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1354264
11 February 1993 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1152223
8 February 1993 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 180412
17 December 1992 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 831006
9 November 1992 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1139475
2 November 1992 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 938734
28 September 1992 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 953727
1 September 1992 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 958283
4 June 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 946331
16 May 1992 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 27952
13 May 1992 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1263732
13 May 1992 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1270853
5 May 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1256898
30 January 1992 COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 961477
3 June 1991 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1226403
25 May 1991 Examination of Repairs
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 927660
17 May 1991 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1217009
11 May 1991 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 512021
2 April 1991 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1227647
29 March 1991 Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 920067
4 March 1991 Administrative
Administrative · Commandant (CG-CVC) · Activity 1238652
28 February 1991 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 906555
15 January 1991 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 916031
11 January 1991 Deficiency Check · Examination of Repairs
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1223096
8 January 1991 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 466809
1 November 1990 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1243382
1 June 1990 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1226323
31 July 1989 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1043250
28 June 1989 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1197831
5 August 1988 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 890129
5 August 1988 Examination of Repairs · Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1043067
14 June 1988 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1032257
31 May 1988 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1041916
10 May 1988 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1038711
10 August 1987 Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1000441
10 August 1987 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1003336
9 July 1987 Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1321231
13 August 1986 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1016407
14 July 1986 Examination of Repairs
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1292395
31 March 1986 Credit Drydock · COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1305057

Deficiency record · 117

07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 20 July 2023 Resolved
The fire detection and fire alarm systems shall be kept in good order so as to ensure their required performance if a fire occurs. 6 troubles are on the FOS fire detection panel.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 July 2023
Resolution: FPS Technician replaced 7 smoke detectors, two modules with reconditioned spare parts, four end line caps has been cleaned. Attending surveyor verified FOS fire alarm panels has no alarm of troubles detected and being in normal operational condition.
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 20 July 2023 Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. 3 of the 4 line throwing appliances on the vessel are expired.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 July 2023
Resolution: Attending surveyor confirmed that expired line throwing apparatus rockets has been replaced with new original ones.
11 - Life Saving Appliances › N/A - No Subsystem › Radio life-saving appliances
Issued 20 July 2023 Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. 1 battery was not sealed of Vessel's lifeboat two-way VHF radios.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 27 July 2023
Resolution: Attending surveyor verified that all 3 spare VHF battery replaced with new spare ones, and seals found to be intact.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 July 2023 Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Various ring buoys on deck are weathered, with name and retro needing to be replaced.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 27 July 2023
Resolution: Attending surveyor reinspected ring buoys on deck and found name re-stenciled and reflective tape replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 30 September 2021 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. The arrangement of the bilge pumping system is to be such as to prevent the possibility of water passing into the machinery spaces. Vessel has a hole on the discharge line off the diaphragm bilge pump.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 October 2021
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 30 September 2021 Resolved
The ignitability of combustible materials shall be restricted. Excessive oil was found in Engine Room in various locations (stbd outboard main condenser condensate pump, fwd port side bilge). Vessel to identify source and clean fire hazard.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 October 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 September 2021 Resolved
All electrical apparatus shall be constructed and so installed that danger of injury in ordinary handling shall not exist. In steering gear flat, vessel is unable to secure cover to motor controller.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 October 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 30 September 2021 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. When it is desired to fit a centralized control system having one or more control stations and various degrees of automatic and remote control of the ships service systems, the control and monitoring systems are to be designed, assembled and installed to assure operation as effective as could be obtained with the same systems arranged for manual control and monitoring by watchkeeping personnel. Steering gear flat bilge high level alarm falsely indicated high level and was reported by the crew to have been an existing issue that happens occasionally for unknown reasons.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 October 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 September 2021 Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Strong and effective rudder stops are to be fitted. Vessel is missing rudder stops on the port side of the rudder.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 October 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 30 September 2021 Resolved
Indicators are to be provided at the control position of watertight doors showing whether the doors are open or closed. Vessel's watertight door in engine room is not showing fully closed locally.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 October 2021
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 30 September 2021 No resolution recorded
Every crew member shall participate in at least one abandon ship drill and one fire drill every month. When a new crew is engaged, these drills shall be held before sailing. When vessel becomes activated, to conduct drills to the satisfaction of the attending marine inspector.
Action required: 701 - Prior to carriage of passengers/cargo
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 25 September 2018 Resolved
Vessel is in ROS status, minimum crew was aboard therefore fire drills were not conducted. Vessel needs to conduct fire and abandon ship drill with full crew in presence of USCG inspectors prior to departure.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 January 2020
Resolution: Deficiency rectified to the satisfaction of the attending Coast Guard Inspectors.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 25 September 2018 Resolved
Port lifeboat canopy holds fractured. Repair to satisfaction of attending class surveyor. Class issued OSR on board IAW NVIC 2-95.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 25 September 2018
Resolved 25 September 2018
Resolution: Class onboard with inspection team. Deficiency had been addressed by OSR and actions to be taken by vessel.
