MAURY USCG vessel records Sign in
← All vessels

SEACOR VOYAGER

SEACOR VOYAGER is a 1998 offshore supply vessel. The Coast Guard has recorded 38 inspections since 1998, most recently in December 2011, along with 94 deficiencies, 1 operational control and 2 casualty investigations between 2003 and 2008.

Records from 1998 to 2011. Most recent: inspection, 1 December 2011.

Built
1998
Last inspected
1 December 2011
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9206839 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WDA7135
477890
Flag
UNITED STATES
367069000 (licence lapsed)
Maury page id
psix-477890

Inspections, by type

…with no type recorded7
Years with a record 14 calendar years (1998–2011)
The 38 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 15 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it452 - Convention (Subpart B), Net Ton
1508 - Convention (Subpart B), Gross Ton
1444 - Displacement, Ton
2158 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

WDA7135MMSI 367069000 · cancelled · compulsorily equipped · granted 9 February 2012, cancelled 18 July 2012
WCY8403MMSI 367069000 · cancelled · compulsorily equipped · granted 8 April 1999, cancelled 14 April 2004
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspected as a tow unit · 2

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

MISS CAROLYN Passenger (Inspected) · MISLE 50264 · 3 May 1999 · activity 161122MISS CARMINE Commercial Fishing Vessel · MISLE 386374 · 3 May 1999 · activity 161122

Inspection history · 38

1 December 2011 Deficiency Check · MARPOL Annex I Examination · Hull Examination · Annual Inspection · Administrative Inspection · Drydock Exam · Cargo Tank Internal · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4202998
18 November 2010 MARPOL Annex I Examination · DAPI Audit · MARPOL Annex IV Survey · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3887854
10 February 2010 Annual Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3678083
18 March 2009 Deficiency Check
Physical examination · Activities Europe · Activity 3435367
10 February 2009 Type not recorded
No type recorded · Activities Europe · Activity 3420810
9 February 2009 Type not recorded
No type recorded · Activities Europe · Activity 3428557
18 November 2008 MTSA/ISPS Verification · COI Inspection · Administrative Inspection · Drydock Exam
Physical examination · Activities Europe · Activity 3369679
24 May 2008 Damage Survey
Physical examination · Activities Europe · Activity 3221992
18 May 2008 Type not recorded
No type recorded · Activities Europe · Activity 3246087
18 January 2008 Annual Inspection · MTSA/ISPS Verification · MARPOL Annex I Examination
Physical examination · Activities Europe · Activity 3127990
12 March 2007 Type not recorded
No type recorded · Activities Europe · Activity 2886307
18 October 2006 Annual Inspection · Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Activities Europe · Activity 2796088
23 January 2006 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2571530
15 November 2005 COI Inspection · MARPOL Annex I Examination · MTSA/ISPS Verification
Physical examination · Activities Europe · Activity 2534939
4 March 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2303748
10 February 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2290183
27 January 2005 Deficiency Check · Annual Inspection
Physical examination · Activities Europe · Activity 2181813
5 November 2004 Deficiency Check
Physical examination · Activities Europe · Activity 2235197
1 November 2004 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2232665
5 June 2004 MTSA/ISPS Verification
Physical examination · Activities Europe · Activity 2058890
12 February 2004 Type not recorded
No type recorded · Activities Europe · Activity 2005388
17 December 2003 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1966057
8 December 2003 Hull Examination · Deficiency Check · Internal Structural Exam
Physical examination · Activities Europe · Activity 1949818
2 December 2003 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1957232
23 October 2003 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1934556
28 August 2003 Deficiency Check · Periodic Inspection
Physical examination · Activities Europe · Activity 1882470
22 June 2003 Type not recorded
No type recorded · Activities Europe · Activity 1826257
18 February 2003 Administrative Inspection
Administrative · Activities Europe · Activity 1745705
25 October 2002 Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1696260
1 September 2002 Annual Inspection
Physical examination · Activities Europe · Activity 1654972
7 January 2002 Re-Inspection
Physical examination · Activities Europe · Activity 1475864
7 February 2001 Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1361945
24 February 2000 Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1046568
13 August 1999 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 776272
13 August 1999 Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 776431
3 May 1999 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 161122
19 February 1999 Administrative
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1129261
23 December 1998 Construction Oversight · Inclining Experiment · Deficiency Check · Hull Examination · Initial Certification
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1383985

