Documentation record
Registered dimensions (L × B × D)269.2 ft × 54.1 ft × 17.8 ft
Registered tonnagegross 2,187 / net 2,187
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGULFPORT SHIPBUILDING · PORT ARTHUR, TX, UNITED STATES · built 1973
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portTAMPA, FL
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 29 August 2025 · expires 30 September 2026
Service, as the file records itOil Recovery
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it2187 - Regulatory (Subpart C or D), Gross Ton
2187 - Regulatory (Subpart C or D), Net Ton
4470 - Dead Weight, Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 16 inspections, each with its date, unit and type; 8 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 16
26 July 2026
COI Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8447357
24 July 2025
Deficiency Check · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8193475
30 August 2024
Periodic Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7992528
6 December 2023
Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7831624
17 October 2023
Administrative Inspection · Internal Structural Exam · Examination of Repairs · Cargo Tank Internal
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7747304
16 August 2022
Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7512821
13 October 2021
Cargo Tank Internal · Internal Structural Exam · Underwater Inspection in lieu of Drydock
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7284999
3 August 2021
Deficiency Check · MARPOL Annex I Examination · COI Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7257126
8 December 2020
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7108860
10 September 2020
Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7032971
6 August 2019
MARPOL Annex I Examination · Periodic Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6745084
4 September 2018
Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6540291
20 August 2018
Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6490964
24 August 2017
MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6227419
29 August 2016
Commercial Dive Inspection · Internal Structural Exam · Cargo Tank Internal · Administrative Inspection · Underwater Inspection in lieu of Drydock
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5986424
18 August 2016
COI Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5968158
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 August 2025
Resolved
Hose used to transfer oil or hazardous material must meet the requirements of § 154.500 of this chapter. Each hose must be marked with one of the following: For oil products, the words “OIL SERVICE”. Each hose also must be marked with the following: (1) Maximum allowable working pressure. MI observed transfer hose was not properly marked with MAWP and the service intended. Mark hose appropriately.
33 CFR 155.800
33 CFR 154.500(e)(2)
33 CFR 154.500(f)(1)
16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 September 2025
Resolved 20 August 2025
Resolution: Received photogrpahs from vessel rep showing proper markings have been made on hose.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 6 December 2023
Resolved
Nonmetallic flexible hose may be used in lube oil, fuel oil and fluid power systems only where flexibility is required and in lengths not exceeding 30 inches.
Marine Inspector identified both fuel oil supply non-metallic hoses were severely dry rotted.
Both hoses were replaced on the spot.
46 CFR 56.60-25(4)
Action required: 10 - Deficiency Rectified
Due 6 December 2023
Resolved 6 December 2023
Resolution: Both fuel oil supply hoses were replaced on hotel generators.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 6 December 2023
Resolved
The reflective intensity of material after testing in accordance with the “resistance to accelerated weathering” test method listed in § 164.018–11 must be at least 50 percent of the values listed in Table 164.018–9.
Marine Inspector identified ring buoy with retro that was severely worn.
New retro tape was applied to the ring buoy.
46 CFR 164.018-9(f)
Action required: 10 - Deficiency Rectified
Due 6 December 2023
Resolved 6 December 2023
Resolution: New retro reflective material was replaced on ring buoy.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 6 December 2023
Resolved
Any tank vessel which is equipped with an internal combustion engine driven cargo pump on the weather deck shall be provided with a minimum of one remote manual shutdown station, conspicuously marked, and located at the midpoint of such vessel, or 100 feet from the engine, whichever is the more practical.
Marine Inspector identified emergency shut-down stenciling was faded.
Crew stenciled markings.
46 CFR 32.50-35(a)
Action required: 10 - Deficiency Rectified
Due 6 December 2023
Resolved 6 December 2023
Resolution: Placard was stenciled.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 16 August 2022
Resolved
Except as provided in paragraph (c) of this section ventilator openings shall be provided with efficient weathertight closing appliances. The relaxation of the requirement for closures on ventilation with coamings exceeding the specified heights for positions 1 and 2 is generally confined to stand alone or free standing ventilation situated on the weather deck and not those situated within the bulkheads of a deck house or superstructure.
Identified a misaligned weathertight closure above the machinery space which is also missing a closing dog. Also, identified a wasted gasket on the hatch to the forward rake compartment.
46 CFR 42.15-45(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 September 2022
Resolved 31 August 2022
Resolution: The operator renewed the misaligned weathertight closure and missing dog closing device above the machinery space and the gasket on the hatch to the forward rake compartment.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 August 2022
Resolved
Any tank vessel which is equipped with an internal combustion engine driven cargo pump on the weather deck shall be provided with a minimum of one remote manual shutdown station, conspicuously marked, and located at the midpoint of such vessel, or 100 feet from the engine, whichever is the more practical.
The stenciling for the emergency cargo pump shut off was found worn and illegible.
46 CFR 32.50-35
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 September 2022
Resolved 31 August 2022
Resolution: The stenciling for the emergency cargo pump shut off was renewed like and in kind.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 16 August 2022
Resolved
The construction and the means for securing the weathertightness of cargo and other hatchways in positions 1 and 2 shall be at least equivalent to the requirements of 42.15-25 and 42.15-30.
Identified wasted gaskets for the flame screen hatches on top of the port cargo tanks #3 and #4.
46 CFR 42.15-20
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 September 2022
Resolved 31 August 2022
Resolution: The operator replaced all of the gaskets for the flame screen hatches on top of the all of the cargo tank hatch openings.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 August 2021
Resolved
All safety and relief valves for use on pressure vessels shall be designed to meet the protection and service requirements for which they are intended and shall be set to relieve at a pressure which does not exceed the "maximum allowable working pressure" of the pressure vessel.
Marine Inspectors unable to verify the relief valve on inspected pressure vessel relieves at a pressure that does not exceed MAWP due to illegible data plate. Additionally, the collar on the relief valve is cracked.
46 CFR 31.30-1 & 46 CFR 54.15-10(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 August 2021
Resolved 17 August 2021
Resolution: Vsl rep replaced pressure vessel relief valve and data plate.