MAURY USCG vessel records
← All vessels

ORC 3

Built
1973
Last inspected
7 March 2018
Documentation
No record in the NVDC file of 10 August 2026
Controls
1 with no removal date recorded

This record may be incomplete: the most recent inspection recorded for this vessel was 8 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 7 March 2018
…with no type recorded23
…past their stated due date3
Operational controls 1 with no removal date recorded
Years with a record 35 calendar years (1982–2018)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

Flag
TRINIDAD AND TOBAGO
Maury page id
psix-47680

Documentation record

Tonnage as PSIX records it773 - Regulatory (Subpart C or D), Gross Ton
773 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
The full record for this vessel

Behind this panel: 78 inspections, each with its date, unit and type; 71 deficiencies with the resolution recorded against each, 3 without one; 1 operational control with no removal date recorded; 3 other vessels inspected with it; no other recorded names; no NVDC documentation record for this Official Number. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 3

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

MASSACHUSETTS Tank Barge · MISLE 54698 · 23 January 2007 · activity 2860436MICHELE LAY Towing Vessel · MISLE 114048 · 13 January 2007 · activity 2916299CONNIE Z Towing Vessel · MISLE 135499 · 13 January 2007 · activity 2916299MASSACHUSETTS Tank Barge · MISLE 54698 · 1 November 2006 · activity 2844990MASSACHUSETTS Tank Barge · MISLE 54698 · 31 October 2006 · activity 2813610

Inspection history · 78

7 March 2018 Loadline Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6367547
24 July 2017 Administrative Inspection · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6219618
19 August 2016 MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5977436
29 April 2015 MTSA Verification · Periodic Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5113330
15 May 2014 MTSA Verification · Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4858825
26 July 2011 Cargo Tank Internal · Internal Structural Exam · MTSA Verification · COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4095136
9 March 2010 Periodic Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3691672
26 May 2009 Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3486136
29 April 2008 Damage Survey · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3195284
30 November 2007 Annual Inspection · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3106756
26 February 2007 Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2878041
21 February 2007 Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2875113
23 January 2007 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2860436
20 January 2007 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2860993
13 January 2007 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2916299
6 December 2006 COI Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2835130
1 November 2006 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2844990
31 October 2006 Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2813610
10 October 2006 Plan Review (Other than "T")
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2797169
26 June 2006 Internal Structural Exam · Cargo Tank Internal · Examination of Repairs · Hull Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2692456
29 June 2005 Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2406799
12 January 2005 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2273775
22 December 2004 Deficiency Check · Periodic Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2262459
23 August 2004 MTSA Verification
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2174273
28 January 2004 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1997116
30 December 2003 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1977928
23 December 2003 Annual Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1968830
11 January 2002 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1478503
12 December 2001 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1474977
23 October 2001 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1076717
31 August 2001 Deficiency Check · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1376711
14 February 2001 Re-Inspection · Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1408673
13 April 2000 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 637516
4 April 2000 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1048314
25 January 2000 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 814586
5 January 2000 Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1046805
27 December 1999 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1437643
31 July 1998 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1437435
26 August 1997 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 784605
12 August 1997 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1425954
7 July 1997 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 437032
30 August 1996 Hull Examination · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1360614
22 May 1996 Deficiency Check
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1084858
13 May 1996 Damage Survey · Examination of Repairs
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1082218
23 August 1995 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1414501
29 March 1995 Type not recorded
No type recorded · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 483975
16 August 1994 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1467423
27 September 1993 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1370705
13 May 1993 Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 358387
17 February 1993 Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 499915
8 October 1992 Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 940895
23 June 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 957757
11 June 1992 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 954843
16 April 1992 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 956753
22 October 1991 COI Inspection · Hull Examination
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1251470
1 October 1991 Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 462134
12 April 1991 Examination of Repairs · Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1211410
12 March 1991 Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 450541
12 March 1991 Permit to Proceed
Administrative · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 1222970
1 March 1991 Damage Survey
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 908447
15 August 1990 COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 922076
31 October 1989 Re-Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1015016
6 July 1989 Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 496757
28 September 1988 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1195413
18 November 1987 Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1000925
18 November 1987 Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1001097
31 March 1987 Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 512378
13 November 1986 Hull Examination · COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1019289
8 September 1986 Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1003381
10 April 1986 Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 466437
16 September 1985 Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 452003
16 September 1985 Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1297605
19 August 1985 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1297012
19 August 1985 COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1297790
17 January 1985 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1286160
29 October 1984 Type not recorded
No type recorded · MSO CINCINNATI · Activity 477713
14 December 1983 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 970720
15 July 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1274346