Deficiency record · 94

Engineering › Bilge Water Management System › Piping
Issued 19 January 2012 Resolved
Renew wasted ballast discharge pipe in the E/R.
Action required: 705 - Other - as specified
Due 25 January 2012
Resolved 25 January 2012
Resolution: Pipe renewed.
Engineering › Diesel Engine (auxiliary) › Governor
Issued 19 January 2012 Resolved
Place #1 winch cooling pump back into an operable status. Currently engine will not run and operate as designed.
Action required: 705 - Other - as specified
Due 25 January 2012
Resolved 25 January 2012
Engineering › Diesel Engine (propulsion-reduction gear) › Gear/Clutch Starter (air motor)
Issued 19 January 2012 Resolved
#1 MDE starter would not engage and start the engine. Repair or replace the starter.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 January 2012
Resolved 25 January 2012
Engineering › Fuel Oil Service System › Valve, Control
Issued 19 January 2012 Resolved
STBD emergency fuel service shutdown valve did not close when tested.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 January 2012
Resolved 25 January 2012
Resolution: Attending MI witnessed proper operation of valve.
Stability › Watertight Integrity › General
Issued 19 January 2012 Resolved
Escape hatches on forecastle and bridge deck have gaskets that are worn and need to be renewed. Currently daylight can be seen through hatch sealing surfaces when dogged down.
Action required: 705 - Other - as specified
Due 25 January 2012
Resolved 25 January 2012
Resolution: Gaskets renewed.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 19 January 2012 Resolved
Bridge breaker panel missing cover over spare breaker opening. Install a blank cover or spare breaker to close the opening.
Action required: 705 - Other - as specified
Due 25 January 2012
Resolved 25 January 2012
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 19 January 2012 Resolved
Fixed CO2 system control mounted on the BKHD IWO weather deck next to the door leading to the messdeck on the STBD side, was locked and had no way to access it. No instructions were posted. The control box needs to be opened and the purpose of the controls need to be ascertained. Post instructions if necessary.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 25 January 2012
Resolved 25 January 2012
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 19 January 2012 Resolved
Mount and label the portable fire extinguisher located in the storeroom on the main deck fwd of the messdeck.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 25 January 2012
Resolved 25 January 2012
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 19 January 2012 Resolved
Mount an approved CO2 extinguisher bracket in the galley for the CO2 extinguisher. The current bracket is designed for a B-2 dry chem and too loose for the CO2 extinguisher.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 25 January 2012
Resolved 25 January 2012
Fire Fighting › Firemans Outfit › Protective Clothing
Issued 19 January 2012 Resolved
Safety locker on 01 deck where the fireman's outfit was stored, was being used for spare parts and cleaning gear. All non-essential equipment shall be removed from the safety locker and stored in the appropriate place.
Action required: 705 - Other - as specified
Due 25 January 2012
Resolved 25 January 2012
Documentation › Markings/Placards › Warning Signs
Issued 19 January 2012 Resolved
GE alarms not posted with appropriate placards in 01 deck passageway and on the weather deck by the towing winch engine. Various other placards are missing throughout the vessel.
Action required: 705 - Other - as specified
Due 25 January 2012
Resolved 25 January 2012
Resolution: Placards posted.
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 18 November 2008 Resolved
Provide the following service reports: pop-off valves, shafts, cutlass bearings, & sea valves (in detail to include original scantlings) ** ACTEUR received copies of calibration certificates from Metrotech of Walvis Bay, Namibia for the following valves:#1, #2,#3 & #4 bulk tanks/Discharge line. Remainder of deficient certs are outstanding.
Action required: 705 - Other - as specified
Due 10 February 2009
Resolved 11 February 2009
Documentation › Safety Management System › Company Responsibility/Authority Documentation
Issued 18 November 2008 Resolved
Provide documentation for the company address change that will effect SMS,ISSC, and CSR.
Action required: 705 - Other - as specified
Due 10 February 2009
Resolved 29 December 2008
Resolution: received documentation regarding company address change pertaining to SMS,ISSC & CSR.
Construction/Loadline › Hull › Hull Plating
Issued 18 November 2008 Resolved
