Records from 2016 to 2025. Most recent: inspection, 6 May 2025.
Documentation record
Registered dimensions (L × B × D)159.0 ft × 30.0 ft × 12.0 ft
Registered tonnagegross 98 / net 66
ITC dimensions (L × B × D)159.0 ft × 30.0 ft × 12.0 ft
ITC tonnagegross 357 / net 107
BuilderSWIFTSHIPS INC · MORGAN CITY LA, UNITED STATES · built 1998
Hull materialAluminum
PropulsionJet Drive
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portMORGAN CITY, LA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 12 January 2026 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it98 - Regulatory (Subpart C or D), Gross Ton
357 - Convention (Subpart B), Gross Ton
66 - Regulatory (Subpart C or D), Net Ton
107 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 11
6 May 2025
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 8131811
22 April 2024
Deficiency Check · Annual Inspection · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7897786
16 May 2023
Administrative Inspection · Annual Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7690004
31 May 2022
Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7463886
25 May 2022
Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7459288
25 May 2021
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7206050
13 April 2021
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7174284
14 November 2019
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6855474
6 November 2018
COI Inspection · Internal Structural Exam · Drydock Exam · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6575890
24 March 2017
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6111119
26 July 2016
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5954097
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 22 April 2024
Resolved
Fuel shutoff valves must be installed in the fuel supply lines to stop fuel flow when servicing accessories. The fuel shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located. The means to operate the fuel shutoff valve at the starboard tank connection from outside the space was insufficient to fully secure the valve. Ensure sufficient means to remotely secure valve in presence of marine inspector prior to departure.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 22 April 2024
Resolved 24 April 2024
Resolution: Operationally tested remote fuel shutoff and confirmed means to fully secure valve.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 22 April 2024
Resolved
The general construction of the vessel must be such as to minimize fire hazards. Several fuel leaks were noted in the fuel lines on the starboard #4 main engine.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 April 2024
Resolved 24 April 2024
Resolution: Observed operational test of #4 main engine and noted no fuel leaks.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 22 April 2024
Resolved
Provisions must be made for closing all supply duct cowls or scoops for a space protected by a fixed gas extinguishing system. Closure devices for port and starboard scoops/cowls serving the engine room were damaged/warped and unable to be securely fitted.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 April 2024
Resolved 24 April 2024
Resolution: Observed installation of scoops/cowls, confirmed straightened to ensure proper fit.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 April 2024
Resolved
Flexible nonmetallic hose used in lube oil, fuel oil, and fluid power systems must be fabricated with an inner tube and a cover of synthetic rubber or other suitable material reinforced with wire braid.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 May 2024
Resolved 24 April 2024
Resolution: Observed installation of approved non-metallic hoses.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 22 April 2024
Resolved
Piping conveying vapor, gas, or liquid, the temperature of which exceeds 150 degrees F, must be suitable insulated where necessary to prevent injuries. Lagging was missing on the #2 main engine exhaust, exposing personnel to hot surfaces.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 May 2024
Resolved 24 April 2024
Resolution: Observed installation of lagging in way of #2 main engine exhaust
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 May 2023
Resolved
Whenever damage or deterioration to hull plating or structural members that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structural examination in any affected space including fuel tanks, and may require the vessel to be drydocked or taken out of service to assess the extent of the damage, and to effect permanent repairs. Vessel is to repair the following deficiencies: leaking raw water pump, crack sea valve, and waste deck piping.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 11 July 2023
Resolved 11 July 2023
Resolution: Vessel repaired all deficiencies.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 25 May 2022
Resolved
Each vessel must be equipped with at least two operable portable battery lights. One of these lights must be located at the operating station and the other at the access to the propulsion machinery space. Flashlight in pilot house in chart table drawer, found ioperable. Flashlight for engine room found in galley not stowed properly. Mount flashlights IAW regulation cited and supply working batteries.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2022
Resolved 26 May 2022
Resolution: Flashlights installed. OPTEST SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 May 2022
Resolved
Where an exhaust pipe passes through a watertight bulkhead, the watertight integrity of the bulkhead must be maintained. Port side outboard main exhaust-to-hull weld covered with epoxy to repair crack. Grind and re-weld.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2022
Resolved 31 May 2022
Resolution: Weld repaired.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 25 May 2022
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following: Inspection of all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather decks. Crack near rescue platfrom door where bulwark is welded to deck. Grind and re-weld.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2022
Resolved 31 May 2022
Resolution: Crack welded. Reapir complete.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 May 2022
Resolved
Fuel lines must be accessible, protected from mechanical injury, and effectively secured against excessive movement and vibration by the use of soft nonferrous metal straps which have no sharp edges and are insulated to protect against corrosion. Where passing through bulkheads, fuel lines must be protected by close fitting ferrules or stuffing boxes. All fuel lines and fittings must be accessible for inspection. Secure fuel piping from excessive vibration port, inboard main engine.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2022
Resolved 31 May 2022
Resolution: Fuel lines secured with installed support bracket.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 25 May 2022
Resolved
The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets and immersion suits. Stowage area under seats and fwd cabinet not properly labeled.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2022
Resolved 31 May 2022
Resolution: Lifejacket placards installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 25 May 2022
Resolved
Electrical equipment used in the following locations must be dripproof:
(1) A machinery space. Missing drip shields on fwd port and stbd battery chargers. Install drip shields.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2022
Resolved 26 May 2022
Resolution: Drip shields installed.
Documentation › Manuals/Policy Documentation › Vessel Specific Watch Policy/Procedures
Issued 26 July 2016
Resolved
SUBMIT DP TRIALS TO MSC FOR FINAL APPROVAL AND PROVIDE UPDATED OPERATIONS MANUAL PER MSC LETTER E2-1303841 DATED 13NOV13. NO DP OPERATIONS UNTIL DP TRIALS AND FINAL APPROVAL FROM MSC. SYSTEMS NOT APPROVED. 46 CFR 182.220
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 17 January 2019
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 26 July 2016
Resolved
DETERIORATING LINE ON 03 LIFEBUOYS. NEED REPLACEMENT. 46 CFR 180.70
Condition: Invalid
Action required: 705 - Other - as specified
Due 5 August 2016
Resolved 1 August 2016