Deficiency record · 71

Documentation › Certificates/Documents › Certificate of Financial Responsibility
Issued 23 August 2016 No resolution recorded
Provide valid copy of COFR.
Condition: Invalid
Action required: 705 - Other - as specified
Due 30 August 2016 — due date passed with no resolution recorded
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 23 August 2016 No resolution recorded
Properly label cargo tank "DANGER KEEP OUT"
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 September 2016 — due date passed with no resolution recorded
Construction/Loadline › Hull › Bottom Plating
Issued 19 August 2016 No resolution recorded
See SECTOR MOBILE LTR issuing Operational Control for vessel being placed in a laid up status in accordance to MSM. Vessel completed annual inspection, yet cannot operate until proper hull and drydock exam is conducted.
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 August 2017 — due date passed with no resolution recorded
Pollution Prevention/Response › Prevention Equipment › Overfill Devices
Issued 15 May 2014 Resolved
1 Meter stick was broken in half and not functioning as designed
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 May 2014
Resolved 16 May 2014
Stability › Watertight Integrity › General
Issued 15 May 2014 Resolved
Approximately 2 inches of water was found in the stern box and in the #1 starboard wing void.
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 May 2014
Resolved 16 May 2014
Stability › Watertight Integrity › General
Issued 9 March 2010 Resolved
Vessel to transit to Sea Side Services at Three Mile Creek to be dry-docked to determine the cause of water ingress to the #3 void.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 17 March 2010
Resolution: Examined cut-out, fit-up, back-gouge, and final weld of insert at bilge knuckle on #3 void. Witnessed satisfactory 2.0 psi air test of #3 void. No leaks were discovered and this deficiency has been satisfied.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 8 March 2010 Resolved
Replace tachometer, jacket water, and oil pressure level gauges. Current gauges are non-responsive and inoperable.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 April 2010
Resolved 23 April 2010
Resolution: Verified replacement and operation of tachometer, jacket water, and oil pressure level gauges.
Documentation › Logs/Records › Transfer Equipment Test/Inspection Records
Issued 30 November 2007 Resolved
Provide equipment test records for piping, cargo hoses, and relief valves as required by 33 CFR 156.170.
Condition: Unknown
Due 30 December 2007
Resolved 9 January 2008
Construction/Loadline › Hull › Hull Plating
Issued 30 November 2007 Resolved
Barge has an 18 inch by 2 inch crack located in the #2 void on the port side. The crack is plugged with shingles and padding; 46 CFR 32.60-1.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 December 2007
Resolved 9 January 2008
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 30 November 2007 Resolved
Provide proper navigation lights as per COLREGS Rule 24.
Condition: Unknown
Due 30 December 2007
Resolved 9 January 2008
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 30 November 2007 Resolved
Draft marks must be painted in contrasting color to the hull as per 46 CFR 32.05-1.
Condition: Improper/Lack of Maintenance
Due 30 December 2007
Resolved 9 January 2008
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 30 November 2007 Resolved
Replace cover and mounting foundation to upgrade safety of prime mover as per 46 CFR 32.35-5.
Due 30 December 2007
Resolved 9 January 2008
Lifesaving › Lifebuoys › Serviceable
Issued 30 November 2007 Resolved
Replace or repair life buoy as per 46 CFR 199.640.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 November 2007
Resolved 9 January 2008
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 30 November 2007 Resolved
Service both CO2 fire extinguishers as per 46 CFR 95.50-10.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 November 2007
Resolved 9 January 2008
Construction/Loadline › Structures › Manhole
Issued 30 November 2007 Resolved
Repair dog on hatch cover - #4 Starboard void as per 46 CFR 32.60-1.
Due 30 December 2007
Resolved 9 January 2008