Provide report regarding the clad welding in areas in the starb'd F/O day tank.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 February 2009
Resolved 11 February 2009
Stability › Watertight Integrity › General
Issued 18 November 2008 Resolved
Provide proof of Coast Guard approval for installation of fire fighting system (Fi Fi).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 February 2009
Resolved 24 January 2009
Resolution: ACTEUR received a copy of approval letter from CG Marine Safety Center (signed T.E. Meyers). Letter in SEACOR VOYAGER MISLE documents as FiFiApproval.
Navigation › Piloting/Steering › Maneuvering Information Fact Sheet
Issued 18 November 2008 Resolved
Install steering gear diagram and instructions in wheel house and install same at the emergency steering station.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 February 2009
Resolved 24 January 2009
Resolution: Received copy of diagram/instructions & a statement from Master that diagram is posted.
Navigation › Piloting/Steering › Steering Magnetic Compass
Issued 18 November 2008 Resolved
Obtain spare steering magnetic compass IAW SOLAS, chapter V, Reg 19, 2.2.1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 December 2009
Resolved 2 March 2010
Deck/Cargo › Mooring/Anchoring › Anchor Chain (general)
Issued 18 November 2008 Resolved
Replace the 4 (four) bad shots of chain on the port anchor.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 February 2009
Resolved 11 March 2009
Engineering › Fuel Oil Service System › Hose
Issued 18 November 2008 Resolved
Provide documentation for fuel transfer hose tests.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 February 2009
Resolved 29 December 2008
Resolution: Received documentation attesting to the certification of ships fuel transfer hoses. CERTIFICATE NUMBERS 08.12.077 & 08.12.073.
Navigation › Emergency Steering › Compass Reading for Emergency Steering
Issued 18 November 2008 Resolved
Align rudder angle indicator on the bridge and the engine control room.
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 December 2009
Resolved 2 March 2010
Fire Fighting › Structural - A Class Divisions › Doors
Issued 18 November 2008 Resolved
Adjust all CLASS-A fire doors to shut and latch when released. (not to be held open) Received statement from Master that all class A fire doors have been adjusted to latch when released. To be verified upon next CG visit. .
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 10 December 2009
Resolved 2 March 2010
Engineering › Sea-water System (primary cooling) › Pump
Issued 18 November 2008 Resolved
Repair general service pump on port side of engine room to proper operating condition.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 December 2009
Resolved 2 March 2010
Communications › Internal Communications System › Sound-powered Telephone
Issued 18 November 2008 Resolved
Install station selector switch on sound powered phone in galley & near emergency fire pump.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 December 2009
Resolved 2 March 2010
Fire Fighting › Fire Pumps › Pressure
Issued 18 November 2008 Resolved
Repair fire pump pressure gauge on bridge.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 December 2009
Resolved 2 March 2010
Fire Fighting › Fire Hydrants › Material
Issued 18 November 2008 Resolved
replace the number 4 (four) fire hydrant with Coast Guard approved fire hydrant. Received statement from ship's master that number 4 hydrant is installed and tested under pressure. //This deficiency to be verified upon next Coast Guard attendance.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 December 2009
Resolved 2 March 2010
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 18 November 2008 Resolved
Address potential exhaust leaks on port and starb'd generators.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 December 2009
Resolved 2 March 2010
Lifesaving › Launching Appliances › Davit
Issued 18 November 2008 Resolved
Repair rescue boat davit to proper operating condition and conduct rescue boat drill. //On 15DEC2008 [name withheld] received phone call from [name withheld] (SEACOR VOYAGE) stating davit exercise and boat drill were satisfactorily conducted. DEF will be verified upon next visit to SEACOR VOYAGER.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 10 December 2009
Resolved 2 March 2010
Fire Fighting › Ventilation Systems › Ducts
Issued 24 May 2008 Resolved
Properly repair all areas damaged by the port exhaust trunk fire. All damaged insulation and lagging to be replaced as needed to ensure original fire protection / insulation properties. Replace port and starboard exhaust flex bellows and ensure proper alignment, install new and / or additional brackets to both sides of the exhaust trunks to ensure proper support.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 June 2008
