Records from 1982 to 1996. Most recent: inspection, 22 May 1996.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 118
22 May 1996
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1085303
12 October 1995
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1407559
12 August 1995
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 381656
1 April 1995
Damage Survey
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1360056
19 March 1995
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 23602
3 October 1994
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1178594
12 September 1994
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1469108
15 May 1994
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 220158
15 April 1994
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 857549
25 December 1993
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 218785
22 September 1993
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1379859
7 September 1993
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 834836
11 May 1993
Examination of Repairs
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1389659
2 March 1993
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1382532
19 December 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1393885
12 October 1992
COI Inspection · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 950475
14 July 1992
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 952203
20 May 1992
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 945044
1 May 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 60721
7 April 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 104880
26 March 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1265820
3 February 1992
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1260261
27 January 1992
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1267403
26 January 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 5732
23 January 1992
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1260226
11 January 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 166386
4 January 1992
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1257202
27 December 1991
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 37443
23 December 1991
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 944940
5 November 1991
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 75993
1 November 1991
Damage Survey
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 940006
23 October 1991
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 133699
22 October 1991
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 146334
7 October 1991
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 346254
3 October 1991
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 938681
3 October 1991
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 940031
16 April 1991
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 907235
20 March 1991
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 924953
14 February 1991
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1219659
6 February 1991
Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1214534
10 December 1990
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 924309
5 December 1990
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 920089
2 November 1990
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 918083
2 November 1990
COI Inspection · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1228385
28 July 1990
Examination of Repairs
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1225616
6 June 1990
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1212334
31 May 1990
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 909594
14 March 1990
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1221843
20 February 1990
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 463328
12 January 1990
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 928040
14 November 1989
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1212243
9 November 1989
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1213420
15 October 1989
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 917634
5 September 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 886572
24 August 1989
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1032331
7 July 1989
Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 537617
17 May 1989
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1343410
11 May 1989
Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 891583
16 March 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 894604
6 March 1989
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1197739
7 February 1989
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1037077
19 January 1989
Administrative
Administrative · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 889807
5 January 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1045048
3 January 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1346992
10 November 1988
Re-Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1207979
7 November 1988
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 892258
11 August 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1345030
18 June 1988
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 926577
18 June 1988
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1205055
17 May 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1205230
11 March 1988
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1338250
1 February 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1018014
11 January 1988
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1012004
20 November 1987
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1333142
16 November 1987
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1331549
7 November 1987
Hull Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1026857
7 November 1987
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1335975
22 October 1987
MARPOL Annex II Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1334591
16 August 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1002732
10 August 1987
Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1336888
17 July 1987
Drydock Extension
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1019867
6 July 1987
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1318871
15 June 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1316031
12 June 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1309796
9 April 1987
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1330706
7 April 1987
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 315262
9 February 1987
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1012312
24 December 1986
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1003460
23 November 1986
Deficiency Check
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1325871
7 November 1986
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1022389
16 September 1986
Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1026640
16 September 1986
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1315727
28 August 1986
Type not recorded
No type recorded · COTP NEW HAVEN · USCG Northeast District (CGD-NE) · Activity 464140
28 August 1986
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1004617
29 April 1986
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1003233
1 March 1986
Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 307240
27 February 1986
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1300240
25 February 1986
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 988293
10 January 1986
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 994199
13 December 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 993955
9 November 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 992244
16 September 1985
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1300121
1 July 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 979180
26 June 1985
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1290794
19 June 1985
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 983010
11 June 1985
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1291683
8 June 1985
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 533467
1 February 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 978620
24 January 1985
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 978767
23 November 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 974585
30 August 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1283445
7 August 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 975961
12 September 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 969341
10 September 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1276142
9 September 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 975514
3 August 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 970631
23 August 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 964008
23 January 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1275570
Engineering
Issued 12 October 1995
Resolved
REPAIR/REPLACE AND PROVE PROPER OPERATION OF THE PORT AND STBD SETTLER TANKS HIGH AND LOW LEVEL ALARMS.
Condition: Unknown
Due 5 November 1995
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Engineering
Issued 12 September 1994
Resolved
CONDUCT AN OVERSPEED TRIP TEST OF THE MAIN TURBINE WHILE AT SEA, LOG THE DATE, TIME AND LOCATION OF TRIP TEST AND THE PARAMETERS OF THE TEST.
Condition: Unknown
Due 12 September 1994
Resolved 12 September 1994
Engineering
Issued 2 March 1993
Resolved
MAKE PERMANENT REPAIRS TO STBD BOILER BY RENEWING PLUGGED TUBES (MIN. OF 77GENERATING)
Condition: Unknown
Due 2 March 1993
Resolved 2 March 1993
Engineering
Issued 19 December 1992
Resolved
PROVE PROPER OPERATION OF ENGINE ROOM VENTILATION SHUTDOWNS.
Condition: Unknown
Due 19 December 1992
Resolved 19 December 1992
Accommodation/Occupational Safety
Issued 19 December 1992
Resolved
SUBMIT PLANS TO MSC FOR ADDITIONAL BERTHS IN CADET STATEROOMS, IN REGARDS TO 46CFR REQUIREMENTS FOR SQUARE FOOTAGE, LOCKERS AND BERTH LIGHTS.
Condition: Unknown
Due 19 December 1992
Resolved 19 December 1992
Fire Fighting
Issued 12 October 1992
Resolved
PROPERLY STENCIL FIRE HOSES.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Navigation
Issued 12 October 1992
Resolved
PROVE PROPER OPERATION OF AUDIBLE ALARM ON BRIDGE OF STEERING GEAR FAILURE.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Lifesaving
Issued 12 October 1992
Resolved
PROVE PROPER OPERATION OF WINCH TO RETREIVE STARBOARD LIFEBOAT.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Fire Fighting
Issued 12 October 1992
Resolved
PROVE PROPER WATER CIRCULATION AT FIRE STATIONS 26 AND 27.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Deck/Cargo
Issued 12 October 1992
Resolved
SUBMIT PLANS FOR BALLAST PIPING MODIFICATIONS.
