SHEAR WATER

SHEAR WATER is a 1974 passenger vessel (inspected). The Coast Guard has recorded 28 inspections since 2016, most recently in September 2025, along with 100 deficiencies, 2 operational controls and 5 casualty investigations between 2003 and 2017.

Records from 2003 to 2025. Most recent: inspection, 24 September 2025.

Built
1974
Last inspected
24 September 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 24 September 2025
…with no type recorded3
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDE2996
Flag
UNITED STATES
Maury page id
psix-47938

Documentation record

Registered dimensions (L × B × D)63.6 ft × 18.5 ft × 6.2 ft
Registered tonnagegross 55 / net 37
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderHILDAGO CORP · MIAMI, FL, UNITED STATES · built 1974
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portWEST PALM BEACH, FL
Trade endorsementsCoastwise, unrestricted, Fishery, Recreational, Registry
DocumentationValid · issued 4 May 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it55 - Regulatory (Subpart C or D), Gross Ton
37 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 28

24 September 2025 Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8240492
14 April 2025 Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 8111648
23 August 2024 Examination of Repairs · Hull Examination · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7987538
9 July 2024 Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7954130
14 January 2024 Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7846939
14 July 2023 COI Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7740459
5 May 2023 In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7681610
18 October 2022 Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7579401
11 August 2022 Internal Structural Exam · Drydock Exam · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7530464
3 May 2022 Internal Structural Exam · Drydock Exam · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7443114
28 March 2022 In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7419654
16 June 2021 Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7226666
27 April 2021 Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7183848
30 September 2020 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 7068397
15 May 2020 Drydock Exam · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6953933
8 October 2019 Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6830485
25 July 2019 Annual Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6759457
23 July 2019 Deficiency Check
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6759441
28 January 2019 Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6615800
10 August 2018 Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6506893
30 January 2018 COI Inspection · DAPI Audit · Deficiency Check
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6346400
23 May 2017 Type not recorded
No type recorded · Station Lake Worth Inlet · USCG Southeast District (CGD-SE) · Activity 6155939
23 May 2017 Type not recorded
No type recorded · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6256977
9 March 2017 DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 6101635
5 August 2016 Deficiency Check · Internal Structural Exam · Drydock Exam · Plan Review "T" Boat
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 5963091
31 May 2016 Type not recorded
No type recorded · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 5892757
29 May 2016 Deficiency Check · Damage Survey
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 5893533
11 April 2016 Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Lake Worth · USCG Southeast District (CGD-SE) · Activity 5851487

Deficiency record · 100

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 September 2025 Resolved
The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located. Remote shutoff valve cable is cut and does not shut the valve from outside the space.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 September 2025
Resolution: Cable replaced. Test sat.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 24 September 2025 Resolved
The owner or operator of a vessel carrying overnight passengers shall have a suitable number of watchmen patrol throughout the vessel during night time. The monitoring device must: Ensure the wakefulness of the crew in the event that a watchman required is unresponsive. Key to operate watch monitoring system was lost and system cannot be operated. Prove proper operation of system prior to carrying overnight passengers.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 26 September 2025
Resolution: System tested. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 24 September 2025 Resolved
Each survival craft must be: secured to the vessel by a painter with a float-free link permanently attached to the vessel. The link must be certified to meet 46 CFR 160.073. Link found broken.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 September 2025
Resolution: Installed.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 24 September 2025 Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. Laz pump indicator is inoperable.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 25 September 2025
Resolution: Corrected.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 24 September 2025 Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: Tides tables: and Current tables. Publications missing.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 26 September 2025
Resolution: On board.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 August 2024 Resolved
Repairs or alterations to the hull or equipment that affect the safety of the vessel must not be made witout the approval of the OCMI. Found a total of 10 deck beams in the E/R with improper repairs. Make repairs to the satisfaction of attending Marine Inspector by 23FEB2025.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 23 February 2025
Resolved 14 April 2025
Resolution: Cleared by activity 8111648.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 9 July 2024 Resolved
A person in command of a documented vessel must have on board that vessel the original Certificate of Documentation currently in effect for that vessel. COD on board is expired.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 July 2024
Resolved 17 July 2024
Resolution: Confirmed that COD has been issued. Image uploaded.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 9 July 2024 Resolved
A vessel of more than 26 feet, but not more than 65 feet must carry a minimum of one life buoy of not less than 24 inches. Life buoy on board is unserviceable. Replace.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 July 2024
Resolved 16 July 2024
Resolution: Image uploaded.