Fire Fighting › Ventilation Systems › Ducts
Issued 24 May 2008 Resolved
Provide proper ventilation closures for the port & starboard exhaust trunks to ensure that all ventilation can be secured and verified to the exhaust trunk space, to include the area between the exhaust fan closure and the top of the exhaust trunk space.
Action required: 705 - Other - as specified
Due 30 November 2008
Resolved 10 June 2008
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 18 January 2008 Resolved
Demonstrate proper operation of the oily water separator recirculation/overboard discharge valve when the oil content meter exceeds 15 parts per million and provide means to independently secure the oil water separator. Recieved email on 02/18/2008 stating that item has been completed. Extended due date to correspond with the COI expiration date.
Due 31 December 2008
Resolved 24 May 2008
Construction/Loadline › Structures › Machinery Space Opening
Issued 18 January 2008 Resolved
Install a second means of escape from the machinery control room that provides a continuous fire shelter to a safe position outside the machinery space. Item will be completed at the next dry dock.
Due 18 December 2008
Resolved 24 May 2008
Construction/Loadline › Structures › Machinery Space Opening
Issued 18 January 2008 Resolved
Provide a second means of escape from the Steering Motor and Pump Room that provides a continuous fire shelter to a safe position outside the machinery space.
Action required: 705 - Other - as specified
Due 18 April 2008
Resolved 2 April 2008
Resolution: Not needed as per SOLAS Chapter II-2 Regulation 13 4.2.3
Communications › Alarms/Indicators › Fire Alarm
Issued 18 January 2008 Resolved
Install smoke detectors in the forward storage space and the engine room locker at the top of the stairs. Recieved E-mail dated 17-Feb-2008 from Master stating that CG-835 has been completed.
Action required: 705 - Other - as specified
Due 31 December 2008
Resolved 24 May 2008
Lifesaving › Inflatable Liferafts › Not on Board
Issued 18 January 2008 Resolved
Install additional life rafts so that “in the event of any one survival craft is lost of rendered unserviceable” the vessel can still accommodate everyone on board from each side of the vessel.
Action required: 705 - Other - as specified
Due 1 May 2008
Resolved 17 April 2008
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 18 January 2008 Resolved
Amend and submit Fire Control Safety Plan that includes the changes identified in EUR02-05.
Action required: 705 - Other - as specified
Due 18 December 2008
Resolved 24 May 2008
Documentation › Safety Management System › Essential Sailing Instructions Documentation
Issued 18 January 2008 Resolved
The following publications, as prescribed by the vessel’s Safety Management System, are missing: Supplement #3 to the 22 Edition ITU List of Call Signs, ITU Manual for use by the Maritime Mobile and Maritime Mobile Satellite Services, Amendment to STCW, Amendment 3 and 4 to the STCW, LSA Code, IMO Standard Marine Communication Phrases and the Monthly Index Update. Recieved E-mail from Master
Action required: 705 - Other - as specified
Due 31 December 2008
Resolved 24 May 2008
Lifesaving › Rescue Boat › Propulsion Transmission
Issued 18 January 2008 Resolved
Repair and or replace the rescue boat impeller and demonstrate its underway operation. Recieved E-mail dated 12-Feb-2008 from Master stating that CG-835 has been completed.
Action required: 705 - Other - as specified
Due 31 December 2008
Resolved 24 May 2008
Communications › Alarms/Indicators › Fire Alarm
Issued 18 January 2008 Resolved
Demonstrate the proper operation of the heat detector in the bow thruster room. Repair and or replace the rescue boat impeller and demonstrate its underway operation. Recieved E-mail dated 12-Feb-2008 from Master stating that CG-835 has been completed.
Action required: 705 - Other - as specified
Due 31 December 2008
Resolved 24 May 2008
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 18 January 2008 Resolved
Install lagging on the starboard main engine and completely close the lagging on the port main engine. Received E-mail from Master dated June 10, 2008 stating the CG-835 has been completed. Extended due date to correspond with annual window due date.
Action required: 705 - Other - as specified
Due 18 December 2008
Resolved 24 May 2008
Construction/Loadline › Structures › Scupper
Issued 18 January 2008 Resolved
Repair or replace the gray water check valve.
Action required: 705 - Other - as specified
Due 18 January 2008
Resolved 18 January 2008
Communications › Visual Communication › Red Warning Signal
Issued 18 January 2008 Resolved