Engineering › Steering Gear System › Feedback Unit
Issued 26 January 2018 Resolved
Steering failure while manuvering inbound.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 May 2019
Resolution: Test of steering gear all sat.
Fire Fighting › Structural - A Class Divisions › Control Stations
Issued 22 January 2018 Resolved
tructural fire protection on Aft Bulkhead between Bridge and Radio room has gaps due to removal of excess equipment. Reinstall/ reseal holes to restore boundary rating with 14 days to satisfaction of attending Class Surveyor.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 1 May 2019
Resolution: Visual inspection of space, holes in bulkhead resealed.
Lifesaving › Lifebuoys › Serviceable
Issued 19 January 2018 Resolved
Multiple liferings aboard require maintenance to renew fraying grablines, faded retro tape, broken plugs, and/or worn away vessel name and homeport. Conduct survey and repair/replace within 7 days to satisfaction of attending Class Surveyor.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 1 May 2019
Resolution: Visual inspection of lifebuoys all sat
Fire Fighting › Fixed Low-Expansion Foam Fire Extinguishing System › Foam Source
Issued 10 March 2017 Resolved
Foam analysis for the protection of cargo holds #3 and hold #4 failed during testing.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 May 2019
Resolution: Verified removal of fixed low expansion foam stations.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 10 March 2017 Resolved
Missing fire, abandon ship and security drills.
Action required: 705 - Other - as specified
Resolved 22 January 2018
Resolution: Conducted Satisfactory Drills.
Personnel › Training › Safety Orientation
Issued 2 September 2015 Resolved
Insufficent number of crew onboard to conduct fire & boat drills.
Action required: 17 - Rectify deficiencies prior to departure
Due 25 October 2016
Resolved 9 September 2016
Resolution: Conducted successful drills to the satisfaction of attending USCG marine inspectors.
Engineering › Sea-water System (primary cooling) › Pump
Issued 27 August 2014 Resolved
Prove that repairs have been made to the malfunctioned components of the cooling water system for the starboard condenser.Tests should be conducted as necessary to ensure proper operation, and done in the presence of an attending ABS Surveyor and Coast Guard Marine Inspector. IAW ACP Supplement.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 31 August 2014
Resolution: Attending ABS Surveyor reported full cooling water capability to the condenser as well as trouble-free operation of the starboard boiler following pump repair.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 25 August 2014 Resolved
Port tailshaft strut bearing was repaired, however when the tail shaft was replaced they could not realign the shaft due to excessive deflection caused by the dry dock. Keystone has made contact with a shipyard in Boston with a graving dock to re-dock the vessel and align the shaft. The tailshaft will be locked during transit to Boston. Prove that the port tailshaft is operational. IAW ACP Supple
Action required: 705 - Other - as specified
Due 9 September 2014
Resolved 21 November 2014
Resolution: Renewed tailshaft strut bearing was installed.
Fire Fighting › Fixed Fire Detection System › Alarms
Issued 25 August 2014 Resolved
The fire detection system for the cargo holds has been tested, however Hold A remains in fault. No cargo operations are allowed until the fire detection system is operating satisfactory. IAW ACP Supplement.
Action required: 705 - Other - as specified
Due 9 September 2014
Resolved 14 November 2014
Resolution: REcieved tech report and conducted random testing of fire detection system. No faults found.
Construction/Loadline › Structures › Deck Plating
Issued 25 August 2014 Resolved
Two holes were found in the No. 8 cargo hold hatch coaming where a control box had been mounted. Temporary repairs were made with doublers. Make permanent repairs while at shipyard in Boston. IAW ACP Supplement.
Action required: 705 - Other - as specified
Due 9 September 2014
Resolved 4 November 2014
Resolution: Witnessed final repairs were made by crop and renew. ABS witnessed water testing.
Construction/Loadline › Structures › Deck Plating
Issued 25 August 2014 Resolved
There is a three (3) foot fracture of the hatch coaming of the No. 5 cargo hold. Recommend making temporary repairs prior to departing Mobile and permanent repairs made at shipyard in Boston. IAW ACP Supplement.
Action required: 705 - Other - as specified
Due 9 September 2014
Resolved 4 November 2014
Resolution: Fractures were corrected by strill stop, gouge and weld. Witnessed final repairs. ABS attended for dye testing.
Construction/Loadline › Structures › Trunk
Issued 25 August 2014 Resolved
Cable penetrations in the port and starboard pipe tunnels on the B deck were found improperly packed. Keystone ordered material from MCT but it has yet to arrive. Make permanent repairs while at shipyard in Boston. IAW ACP Supplement.