Condition: Unknown
Due 17 December 1992
Resolved 17 December 1992
Engineering
Issued 12 October 1992
Resolved
PROPERLY REPAIR PIPING IN WAY OF SOFTPATCH IN PIPING FOR FRESH DRAIN PUMP DISCHARGE TO DISTILLED WATER TANK.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Accommodation/Occupational Safety
Issued 12 October 1992
Resolved
INSURE BOTH CADET STATEROOMS, WHERE 2 MORE BERTHS HAVE BEEN ADDED, MEET THEREQUIREMENTS OF 46 CFR 92.20-20 IN REGARDS TO SQUARE FOOTAGE, LOCKERS AND 46 CFR 111.75-15(D) FOR BERTH LIGHTS.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Electrical
Issued 12 October 1992
Resolved
PROPERLY REMOVE OR DEADEND WIRING LOCATED ABOVE BILGE MANIFOLD ON THE PORT SIDE OF LOWER ENGINE ROOM.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Accommodation/Occupational Safety
Issued 12 October 1992
Resolved
RENEW LADDER LANDING PLATE AND ASSOCIATED FRAMING ON STARBOARD SIDE OF LOWER ENGINE ROOM.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Engineering
Issued 12 October 1992
Resolved
PROPERLY CAP/PLUG/REMOVE PIPING FOR REMOVED EVAPORATOR.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Electrical
Issued 12 October 1992
Resolved
PROPERLY REMOVE OR DEADEND ALL WIRING FOR REMOVED EVAPORATOR.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Engineering
Issued 12 October 1992
Resolved
PROVIDE MECHANICAL CLOSURES FOR ALL MAIN DECK CONTAINMENT.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Fire Fighting
Issued 12 October 1992
Resolved
PROVIDE PROPER APPLICATOR BRACKETS FOR ALL PORTABLE FIRE EXTINQUISHERS.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Deck/Cargo
Issued 12 October 1992
Resolved
PROVE PROPER OPERATION OF STARBOARD WINCH ON FANTAIL.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Lifesaving
Issued 12 October 1992
Resolved
INSTALL AND PROVE PROPER OPERATION OF EMBARKATION LIGHT FOR PORT LIFEBOAT.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Construction/Loadline
Issued 12 October 1992
Resolved
RENEW GASKETS TO MANHOLE ACCESS TRUNK HATCHES ON MAIN DECK.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Fire Fighting
Issued 12 October 1992
Resolved
PROPERLY SEAL THE WIRE RUN PENETRATING THE DECK BETWEEN THE STAIR TOWER ANDTHE BRIDGE.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Construction/Loadline
Issued 12 October 1992
Resolved
PROVE PROPER OPERATION OF THE #2 BILGE AND BALLAST PUMP.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Fire Fighting
Issued 12 October 1992
Resolved
PROVE PROPER OPERATION OF ENGINE ROOM VENTILATION SHUTDOWNS.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Engineering
Issued 12 October 1992
Resolved
REPAIR AUTOMIZING STEAM RELIEF VALVE.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Fire Fighting
Issued 12 October 1992
Resolved
PROVE PROPER OPERATION OF EMERGENCY GENERATOR ROOM VENT CLOSURE.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Construction/Loadline
Issued 12 October 1992
Resolved
RENEW WASTED BRACKETS FOR HYDRAULIC LINES LOCATED IN PIPE TUNNEL.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Electrical
Issued 12 October 1992
Resolved
PROPERLY REPAIR WIRING ON FANTAIL AND PROVE PROPER OPERATION OF HIGH LEVEL ALARMS FOR AFT PEAK AND SETTLER TANKS.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Construction/Loadline
Issued 12 October 1992
Resolved
RENEW GASKETS ON GOOSENECK VENTS ON FANTAIL.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Accommodation/Occupational Safety
Issued 12 October 1992
Resolved
REPAIR ALL RECIRCULATION VENTS IN ACCOMMONDATION SPACES.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Construction/Loadline
Issued 12 October 1992
Resolved
PROPERLY REPAIR STORAGE CONTAINERS FOR DAYSHAPES LOCATED AFT OF BRIDGE.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Accommodation/Occupational Safety
Issued 12 October 1992
Resolved
REMOVE OR PROVE PROPER OPERATION OF THE INCINERATOR.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Lifesaving
Issued 12 October 1992
Resolved
PROVIDE 25 COAST GUARD APPROVED IMMERSION SUITS.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Engineering
Issued 12 October 1992
Resolved
PROVE PROPER OPERATION OF THE FORCED DRAFT FAN PRESSURE DIFFERENTIAL SWITCH.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Fire Fighting
Issued 12 October 1992
Resolved
PROVE PROPER OPERATION OF FIRE SCREEN DOORS IN STAIR TOWER.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Fire Fighting
Issued 12 October 1992
Resolved
PROPERLY NUMBER ALL PORTABLE FIRE EXTINQUISHERS.
Condition: Unknown
Due 12 October 1992
Resolved 12 October 1992
Documentation
Issued 12 October 1992
Resolved
SUBMIT PLANS FOR NEW EVAPORATOR INSTALLATION.
Condition: Unknown
Due 17 December 1992
Resolved 17 December 1992
Navigation
Issued 3 February 1992
Resolved
MAKE PERMANENT REPAIRS TO VESSEL'S RUDDER SLIPPING PROBLEMS PRIOR TO DEPARTING PORT OF GDANSK, POLAND. SUBMIT ABS REPAIR REPORT UPON COMPLETION OF REPAIRS TO [name withheld].
Condition: Unknown
Due 3 February 1992
Resolved 3 February 1992
Construction/Loadline
Issued 27 January 1992
Resolved
EFFECT PERMANENT REPAIRS TO SIDESHELL LIN #5 STARBOARD SWB TANK AT FRAME 157. PERMANENT REPAIRS TO BE COMPLETED NO LATER THAN NEXT CREDIT HULL EXAM.
Condition: Unknown
Due 27 January 1992
Resolved 27 January 1992
Electrical
Issued 4 January 1992
Resolved
REPAIR AND PROVE OPERATION OF THE EMERGENCY GENERATOR OVERSPEED TRIP, ALSO DEMONSTRATE OPERATION OF THE LOW LUBE OIL PRESSURE AND J/W TEMPERATURE ALARMS.
Condition: Unknown
Due 4 January 1992
Resolved 4 January 1992
Unknown
Issued 4 January 1992
Resolved
REPAIR INCINERATOR AS NECESSARY AND DEMONSTRATE PROPER OPERATION OF ALL SAFETY DEVICES AS PER OPERATING MANUAL.
Condition: Unknown
Due 4 January 1992
Resolved 4 January 1992
Construction/Loadline
Issued 4 January 1992
Resolved
MAKE REPAIRS AND PROPERLY ADJUST THE QAWTD ACCESS TO THE STEERING GEAR ROOMFROM THE AFT MAIN DECK.
Condition: Unknown
Due 4 January 1992
Resolved 4 January 1992
Electrical
Issued 4 January 1992
Resolved
REPAIR FOCS'LE LIGHT RECEPTICALS(NUMEROUS LOCATIONS THROUGH OUT), GLOBES AND GUARDS INSTALLED WHERE MISSING.
Condition: Unknown
Due 4 January 1992
Resolved 4 January 1992
Construction/Loadline
Issued 4 January 1992
Resolved
REPAIR WASSTED BALLAST TANK VENT PIPING LOCATED ON THE MAIN CARGO DECK FOR THE FORWARD VENTS (NUMEROUS LOCATIONS).
Condition: Unknown
Due 4 January 1992
Resolved 4 January 1992
Fire Fighting
Issued 4 January 1992
Resolved
REPAIR AND DEMONSTRATE OPERATION OF THE CARGO DECK FOAM MONITORS TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR. ALSO PROVIDE COPY OF LAST FOAM ANALSYS REPORT AND MARK FOAM TANK WITH TEST DATE.