Add or relocate audible and visual alarms so they are detectable by crew in the vicinity of the starboard generator. Recieved E-mail dated 17-Feb-2008 from Master stating that CG-835 has been completed.
Action required: 705 - Other - as specified
Due 31 December 2008
Resolved 24 May 2008
Engineering › Steering Gear System › Rudder Angle Indicator
Issued 18 January 2008 Resolved
Align the rudder angle indicator on the bridge and engine control room. Repair and or replace the rescue boat impeller and demonstrate its underway operation. Recieved E-mail dated 17-Feb-2008 from Master stating that CG-835 has been completed.
Action required: 705 - Other - as specified
Due 31 December 2008
Resolved 24 May 2008
Communications › Alarms/Indicators › Lube Oil Level Alarm
Issued 18 January 2008 Resolved
Demonstrate the proper operation of safeties (high jacket water temperature, over speed and low lube oil) on the starboard generator. Repair and or replace the rescue boat impeller and demonstrate its underway operation. Recieved E-mail dated 12-Feb-2008 from Master stating that CG-835 has been completed.
Action required: 705 - Other - as specified
Due 31 December 2008
Resolved 24 May 2008
Construction/Loadline › Structures › Door
Issued 18 January 2008 Resolved
Remove the bolts and blank the holes from the two engine room emergency escape trunks.
Action required: 705 - Other - as specified
Due 18 January 2008
Resolved 18 January 2008
Lifesaving › Inflatable Liferafts › Carriage Requirement
Issued 18 January 2008 Resolved
Proper install liferafts as per 46 CFR 199.150.
Due 18 December 2008
Resolved 18 January 2008
Engineering › Shafting/Propeller Arrangements › Propeller (controllable pitch)
Issued 18 October 2006 Resolved
Found evidence of a leaking starboard CPP dating back to DEC2006. See narrative for details. Vessel is to remain in drydock until satisfactory repairs are made to the CPP. 24NOV06: Rcvd ABS report documenting sea trials and diver inspection. Vessel shaft and CPP appears satisfactory. No vibration or oil leakage. Verify at next exam.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Operations/Management › Drug and Alcohol Testing › Testing, Pre-employment
Issued 18 October 2006 Resolved
Vessel has no records for pre-employment or ongoing random drug testing as required by CFR's and by company SMS program. Prior to returning to operation, provide proof to ACTEUR of drug testing for the entire crew. 11/24/06: Received e-mail from the vessel. Verify at next annual exam.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 18 October 2006 Resolved
Vessel does not have adequate means for conducting post incident alcohol testing within 2 hours. Provide testing equipment onboard vessel to meet 2 hour testing requirement. 24NOV06: Rcvd e-mail that the vessel has found the testing equipment onboard. Verify at next annual exam.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 18 October 2006 Resolved
Automation Testing: Prior to returning to operation, provide ACTEUR with test report for all items covered in the USCG Approved Periodic Safety Test procedures. This report shall include all items in the test procedures in Section I, II, III, & IV. Items which have alarm or shutdown settings shall include the observed values in the report. 24NOV06: Rcvd e-mail from the vsl. Verify next exam.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Engineering › Compressed Air System (start air) › Valve
Issued 18 October 2006 Resolved
Relief valves on all pressure vessels (start air receivers and bulk tanks) need to be bench tested. Vessel attempted to test onboard, but the supply line was not enough to witness proper pop off and resetting of the valves. 24NOV06: Rcvd e-mail from the vessel. Verify at next exam.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Electrical › Electrical Distribution System (emergency) › Main-emergency Bus Tie
Issued 18 October 2006 Resolved
Black out test for emergency generator: The generator currently has a defective breaker. Repair system and demonstrate proper automatic operation to ABS prior to operation. Also during precious test of the system, it was noted that several emerg lights on bridge did work on emergency load. 24NOV06: Rcvd e-mail that the emergency bus transfer was working properly. Verify at next exam.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Fire Fighting › Means of Escape › Blocked
Issued 18 October 2006 Resolved
Access hatches to engineroom: Demonstrate proper operation and closure of spring assisted access hatches to ABS surveyor and provide ABS report to ACTEUR. 24NOV06: Rcvd e-mail notification from the vessel. Verify at next exam.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Lifesaving › Launching Appliances › Davit