Action required: 705 - Other - as specified
Due 9 September 2014
Resolved 4 November 2014
Resolution: Wintessed proper packing of cable penetrations.
Construction/Loadline › Structures › Ventilators
Issued 25 August 2014 Resolved
Five (5) FO tank inverted tank vents with balls are damaged/defective. The FO tanks are empty and each has a second inverted vent. Those vents are to be manually closed and restrict filling the tanks until new balls can be located and installed. IAW ACP Supplement.
Action required: 705 - Other - as specified
Due 9 September 2014
Resolved 4 November 2014
Resolution: A total of 07 new tank vetes were installed.
Engineering › Generator (propulsion/auxiliary-electric) › Coil
Issued 15 May 2014 Resolved
Emergency generator automatic starting coil is inoperabe.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 May 2014
Resolution: Coil replaced. Generator tested. All sat.
Engineering › Steam Boiler (propulsion) › Automation Equipment
Issued 11 April 2007 Resolved
Main Propulsion Automation tests must be conducted IAW Approved test procedures, prior to getting vessel underway.
Action required: 17 - Rectify deficiencies prior to departure
Due 1 June 2008
Resolved 1 May 2009
Resolution: In the company of attending ABS Surveyor and USCG, conducted main propulsion automation tests, tested boiler safeties and relief’s. All tests SAT
Lifesaving › Launching Appliances › Davit
Issued 11 April 2007 Resolved
Conduct satisfactory weight tests on both life boats and davits, prior to getting vessel underway.
Action required: 17 - Rectify deficiencies prior to departure
Due 11 April 2008
Resolved 13 August 2007
Operations/Management › Drills/Instruction › Fire
Issued 11 April 2007 Resolved
Conduct satisfactory Fire and Boat drills prior to getting vessel underway.
Action required: 17 - Rectify deficiencies prior to departure
Due 1 June 2008
Resolved 1 May 2009
Resolution: Conducted fire drill in the galley fryer with ships crew, crew actions were timely and safe. Conducted abandon ship drill with ships crew, discussed safety and boat lowering commands.
Operations/Management › Drills/Instruction
Issued 22 October 2003 Resolved
Conduct fire and boat drill upon activation; prior to departure.
Due 22 December 2003
Resolved 21 January 2004
Engineering › Feedwater/Condensate Water System
Issued 13 March 2003 Resolved
Starboard scoop check valve to main condensor leaking, provide class society condition report. LEGACY COMPONENT DESC: Condensor
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 March 2003
Resolution: Performed maint, repairs sat.
Fire Fighting › Fire Patrol
Issued 13 March 2003 Resolved
Fire alrm pull boxes not working, complete system in alarm and trouple lights indictaing, when operated the pull boxes do not indicate an emergency, provide service report, system to be in operation prior to departure from port. LEGACY COMPONENT DESC: Call Points
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 March 2003
Resolution: Service company on board, tested two zones, all sat.
Documentation
Issued 11 July 2000 Resolved
SHIP BOARD FIRE PLAN IS NOT CG APPROVED.
Condition: Unknown
Due 11 July 2000
Resolved 11 July 2000
Navigation
Issued 6 October 1999 Resolved
PROVIDE PROOF THAT GMDSS HAS BEEN PROPERLY REGISTERED WITH FCC TO IDENTIFY VESSEL.
Condition: Unknown
Due 6 October 1999
Resolved 6 October 1999
Construction/Loadline
Issued 6 October 1999 Resolved
PROVE PROPER OPERATION OF OILY WATER SEPARATOR AND IT'S MONITOR PRIOR TO USING.
Condition: Unknown
Due 6 October 1999
Resolved 6 October 1999
Deck/Cargo
Issued 6 October 1999 Resolved
PROVIDE A PORTABLE CARBON MONOXIDE SENSING DEVICE CAPABLE AUTOMATICALLY SENSING CARBON MONOXIDE LEVELS ON CARGO DECKS PRIOR TO LOADING CARGO.
Condition: Unknown
Due 6 October 1999
Resolved 6 October 1999
Unknown
Issued 6 October 1999 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 6 October 1999
Resolved 6 October 1999
Lifesaving
Issued 6 October 1999 Resolved
CONDUCT FIRE/BOAT DRILL TO THE SATISFACTION OF THE ATTENDING CG INSPECTOR PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 6 October 1999
Resolved 6 October 1999
Deck/Cargo
Issued 6 October 1999 Resolved
PROVIDE PERSONAL CARBON MONOXIDE MONITORS FOR ALL PERSONNEL WORKING ON THE CARGO DECKS DURING VEHICLE OPERATIONS PRIOR TO LOADING CARGO.
