Records from 1986 to 2021. Most recent: inspection, 28 December 2021.
Documentation record
Registered dimensions (L × B × D)158.1 ft × 42.5 ft × 12.0 ft
Registered tonnagegross 591 / net 177
ITC dimensions (L × B × D)158.1 ft × 42.5 ft × 12.0 ft
ITC tonnagegross 591 / net 177
BuilderMAXON MARINE INDUS.,INC. · TELL CITY, IN, UNITED STATES · built 1974
Hull materialSteel
PropulsionNot recorded
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portPORT CANAVERAL, FL
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 17 March 2026 · expires 30 April 2027
Service, as the file records itFreight Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it591 - Convention (Subpart B), Gross Ton
177 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 16
28 December 2021
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7386477
11 June 2015
Type not recorded
No type recorded · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 5150350
26 May 2015
Type not recorded
No type recorded · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 5141973
16 May 2015
Type not recorded
No type recorded · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 5131222
7 November 1997
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 18571
10 February 1994
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1163661
19 October 1993
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1157451
20 October 1992
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1264638
1 October 1992
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1262008
22 September 1992
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1262444
17 July 1990
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 907961
22 September 1989
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1004441
26 June 1989
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1044264
14 June 1988
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1204138
2 June 1988
Hull Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 889064
19 December 1986
COI Inspection · Hull Examination
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1027053
Documentation
Issued 22 September 1992
Resolved
PROVIDE COPY LOADLINE CERTIFICATE WHEN ISSUED BY ABS. TO BE PRESENTED TO MARINE INSPECTOR DURING DRYDOCK OR FAXED TO MIO NEW YORK BY 22OCT92.
Condition: Unknown
Due 26 October 1992
Resolved 26 October 1992
Construction/Loadline
Issued 17 July 1990
Resolved
REPAIR #1 LONG. FRAME ON THE OUTBOARD SIDE IN THE #2 PORT COMPT. NOTED A CRACK WELD IN THE FRAME.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Construction/Loadline
Issued 17 July 1990
Resolved
REPAIR #2 LONG. FRAME ON THE OUTBOARD SIDE IN THE #4 STBD COMPT. NOTED TWO CRACKED WELDS AT THE LONG. JOINTS
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Construction/Loadline
Issued 26 June 1989
Resolved
FRAMES #8, 9, 11 AND 13 LOCATED IN THE BOW RAKE ARE BUCKLED AND RELATED HULL SET IN, CROP AND RENEW.
Condition: Unknown
Due 26 June 1989
Resolved 26 June 1989
Construction/Loadline
Issued 26 June 1989
Resolved
REWELD ALL SIDE SHELL LONGITUDINALS TO VERTICAL BULKHEAD STIFFENERS WERE CRACKED AND BETWEEN #3 AND #4 VERTICAL BULKHEAD STIFFENERS REWELD ALL CRACKED SIDE SHELL LONG. LOCATED IN THE #4 PORT WING COMPARTMENT APPROX. 9 AREAS TO WELD.
Condition: Unknown
Due 26 June 1989
Resolved 26 June 1989
Construction/Loadline
Issued 26 June 1989
Resolved
FRAME #7 LOCATED IN THE BOW RAKE IS BUCKLED AND RELATED HULL PLATE SET IN, CROP AND RENEW.
Condition: Unknown
Due 26 June 1989
Resolved 26 June 1989
Construction/Loadline
Issued 26 June 1989
Resolved
FRAMES #16 THRU 20 LOCATED IN THE BOW RAKE ARE BUCKLED AND RELATED HULL PLATE SET IN, CROP AND RENEW.
Condition: Unknown
Due 26 June 1989
Resolved 26 June 1989
Construction/Loadline
Issued 26 June 1989
Resolved
#1 AD 2 SIDE SHELL LONGITUDINALS LOCATED IN THE #3 STARBOARD WING COMPART- MENT IN WAY OF THE AFTER BULKEAD, ARE BUCKLED AND RELATED SIDE SHELL SET INCROP AND RENEW.
Condition: Unknown
Due 26 June 1989
Resolved 26 June 1989
Construction/Loadline
Issued 26 June 1989
Resolved
#3 AND 4 DECK LONGITUDINALS LOCATED IN THE #3 STARBOARD WING COMPARTMENT ARE BUCKLED AND RELATED BOTTOM SHELL SET IN, CROP AND RENEW.
Condition: Unknown
Due 26 June 1989
Resolved 26 June 1989
Construction/Loadline
Issued 26 June 1989
Resolved
SIDE SHELL LONGITUDINALS 1 THRU 6 LOCATED IN THE #4 STARBOARD WING COMPART-MENT, BETWEEN VERTICAL FRAMES 2 AND 3 ARE BUCKLED AND RELATED SIDE SHELL SET IN, CROP AND RENEW.
Condition: Unknown
Due 26 June 1989
Resolved 26 June 1989
Construction/Loadline
Issued 26 June 1989
Resolved
SIDE SHELL HEAVILY SET IN, LOCATED IN THE #4 STARBOARD COMPARTMENT IN WAY OF #4 VERTICAL FRAME, CROP AND RENEW APPROX. SIZE 4' X 6' AREA.
Condition: Unknown
Due 26 June 1989
Resolved 26 June 1989
Construction/Loadline
Issued 26 June 1989
Resolved
REWELD ALL SIDE SHELL LONGITUDINALS TO THE VERTICAL BULKHEAD STIFFENERS, WERE CRACKED IN THE #5 STARBOARD WING COMPARTMENT, APPROX. 4 EACH.
Condition: Unknown
Due 26 June 1989
Resolved 26 June 1989
Construction/Loadline
Issued 26 June 1989
Resolved
REWELD ALL SIDE SHELL LONGITUDINALS TO THE VERTICAL BULKHEAD STIFFENERS WERE CRACKED IN TH #5 PORT WIND COMPARTMENT, APPROX. 4 EACH.
Condition: Unknown
Due 26 June 1989
Resolved 26 June 1989
Documentation
Issued 2 June 1988
Resolved
PROVIDE EVIDENCE OR ANNUAL LOAD LINE EXAMINATION BEING COMPLETED. VESSEL ISRESTRICTED TO LAKES, BAYS AND SOUND UNTIL COMPLETION OF THIS REQUIREMENT.
Condition: Unknown
Due 2 June 1988
Resolved 2 June 1988