Condition: Unknown
Due 4 January 1992
Resolved 4 January 1992
Deck/Cargo
Issued 4 January 1992
Resolved
PROVE OPERATION OF THE OIL DISCHARGE MONITOR, ODM SAMPLING PUMP AND SYSTEM OPERATION IAW THE APPV'D OPERATIONS MANUAL.
Condition: Unknown
Due 4 January 1992
Resolved 4 January 1992
Lifesaving
Issued 4 January 1992
Resolved
PROVIDE THREE (3) PORTABLE LIFEBOAT EMERGENCY RADIOS TO MEET THE SOLAS '83 AMENDMENTS REQUIREMENT OF CHAPTER III, PART B REQULATION 6.2.1 AND CHAPTER IV REGULATION 14.
Condition: Unknown
Due 4 January 1992
Resolved 4 January 1992
Lifesaving
Issued 23 December 1991
Resolved
HAVE AFT 20 PERSON VIKING LIFERAFT (SER#J/05986) SERVICED AT A USCG APPROVED FACILITY AT FIRST U.S. PORT OF CALL. RAFT SERVICED AT UNAPPROVED FACILITY IN NOV 91. SUBMIT COPY OF SERVICING CERTIFICATE TO [name withheld] TO CLEAR THIS REQUIREMENT.
Condition: Unknown
Due 23 December 1991
Resolved 23 December 1991
Construction/Loadline
Issued 1 November 1991
Resolved
EFFECT PERMANENT REPAIRS TO SIDESHELL IN #5 STARBOARD SWB TANK AT FRAME_x001C_ 157. PERMANENT REPAIRS TO BE COMPLETED NO LATER THAN NEXT CREDIT HULL EXAM._x001C_ _x001C_
Condition: Unknown
Due 1 November 1991
Resolved 1 November 1991
Construction/Loadline
Issued 1 November 1991
Resolved
PROVIDE TO [name withheld] A COPY OF THE VESSEL'S OFFICIAL LOG STATING THAT _x001C_SWB TANK #5 STARBOARD WAS ENTERED, AND THE TEMPORARY REPAIRS ARE ADEQUATE._x001C__x001C_ _x001C_
Condition: Unknown
Due 1 November 1991
Resolved 1 November 1991
Construction/Loadline
Issued 20 March 1991
Resolved
COMPLETE REPAIRS TO PORT POTABLE WATER TANK IN ACCORDANCE WITH REPAIR PROPOSAL OF 15MAR91. REPAIRS SHALL BE TO SATISFACTION OF ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 20 March 1991
Resolved 20 March 1991
Accommodation/Occupational Safety
Issued 6 February 1991
Resolved
SUBMIT REPAIR PROPOSAL FOR REPAIRS TO PORT POTABLE WATER TANK WHERE BOTTOM PLATING AND FRAMING ARE BOWED (TANK IS NOT INTEGRAL TO HULL).
Condition: Unknown
Due 6 February 1991
Resolved 6 February 1991
Construction/Loadline
Issued 5 December 1990
Resolved
COMPLETE FILLET WELD TO UNDERSIDE OF STRENGTH MEMBER BETWEEN FWD BLHD AND 1ST DEEPFRAME IN #1PT DOUBLEBOTTOM BLT TK, ALSO INSERT WASTED CARGO HOLD LONG #1 BTWN FR#1&2. RENEW LWR HULL PLATE STIFFENER & LONG #1 IN FR#2 LOCATED IN #1ST DOUBLEBOTTOM BALLAST TK.
Condition: Unknown
Due 5 December 1990
Resolved 5 December 1990
Electrical
Issued 2 November 1990
Resolved
THE AUX DIESEL GENERATOR MAY NOT BE ABLE TO CARRY THE REQUIRED AT-SEA HOTELAND CARGO SERVICE LOADS AS WELL AS SIMULTANEOUSLY MANEUVER THE VESSEL. SUBMIT TO THE MSC A DETAILED PROPOSAL FOR BRINGING THE VESSEL INTO COMPLIANCE WITH ELECTRICAL ENGINEERING REGULATIONS._x001C_
Condition: Unknown
Due 2 November 1990
Resolved 2 November 1990
Construction/Loadline
Issued 2 November 1990
Resolved
Properly repair/renew wasted & fractured portions of ladder manholes leading from wing tanks to double bottoms in #1 and 9 port and starboard wing tank/dobule bottoms.
Condition: Unknown
Due 2 November 1990
Resolved 2 November 1990
Accommodation/Occupational Safety
Issued 2 November 1990
Resolved
Prove proper operation of remote ventilation stop from bridge.
Condition: Unknown
Due 2 November 1990
Resolved 2 November 1990
Construction/Loadline
Issued 2 November 1990
Resolved
Properly repair wasted portion of sidelong/ladder landing in #1 port doublebottom.
Condition: Unknown
Due 2 November 1990
Resolved 2 November 1990
Deck/Cargo
Issued 2 November 1990
Resolved
Prove proper operation of the cargo/ballast monitor.
Condition: Unknown
Due 2 November 1990
Resolved 2 November 1990
Electrical
Issued 2 November 1990
Resolved
Replace port and starboard lifeboat motor controllers.
Condition: Unknown
Due 2 November 1990
Resolved 2 November 1990
Construction/Loadline
Issued 2 November 1990
Resolved
Renew wasted section of goosenect vent pipe to MSD tank and renew wasted_x001C_ sections of goosenect vent pipe to #9 port double bottom.
Condition: Unknown
Due 2 November 1990
Resolved 2 November 1990
Electrical
Issued 2 November 1990
Resolved
Provide flame inpingement bowls for fuel oil filters on the emergency_x001C_ diesel generator.
Condition: Unknown
Due 2 November 1990
Resolved 2 November 1990
Accommodation/Occupational Safety
Issued 2 November 1990
Resolved
Submit copy of incinerator instruction manual to Coast GUard for approval_x001C_ and prove proper operation of incinerator shutdowns.
Condition: Unknown
Due 2 November 1990
Resolved 2 November 1990
Accommodation/Occupational Safety
Issued 2 November 1990
Resolved
Provide relief valve hand relieving gear and test relief valves on the_x001C_ forward and stack air receivers.
Condition: Unknown
Due 2 November 1990
Resolved 2 November 1990
Construction/Loadline
Issued 2 November 1990
Resolved
Properly repair fracture between aft peak void and port settler tank.
Condition: Unknown
Due 2 November 1990
Resolved 2 November 1990
Construction/Loadline
Issued 2 November 1990
Resolved
Properly repair/renew wasted & fracture portions of longitudinal stiffenersjoining double bottom & cargo tank buikhead in #1 starboard double bottom, #1C from bottom and first four from top._x001C_
Condition: Unknown
Due 2 November 1990
Resolved 2 November 1990
Deck/Cargo
Issued 2 November 1990
Resolved
Hydrostatically test all deck cargo piing to 1.5 MAWP; prove operation of _x001C_cargo relief valve and prove operation of cargo pump pressure gauge to _x001C_ within 10%.