05 - Radio Communications › N/A - No Subsystem › Main installation
Issued 9 July 2024 Resolved
The provisions of Part III of Title III of the Communication Act require vessels carry a radiotelephone installation complying with this subpart. FCC Radiotelephony Certificate not on board. Vessel restricted to not more than 1000 feet from shore. 47 CFR 80.901
Action required: 705 - Other - as specified
Resolved 15 July 2024
Resolution: Provided.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 14 July 2023 Resolved
All mattresses must comply with U.S. Department of Commerce or IMO Resolution A.688(17). Provide documentation that mattresses meet standards. Def changed from 701 to 705 with due date of 01AUG23. See Act# 7740459 for details. Def changed back to 701 on 01AUG23. See Act# 7740459.
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 August 2023
Resolved 8 September 2023
Resolution: All comply.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 14 July 2023 Resolved
On a vessel of at least 26' a visual/audio alarm must be provided at the operating station. LAZ bilge alarm INOP. Repair by 21JUL2023.
Condition: Invalid
Action required: 705 - Other - as specified
Due 21 July 2023
Resolved 18 July 2023
Resolution: Alarm tested. All sat.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 14 July 2023 Resolved
Renewal of a COI shall include and inspection of structure. The inspection shall be such to insure the vessel is in satisfactory condition. Found 03 deck beams in E/R with with severe angel hair. Clean beams for further inspection. Clean by 21JUL2023. 46 CFR 176.05-10
Action required: 705 - Other - as specified
Due 21 July 2023
Resolved 18 July 2023
Resolution: Beams cleaned and inspected. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 July 2023 Resolved
A vessel must carry one floating waterlight. Life ring and life float water lights are INOP. Vessel restricted to day time operations.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 July 2023
Resolved 21 July 2023
Resolution: Batteries replaced. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 July 2023 Resolved
A submersible electric bilge pump may be used provided that the pump is permanently mounted. All electric bilge pumps not permanently mounted.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 July 2023
Resolved 21 July 2023
Resolution: All permanently mounted.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 14 July 2023 Resolved
A vessel must carry adequate and up-to-date charts and pubs. Charts, Coast Pilot and Light List are outdated.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 July 2023
Resolved 18 July 2023
Resolution: Up-to-date charts and pubs provided.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 July 2023 Resolved
All electrical installations shall be to the satisfaction of the [name withheld] the following items: 1) Replaced blade fuses in E/R with UL listed cartridge fuses. 2) Remove dead end wire next to polisher pump or install in J-box. 3) Remove dead end wire next to high amp start switch or install in J-box. 4) Permanently mount A/C water pump. 5) Permanently mount fresh water accumulator tank and pump. 6) Repair wire connections to fresh water accumulator tank. 7) Properly secure wires for transducer in E/R stbd side. 8) Repair wire connections to hot water tank. 9) Repair wire connections to high press pump J-box. 10) Remove all wing nuts from battery terminals. 11) Remount light in LAZ. 46 CFR 183.01-15
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 July 2023
Resolved 7 August 2023
Resolution: All issues resolved.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 14 July 2023 Resolved
Vessel must submit plans to the cognizant OCMI for the installation and use of monitoring device to ensure the wakefulness of the watchmen. Vessel not fitted with watch monitor equipment, submit electrical drawing and plan with layout of equipment to OCMI for approval. Install equipment by 14OCT2023.
