Records from 1998 to 1999. Most recent: inspection, 27 January 1999.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Lifesaving
Issued 8 September 1998
Resolved
Provide machinery guards to cover power take off hub for the port and starboard ship service generators.
Condition: Unknown
Due 17 October 1998
Resolved 17 October 1998
Lifesaving
Issued 8 September 1998
Resolved
Port lifeboat, repair/replace the middle shive on the forward davit arm andthe first shive outboard of teh winch on the forward davit arm. To be completed to the satisfacto of the class society. SOLAS 74 amended III/19.
Condition: Unknown
Due 2 December 1998
Resolved 2 December 1998
Lifesaving
Issued 8 September 1998
Resolved
Store all compressed gas cyclinders in proper storage racks in accordance with 46 CFR 147.60(b).
Condition: Unknown
Due 17 October 1998
Resolved 17 October 1998
Deck/Cargo
Issued 5 August 1998
Resolved
PROVIDE VERIFICATION FROM THE CLASSIFICATION SOCIETY THAT THE MODIFICATION TO CARGO PIPING VALVE CONTROL SYSTEM AND CARGO CONTROL PANEL INDICATOR SYSTEMS ARE APPROVED BY CLASS.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Deck/Cargo
Issued 7 July 1998
Resolved
Repair all piping, valves and supports of hydraulic system on deck.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Documentation
Issued 7 July 1998
Resolved
Fullfill class conditions (1-4) attached to Safety Construction certificatedated 21 June 98.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Electrical
Issued 7 July 1998
Resolved
Repair pump room lighting at first ladder.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Deck/Cargo
Issued 7 July 1998
Resolved
PROVIDE OIL TRANSFER PROCEDURES IN ACCORDANCE WITH 33 CFR 155.750._x001C_
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Electrical
Issued 7 July 1998
Resolved
Ensure all on deck wiring is not exposed.
Condition: Unknown
Due 5 August 1998
Resolved 5 August 1998
Navigation
Issued 7 July 1998
Resolved
PROVIDE REVOLUTION RATE INDICATOR FOR SHAFT.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Navigation
Issued 7 July 1998
Resolved
PROVIDE PITCH INDICATOR ON BRIDGE FOR PROPELLER.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Deck/Cargo
Issued 7 July 1998
Resolved
Ensure hydraulic systems control lines are leak free, specifically those just forward of the house.
Condition: Unknown
Due 9 September 1998
Resolved 9 September 1998
Deck/Cargo
Issued 7 July 1998
Resolved
ENSURE HYDRAULIC VALVES IN PUMPROOM ARE FREE OF LEAKAGE
Condition: Unknown
Due 5 August 1998
Resolved 5 August 1998
Deck/Cargo
Issued 7 July 1998
Resolved
REPAIR GAPS IN DECK COAMING CONTAINMENT.
Condition: Unknown
Due 5 August 1998
Resolved 5 August 1998
Documentation
Issued 7 July 1998
Resolved
PROVIDE OIL DISCHARGE PLACARD(S).
Condition: Unknown
Due 5 August 1998
Resolved 5 August 1998
Navigation
Issued 7 July 1998
Resolved
FULFILL RECOMMENDATIONS OF CLASS ATTACHED TO SAFETY EQUIPMENT CERTIFICATED DATED 21JUN98.
Condition: Unknown
Due 5 August 1998
Resolved 5 August 1998
Navigation
Issued 7 July 1998
Resolved
FIT SHIP WITH GYRO COMPASS AS PER SOLAS 74 AMD REG V/12 AND RECOMMENDATION OF CLASS.
Condition: Unknown
Due 5 August 1998
Resolved 5 August 1998
Lifesaving
Issued 7 July 1998
Resolved
REPLACE LIFEBOAT FALLS (AS PER CONDITION OF CLASS)._x001C_
Condition: Unknown
Due 5 August 1998
Resolved 5 August 1998
Lifesaving
Issued 7 July 1998
Resolved
Prove proper operation of EPIRB (test light will not come on)._x001C_
Condition: Unknown
Due 5 August 1998
Resolved 5 August 1998
Fire Fighting
Issued 7 July 1998
Resolved
Provide additional hangers on sprinkler pipe in paint locker.
Condition: Unknown
Due 5 August 1998
Resolved 5 August 1998
Lifesaving
Issued 7 July 1998
Resolved
Date and record change of lifeboat drinking water.
Condition: Unknown
Due 5 August 1998
Resolved 5 August 1998
Deck/Cargo
Issued 7 July 1998
Resolved
Repair indicator lights on cargo control panel. ensure all indicate proper opening and closing of remote control cargo valves and operation of RPM gauges for cargo pumps.
Condition: Unknown
Due 5 August 1998
Resolved 5 August 1998
Deck/Cargo
Issued 7 July 1998
Resolved
Ensure anchor chain stop for starboard anchor fits properly.
Condition: Unknown
Due 5 August 1998
Resolved 5 August 1998
Construction/Loadline
Issued 7 July 1998
Resolved
Ensure valves to ballast tank strainer closes properly and is leak free.
Condition: Unknown
Due 5 August 1998
Resolved 5 August 1998