Construction/Loadline › Structures › Manhole
Issued 30 November 2007 Resolved
Repair dog on hatch cover - Stern rake as per 46 CFR 32.60-1.
Due 30 December 2007
Resolved 9 January 2008
Construction/Loadline › Hull › Hull Plating
Issued 30 November 2007 Resolved
Provide gauging report and original scantlings for port & starboard sides in way of cargo piping as per 46 CFR 32.60-1.
Due 30 December 2007
Resolved 9 January 2008
Stability › Watertight Integrity › General
Issued 30 November 2007 Resolved
Dewater #2 void as per 46 CFR 31.10-21.
Due 30 December 2007
Resolved 9 January 2008
Deck/Cargo › Holds/Tanks › Flame Arrester
Issued 30 November 2007 Resolved
Replace stern flame screen as per 33 CFR 156.120 (p).
Due 30 December 2007
Resolved 9 January 2008
Deck/Cargo › Holds/Tanks › Ventilation Exhaust Outlet
Issued 30 November 2007 Resolved
Prove operation of #2 Port gooseneck closure device as per 46 CFR 56.50-85.
Due 30 December 2007
Resolved 9 January 2008
Construction/Loadline › Hull › Hull Plating
Issued 30 November 2007 Resolved
Tank top gauging required on both sides of manifold along frame lines as per 46 CFR 32.60-1.
Due 30 December 2007
Resolved 9 January 2008
Construction/Loadline › Hull › Hull Plating
Issued 21 February 2007 Resolved
Barge has an 18 inch by 2 inch crack located in the #2 void on the port side. The crack is plugged with shingles and padding.
Condition: Unknown
Action required: 705 - Other - as specified
Due 21 March 2007
Resolved 30 November 2007
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 6 December 2006 Resolved
Paint draft marks in contrasting color to the hull in accordance with 46 CFR 32.05-1(f).
Action required: 705 - Other - as specified
Due 6 January 2007
Resolved 13 December 2006
Resolution: Painted missing draft marks.
Pollution Prevention/Response › Response Equipment › Containers
Issued 6 December 2006 Resolved
Provide required discharge removal equipment (complete spill kit container) for use during transfer operations in accordance with 33 CFR 155.215.
Action required: 705 - Other - as specified
Due 6 January 2007
Resolved 13 December 2006
Resolution: Provided required discharge removal (spill kit) equipment: sorbents; nonsparking hand scoop/shovel, 2 goggles, 2 pair gloves, 2 suits, container for waste, 1 bag emulsified for deck cleaning.
Engineering › Fuel Oil Service System › Hose
Issued 6 December 2006 Resolved
Replace engine non-metallic flexible hoses with SAE J-1942 approved hoses in accordance with 46 CFR 56.60-25.
Action required: 705 - Other - as specified
Due 6 January 2007
Resolved 13 December 2006
Resolution: Fuel hoses replaced with new SAE J-1942 approved hoses
Engineering › Pressure Vessel › Relief Valve
Issued 6 December 2006 Resolved
Provide annual test report for pressure relief valve in accordance with 46 CFR 61.15-5 (c).
Action required: 705 - Other - as specified
Due 6 January 2007
Resolved 13 December 2006
Resolution: Provided report from 07 Dec 2006 testing of pressure relief valve.
Engineering › Fuel Oil Service System › Hose
Issued 6 December 2006 Resolved
Provide chaffing gear to required non-metallic flexible hoses in accordance with SAE J-1942 standards and good marine practice.
Action required: 705 - Other - as specified
Due 6 January 2007
Resolved 13 December 2006
Resolution: Provided chaffing gear to all required hoses.
Construction/Loadline › Hull › Hull Plating
Issued 13 July 2006 Resolved
Repair or renew uppermost section of formed port bilge knuckle plating. To be cropped out and inserted in way of area which is presently sharply indented/creased in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Bracket
Issued 13 July 2006 Resolved
Repair or renew bilge bracket in way of the knucke insert on the port bilge knuckle in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Hull Plating
Issued 13 July 2006 Resolved
Repair or renew 2nd section of formed port bilge knuckle plating along an approximate 8' length as marked in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Bracket
Issued 13 July 2006 Resolved
Repair or renew port bilge knuckle brackets in way of the 2nd port bilge knuckle insert in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Hull Plating
Issued 13 July 2006 Resolved