Condition: Unknown
Due 6 October 1999
Resolved 6 October 1999
Electrical
Issued 3 June 1998 Resolved
PROPERLY GROUND, SECURE DEAD END WIRES, AND INSTALL PROPER ELECTRICAL STUFFING TUBES FOR STARBOARD HF ANTENNA BOX.
Condition: Unknown
Due 3 June 1998
Resolved 3 June 1998
Lifesaving
Issued 3 June 1998 Resolved
PRIOR TO GETTING UNDERWAY, CONDUCT FIRE AND BOAT DRILLS, INCLUDING PROVING OPERATION OF BOATS, IN PRESENCE OF USCG MARINE INSPECTOR.
Condition: Unknown
Due 3 June 1998
Resolved 3 June 1998
Lifesaving
Issued 3 June 1998 Resolved
PROVIDE PROPER EMBARKATION STATION LADDERS FOR FORWARD LIFERAFTS IN ACCORDANCE WITH 46CFR199.
Condition: Unknown
Due 3 June 1998
Resolved 3 June 1998
Electrical
Issued 3 June 1998 Resolved
INSTALL PLUGS ON SHIPBOARD END OF SHORE POWER CABLES THAT MATCH SHIPS RECEPTACLES.
Condition: Unknown
Due 3 June 1998
Resolved 3 June 1998
Engineering
Issued 21 November 1997 Resolved
STARBOARD MAIN CIRCULATING DISCHARGE EXPANSION JOINT WAS NOT MADE AVAILABLEFOR INSPECTION DURING CREDIT DRYDOCK HULL EXAMINATION IN ACCORDANCE WITH COMDT NOTICE 16000.7, MARINE SAFETY MANUAL, VOL. II, CH 8.F.3. MAKE JOINT READY FOR INSPECTION NOT LATER THAN COMPLIANCE DATE.
Condition: Unknown
Due 21 November 1997
Resolved 21 November 1997
Lifesaving
Issued 21 May 1997 Resolved
PROPERLY LABEL ALL FIFERING STATIONS.
Condition: Unknown
Due 21 May 1997
Resolved 21 May 1997
Deck/Cargo
Issued 21 May 1997 Resolved
REPLACE ALL GASKETS ON ALL VENTS IN WAY OF FORECASTLE.
Condition: Unknown
Due 21 May 1997
Resolved 21 May 1997
Engineering
Issued 21 May 1997 Resolved
VESSEL SHALL COMPLETED ALL OPERATIONAL TESTS AND SAFETY OPERATIONS ASSOCIATED WITH HOT PLANT OPERATION. ENSURE ALL TESTS AND OPERATIONS ARE TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 21 May 1997
Resolved 21 May 1997
Fire Fighting
Issued 21 May 1997 Resolved
PROVIDE BOLTS AND NUTS FOR ONE OF TWO INTERNATIONAL SHORE CONNECTIONS.
Condition: Unknown
Due 21 May 1997
Resolved 21 May 1997
Fire Fighting
Issued 21 May 1997 Resolved
REPLACE PRESSURE SWITCH AND PROVE PROPER OPERATION IN PRESENCE OF CG MARINEINSPECTOR ON HANGER DECK "A" HOLD 1, 2, 3, AND 4. DO NOT RUN VENTILATION UNTIL COMPLETE.
Condition: Unknown
Due 21 May 1997
Resolved 21 May 1997
Engineering
Issued 21 May 1997 Resolved
VESSEL SHALL COMPLETE ISSUED WORKLIST TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 21 May 1997
Resolved 21 May 1997
Lifesaving
Issued 21 May 1997 Resolved
RENEW LIFEBOAT FALLS AND CONDUCT LIFEBOAT WEIGHT TEST PRIOR TO DEPARTING THE PORT OF NEW ORLEANS. TEST MUST BE CONDUCTED IN PRESENCE OF CG MARINE INSPECTOR.
Condition: Unknown
Due 21 May 1997
Resolved 21 May 1997
Construction/Loadline
Issued 21 May 1997 Resolved
LABEL ALL WATERTIGHT DOORS IN ENGINEROOM.
Condition: Unknown
Due 21 May 1997
Resolved 21 May 1997
Electrical
Issued 21 May 1997 Resolved
INSTALL LIGHT COVERS ON ALL LIGHT FIXTURES IN STEERING ROOM.
Condition: Unknown
Due 21 May 1997
Resolved 21 May 1997
Lifesaving
Issued 13 June 1996 Resolved
Legibly scribe/mark the waterline mark on the port and starboard lifeboat placards, in accordance with NVIC 6-81.