Issued 18 October 2006 Resolved
Rescue Boat Davit: Provide completed maintenance and lubrication report to ACTEUR as provided in the back of the Welin Lambie davit maintenance manual. Complete overload weight test and launching appliance test with ABS surveyor. Demonstrate satisfactory launching and operation of the rescue boat to ABS surveyor. 11/24/06: Rcvd e-mail from the vessel. Verify at next exam.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Fire Fighting › Fixed Fire Detection System › Control Panel
Issued 18 October 2006 Resolved
Fire detection panel: The main panel is out of commission. This casualty occurred at some time during the drydocking. Prior to returning to operation, provide ACTEUR proof of proper operation and testing of the fire detection system. 24NOV06: Rcvd e-mail from the vessel. Verify at next inspection.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 18 October 2006 Resolved
Fixed CO2 system: During servicing of the system, technicians found the main distribution valve to the engineroom was defective. Prior to operation, provide report that CO2 extinguishing system is working properly. 11/24/06: Rcvd e-mail from the vessel. Verify at next inspection.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 18 October 2006 Resolved
Vessel could not demonstrate proper operation of auto recirculation/ovbd valves. Additionally, in the OIL discharge mode, water was still passing through the overboard line. The op manual doesn't discuss opening the content meter sample discharge, but there will not be any flow if this is not done. Finally, there is no means to secure OWS from ovbd discharge. Rcvd e-mail. Verify at next visit
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 18 October 2006 Resolved
Accomodations: Freezers - missing "Man Inside" alarm switch. Refrigerator in galley - door will not stay shut. Galley serving window - prove proper operation of the self closing overhead door (when weak link was removed, door did not shut). Doors throughout accomodations - fix door handles. 11/24/06 - Rcvd e-mail from the vessel. Verify at next inspection.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 18 October 2006 Resolved
Starboard Chain Locker - Fix light and ladder inside space. 11/24/06 - Rcvd e-mail from the vessel. Verify at next inspection.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Fire Fighting › Means of Escape › Doorways
Issued 18 October 2006 Resolved
Fire doors on both side of the engine room: The self closing mechanism does not shut the doors and latch properly. Repair the closing devices. 11/24/06: Rcvd e-mail from the vessel. Verify at next inspection.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Construction/Loadline › Structures › Deck Plating
Issued 18 October 2006 Resolved
Main deck - steel cover for deck boards has broken loose from the main deck. Reweld to the deck. 11/24/06: Rcvd e-mail from the vessel. Verify at next inspection.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Engineering › Fuel Oil Storage/Transfer System › Gauge
Issued 18 October 2006 Resolved
Site glasses on starboard CPP port lube oil expansion tank is missing a valve and leaking. Replace the missing valves. 11/24/06: Rcvd e-mail from the vessel. Verify at next inspection.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Engineering › Diesel Engine (propulsion-reduction gear) › Crankcase
Issued 18 October 2006 Resolved
Crankcase overpressure alarm/shutdown switches: Switches are not working properly on port and starboard main engine. Replace switches during drydock. 11/24/06: Rcvd e-mail from the vessel. Verify at next inspection.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Fire Fighting › Fixed Fire Detection System › Heat Detectors
Issued 18 October 2006 Resolved
Heat gun for testing heat detectors is missing. Provide new blow dryer as required in the manufacturer's manual. 11/24/06: Rcvd e-mail from the vessel. Verify at next inspection.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Navigation › Piloting/Steering › Compass Deviation Table
Issued 18 October 2006 Resolved
Provide magnetic compass calibration and update deviation card after drydocking. 11/24/06: Rcvd e-mail from the vessel. Verify at next inspection.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Documentation › Certificates/Documents › Cargo Ship Safety Radio Certificate
Issued 18 October 2006 Resolved
Safety radio certificate onboard is expired. Vessel has repairs ongoing to TELEX. Vessel required to complete all repairs to GMDSS and complet Safety Radio survey. 11/24/06: Rcvd e-mail from the vessel. Verify at next inspection.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Documentation › Logs/Records › Oil Record Book
Issued 18 October 2006 Resolved