Repair or renew uppermost section of formed starboard bilge knuckle plating. To be cropped out and inserted in way of area which is presently sharply indented/creased in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 8 August 2006
Resolution: Reviewed engineering report, conferred with porofessional engineer and consulted with [name withheld] deformation to the next drydock period as it is (a) above the waterline, (b) no structural members are damaged inside.
Construction/Loadline › Hull › Bracket
Issued 13 July 2006 Resolved
Repair or renew stbd. bilge knuckle brackets in way of the stbd. bilge knuckle insert in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Hull Plating
Issued 13 July 2006 Resolved
Repair or renew formed port gunwale plating. To be gouged out and completely re-welded from both sides along an approximate 9/ longitudinal length in between frame bay No's 2-3 as marked, with an approximate 3/8" diameter hole being drilled through the plating at both terminal ends of the fracture, and with both of those stop holes also being fully welded both sides in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Hull Plating
Issued 13 July 2006 Resolved
Repair or renew formed stbd. gunwale plating. To be gouged out and completely re-welded from both sides along an approximate 9/ longitudinal length in between frame bay No's 2-3 as marked, with an approximate 3/8" diameter hole being drilled through the plating at both terminal ends of the fracture, and with both of those stop holes also being fully welded both sides in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Construction/Loadline › Hull › Longitudinal Frame
Issued 13 July 2006 Resolved
Repair or renew after 67" length of bottom longitudinal frame No's 1-8 (as references from the port side) along with their corresponding tripping brackets in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Weld
Issued 13 July 2006 Resolved
Gouge and reweld approximately forty (40) broken 3"x5/16 filet welds as marked throughout the compartment to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Side Shell
Issued 13 July 2006 Resolved
Repair or renew No. 1 port wing tank upper 18" area of side shell plating, and the outboard 18" area of main deck, to be cropped out and renewed along an approximate 32' continuous length which commences about 4' aft of the forward bulkhead, and extends on to the after frame bay, with a piece of 4"x4"x3/8"-9.8# angle iron being used to form the new gunwale in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Side Shell
Issued 13 July 2006 Resolved
Repair or renew No. 4 port wing tank upper 18" area of side shell plating, and the outboard 18" area of main deck, to be cropped out and renewed in way of the tank's after 3 frame bays as designated by owners, with a piece of 4"x4"x3/8"-9.8# angle iron being used to form the new gunwale in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Weld
Issued 13 July 2006 Resolved
Repair or renew an approximate total of fifty (50) broken 3"x5/16 filet welds as marked throughout the stern compartment. To be remade in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Transverse Frame
Issued 13 July 2006 Resolved
Repair and renew an approximate 7' length of transserve transom frame (referenced from main deck downwards) No. 3 to be cropped out and renewed as marked in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Longitudinal Frame
Issued 13 July 2006 Resolved
Repair or renew approximately 3' deck longitudinal frames No. 12 adjacent to manhole in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Longitudinal Frame
Issued 13 July 2006 Resolved
Repair or renew approximately 4' deck longitudinal frames No. 15 adjacent to manhole in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Side Shell
Issued 13 July 2006 Resolved
Repair or renew No. 4 stbd. wing tank: upper 18" area of side shell plating, and the outboard 18" area of main deck, to be cropped out and renewed in between frame bay No's 2-5 as designated by owners, with a piece of 4"x4"x3/8" -9-8# angle iron being used to form the new gunwale in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Hull Plating
Issued 13 July 2006 Resolved