Condition: Unknown
Due 13 June 1996
Resolved 13 June 1996
Lifesaving
Issued 13 June 1996 Resolved
Prove proper operation of the port lifeboat winch centrifugal brake (governor). There is no rate of lowering control in accordance with 46 CFR 94.35-5(b)(4)(iii).
Condition: Unknown
Due 13 June 1996
Resolved 13 June 1996
Lifesaving
Issued 13 June 1996 Resolved
Repair the broken drive pin for the port lifeboat winch, manual retrieval drive shaft.
Condition: Unknown
Due 13 June 1996
Resolved 13 June 1996
Accommodation/Occupational Safety
Issued 24 May 1996 Resolved
Replace missing chlorine tablet dispenser in aft MSD.
Condition: Unknown
Due 24 May 1996
Resolved 24 May 1996
Electrical
Issued 24 May 1996 Resolved
Remove all plastic wire ties in aff mooring station and replace with metal brackets/ties.
Condition: Unknown
Due 24 May 1996
Resolved 24 May 1996
Engineering
Issued 24 May 1996 Resolved
Repair leaking oil valve, aft eng of auxiliary diesel engine.
Condition: Unknown
Due 24 May 1996
Resolved 24 May 1996
Deck/Cargo
Issued 24 May 1996 Resolved
Modify or replace hand control to #2 Fwd constant tension winch so it operates properly.
Condition: Unknown
Due 24 May 1996
Resolved 24 May 1996
Engineering
Issued 24 May 1996 Resolved
Test main turbine overspeed trip at sea. Send copy of official log to OCMINew Orleans.
Condition: Unknown
Due 24 May 1996
Resolved 24 May 1996
Lifesaving
Issued 24 May 1996 Resolved
Conduct weight test and operation test of port motor lifeboat, including releasing gear in presence of CG Marine Inspector._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 24 May 1996
Resolved 24 May 1996
Fire Fighting
Issued 30 October 1995 Resolved
Provide approved plan from USCG Marine Safety Center for bypass circuit modification to CO2 time delay/smoke detection system in bosun's stores on 2nd deck.
Condition: Unknown
Due 30 October 1995
Resolved 30 October 1995
Fire Fighting
Issued 11 August 1995 Resolved
Provide approved plan for Kidde smoke detection system modification in bosun's stores fwd on 2nd deck and prove proper operation of CO2 time delayand smoke accumulator prior to placing vessel in service.
Condition: Unknown
Due 11 August 1995
Resolved 11 August 1995
Electrical
Issued 8 June 1995 Resolved
Prove proper operation of Standby diesel generator reverse power relay prior to placing vessel in service.
Condition: Unknown
Due 8 June 1995
Resolved 8 June 1995
Lifesaving
Issued 8 June 1995 Resolved
Lower PORT lifeboat to water, Demonstrate proper operation of releasing gear and operate boat in water. If not conducted in the presence of a CG Inspector, log same in vessel official log and forward copy to [name withheld].
Condition: Unknown
Due 8 June 1995
Resolved 8 June 1995
Engineering
Issued 8 June 1995 Resolved
Prove proper operation of port boiler prior to placing vessel in service._x001C_ _x001C_ _x001C_ 46/62.35-20
Condition: Unknown
Due 8 June 1995
Resolved 8 June 1995
Lifesaving
Issued 8 June 1995 Resolved
Lower Starboard life to water. Demonstrate proper operation of releasing gear and operate boat in water. If not conducted in the presence of CG inspector, log same in vessels official log and forward copy to [name withheld].
Condition: Unknown
Due 8 June 1995
Resolved 8 June 1995
Engineering
Issued 8 June 1995 Resolved
Prove proper operation of starboard boiler prior to placing vessel in service._x001C_ _x001C_ 46/62.35-20
Condition: Unknown
Due 8 June 1995
Resolved 8 June 1995
Electrical
Issued 8 June 1995 Resolved
Prove proper operation of both (2) turbine generators overspeed trips, reverse power relays, low oil pressure shutdowns prior to placing vessel inservice.
Condition: Unknown
Due 8 June 1995
Resolved 8 June 1995
Electrical
Issued 8 June 1995 Resolved
Prove proper operation of standby diesel generator engine safety devices and shutdowns including low oil pressure shutdown and J/W high temperature alarm.
Condition: Unknown
Due 8 June 1995
Resolved 8 June 1995
Engineering
Issued 8 June 1995 Resolved
PROVE PROPER OPERATION OF F/O VALVE, PORT AFT IN STANDBY GENERATOR COMPARTMENT.
Condition: Unknown
Due 8 June 1995
Resolved 8 June 1995
Lifesaving
Issued 8 June 1995 Resolved
Relpace expired condensed milk in both lifeboats with like kind or an approved alternate.