During record review, found that vessel did not have past oil record book covering 01SEP05 thru 19JUL06. The current ORB does not have entries for collection/disposal of oil residues; any records of bunkers for the hydraulic oil for the CPP system; nor any entries for the potential discharge of oil from the leaking CPP hub. Instructed vsl on proper ORB entries. Inspect thoroughly next year.
Action required: 705 - Other - as specified
Due 28 November 2007
Resolved 18 January 2008
Documentation › Logs/Records › Report of Marine Accident, Injury or Death
Issued 18 October 2006 Resolved
Vessel never made notification to the USCG of the leaking starboard CPP. Review of the engineering rough logs reveals that the vessel was leaking approx 1 gal/day from hub. Additionally, the vessel completed an emergency drydocking in Lagos, Nigeria to replace both prop shaft inboard seals without bothering to repair the leaking starboard CPP.
Action required: 705 - Other - as specified
Due 19 October 2006
Resolved 19 October 2006
Resolution: USCG discovered the problem.
Engineering › Lubricating Oil Service System › Gauge
Issued 1 December 2005 Resolved
Repair or replace the following inoperable gauges; port main engine lube oil, both generator RPM gauges and the port air receiver pressure gauge. * This item was reported as corrected by [name withheld] via e-mail dated 09 February 2006. Must be verified during next examination. *
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 18 October 2006
Engineering › Bilge Water Management System › Strainer
Issued 1 December 2005 Resolved
Install strainer on the bow-thruster bilge suction line. * This item was reported as corrected by [name withheld] via e-mail dated 09 February 2006. Must be verified during next examination. *
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 18 October 2006
Fire Fighting › Fixed CO2 Fire Extinguishing System › Piping
Issued 1 December 2005 Resolved
Replace the three kinked jacketed hoses in the CO2 room.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 18 October 2006
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 1 December 2005 Resolved
Label and install spindle valve handle near the fuel oil settling and service tanks shut-off valves. * This item was reported as corrected by [name withheld] via e-mail dated 09 February 2006. Must be verified during next examination. *
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 18 October 2006
Communications › Alarms/Indicators › Fire Alarm
Issued 1 December 2005 Resolved
Reattach the missing CO2 "door open" audible alarm in the bow thruster room. * This item was reported as corrected by [name withheld] via e-mail dated 09 February 2006. Must be verified during next examination. *
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 18 October 2006
Construction/Loadline › Structures › Door
Issued 1 December 2005 Resolved
Adjust dogs on the watertight doors so that they close securely. * This item was reported as corrected by [name withheld] via e-mail dated 09 February 2006. Must be verified during next examination. *
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 18 October 2006
Navigation › Piloting/Steering › Deviation Table/Graph
Issued 1 December 2005 Resolved
Place a current deviation table aboard the vessel. * This item was reported as corrected by [name withheld] via e-mail dated 09 February 2006. Must be verified during next examination. *
Due 28 February 2007
Resolved 18 October 2006
Lifesaving › Lifebuoys › Self-Activitating Smoke Signals
Issued 1 December 2005 Resolved
Replace the existing bridge wing life rings with a life of sufficient mass to operate the quick release arrangement. * This item was reported as corrected by [name withheld] via e-mail dated 09 February 2006. Must be verified during next examination. *
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 18 October 2006
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 27 January 2005 Resolved
Submit Automation test procedures for approval in accordance with 46 CFR 127.00 and 46 CFR 127.120. Increased manning to 1 Chief Engineer 2 Lic eng and three QMED's. 31 Jan05 Vessel automation test procedures were found onboard but proper test equipment is not on hand to complete test. 01Apr cleared via e-mail remain, open until cleared by Inspector.
Condition: Unknown
Action required: 705 - Other - as specified
Due 14 December 2005
Resolved 1 December 2005
Construction/Loadline › Penetrations › Gasket
Issued 27 January 2005 Resolved
Renew/replace all gasket material on main deck and bow. Item cleared via e-mail dated 01 Apr 05, item will remain opened until cleared by attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 December 2005
Resolved 1 December 2005