Condition: Unknown
Due 2 November 1990
Resolved 2 November 1990
Deck/Cargo
Issued 2 November 1990
Resolved
Complete satisfactory test of all cargo pump overspeeds and remote shut-_x001C_ downs.
Condition: Unknown
Due 2 November 1990
Resolved 2 November 1990
Electrical
Issued 2 November 1990
Resolved
Replace proper EYS poured fittings for stripping line and #2 header_x001C_ controllers on the port side manifold.
Condition: Unknown
Due 2 November 1990
Resolved 2 November 1990
Deck/Cargo
Issued 2 November 1990
Resolved
Complete satisfactory internal examination and operational test of IGS.
Condition: Unknown
Due 2 November 1990
Resolved 2 November 1990
Engineering
Issued 6 June 1990
Resolved
PERFORM HYDROSTATIC TEST OF 6" DIA. X 3' SECTION OF STEAM PIPE AFT OF PORT BULKHEAD STEAM STOP IN MAIN STEAM LINE, SAID SECTION HAVING BEEN REPAIRED BY WELDING ON 9 JUN 90. THE HYDROSTATIC TEST IS TO BE PERFORMED TO THE SATISFACTION OF THE COGNIZANT [name withheld] 30NOV90 OR NEXT DD, WHICHEVER IS FIRST.
Condition: Unknown
Due 6 June 1990
Resolved 6 June 1990
Engineering
Issued 6 June 1990
Resolved
EFFECT PERMANENT REPAIRS TO THREE FT SECTION OF 6 IN. LINE AFT OF PORT BULKHEAD STEAM STOP IN MAIN STEAM LINE PRIOR TO DEPARTURE FROM NEW ORLEANS TO SATISFACTION OF THE COGNIZANT [name withheld] TO BE CONDUCTED NOT LATER THAN 30NOV90.
Condition: Unknown
Due 6 June 1990
Resolved 6 June 1990
Lifesaving
Issued 15 October 1989
Resolved
REPLACE 18 RING BUOYS TEMPORARILY REPAIRED FOR ONE VOYAGE TO U.S. PORT.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Lifesaving
Issued 15 October 1989
Resolved
SERVICE BOTH LIFEBOATS UPON ARRIVAL IN NEXT U.S. PORT OR LATEST BY 30 NOVEMBER 1989.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Lifesaving
Issued 15 October 1989
Resolved
REPLACE CONDEMNED EXPOSURE SUITS TO NUMBER 37 TOTAL. UNTIL SUITS ARE REPLACED, 28 TOTAL PERSONS ALLOWED ONBOARD WHILE VESSEL OPERATES IN WATERS AS PER 46 CFR 94.41-1.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Lifesaving
Issued 15 October 1989
Resolved
REPLACE ONE MISSING BUOYANT ROCKET FOR LINE THROWING GUN.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Deck/Cargo
Issued 15 October 1989
Resolved
RENEW/REPLACE LEAKING DRESSER COUPLINGS FOR 8 INCH STRIPPING LINES IN WAY OF PORT AND STARBOARD OF #9 AND STARBOARD SIDE OF #8 CARGO TANKS.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Navigation
Issued 15 October 1989
Resolved
INSTALL ARPA AS PER 33 CFR 164.38.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Electrical
Issued 15 October 1989
Resolved
MAKE PERMANENT REPAIR TO STUFFING TUBE FOR POWER CABLE TO EMERGENCY FIRE PUMP PASSING THROUGH FORWARD BULKHEAD OF FOAM ROOM ON CARGO DECK SIDE.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Fire Fighting
Issued 15 October 1989
Resolved
PROVE PROPER OPS OF CO2 ACTIVATED PRESSURE SWITCH SHUTDOWN FOR EMERGENCY GENERATOR & VENT LOUVER CLOSURE. ALSO PROVE PROPER OPS OF FLAME ACTIVATED CO2 RELEASE MECHANISM IN EMER. GENERATOR RM. LIVE FIRE WATCH IS TO BE POST-ED FOR EMER. GENERATOR RM WHILE UNIT IS OPERATING UNTIL CORRECTIONS MADE.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Fire Fighting
Issued 15 October 1989
Resolved
REPLACE PORTABLE FIRE EXTINGUISHER BRACKETS AT STATIONS #3, 4, 19 AND 21A.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Lifesaving
Issued 15 October 1989
Resolved
RENEW RUDDER PINS ON PORT AND STARBOARD LIFEBOATS.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Lifesaving
Issued 15 October 1989
Resolved
RENEW WASTED, OR OTHERWISE RE-SECURE GRABRAILS ON PORT AND STARBOARD LIFEBOATS.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Lifesaving
Issued 15 October 1989
Resolved
REPLACE WASTED SEA AND BOAT PAINTERS FOR PORT AND STARBOARD LIFEBOATS.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Engineering
Issued 15 October 1989
Resolved
DEMONSTRATE PROPER OPERATION OF OILY WATER SEPARATOR SYSTEM. SOLENOID TO DIRECTIONAL CONTROL VALVE IS OPERABLE.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Deck/Cargo
Issued 15 October 1989
Resolved
MAKE PERMANENT REPAIR TO INERT GAS GENERATOR FUEL SUPPLY LINE IN IGG ROOM IAW 46 CFR 56.97-40 AND 56.50-65(E).
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Navigation
Issued 15 October 1989
Resolved
REPAIR/REPLACE PORT AND CENTER WINDOW WIPERS ON PILOT HOUSE FORWARD WIND SHIELD.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Navigation
Issued 15 October 1989
Resolved
REPAIR/REPLACE MAGNIFYING GLASS (SPIDER) FOR STEERING GYRO REPEATER ON BRIDGE CONSOLE.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Deck/Cargo
Issued 15 October 1989
Resolved
TEST CARGO PUMP EMERGENCY SHUTDOWN AT FIRST U.S. PORT.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Deck/Cargo
Issued 15 October 1989
Resolved
DEMONSTRATE PROPER OPERATION OF HIGH TEMPERATURE AND DECK WATER SEAL ALARMSAND SHUTDOWNS FOR INERT GAS SYSTEM.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Electrical
Issued 15 October 1989
Resolved
DEMONSTRATE PROPER OPERATION OF EMERGENCY GENERATOR STARTING SYSTEM BY WAY OF EMERGENCY BATTERY AND AUTO START SEQUENCE.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Engineering
Issued 15 October 1989
Resolved
PROVIDE PLAN REVIEW, INCLUDING WELDER'S PROCEDURES AND QUALIFICATIONS AND PROPER TESTS REQUIRED BY 46 CFR 56.97 AND 56.95 FOR NEWLY INSTALLED AIR COMPRESSOR AND PACKAGED RECEIVER MADE BY SULLAIR CORP.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Engineering
Issued 15 October 1989
Resolved
PROVIDE HEAT SHIELD AND REPAIR FUEL LEAKS ON FUEL OIL FILTERS FOR AUXILIARYAND EMERGENCY DIESEL GENERATORS.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Engineering
Issued 15 October 1989
Resolved
UPON PERMANENT REPAIR OF MACHINERY SPACE MAIN SUPPLY FAN DEMONSTRATE PROPEROPERATION OF MACHINERY SPACE REMOTE SHUTDOWNS INCLUDING FUEL TRANSFER AND SERVICE PUMPS.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Electrical
Issued 15 October 1989
Resolved
REFABRICATE BATTERY STORAGE SHELVES AND BOXES IN STORAGE ROOM TO PROPERLY SUPPORT THE NEW BATTERIES IN ACCORDANCE WITH 46 CFR 111.15 STORAGE ROOM HASPOWER VENTILATION WITHOUT SUPPLY VENTS.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Lifesaving
Issued 15 October 1989
Resolved
REPLACE ONE HAND HELD FLARE IN STARBOARD LIFEBOAT.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Lifesaving
Issued 15 October 1989
Resolved
CONDUCT WEIGHT TEST ON PORT LIFEBOAT.