Action required: 705 - Other - as specified
Due 14 October 2023
Resolved 8 September 2023
Resolution: Plans submitted. System inspected and tested. All sat.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 14 July 2023 Resolved
Vessel must have and interconnected fire/alarm detection system in compliance with 46 CFR 181.450 installed in all enclosed areas where passengers and crew have routine access including accommodation and machinery spaces. Install equipment by 14OCT2023. 46 CFR 181.405
Action required: 705 - Other - as specified
Due 14 October 2023
Resolved 8 September 2023
Resolution: Interconnected detectors installed and tested. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 20 October 2022 Resolved
Life float has excessive cracking throughout and is in a non-serviceable condition. Life float to be replaced in kind or with an IBA to accomodate at least 67% of the total persons allowed. 46 CFR 180.202
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 November 2022
Resolved 15 December 2022
Resolution: Life float replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 20 October 2022 Resolved
Chemical lights for 19 life jackets are expired. Lights to be replaced prior to operating any further than 20 miles from a harbor of safe refuge. 46 CFR 180.75
Action required: 705 - Other - as specified
Resolved 5 November 2022
Resolution: Lights replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 October 2022 Resolved
Life ring retro-reflective tape is weathered and in non-serviceable condition. Tape to be replaced with approved type. 46 CFR 180.70
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 November 2022
Resolved 5 November 2022
Resolution: Tape replaced.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 20 October 2022 Resolved
Forward railing stanchion mounting near the anchor is loose. Secure stanchion mounting for railing. 46 CFR 177.900
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 November 2022
Resolved 5 November 2022
Resolution: Mounting secured.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 20 October 2022 Resolved
Bilge high level alarms not labeled. Properly label each alarm with the space the alarm recognizes. 46 CFR 182.530
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 November 2022
Resolved 5 November 2022
Resolution: Alarms labeled.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 20 October 2022 Resolved
Sound signal inoperative. Provide proper sound signal for the vessel. 33 CFR 86
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 November 2022
Resolved 5 November 2022
Resolution: Sound signal provided.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 19 May 2022 Resolved
Head through hull suction valve on the stbd side hull does not close. Repair or replace valve prior to credit dry-dock. 46 CFR 179.350
Action required: 705 - Other - as specified
Resolved 23 June 2022
Resolution: Valve replaced.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 19 May 2022 Resolved
Possible void found port side aft in the he hull laminate. Make repairs to marked area prior to credit dry-dock. 46 CFR 176.610
Action required: 705 - Other - as specified
Resolved 23 June 2022
Resolution: Repairs SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 19 May 2022 Resolved
Generator fuel supply hose to filter is not of an approved type. Replace hose with approved hose and fittings prior to credit dry-dock. 46 CFR 182.720
Action required: 705 - Other - as specified
Resolved 23 June 2022
Resolution: Hose and fitting replaced SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 May 2022 Resolved
Two electrical outlets in the galley near sink and ice machine are not GFCI outlets. Replace current outlets with GFCI outlets prior to credit dry-dock. 46 CFR 183.210
Action required: 705 - Other - as specified
Resolved 23 June 2022
Resolution: Outlets replaced SAT.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 May 2022 Resolved
Emergency escape in the overhead in forward berthing does not have handles or rails to aide passenger's egress out of hatch. Install some type of hand hold at emergency exit prior to credit dry-dock. 46 CFR 177.500
Action required: 705 - Other - as specified
Resolved 23 June 2022
Resolution: Two handles installed SAT.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 19 May 2022 Resolved
Numerous cracks found in welds and pipe frame for the dive platform. Make repairs prior to credit dry-dock. 46 CFR 176.610
Action required: 705 - Other - as specified
Resolved 23 June 2022
Resolution: Cracks repaired SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 19 May 2022 Resolved
Starboard main propulsion engine strainer basket wasted. Replace basket prior to credit dry-dock. 46 CFR 182.420
Action required: 705 - Other - as specified
Resolved 23 June 2022
Resolution: Basket replaced.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 1 September 2021 Resolved
EPIRB hydrostatic release found expired. Replace release. Route reduced to no more than 3 miles from shore. 46 CFR 185.740
Action required: 705 - Other - as specified
Resolved 3 September 2021
Resolution: HRU replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 September 2021 Resolved
Attached bilge pump flexible hose section at pump cracked at numerous locations. Replace hose with approved type with two hose clamps at each connection. 46 CFR 182.720
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 September 2021
Resolved 3 September 2021
Resolution: Flexible hose replaced with hose clamps.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 September 2021 Resolved
Electrical box in the machinery space attached to overhead is covered with tape and has visible twist-on type wire nuts. Electrical box must be fully enclosed. 46 CFR 183.340
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 September 2021
Resolved 3 September 2021
Resolution: Electrical box enclosed SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 September 2021 Resolved