Condition: Unknown
Due 8 June 1995
Resolved 8 June 1995
Electrical
Issued 3 June 1994 Resolved
REPLACE CIRCUT BRAKER CKT-EP-415 SMOKE DETECTOR ON EMERGENCY SWITCH BOARD AND DEMONSTRATE TO A US COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 3 June 1994
Resolved 3 June 1994
Deck/Cargo
Issued 3 June 1994 Resolved
CONDUCT A DEMONSTRATION OF THE CARBON MONOXIDE AND EXPLOSIVE GAS DETECTION SYSTEMS TO A US COAST GUARD MARINE INSPECTION._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 June 1994
Resolved 3 June 1994
Engineering
Issued 3 June 1994 Resolved
REMOVE AND OVER HAUL GAS CYLINDERS FOR NITROGEN BLANKET OF MAIN BOILERS_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 June 1994
Resolved 3 June 1994
Lifesaving
Issued 3 June 1994 Resolved
CONDUCT A WEIGHT TEST OF THE PORT LIFE BOAT IN THE PRESENCE_x001C_ OF A CG MARINE INSPECTOR
Condition: Unknown
Due 3 June 1994
Resolved 3 June 1994
Construction/Loadline
Issued 3 June 1994 Resolved
CLEAN ALL BILGE WELLS AND ROSE BOXES THRU OUT VESSEL OF SAND AND FOREIGN MATTER_x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 June 1994
Resolved 3 June 1994
Fire Fighting
Issued 3 June 1994 Resolved
REPAIR OR REPLACE FIRE MAIN HOSE STATION VALVES AT #76,#82,#79, AND CONDUCTA DEMONSTRATION IN THE PRESENCE OF A US COAST GUARD MARINE INSPECTOR._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 August 1994
Resolved 6 June 1994
Engineering
Issued 31 August 1993 Resolved
MAKE ALL 8 OF THE 12 INCH, 900 POUND ROCKWELL STEAM VALVES AVAILABLE FOR MOUNTING SURVEY; TO INCLUDE MAGNETIC PARTICLE TESTING. ALL REPAIRS TO BE MADE TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 31 August 1993
Resolved 31 August 1993
Fire Fighting
Issued 25 May 1993 Resolved
REMOVE, REPAIR OR REPLACE SMOKE DETECTING SYSTEM. _x001C_ THIS REQUIREMENT WAS FIRST ISSUED UNDER MI93006329 DTD 12MAR93 BY NEWMS.
Condition: Unknown
Due 15 September 1993
Resolved 15 September 1993
Fire Fighting
Issued 12 March 1993 Resolved
Remove, repair or replace smoke detecting system.
Condition: Unknown
Due 12 March 1993
Resolved 12 March 1993
Fire Fighting
Issued 12 March 1993 Resolved
Prove proper operation of CO and combustible gas detecting system.
Condition: Unknown
Due 12 March 1993
Resolved 12 March 1993
Fire Fighting
Issued 28 September 1992 Resolved
PROVIDE PLANS FOR SMOKE DETECTION SYSTEM (ROS FIRE ALARM SYSTEM) TO [name withheld], LA FOR REVIEW AND APPROVAL. ALSO PROVIDE UPDATED FIRE CONTROLPLAN, WITH SMOKE DETECTION SYSTEM INCLUDED FOR REVIEW AND APPROVAL.
Condition: Unknown
Due 28 September 1992
Resolved 28 September 1992
Construction/Loadline
Issued 30 January 1992 Resolved
DEMONSTRATE PROPER OPERATION OF THE BILGE HIGH LELVEL MONITOR PANEL LOCATEDAT THE MAIN PROPULSION CONTROL STATION
Condition: Unknown
Due 30 January 1992
Resolved 30 January 1992
Electrical
Issued 30 January 1992 Resolved
INSTALL PROTECTIVE COVERS OVER ALL LIGHTING FIXTURES LOCATED THROUGHTOUT THE ENGINEERING SPACES(STACK SPACE, MID-LEVEL BOILER DECKS & MAIN ENGINEROOM FLATS)
Condition: Unknown
Due 30 January 1992
Resolved 30 January 1992
Deck/Cargo
Issued 30 January 1992 Resolved
RESTENCIL AFT CRANE "SWL" MARKINGS ON BOTH BOOMS AND HOOKS, ALSO RESTENCIL FORWORD PORT CRANE HOOK.
Condition: Unknown
Due 30 January 1992
Resolved 30 January 1992
Lifesaving
Issued 30 January 1992 Resolved
COMPLETE REPAIRS TO THE STBD LIFEBOAT JELLCOAT LOCATED AT THE BOW/STERN ON THE INBOARD SIDE. ALL REPAIRS TO BE COMPLETED IAW APPROVED PROCEDURES BY ANAPPROVED REPAIR COMPANY/FACILITY. ALL REPAIRS TO BE COMPLETED TO THE SATISFACTION OF THE ATTENDING CG MARINE INSPECTOR.