Condition: Unknown
Due 15 October 1989
Resolved 15 October 1989
Deck/Cargo
Issued 6 March 1989
Resolved
NDT RAPTURED SECTION OF MAIN CARGO STRIPPING LINE, RENEW IN-KIND AS DETER- MINED BY NDT, CONDUCT HYDRO AT 1 1/2 TIMES MAWP.
Condition: Unknown
Due 6 March 1989
Resolved 6 March 1989
Unknown
Issued 3 January 1989
Resolved
MAKE PERMANENT REPAIRS TO CRACKED BULKHEAD ON STARBOARD SETTLER TANK IN WAY OF AFTER PEAK TANK BY CROPPING AND RENEWING PLATE (USING INSERT) AND STIFFENERS TO GOOD METAL, AS ORIGINAL AND MAKE TANK AVAILABLE FOR HYDROSTATIC TEST AS PER 46CFR32.60-1.
Condition: Unknown
Due 3 January 1989
Resolved 3 January 1989
Unknown
Issued 3 January 1989
Resolved
MAKE PERMANENT REPAIRS TO CRACKED BULKHEAD ON PORT SETTLER TANK IN WAY OF AFTER PEAK TANK BY CROPPING AND RENEWING PLATE (USING INSERT) AND STIFFENERS TO GOOD METAL, AS ORIGINAL AND MAKE TANK AVAILABLE FOR HYDROSTATIC TEST AS PER 46CFR32.60-1.
Condition: Unknown
Due 3 January 1989
Resolved 3 January 1989
Deck/Cargo
Issued 10 November 1988
Resolved
PRIOR TO CARRYING CARGOES ONBOARD REQUIRING INERTING DEMONSTRATE SATISFACTORY OPERATION OF INERT GAS GENERATOR. THIS REQUIREMENT SHALL BE COMPLETED TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 10 November 1988
Resolved 10 November 1988
Accommodation/Occupational Safety
Issued 10 November 1988
Resolved
MAKE PERMANENT REPAIRS TO TEMPORARY REPAIRS ON MARINE SANITATION DEVICE HOLDING TANK TOP FOUR (4) ACCESS COVERS (SERVICING BOLTS). ABOVE TO BE COMPLETED TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 10 November 1988
Resolved 10 November 1988
Engineering
Issued 10 November 1988
Resolved
MAKE PERMANENT REPAIRS BACK TO ORIGINAL ON PORT BOILER LOW LOW WATER LEVEL TRIP ASSEMBLY AND DEMONSTRATE SATISFACTORY OPERATION OF THE SAME. (AUTOMATION TEST PROCEDURE NO. 22) ABOVE SHALL BE COMPLETED TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 10 November 1988
Resolved 10 November 1988
Engineering
Issued 10 November 1988
Resolved
SUBMIT REVISED MACHINERY PLANT AUTOMATED TEST PROCEDURES TO USCG MARINE SAFETY CENTER WASHINGTON, DC FOR APPROVAL AND PLACE THE SAME ONBOARD. PROVIDE USCG HOUMI OCMI WITH A COPY OF THE SAME.
Condition: Unknown
Due 10 November 1988
Resolved 10 November 1988
Unknown
Issued 18 June 1988
Resolved
INSTALL WARM UP BY-PASS LINE ON TURBINE MAIN STEAM STOP VALVE AND CONDUCT HYDROSTATIC TEST TO 1.25 MAXIMUM ALLOWABLE WORKING PRESSURE TO REPAIRED AREA IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR. (TO BE COMPLETED ATNEXT DRYDOCK EXAM BUT NOT LATER THAN 30 NOVEMBER 1990.)
Condition: Unknown
Due 18 June 1988
Resolved 18 June 1988
Unknown
Issued 18 June 1988
Resolved
MAKE AVAILABLE FOR INTERNAL INSPECTION BY A COAST GUARD MARINE INSPECTOR THE MAIN STEAM STOP VALVE FOR PROPULSION TURBINE. (TO BE COMPLETED AT NEXT DRYDOCK EXAM BUT NOT LATER THAN 30 NOVEMBER 1990.)
Condition: Unknown
Due 18 June 1988
Resolved 18 June 1988
Deck/Cargo
Issued 18 June 1988
Resolved
REPAIR AND TEST INERT GAS SYSTEM FUEL OIL RETURN LINE TO PORT SETTLER TANK.
Condition: Unknown
Due 18 June 1988
Resolved 18 June 1988
Engineering
Issued 18 June 1988
Resolved
CONDUCT TEST OF ATOMIZING STEAM AND EJECTOR STEAM RELIEF VALVES.
Condition: Unknown
Due 18 June 1988
Resolved 18 June 1988
Engineering
Issued 18 June 1988
Resolved
PROVIDE APPROVAL DOCUMENTATION FOR THE AUTHORIZATION TO CARRY DIESEL OIL INTHE STARBOARD SETTLER TANK.
Condition: Unknown
Due 18 June 1988
Resolved 18 June 1988
Construction/Loadline
Issued 18 June 1988
Resolved
MAKE PERMANENT REPAIRS TO WASTED BRACKETS AND STIFFENERS IN AFT PEAK TANK AND PERMANENT REPAIRS TO CRACKS ON PORT AND STARBOARD AFTER BULKHEADS FOR THE SETTLER TANKS.
Condition: Unknown
Due 18 June 1988
Resolved 18 June 1988
Unknown
Issued 18 June 1988
Resolved
PROVIDE DOCUMENTATION THAT MAIN FEED PUMP RELIEF VALVES HAVE BEEN RENEWED.