Fuse panel at forward bulkhead in machinery space is open without a cover or enclosure. Fuse panel to be inside an enclosure and fuses labeled. 46 CFR 183.330
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 September 2021
Resolved 3 September 2021
Resolution: Enclosure installed around fuse panel.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 September 2021 Resolved
Battery terminal connections do not have permanent type connectors. Install permanent type connectors at all battery terminal connections. 46 CFR 183.350
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 September 2021
Resolved 3 September 2021
Resolution: Connectors installed SAT.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 5 October 2020 Resolved
Certificate of Documentation expired. Provide proof of documentation or proof that documentation has been applied for prior to operations. 46 CFR 67.7
Action required: 60 - Rectify deficiencies prior to movement
Resolved 6 October 2020
Resolution: COD provided.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 5 October 2020 Resolved
EPIRB battery expired. Replace battery or replace EPIRB. Operations restricted to no more than 3 miles from shore. 46 CFR 185.728(b)
Action required: 705 - Other - as specified
Resolved 7 October 2020
Resolution: Battery replaced in kind.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 5 October 2020 Resolved
Current fire service report not provided. Provided annual fire service report prior to carrying passengers. 46 CFR 176.810(b)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 October 2020
Resolution: Fire service report provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 October 2020 Resolved
Provide life jacket lights for four adult life jackets and one child life jacket. Total persons allowed reduced to 18 with only 1 child. 46 CFR 180.75
Action required: 703 - Prior to bunkering operations
Resolved 7 October 2020
Resolution: Lights attached to life jackets.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 5 October 2020 Resolved
Life ring missing retro-reflective tape. Apply approved type retro-reflective tape to life ring at required areas. 46 CFR 185.604(i)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2020
Resolved 6 October 2020
Resolution: Retro-reflective tape applied.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 5 October 2020 Resolved
No sound signal provided. Repair installed horn or provide equivalent sound signal. 46 CFR 86
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2020
Resolved 7 October 2020
Resolution: Air horn onboard.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 5 October 2020 Resolved
Two glass light covers in machinery space are missing protective coverings. Install guards to light covers. 46 CFR 183.410
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2020
Resolved 15 October 2020
Resolution: Guards in place over lights.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 5 October 2020 Resolved
Breaker panel door has opening and is missing securing latch. Close opening and install latch. 46 CFR 183.330(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2020
Resolved 15 October 2020
Resolution: Latch installed over opening in door.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 5 October 2020 Resolved
Lazerette watertight hatch missing securing device. Install securing device for hatch. 46 CFR 179.360(b)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2020
Resolved 8 October 2020
Resolution: Lanyard attached.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 5 October 2020 Resolved
Program MMSI number into VHF radios. 47 CFR 80.905
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2020
Resolved 7 October 2020
Resolution: Number programmed into radio.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 5 October 2020 Resolved
Label life float oars with vessel's name. 46 CFR 185.604(g)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2020
Resolved 6 October 2020
Resolution: Oars labeled.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 5 October 2020 Resolved
Make repairs to damaged area of fiberglass where side shell meets the deck at port side embarkation station. 46 CFR 176.610
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 November 2020
Resolved 6 November 2020
Resolution: Repairs made SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 5 October 2020 Resolved
Provide combustible bin for stowage of oily rags. 46 CFR 176.830
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 October 2020
Resolved 8 October 2020
Resolution: Bin provided.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 3 June 2020 Resolved
Solid keel found to be filled with water. Fiberglass to be ground down to show core and extent of water intrusion. Repairs to be made to the satisfaction of marine inspector prior to credit dry-dock. 46 CFR 176.610
Action required: 705 - Other - as specified
Resolved 1 July 2020
Resolution: Repairs completed SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 June 2020 Resolved
Shaft log and strut bearings on both shafts excessively worn. Replace with new bearings prior to credit dry-dock. 46 CFR 176.630
Action required: 705 - Other - as specified
Resolved 1 July 2020
Resolution: Bearings replaced.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 3 June 2020 Resolved
4 transverse deck beams on the port side of the machinery space and one on the stbd side are rotted. Replace rotted beams with new to the satisfaction of marine inspector prior to credit dry-dock. 46 CFR 176.610
Action required: 705 - Other - as specified
Resolved 1 July 2020
Resolution: Beams replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 June 2020 Resolved
Replace cracked raw water hose at exhaust connection on stbd main propulsion engine prior to credit dry-dock. 46 CFR 182.100
Action required: 705 - Other - as specified
Resolved 1 July 2020
Resolution: Hose replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 June 2020 Resolved
Replace port main propulsion engine's sea suction strainer basket due to excessive wastage prior to credit dry-dock. 46 CFR 182.420(a)(2)
