Records from 1998 to 2012. Most recent: inspection, 10 February 2012.
Inspection history · 57
10 February 2012
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4242248
28 January 2012
ISPS II Exam · COC-CHEM Renew · Ballast Water Examination
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 4230432
24 February 2010
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3685483
12 February 2010
MARPOL Annex II Examination · Ballast Water Examination · MARPOL Annex V Examination · ISPS I Exam · COC-CHEM Renew · MARPOL Annex I Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 3678220
12 September 2008
ISPS III Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 3321601
6 August 2008
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3290789
6 August 2008
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3290793
6 August 2008
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3290800
22 March 2008
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3183902
21 March 2008
Administrative Inspection · Deficiency Check · MARPOL Annex I Examination · ISPS II Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3168833
14 March 2008
Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3164527
14 March 2008
Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3164593
10 March 2008
MARPOL Annex I Examination · Ballast Water Examination · ISPS II Exam · MARPOL Annex V Examination · COC-CHEM Renew
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 3161609
8 July 2006
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2706009
8 July 2006
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 2707773
7 July 2006
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2704931
8 May 2006
Random ISPS/MTSA/PSC
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2643994
28 March 2006
Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2611346
15 November 2005
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2535207
3 November 2005
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2527575
2 November 2005
Random ISPS/MTSA/PSC
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2526814
25 September 2005
Random ISPS/MTSA/PSC · Ballast Water Examination · MARPOL Annex II Examination · MARPOL Annex I Examination · COC-CHEM Annual · MARPOL Annex V Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2500440
17 August 2005
ISPS II Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2465646
15 August 2005
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 2463972
29 July 2005
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2444004
4 July 2005
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2417323
2 June 2005
PII Safety Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 2376549
14 January 2005
Administrative Inspection
Administrative · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 2275097
8 August 2004
Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2162094
7 August 2004
Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 2158942
13 July 2004
PII Safety Exam · COC-TVE Annual · ISPS II Exam
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 2131316
25 September 2003
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1934045
25 September 2003
Damage Survey
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1943101
11 September 2003
Ballast Water Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1902287
22 April 2003
Administrative Inspection
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1777482
18 April 2003
Deficiency Check · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1775940
10 April 2003
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1771834
6 November 2002
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1710303
31 August 2002
Certificate of Compliance
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1669470
27 March 2002
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1598346
25 March 2002
Ballast Water Examination · Periodic Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1495785
10 February 2002
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1487669
2 January 2002
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1477225
21 September 2001
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 294016
20 September 2001
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1362448
21 February 2001
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 287408
8 August 2000
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 280766
8 August 2000
Letter of Compliance (Initial/Renewal)
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1053446
17 March 2000
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 275919
30 June 1999
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 159096
30 June 1999
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 430111
7 May 1999
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 428245
7 May 1999
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1129809
3 November 1998
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 422266
4 August 1998
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 418910
24 June 1998
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 417391
24 June 1998
Letter of Compliance (Initial/Renewal)
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1128391
Fire Fighting › Means of Escape › Doorways
Issued 12 February 2010
Resolved
Fire door on lower level emergency escape in engine room does not self close and hangs up on the deck plate
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 March 2010
Resolved 24 February 2010
Resolution: Class report dated 19 Feb 2010 stated "Fire door now adjusted and found satisfactory."
Deck/Cargo › Inert Gas System › Venting System
Issued 10 February 2010
Resolved
The inert gas system could not tested. Prior to loading cargo requiring inert gas and no later than 30 days the vessel must provide a class report attesting to the proper operation of the inert gas system and all alrms and shutdowns and calibration of oxygen sensor.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 March 2010
Resolved 24 February 2010
Resolution: Class report dated 19 Feb 2010 stated "IGS oxygen sensor now renewed and calibrated. IGS system alarms and shut-downs tested and found satisfactory."
Engineering › Bilge Water Management System › Piping
Issued 10 February 2010
Resolved
Soft patch on the OWS overboard discharge line at flange 20/21. Vessel to provide class report attesting to the proper repairs of the piping within 30 days.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 March 2010
Resolved 24 February 2010
Resolution: Class Rerport dated 19 Feb 2010 stated "OWS discharge line now renewed between flanges examined and found satisfactory."