Condition: Unknown
Due 18 June 1988
Resolved 18 June 1988
Construction/Loadline
Issued 18 June 1988
Resolved
REMOVE BUNKER "C", GAS FREE AND MAKE AVAILABLE FOR INTERNAL INSPECTION BY ACOAST GUARD MARINE INSPECTOR THE AFT PEAK TANK TO LOCATE POSSIBLE FRACTURE ON BOTTOM OF SETTLER TANKS.
Condition: Unknown
Due 18 June 1988
Resolved 18 June 1988
Engineering
Issued 18 June 1988
Resolved
MAKE AVAILABLE FOR INTERNAL INSPECTION BY A COAST GUARD MARINE INSPECTOR THE MAIN STEAM STOP VALVE FOR PROPULSION TURBINE.
Condition: Unknown
Due 18 June 1988
Resolved 18 June 1988
Engineering
Issued 18 June 1988
Resolved
REPAIR AND TEST STICK THROTTLE CONTROLS ON BRIDGE AND ENGINEROOM.
Condition: Unknown
Due 18 June 1988
Resolved 18 June 1988
Engineering
Issued 18 June 1988
Resolved
INSTALL WARM UP BY-PASS LINE ON TURBINE MAIN STEAM STOP VALVE AND CONDUCT HYDROSTAIC TEST TO 1.25 MAXIMUM ALLOWABLE WORKING PRESSURE TO REPAIRED AREAIN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 18 June 1988
Resolved 18 June 1988
Unknown
Issued 18 June 1988
Resolved
PROVIDE DOCUMENTATION FOR COAST GUARD APPROVAL OF AFT EVAPORATOR INSTALLATION.
Condition: Unknown
Due 18 June 1988
Resolved 18 June 1988
Deck/Cargo
Issued 18 June 1988
Resolved
CONDUCT TEST OF #1 CARGO PUMP TURBINE LUBE OIL TRIP. DO NOT OPERATE TURBINE UNTIL LUBE OIL TRIP HAS BEEN INSTALLED AND TESTED.
Condition: Unknown
Due 18 June 1988
Resolved 18 June 1988
Engineering
Issued 16 August 1987
Resolved
PROVIDE ON BOARD A STANDARD DISCHARGE CONNECTION
Condition: Unknown
Due 16 August 1987
Resolved 16 August 1987
Engineering
Issued 16 August 1987
Resolved
DISCONNECT SUCTION PIPE BETWEEN THE SLUDGE TANK AND THE BILGE PUMP MANIFOLDAND REPIPE SUDGE TANK TO MAIN DECK DISCHARGE WITH APPROPRIATE PUMP. DOUBLE CHECK VALVES MUST BE INSTALLED AT THE BILGE PUMP DECK. DISCHARGE PIPE CONNECTION TO PREVENT OIL SLUDGE RETURNING TO THE BILGE.
Condition: Unknown
Due 16 August 1987
Resolved 16 August 1987
Deck/Cargo
Issued 16 August 1987
Resolved
PRIOR TO LOADING OIL CARGOES MAKE PERMANENT ALTERATIONS TO DISABLE THE EXISTING SPOPOL PIECE CROSS CONNECT BETWEEN THE 9C CARGO TANK AND THE BALLAST SYSTEM.
Condition: Unknown
Due 16 August 1987
Resolved 16 August 1987
Deck/Cargo
Issued 16 August 1987
Resolved
PRIOR TO LOADING OIL CARGOES MAKE PERMANENT REPAIRS TO THE INERT GAS GENERATOR DUCT AND HOUSING. REINFORCEMENT SHALL BE INSTALLED.
Condition: Unknown
Due 16 August 1987
Resolved 16 August 1987
Documentation
Issued 16 August 1987
Resolved
PRIOR TO LOADING OIL CARGOES, PROVIDES ON BOARD THE TYPE TEST APPROVAL LETTER FOR THE BALLAST MONITOR, AND AMENDED CRUDE OIL WASH. ICS OPERATIONS
Condition: Unknown
Due 16 August 1987
Resolved 16 August 1987
Deck/Cargo
Issued 7 April 1987
Resolved
33 CFR 159.1 VESSEL FAILED TO USE IT'S OPERABLE MARINE SANITATION DEVICE, CONSEQUENTLY IT DISCHARGED IT'S RAW UNTREATED SEWAGE DIRECTLY OVERBOARD.
Condition: Unknown
Due 7 April 1987
Resolved 7 April 1987
Electrical
Issued 9 February 1987
Resolved
MAKE PERMANENT REPAIRS TO THE D-G PRIME MOVER PRIOR TO 10APR87. ONE INTERNATIONAL VOYAGE IS AUTHORIZED DURING THIS PERIOD. NO SUBCHAPTER D CARGOES MAY BE CARRIED DURING THIS RESTRICTION PERIOD.
Condition: Unknown
Due 9 February 1987
Resolved 9 February 1987
Construction/Loadline
Issued 24 December 1986
Resolved
HARD PIPE CARGO HOLD NO. 9 TO THE SEGREGATED BALLAST SYSTEM USING PLANS APPROVED BY THE U.S. COAST GUARD.
Condition: Unknown
Due 24 December 1986
Resolved 24 December 1986
Construction/Loadline
Issued 24 December 1986
Resolved
RESUBMIT TRIM AND STABILITY BOOK SHOWING CHANGE OF NO. 9 HOLD FORM DEDICAT-ED BALLAST TO SEGREGATED BALLAST.
Condition: Unknown
Due 24 December 1986
Resolved 24 December 1986
Engineering
Issued 7 November 1986
Resolved
OPEN FOR EXAMINATION THE PORT AND STARBOARD SUPERHEATER STOP VALVES.
Condition: Unknown
Due 7 November 1986
Resolved 7 November 1986
Engineering
Issued 7 November 1986
Resolved
ADJUST AS NECESSARY AND DEMONSTRATE SATISFACTORY BLOWDOWN OF STARBOARD PILOT AND SUPERHEATER SAFETY VALVES.
Condition: Unknown
Due 7 November 1986
Resolved 7 November 1986
Engineering
Issued 7 November 1986
Resolved
ON PORT BOILER CROP AND RENEW FRACTURED AND DISTORTED INNER COATING IN WAY OF UPPER REGISTER.
Condition: Unknown
Due 7 November 1986
Resolved 7 November 1986
Engineering
Issued 7 November 1986
Resolved
REPLACE ALL PLUGGED TUBES ON STARBOARD BOILER ROWS D, E, F, AND G AND ANY ADDITIONAL PLUGGED TUBES DEEMED NECESSARY BY THE ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 7 November 1986
Resolved 7 November 1986
Navigation
Issued 7 November 1986
Resolved
INSTALL DECK GRATINGS AROUNDSTEERING GEAR MACHINERY TO COMPLY WITH SOLAS CHAPTER II-1 REGULATION 29.13.2.