Engineering › Compressed Air System (control)
Issued 11 December 2003 Resolved
PROVIDE RELIEF VALVE OF PROPER SIZE FOR EMERGENCY FUEL SHUT OFF AIR RECEIVER. LEGACY COMPONENT DESC: Receiver/Bottle
Due 20 January 2004
Resolved 12 February 2004
Resolution: Received email notification that relief valve wasw installed and tested lon the air receiver. Verify at next visit to vessel.
Deck/Cargo › Ballast
Issued 11 December 2003 Resolved
MAKE PERMANENT REPAIRS TO ON OPERATIONAL REACH ROD IN THE FOR PEAK TANK, LOWER LEVEL. LEGACY COMPONENT DESC: Valves
Due 20 January 2004
Resolved 10 March 2004
Accommodation/Occupational Safety › Other Accommodation Spaces
Issued 11 December 2003 Resolved
ENCLOSE MAN HOLE/LIGHTERING HOLE IN MESS ROOM AND RESTORE TO A-60.
Due 20 January 2004
Resolved 10 March 2004
Lifesaving › Rescue Boat Equipment
Issued 11 December 2003 Resolved
TROUBLE SHOOT, MAKE PERMANENT REPAIRS AND PROVE PROPER OPERATION OF RESCUE MOTOR.
Action required: 17 - Rectify deficiencies prior to departure
Due 20 January 2004
Resolved 10 March 2004
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 28 August 2003 Resolved
replace fire ext by paint locker LEGACY COMPONENT DESC: Location
Condition: Unknown
Due 28 August 2003
Resolved 28 August 2003
Engineering › Fuel Oil Service System
Issued 28 August 2003 Resolved
Mark fuel oil shutdowns on stern
Condition: Design Flaw
Due 28 August 2003
Resolved 28 August 2003
Accommodation/Occupational Safety › Washroom/Toilet
Issued 28 August 2003 Resolved
Prove roper operation of OWS
Condition: Unknown
Due 28 August 2003
Resolved 28 August 2003
Engineering › Diesel Engine (propulsion/auxiliary-electric)
Issued 28 August 2003 Resolved
Prove proper operation of main prop alarms
Condition: Unknown
Due 28 August 2003
Resolved 28 August 2003
Engineering › Pressure Vessel
Issued 25 August 2003 Resolved
Provide testing documention of pressure releif valves for p-tanks. LEGACY COMPONENT DESC: Relief Valve
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 September 2003
Resolved 12 October 2003
Resolution: Completed via e-mail by boat captian Gregory J. Goodyard Lic#895961
Fire Fighting › Structural - A Class Divisions
Issued 1 September 2002 Resolved
Install closure devices for both Emergency Escape Doors out of engineroom. LEGACY COMPONENT DESC: Openings - Fire Doors
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 1 November 2002
Resolved 27 September 2002
Resolution: Received fax from [name withheld] (Lic No. 895961) stating that closure devices have been installed and are working properly.
Fire Fighting › Miscellaneous Items
Issued 1 September 2002 Resolved
Update Fire Control Plan and submit to Marine Safety Center for approval.
Condition: Unknown
Action required: 705 - Other - as specified
Due 1 November 2002
Resolved 24 May 2004
Resolution: Reviewed fire control plan. Plans approved with letter issued 24May04
Documentation › Certificates/Documents
Issued 7 January 2002 Resolved
Provide renewed SOLAS SAFETY RADIO CERT, issued by duly authorized FCC licensed person. LEGACY COMPONENT DESC: Cargo Ship Safety Radio Certificate
Due 8 March 2002
Resolved 22 March 2002
Resolution: Received faxed copy on new issued Radio cert. from company rep., added / updated vessel documents to reflect this.
Lifesaving
Issued 23 December 1998 Resolved
CONDUCT SATISFACTORY FIRE, ABANDON SHIP, AND MAN OVERBOARD DRILLS TO THE SATISFACTION OF THE ATTENDING COAST GUARD MARINE INSPECTOR._x001C_ _x001C_ SEE SOLAS 97 II-2/20.3 & III/18.3
Condition: Unknown
Due 10 January 1999
Resolved 6 January 1999
Documentation
Issued 23 December 1998 Resolved
PROVIDE FOR REVIEW ALL CREW LICENSES WITH STCW ENDORSEMENTS._x001C_ _x001C_ SEE STCW 95
Condition: Unknown
Due 10 January 1999
Resolved 6 January 1999
Deck/Cargo
Issued 23 December 1998 Resolved
PROVIDE PLAN REVIEW AND CARGO AUTHORIZATION FROM MARINE SAFETY CENTER FOR CARRIAGE OF NOXIOUS LIQUIDS SUBSTANCES PRIOR TO CARRIAGE ON INTERNATIONAL VOYAGES.
Condition: Unknown
Due 23 December 1998
Resolved 23 December 1998
Deck/Cargo
Issued 23 December 1998 Resolved
PROVIDE A CARGO RECORD BOOK PRIOR TO DOMESTIC OR INTERNATIONAL CARRIAGE OF NOXIOUS LIQUID SUBSTANCES (NLS) AS PER 46 CFR 125.120
Condition: Unknown
Due 23 December 1998
Resolved 23 December 1998
Deck/Cargo
Issued 23 December 1998 Resolved
PROVIDE AN A.B.S. APPROVED CARGO SECURING MANUAL._x001C_ (ITEM MUST BE COMPLETED PRIOR TO INTERNATIONAL VOYAGES)_x001C_ SEE SOLAS 97 VI/5
Condition: Unknown
Due 23 January 1999
Resolved 14 January 1999

Casualty record · 2

22 June 2003Significant Marine Casualty · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 1826257
18 May 2008Routine · role: Involved in a Marine Casualty · activity 3246087
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.