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 12 September 2008
Resolved
Vessel Co2 system inoperable supply / return. Line for Co2 bottle activation found disconnected.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 September 2008
Resolution: Received class report from agent.
Engineering › Diesel Engine (propulsion-direct drive) › Turbocharger
Issued 12 September 2008
Resolved
Vessel lost ability to go astern while mooring at facility. Remote control from navigation bridge and engine control failed to control the direction of thrust.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 12 September 2008
Resolved 17 September 2008
Resolution: Recieved class report from agent.
Navigation › Collision/Grounding Avoidance › Echo-sounding Device
Issued 12 September 2008
Resolved
Echo-sounding device was found inoperable. Vessel transited into the port without notifying the Coast Guard in accordance with 33 CFR 164.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 September 2008
Resolution: Received class report from agent.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 22 March 2008
Resolved
OWS would be energized and alarm immediately creating the system to shut down automatically. Technician to attest to proper operation of OWS. Faxed report to be sent to Sector Boston.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 March 2008
Resolution: Witnessed operational test of the OWS while the technician was on the vessel. Received a class report to the fact that the technician attested to the proper operation of the system.
Pollution Prevention/Response › Prevention Equipment › Incinerator, Shipboard
Issued 22 March 2008
Resolved
Incinerator would start for about 20 seconds and then shut down automatically. Technician to attest to proper operation of OWS. Faxed report to be sent to Sector Boston.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 March 2008
Resolution: Witnessed proper operation of the OWS while class and technician were on the vessel. Operation of the OWS found to be satisfactory.
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 10 March 2008
Resolved
Noted that the OWS that is installed on the vessle is not installed according to the IOPP Certificate on board. Specifically, the 3 way valve specified in 2.2.2.1 is not installed. Rectify to the satisfaction of the classification society. Until rectified, retain all oil residues on board or discharge ashore to approved receiving facility.
Action required: 705 - Other - as specified
Due 26 March 2008
Resolved 14 March 2008
Resolution: Rcvd Class report regarding reissue of IOPP reflecting actual instilation of OWS system.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 10 March 2008
Resolved
Found cargo tank trunk hatch cover gasket was leaking on 3port. Repair prior to conducting cargo operations and provide a report from class attesting to the condition of ALL tank trunk gaskets. Provide report to the USCG prior to conducting cargo operations within 7 days.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 March 2008
Resolved 14 March 2008
Resolution: Rcvd Class report imposing a condition of class for renewal of gaskets at dry dock in May 08.
Deck/Cargo › Inert Gas System › Main Valve
Issued 10 March 2008
Resolved
Crew must prove proper operation of entire IGS prior to departure from St. Croix to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Resolved 14 March 2008
Resolution: Rcvd Class report attesting to satisfactory operation of IGS.
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 10 March 2008
Resolved
Found non approved piping installed in between Donkey pump and General Service pump suction manifold. Ship is required to have Classification society to determine if the pipe is installed IAW approved plans.
Condition: Improper Installation
Action required: 15 - Rectify deficiencies by next port
Due 22 March 2008
Resolved 26 March 2008
Resolution: Sector Boston had vessel crew remove the pipe and blank off the open ends of the pipes it was connecting.
Engineering › Steering Gear System › Piping
Issued 2 November 2005
Resolved
Excessive oil leaking around steering. This is an ongoing issue with steering. Prior to departure, ship to have steering tested in the presence of class to ensure proper operation and to determine cause of excessive oil.
Action required: 17 - Rectify deficiencies prior to departure
Due 3 November 2005
Resolved 3 November 2005
Resolution: Steering system inspected by classification society, connections tightened and system run to ensure no further leaks.
Operations/Management › Vessel Safety Management › Safety/Environmental Protection Policy
Issued 2 November 2005
Resolved
Cargo tanks found in a negative or zero pressure. IGS was lit-off and tanks where placed back under pressure.