Condition: Unknown
Due 7 November 1986
Resolved 7 November 1986
Engineering
Issued 7 November 1986
Resolved
COMPLETE INSTALLATION AND DEMONSTRATE PROPER OPERATION OF ENGINE ROOM OILY WATER SEPARATOR AND BILGE ALARMS.
Condition: Unknown
Due 7 November 1986
Resolved 7 November 1986
Engineering
Issued 16 September 1986
Resolved
OPEN & PREPARE FOR INSPECTION "ALL" MOUNTS ON PORT AND STARBOARD BOILERS WHICH WERE DUE 23AUG86. THIS REQUIREMENT GRANTS EXTENSION ONLY TO 20NOV86. IAW AMERICAN MAINTENANCE TRANSPORT LETTER REQUEST OF 15SEP86. ATTACHED.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Deck/Cargo
Issued 16 September 1986
Resolved
PROVIDE ORIGINAL INSTALLATION PRINT & DEMONSTRATE PROPER OPERATION OF P/S CARGO MAINFOLD LOADING/DISCHARGE VALVES THROUGH LOCAL LYDRAULIC ACTUATORS.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Deck/Cargo
Issued 16 September 1986
Resolved
CLEAN, RENEW FLAME SCREENS AS NECESSARY & PROVE OPERATION OF PRESSURE/ VACUUM VALVES ON ALL 9 CARGO TANKS.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Deck/Cargo
Issued 16 September 1986
Resolved
REPAIR & PROVE OPERATION OF ALL OPEN/CLOSE VALVE INDICATOR LIGHTS IN CARGO CONTROL ROOM.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Electrical
Issued 16 September 1986
Resolved
REPAIR COVER HOLD DOWN BOLTS & PROPERLY SECURE & MAKE EXPLOSION PROOF #1 (PORTSIDE MAIN DECK) EMERGENCY SHUT-DOWN BILGE PUMP SWITCH.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Navigation
Issued 16 September 1986
Resolved
INSTALL & PROVIDE FOR INSPECTION & TEST LOW LEVEL AUDIBLE & VISUAL ALARMS FOR THE P/S STEERING GEAR HYDRAULIC FLUID RESERVOIRS TO THE BRIDGE AND MACHINERY SPACE & A FIXED STORAGE TANK WITH SUFFICIENT CAPACITY TO RE- CHARGE AT LEAST ONE POWER ACTUATING SYSTEM/RESERVOIR-SOLAS REG 24 DUE 91386
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Navigation
Issued 16 September 1986
Resolved
OPEN AND PREPARE FOR INSPECTION AIR WHISTLE AIR RECEIVER LOCATED IN STACK & TEST RELIEF VALVE WHICH WAS DUE 31AUG86.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Navigation
Issued 16 September 1986
Resolved
REPAIR AND PROVE OPERATION OF STEAM WHISTLE IN MANUAL & AUTOMATIC MODES.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Engineering
Issued 16 September 1986
Resolved
RENEW LEAKING BELLOWS EXPANSION TYPE JOINTS ON P/S BOILER SUPERHEATER SAFETY VALVE ESCAPE PIPING.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Deck/Cargo
Issued 16 September 1986
Resolved
CONDUCT HYDROSTATIC TEST OF ALL CARGO TANKS 1-9 BY FILLING ADJACENT BALLAST TANKS & MAKING PERMANENT REPAIRS TO ALL LEAKS FOUND INCLUDING ATTACHED LIST OF LEAKS CURRENTLY STOPPED WITH TEMP PATCHES, AFTER GAS FREEING VESSEL(SEE VESSEL FILE FOR LIST OF PATCHES.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Engineering
Issued 16 September 1986
Resolved
MAKE PERMANENT REPAIRS TO SMALL CRACK AT TOP OF CENTER LINE & PORT FUEL OIL BUNKER TANKS LEAKING INTO #9 CARGO TANK, CURRENTLY DRILL STOPPED & TEMPORARILY PATCHED, AFTER GAS-FREEING VESSEL.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Deck/Cargo
Issued 16 September 1986
Resolved
RENEW ALL BROKEN & MISSING SECURING BOLTS FOR CARGO TANK BUTTERWORTH PLATES ON MAIN DECK, AFTER GAS-FREEING VESSEL.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Engineering
Issued 16 September 1986
Resolved
PROVIDE USCG AUTHORIZATION TO ALLOW CARRIAGE OF MARINE DIESEL IN STBD SETTLER WITH PROPER ISOLATION FROM MAIN BOILER FIEL OIL & HEATING SYSTEM PRIOR TO LOADING THIS TYPE FUEL FOR GRAIN EVACUATOR ENGINES.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Engineering
Issued 16 September 1986
Resolved
PROCURE, INSTALL & PROVE OPERATION OF VISUAL FLASHING INDICATOR LIGHT ON ENGINE ORDER TELEGRAPH WRONG DIRECTION ALARM. - (SIGHTED REQUISITION).
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Engineering
Issued 16 September 1986
Resolved
PROCURE, INSTALL & PROVE OPERATION OF STACK TEMPERATURE REMOTE READING THERMOMETER AT ENGINE ROOM CONTROL CONSOLE.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Electrical
Issued 16 September 1986
Resolved
PROCURE, INSTALL & PROVE OPERATION OF NEW 120 VOLT GROUND DETECTOR LAMP SOCKET EMPLACEMENTS ON ENGINE ROOM CONTROL CONSOLE. -(SIGHTED REQUESITION)
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Engineering
Issued 16 September 1986
Resolved
REPAIR & PROVE OPERATION OF PORT F/O STORAGE TANK REACH ROD GEAR BOX VALVE CLOSURE ASSEMBLY.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Deck/Cargo
Issued 16 September 1986
Resolved
MAKE PERMANENT REPAIRS TO TEMPORARY PATCHED SHIPS SERVICE AIR PIPING ON MAIN DECK CARGO AREA & HYDROSTATIC TEST TO 1 1/2 MAWP, AFTER GAS-FREEING VESSEL.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Deck/Cargo
Issued 16 September 1986
Resolved
REPAIR OR REMOVE ALL CARGO TANK REMOTE READING GAUGES IN CARGO CONTROL ROOM, AS SYSTEM HAS BEEN DISCONTINUED DUE TO UNRELIABILITY.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Deck/Cargo
Issued 16 September 1986
Resolved
RENEW BROKEN BOLTS ON INSPECTION PLATE TO HYDRAULIC OIL RESERVOIR FOR CARGO HATCH PUMP IN FO'CASTLE STOWAGE ROOM.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Deck/Cargo
Issued 16 September 1986
Resolved
REBRACKET ALL PIPE HANGERS TO HYDRAULIC LINES ON MAIN DECK & ESPECIALLY AT P/S CARGI MANIFOLD LOADING/DISCHARGE LOCAL HYDRAULIC VALVE ACTUATORS, AFTER GAS-FREEING VESSEL.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Deck/Cargo
Issued 16 September 1986
Resolved
MAKE PERMANENT REPAIRS TO ALL LEAKING DRESSER COUPLINGS, BROKEN & MISSING DRESSER COUPLING RETAINER CLIPS & BROKEN/MISSING PIPE HANGERS & BRAKETS ON MAIN DECK, AFTER GAS-FREEING VESSEL.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Engineering
Issued 16 September 1986
Resolved
OPEN & PREPARE FOR INSPECTION THE FIRE & WATER SIDES OF PORT & STARBOARD BOILERS WHICH WERE DUE 31AUG86. THIS REQUIREMENT GRANTS EXTENSION ONLY TO 20NOV86. IAW AMERICAN TRANSPORT LETTER REQUEST. ATTACHED.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Deck/Cargo
Issued 10 January 1986
Resolved
MAKE PERMANENT REPAIRS TO ALLLEAKING CARGO TANKS. PROVE TIGHTNESS OF ALL CARGO TANKS TO THE SATISFACTION OF THE COGNIZANT MARINE INSPECTOR UPON RETURN VOYAGE IN NO CASE LATER THAN 1MAY 1986.