Condition: Unknown
Due 30 January 1992
Resolved 30 January 1992
Lifesaving
Issued 30 January 1992 Resolved
LOWER PORT LIFEBOAT TO WATER, DEMONSTRATE PROPER OPERATION OF RELEASING GEAR, OPERATE BOAT IN WATER. IF NOT CONDUCTED IN THE PRESENCE OF A CG MARINE INSPECTOR, LOG SAME IN VESSELS OFFICAL LOG AND FORWARD A COPY TO THEOCMI, NEW ORLEANS AT THE ABOVE ADDRESS.
Condition: Unknown
Due 30 January 1992
Resolved 30 January 1992
Fire Fighting
Issued 30 January 1992 Resolved
RECONNECT AND DEMONSTRATE BOTH PORT/STBD FORCED DRAFT VENT INLET FIRE DAMPNERS REMOTE MECHNAICAL OPERATION FROM THE PORT/STBD BOAT DECKS.
Condition: Unknown
Due 30 January 1992
Resolved 30 January 1992
Engineering
Issued 30 January 1992 Resolved
COMPLETE ALL ELECTRICAL REPAIRS AND PROPERLY INSULATE BOTH FWD & AFT STBD FORCED DRAFT BLOWER MOTOR HEATER COIL CONNECTIONS AND REINSTALL PROTECTIVE SCREENS.
Condition: Unknown
Due 30 January 1992
Resolved 30 January 1992
Electrical
Issued 30 January 1992 Resolved
REPLACE MAIN SALT WATER SERVICE PUMP BREAKER ACTUATOR LOCATED ON THE MAIN POWER PANEL. UNTIL REPAIRS ARE COMPLETED ENSURE BREAKER OPENING IS PROPERLYBLANKED CLOSED TO PREVET SHOCK HAZZARD.
Condition: Unknown
Due 30 January 1992
Resolved 30 January 1992
Electrical
Issued 30 January 1992 Resolved
COMPLETE REPAIRS AND DEMONSTRATE PROPER OPERATION OF THE STAND-BY DIESEL GENERATOR TACHOMETER
Condition: Unknown
Due 30 January 1992
Resolved 30 January 1992
Electrical
Issued 30 January 1992 Resolved
DEMONSTRATE PROPER OPERATION OF THE PORT STEAM TURBO GENERATOR MAIN BREAKERCHARGING SYSTEM AND THAT THE BREAKER PROERLY TIES THE GENERATOR TO THE MAINELECTICAL BOARD UNDER RATED LOAD.
Condition: Unknown
Due 30 January 1992
Resolved 30 January 1992
Engineering
Issued 29 March 1991 Resolved
RENEW #33 #34 AND #35 SCREEN TUBES IN PORT BOILER AT NEXT DRYDOCK AVAILABLITY.
Condition: Unknown
Due 29 March 1991
Resolved 29 March 1991
Engineering
Issued 29 March 1991 Resolved
MAKE BOTH BOILERS AVAILABLE FOR USCG MARINE INSPECTOR, NO LATER THAN 30JUN91.
Condition: Unknown
Due 29 March 1991
Resolved 29 March 1991
Engineering
Issued 29 March 1991 Resolved
PROVIDE TUBE SAMPLE ANALYSIS /GAUGING OF GENERATING TUBES, REMAINING SUPER HEATER SUPPORT TUBES AND SCREEN TUBES OF BOTH BOILERS PRIOR TO 30JUN91.
Condition: Unknown
Due 29 March 1991
Resolved 29 March 1991
Engineering
Issued 29 March 1991 Resolved
RENEW ALL PLUGGED SUPERHEATER SUPPORT TUBES IN PORT AND STBD BOILER AT NEXTDRYDOCK AVAILABILTY.
Condition: Unknown
Due 29 March 1991
Resolved 29 March 1991
Construction/Loadline
Issued 11 January 1991 Resolved
REPAIR THE 2 INCH CRACK IN THE TOP OF THE NUMBER EIGHT CARGO HOLD HATCH COVER. CRACK IS LOCATED NEAR THE AFT PORT CORNER OF THE STARBOARD HATCH.
Condition: Unknown
Due 11 January 1991
Resolved 11 January 1991
Construction/Loadline
Issued 11 January 1991 Resolved
MAKE PERMANENT REPAIRS TO THE INSET IN THE AFT PEAK TANK AT JUNCTION OF SIDE SHELL AND TRANSOM, STARBOARD SIDE.