Repair or renew No. 4 stbd. wing tank: outbound 15" area of bulkhead to be cropped out and inserted in way of its lower 8' area, along with three (3) adjacent tripping brackets in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Resolution: Repaired and tested sat.
Construction/Loadline › Hull › Side Shell
Issued 13 July 2006 Resolved
Repair or renew No. 2 stbd. wing tank: upper 18" area of side shell plating, and the outboard 18" area of main deck, to be cropped out and renewed in between frame bay No's 3-5 as designated by owners, with a piece of 4"x4"x3/8" -9-8# angle iron being used to form the new gunwale in accordance with NVIC 7-68.
Action required: 705 - Other - as specified
Due 24 August 2006
Resolved 17 August 2006
Resolution: Repaired and tested sat.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 22 December 2004 Resolved
Provide a revised plan for transfer procedures in accordance with 33 CFR 155.750 and 155.720. Plan must correctly address the description of discharging containment system.
Action required: 705 - Other - as specified
Due 22 January 2005
Resolved 11 January 2005
Resolution: Vessel representative submitted a revised transfer procedures. I reviewed the transfer procedures and found them to be in accordance with 33 CFR 155.750 and 155.720. Plan correctly addressed the description of discharging the containment system.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Relief Valve
Issued 22 December 2004 Resolved
Repack all cargo tank reach rods and deep well pump reach rod assembly to ensure penetrations are gas tight as per 46 CFR 56.50-1.
Condition: Unknown
Action required: 705 - Other - as specified
Due 22 January 2005
Resolved 22 January 2005
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Flame Screens
Issued 22 December 2004 Resolved
Clean or renew flame screen for diesel fuel tank as per 46 CFR 56.50-85.
Action required: 705 - Other - as specified
Due 22 January 2005
Resolved 29 June 2005
Resolution: flame screen for diesel fuel tank was renewed.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Relief Valve
Issued 22 December 2004 Resolved
Repair or renew valve indicator to No.1 cargo tank reach rod assembly as per 46 CFR 56.20-9.
Action required: 705 - Other - as specified
Due 22 January 2005
Resolved 29 June 2005
Resolution: Valve indicator to No.1 cargo tank reach rod was properly repaired.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 22 December 2004 Resolved
Provide safety locking device to each cam handles assembled to the coupler of the cargo tank stripping hose connections to ensure against the handles being opened unintenionally or vibrating open. This locking device must require a seperate, deliberate effort in the opening operation over the standard handle operation in accordance with 33 CFR 154.500 (d)(3) .
Condition: Unknown
Action required: 705 - Other - as specified
Due 22 January 2005
Resolved 29 June 2005
Resolution: safety locking devices were installed to each cam handle in accordance with 33 CFR 145.500 (d)(3).
Construction/Loadline › Structures
Issued 23 December 2003 Resolved
Repair hole located on main deck starboard side above stern void. LEGACY COMPONENT DESC: Deck Plating
Condition: Unknown
Action required: 705 - Other - as specified
Due 23 January 2004
Resolved 28 January 2004
Resolution: Steel renewed. Witnessed air test to 1.5 PSI, SAT.
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 2 January 2002 Resolved
Cargo pump located on weather deck did not have a cover as required by 46 CFR 32.35-5. LEGACY COMPONENT DESC: Cargo Pump
Action required: 705 - Other - as specified
Due 11 January 2002
Resolved 11 January 2002
Resolution: Cargo pump was fitted with adequate cover to protect it while in operation.
Pollution Prevention/Response › Response Equipment
Issued 12 December 2001 Resolved
PROVIDE ADEQUATE DISCHARGE REMOVAL EQUIPMENT LEGACY COMPONENT DESC: Containers
Condition: Improper/Lack of Maintenance
Due 11 January 2002
Resolved 11 January 2002
Resolution: Vessel was equipped with a complete and inventoried discharge removal kit.
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 12 December 2001 Resolved
PROVIDE PROOF OF CALIBRATION FOR CARGO PUMP DISCHARGE PRESSURE GAUGE LEGACY COMPONENT DESC: Cargo Manifold