Condition: Unknown
Due 10 January 1986
Resolved 10 January 1986
Unknown
Issued 26 June 1985
Resolved
ON ADDITIONAL [name withheld] CARRIED. IF THE AUX GENERATOR MUST BE USEDON OF THE [name withheld] AT THE CONTROL BOARD AT ALL TIMES. VESSEL WILLHAVE ASSIST TUGS WHILE TRANSISTING CHANNELS.
Condition: Unknown
Due 26 June 1985
Resolved 26 June 1985
Electrical
Issued 26 June 1985
Resolved
THE CIRCUT BREAKER FOR THE DIESEL AUX. GENERATOR WILL BE RENEWED AND BOTH THE AUX. GENERATOR AND SHIPS SERVICE TURBINE GENERATOR PARALLEL OPERATION AND REVERSE POWER RELAYS WILL BE PROVED TOSATISFACTION OF THE COGNIZANT OFFICER IN CHARGE MARINE INSPECTION.
Condition: Unknown
Due 26 June 1985
Resolved 26 June 1985
Documentation
Issued 11 June 1985
Resolved
POST A COPY OF THE VESSELS FIRE CONTROL PLAN IN A WATERTIGHT CONTAINER OUTSIDE THE VESSELS SUPERSTRUCTURE OR AT THE GANGWAY AS REQUIRED BY SOLAS 1974 AMENDMENT.
Condition: Unknown
Due 11 June 1985
Resolved 11 June 1985
Fire Fighting
Issued 11 June 1985
Resolved
PROVIDE ON BOARD THE VESSEL FOUR FIREMANS OUTFITS AS REQUIRED BY SOLAS 1974AMENDMENT.
Condition: Unknown
Due 11 June 1985
Resolved 11 June 1985
Unknown
Issued 30 August 1984
Resolved
TEST THE CARGO AND BALLAST PUMP TURBINE OVERSPEED TRIPS.
Condition: Unknown
Due 30 August 1984
Resolved 30 August 1984
Unknown
Issued 30 August 1984
Resolved
TEST THE EMERGENCY GENERATOR OVERSPEED TRIP AND THE ALARM SYSTEM.
Condition: Unknown
Due 30 August 1984
Resolved 30 August 1984
Unknown
Issued 30 August 1984
Resolved
TEST THE EMERGENCY FIRE PUMP RELIEF VALVE.
Condition: Unknown
Due 30 August 1984
Resolved 30 August 1984
Unknown
Issued 30 August 1984
Resolved
INTERNALLY EXAMINE THE DC HEATER AT THE NEXT DRYDOCK.
Condition: Unknown
Due 30 August 1984
Resolved 30 August 1984
Unknown
Issued 30 August 1984
Resolved
MAKE PERMANENT REPAIRS TO THE BUTTERWORTH/FIRE PUMP OVERBOARD DISCHARGE LINE IN WAY OF THE OVERBOARD CONTROL VALVE (ENGINE ROOM LOWER LEVEL).
Condition: Unknown
Due 30 August 1984
Resolved 30 August 1984
Unknown
Issued 30 August 1984
Resolved
TEST THE IGS CONTROLS AND ALARMS PRIOR TO LOADING CRUDE OIL.
Condition: Unknown
Due 30 August 1984
Resolved 30 August 1984
Unknown
Issued 10 September 1983
Resolved
MAKE PERMANENT REPAIRS TO THE DAMAGED RAILING ON THE PORT SIDE MAIN DECK. TEMPORARY SAFETY LINES SHALL BE RIGGED UNTIL REPAIRS ARE COMPLETED.
Condition: Unknown
Due 10 September 1983
Resolved 10 September 1983
Unknown
Issued 10 September 1983
Resolved
THE FOLLOWING DEFICIENCIES ARE FOR THE ULTRASEA, DN555146.
Condition: Unknown
Due 10 September 1983
Resolved 10 September 1983
Unknown
Issued 10 September 1983
Resolved
MAKE PERMANENT REPAIRS TO THE INERT GAS SYSTEM SUPPLY LINE, AFT OF THE DECKWATER SEAL IN WAY OF THE TEMPORARY PATCH.
Condition: Unknown
Due 10 September 1983
Resolved 10 September 1983
Unknown
Issued 3 August 1983
Resolved
REPAIR THE STEAM TURBINE GENERATOR OVERSPEED TRIP AND DEMONSTRATE ITS PROPER OPERATION.
Condition: Unknown
Due 3 August 1983
Resolved 3 August 1983
Unknown
Issued 3 August 1983
Resolved
LABEL THE GENERAL ALARM LIGHT IN THE ENGINE ROOM AND THE GENERAL ALARM BELLIN THE VICINITY OF THE STARBOARD CARGO PUMP AS REQUIRED BY 46 CFR 113.25-20
Condition: Unknown
Due 3 August 1983
Resolved 3 August 1983
Unknown
Issued 3 August 1983
Resolved
REPAIR THE FUEL OIL HEATER, CONDENSATE RETURN LINE.
Condition: Unknown
Due 3 August 1983
Resolved 3 August 1983
Unknown
Issued 3 August 1983
Resolved
MAKE REPAIRS TO THE BUTTERWORTH PUMP DISCHARGE LINE AT THE FIRST WELDED JOINT.
Condition: Unknown
Due 3 August 1983
Resolved 3 August 1983
Unknown
Issued 3 August 1983
Resolved
THE FOLLOWING DEFICIENCIES ARE FOR THE ULTRASEA, DN555146.
Condition: Unknown
Due 3 August 1983
Resolved 3 August 1983
Unknown
Issued 3 August 1983
Resolved
MAKE PERMANENT REPAIRS TO THE DAMAGED PORT MAIN DECK RAILING. TEMPORARY SAFETY LINES SHALL BE RIGGED UNTIL REPAIRS ARE COMPLETED.
Condition: Unknown
Due 3 August 1983
Resolved 3 August 1983