Condition: Unknown
Due 11 January 1991
Resolved 11 January 1991
Documentation
Issued 1 June 1990 Resolved
COMPLETE WORKLIST DATED 24MAY90.
Condition: Unknown
Due 1 June 1990
Resolved 1 June 1990
Accommodation/Occupational Safety
Issued 1 June 1990 Resolved
INSTALL AND PROVE PROPER OPERATION OF DOOR CLOSURE ON MAIN DECK AFTER HOUSEPORT SIDE STAIR TOWER.
Condition: Unknown
Due 1 June 1990
Resolved 1 June 1990
Electrical
Issued 1 June 1990 Resolved
RENEW AND DEMONSTRATE PROPER OPERATION OF ENGINE ROOM VENTILATION FAN CIRCUIT BREAKER.
Condition: Unknown
Due 1 June 1990
Resolved 1 June 1990
Engineering
Issued 1 June 1990 Resolved
DEMONSTRATE PROPER OPERATION OF PORT BOILER COMBUSTION CONTROL.
Condition: Unknown
Due 1 June 1990
Resolved 1 June 1990
Lifesaving
Issued 1 June 1990 Resolved
CONDUCT FIRE AND BOAT DRILL.
Condition: Unknown
Due 1 June 1990
Resolved 1 June 1990
Lifesaving
Issued 1 June 1990 Resolved
CONDUCT WEIGHT, SUSPENSION AND RELEASE TEST OF STARBOARD LIFEBOAT.
Condition: Unknown
Due 1 June 1990
Resolved 1 June 1990
Fire Fighting
Issued 28 June 1989 Resolved
PROVE PROPER OPERATION OF CO2 SYSTEM HEAT ACTIVATED DEVICE IN EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 28 June 1989
Resolved 28 June 1989
Electrical
Issued 28 June 1989 Resolved
DEMONSTRATE PROPER OPERATION OF EMERGENCY GENERATOR LOW LUBE OIL ALARM. (SYSTEM ONLY HAS SHUTDOWN INSTALLED)
Condition: Unknown
Due 28 June 1989
Resolved 28 June 1989
Electrical
Issued 28 June 1989 Resolved
DEMONSTRATE PROPER OPERATION OF THE EMERGENCY GENERATOR HIGH COOLING WATER TEMPERATURE ALARM. (SYSTEM ONLY HAS HIGH WATER TEMP SHUTDOWN)
Condition: Unknown
Due 28 June 1989
Resolved 28 June 1989
Electrical
Issued 5 August 1988 Resolved
MAKE PERMANENT REPAIRS TO THE NO.1 STARBOARD SSTG; VESSEL HAS NO.2 PART 1STG & AN AUX GENERATOR WHICH IS CAPABLE OF SUBSTAINING UNDERWAY LOADING; PERFORM AN OPERATIONAL TEST WITHIN (30) DAYS.
Condition: Unknown
Due 5 August 1988
Resolved 5 August 1988
Deck/Cargo
Issued 5 August 1988 Resolved
MAKE PERMANENT REPAIRS TO THE ELEVATOR.
Condition: Unknown
Due 5 August 1988
Resolved 5 August 1988
Construction/Loadline
Issued 31 May 1988 Resolved
REPANT LOADLINE AND PLIMSOL MARK AS REQUIRED BY 46 CFR 97.40-15.
Condition: Unknown
Due 31 May 1988
Resolved 31 May 1988
Engineering
Issued 31 May 1988 Resolved
CONDUCT TESTING OF THE MAIN TURBINE OVERSPEED TRIPS AND PROVIDE A COPY OF THE LOG ENTRY DOCUMENTING THE SAME, TO THE ABOVE ADDRESS.
Condition: Unknown
Due 31 May 1988
Resolved 31 May 1988
Fire Fighting
Issued 31 May 1988 Resolved
PROVIDE EVIDENCE OF FIXED CO2 SYSTEMS SEVICING AS REQUIRED BY 46 CFR 91.25-2(A)(2).
Condition: Unknown
Due 31 May 1988
Resolved 31 May 1988
Lifesaving
Issued 31 May 1988 Resolved
IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR, CONDUCT A WEIGHT TEST OFSHIP'S STARBOARD LIFEBOAT AS REQUIRED 46 CFR 91.25-15.
Condition: Unknown
Due 31 May 1988
Resolved 31 May 1988
Unknown
Issued 9 July 1987 Resolved
COMPLETE DECK AND ENGINEER WORK LIST DATED 05JUN87
Condition: Unknown
Due 9 July 1987
Resolved 9 July 1987

Casualty record · 3

9 December 2012Routine · role: Involved in a Marine Casualty · activity 4501410
17 January 2017Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 6477173
27 January 2018Routine · role: Involved in a Marine Casualty · activity 6345756
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.