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 11 January 2002
Resolved 11 January 2002
Resolution: Vessel reps. provided MIO mobile with proof of calibration for cargo discharge pressure gauge.
Operations/Management › Cargo Transfer/Lightering › Making a Connection
Issued 12 December 2001 Resolved
SUBMIT TRANSFER PROCEDURES FOR "OVER THE TOP" TRANSFER OPERATIONS FOR APPROVAL. VESSEL SHALL LIMIT ALL TRANSFER OPERATIONS TO UTILIZING THE FIXED CARGO PIPING SYSTEM UNTIL "OVER THE TOP"TRANSFER PROCEDURES ARE APPROVED. LEGACY COMPONENT DESC: Vessel Transfer Procedures on Hand
Condition: Improper/Lack of Maintenance
Due 12 June 2002
Resolved 22 December 2004
Resolution: Vessel was issued letter of alternative compliance on 02 FEB 2004, for conducting "over the top" transfer operations.
Construction/Loadline
Issued 31 August 2001 Resolved
INSERT APPROXIMATELY 4'X5' AREA ON STBD SIDE OF FWD KEVAL, MAIN DECK.
Condition: Unknown
Due 1 March 2002
Resolved 1 March 2002
Resolution: Examined area which localized pitting has occured. Owner provided satisfactory guaging readings that support renewal of area not required at this time. Area shall be examined at next drydock to determine is renewal is required.
Construction/Loadline
Issued 31 August 2001 Resolved
INSERT SIDE SHELL PLATING IN #3 STBD, NEAR WATERTIGHT BULKHEAD.
Condition: Unknown
Due 1 March 2002
Resolved 1 March 2002
Resolution: Examined area at the request of vessel owner/operator. Damage in area is localized and does not affect the structural integrity of the barge. Repair are not warranted at this time. Area to be re-evaluated at next drydock period.
Deck/Cargo
Issued 14 February 2001 Resolved
REMOVDE PETCOCK ON PRIME MOVER FUEL FILTER.
Condition: Unknown
Due 8 March 2001
Resolved 5 March 2001
Documentation
Issued 14 February 2001 Resolved
DO NOT OPERATE OR TRANSFER UNTIL EVIDENCE OF TRANSFER PROCEDURES ARE SHOWN TO COGNIZANT [name withheld] 33 CFR 155 SUBPART C.
Condition: Unknown
Due 8 March 2001
Resolved 5 March 2001
Deck/Cargo
Issued 14 February 2001 Resolved
Install indicating devices on all tank valves IAW 46 CFR 56.20-9(a).
Condition: Unknown
Due 14 February 2001
Resolved 14 February 2001
Engineering
Issued 14 February 2001 Resolved
INSTALL PROTECTIVE GUARD AROUND PRIME MOVER EXHAUST PIPE.
Condition: Unknown
Due 8 March 2001
Resolved 5 March 2001
Lifesaving
Issued 14 February 2001 Resolved
REPLACE WARNING SIGNS ON CARGO HATCH COVERS.
Condition: Unknown
Due 8 March 2001
Resolved 5 March 2001
Documentation
Issued 27 December 1999 Resolved
COFR is not registered to current operator. Vessel is prohibited from loading cargo until this item is cleared by the Coast Guard.
Condition: Unknown
Due 13 January 2000
Resolved 13 January 2000
Documentation
Issued 27 December 1999 Resolved
Provided an updated copy of the Vessel Response Plan.
Condition: Unknown
Due 27 December 1999
Resolved 27 December 1999
Documentation
Issued 27 December 1999 Resolved
Complete inspection for certification.
Condition: Unknown
Due 2 February 2000
Resolved 2 February 2000
Deck/Cargo
Issued 12 August 1997 Resolved
PROPERLY INSULATE OR COVER EXPOSED STEAM PIPING ON TANK TOP AND SIDES. THE USE OF THE STEAM SYSTEM IS PROHIBITED UNTIL MODIFICATIONS ARE INSPECTED TO THE SATISFACTION OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 12 August 1997
Resolved 12 August 1997
Construction/Loadline
Issued 13 May 1996 Resolved
MAKE PERMANENT REPAIRS TO 6 INCH AND 1 INCH CRACKS IN WAY OF NO. 1 STBD WING VOID BILGE KNUCKLE PRIOR TO LOADING NEXT CARGO. REPAIRS SHALL BE TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 13 May 1996
Resolved 13 May 1996
Deck/Cargo
Issued 13 May 1993 Resolved
FLAME SCREEN HAD HOLES
Condition: Unknown
Due 29 September 1993
Resolved 29 September 1993
Deck/Cargo
Issued 16 April 1992 Resolved
WELD BOTTOM SIDE OF CARGO TANK FILL PIPE DONUT DOUBLERS AFTER REMOVAL OF ALL CARGO RESIDUE AND CERTIFIED GASFREE SAFE FOR WORK/WORKERS.
Condition: Unknown
Due 16 April 1992
Resolved 16 April 1992
Deck/Cargo
Issued 16 April 1992 Resolved
PROVIDE AMENDED CARGO PIPING DIAGRAM FOR TRANSFER PROCEDURES TO INCLUDE MODIFICATIONS TO CARGO FILL HEADER.
Condition: Unknown
Due 16 May 1992
Resolved 20 April 1992

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.