Due 2 November 2005
Resolved 2 November 2005
Resolution: Corrected while on board
Operations/Management › Vessel Safety Management › Safety/Environmental Protection Policy
Issued 2 November 2005
Resolved
Vessel procedures as per Master is to isolate each tank from main IG line. By doing this it isolates the pressure sensor required by Solas74 II-2/62.3.1 located on bridge. Prior to departing the port, vessel to have system and procedure in place to ensure that the pressure in the tanks are being monitored. Solas 74 62.2.2
Action required: 17 - Rectify deficiencies prior to departure
Due 3 November 2005
Resolved 3 November 2005
Resolution: Management provided Coast Guard a copy of IGS Manual which states they have to have tanks in positive pressure.
Navigation › Collision/Grounding Avoidance › Radar
Issued 29 July 2005
Resolved
Vessel granted outbound deviation for inop radar. Part will be available in next port.
Action required: 15 - Rectify deficiencies by next port
Resolved 15 August 2005
Resolution: RECEIVED FAX ATTESTING TO REPAIRS BEING MADE AND CHECKED WITH VESSEL TRAFFIC SERVICE NEW YORK TO VERIFY RADAR WAS FUNCTIONING PROPERLY
Deck/Cargo › Vapor Control Systems › Inerting System
Issued 13 July 2004
Resolved
Found cargo tanks 1P & 1S at 19%-20% oxygen content. Cargo ops have been stopped. O2 levels to be below 8% prior to commencing operations. SOLAS II-2
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 July 2004
Resolved 13 July 2004
Construction/Loadline › Markings
Issued 31 August 2002
Resolved
Vessel's Port and Starboard Loadline markings were not clearly visible due to wear on hull. To be corrected at next drydock or earlier depending upon aaccessibility. ICLL 1966 Reg 8 LEGACY COMPONENT DESC: Load Line Mark
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 February 2003
Resolved 18 April 2003
Documentation › Certificates/Documents
Issued 31 August 2002
Resolved
Safety Equipment Certificate failed to correctly reflect proper number of required Lifebouys. SEC stated vessel was fitted with only one lifebuoy. To be corrected by class at next survey. SOLAS 74/I LEGACY COMPONENT DESC: Cargo Ship Safety Equipment Certificate
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 May 2003
Resolved 5 September 2003
Lifesaving › Lifeboat Equipment
Issued 31 August 2002
Resolved
Stern launch freefall lifeboat was missing searchlight. SOLAS 74/ III.41.8 LEGACY COMPONENT DESC: Searchlight
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 3 September 2002
Resolved 1 September 2002
Resolution: Received copy of purchase reciept.
Accommodation/Occupational Safety › Ventilation
Issued 31 August 2002
Resolved
#4 cargo tank high velocity P/V located near walkway presents danger to crew if vessel is carrying hazardous cargoes in that tank. Current location must be addressed and approved by class. Address and/or correct to the satisfaction of class at or before next drydock. 46 CFR 153.353.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 May 2003
Resolved 5 September 2003
Deck/Cargo › Inert Gas System
Issued 26 March 2002
No resolution recorded
IG deck water seal (seawater) discharge line in port side lower engine room has cement patch. Repair to satisfaction of class (Lloyds) or USCG inspector. LEGACY COMPONENT DESC: Water Seal
Condition: Unknown
Action required: 15 - Rectify deficiencies by next port
Resolution: Item corrected.
Deck/Cargo
Issued 7 May 1999
Resolved
BILGE LEVEL ALARM MISSING IN EMERGENCY FIRE FIRE PUMP SPACE. INSTALL TO SATISFICATION OF CLASS.
Condition: Unknown
Due 2 July 1999
Resolved 2 July 1999
Deck/Cargo
Issued 7 May 1999
Resolved
DRAINS FOR VAPOR RECOVERY SYSTEM NOT AT LOWEST POINTS FOR EACH STATION.
Condition: Unknown
Due 2 July 1999
Resolved 2 July 1999
Deck/Cargo
Issued 24 June 1998
Resolved
ATTACHED PERMANENT STUD AT THE TOP OF THE VAPOR COLLECTION SYSTEM CONNECTION FLANGE FACE, PER 46 CFR 39.20(e), PRIOR TO THE NEXT U.S. PORT VISIT.
Condition: Unknown
Due 5 August 1998
Resolved 5 August 1998