Action required: 705 - Other - as specified
Resolved 1 July 2020
Resolution: Strainer basket replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 June 2020 Resolved
Install a blank to fill the opening in the breaker panel prior to credit dry-dock. 46 CFR 183.330(b)
Action required: 705 - Other - as specified
Resolved 1 July 2020
Resolution: Blank installed.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 7 February 2019 Resolved
Replace wasted/weathered life float painter line with 100 feet of approved type line. Route restricted to Limited Coastwise. 46 CFR 180.175(f)(3)
Action required: 705 - Other - as specified
Resolved 8 February 2019
Resolution: Painter line replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 February 2019 Resolved
Replace wasted/weathered ring life buoy. 46 CFR 180.170
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2019
Resolution: Ring life buoy replaced.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 7 February 2019 Resolved
Provide fire system service report proving proper operation of pre-engineered fixed gas fire extinguishing system. 46 CFR 181.420
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 February 2019
Resolution: Service report received; all tests SAT.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 7 February 2019 Resolved
Provide lights for 13 life jackets. Route restricted to limited coastwise. 46 CFR 180.75
Action required: 705 - Other - as specified
Resolved 8 February 2019
Resolution: Lights provided for all life jackets.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 7 February 2019 Resolved
Provide current FCC Station License; route restricted to no more than 1000 feet from shore. 47 CFR 80.13
Action required: 705 - Other - as specified
Resolved 8 February 2019
Resolution: Current FCC station license provided.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 7 February 2019 Resolved
Provide current FCC Safety Certicate; restricted to no more than 1000 feet from shore. 47 CFR 80.401
Action required: 705 - Other - as specified
Resolved 8 February 2019
Resolution: Current FCC Safety Cert provided.
05 - Radio Communications › N/A - No Subsystem › Performance standards for radio equipment
Issued 7 February 2019 Resolved
Provide current FCC Marine Radio Operator's Permit; restricted to no more than 1000 feet from shore. 47 CFR 80.159
Action required: 705 - Other - as specified
Resolved 8 February 2019
Resolution: MROP provided.
05 - Radio Communications › N/A - No Subsystem › Functional requirements
Issued 7 February 2019 Resolved
Install GPS integrated radios or connect radios to intalled GPS. 47 CFR 80.905
Action required: 705 - Other - as specified
Resolved 8 February 2019
Resolution: GPS connected to radios.
05 - Radio Communications › N/A - No Subsystem › Functional requirements
Issued 7 February 2019 Resolved
Program MMSI number into radios. 47 CFR 80.905
Action required: 705 - Other - as specified
Resolved 8 February 2019
Resolution: MMSI number installed in radios.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 February 2019 Resolved
Prove operation of aft engine room auto bilge pump visual alarm. 46 CFR 182.530(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2019
Resolved 11 March 2019
Resolution: Visual alarm SAT.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 7 February 2019 Resolved
Repair/seal cracks in life float. 46 CFR 180.175
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2019
Resolved 23 July 2019
Resolution: Cracks sealed.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 7 February 2019 Resolved
Replace wasted retro-reflective tape on life float. 46 CFR 180.175
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2019
Resolved 11 March 2019
Resolution: Tape replaced SAT.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 7 February 2019 Resolved
Install rail course at fantail embarkation station. 46 CFR 177.900(g)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2019
Resolved 11 March 2019
Resolution: Equivalent installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 February 2019 Resolved
Install permanent type connectors on all battery cable connection to terminals. 46 CFR 183.350
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2019
Resolved 11 March 2019
Resolution: Nyloc nuts installed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 7 February 2019 Resolved
Re-label life-jackets, life float oars and bilge suction manifold. 46 CFR 185.604
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2019
Resolved 11 March 2019
Resolution: All re-labeled SAT.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 14 August 2018 Resolved
Replace 02 worn hydraulic steering hoses with approved type. 46 CFR 182.40-1(a)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 August 2018
Resolved 24 August 2018
Resolution: Hoses replaced with approved type.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 August 2018 Resolved
Battery cables to be secured to battery terminals with a permanent type connector. 46 CFR 183.05-20(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 August 2018
Resolved 24 August 2018
Resolution: Lock nuts installed on battery cables to terminals.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 August 2018 Resolved
Replace both main diesel engine reduction gear shift cables. 46 CFR 182.05
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 August 2018
Resolved 24 August 2018
Resolution: Shift cables replaced and tested SAT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 August 2018 Resolved
Prove proper operation of stbd main diesel engine sea suction valve. 46 CFR 182.05-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 August 2018
Resolved 24 August 2018
Resolution: Sea suction valve SAT.
Communications › Alarms/Indicators › Bilge Alarm
Issued 30 January 2018 Resolved
Prove proper operation of the lazerette bilge alarm.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 January 2018
Resolution: Proved proper operation of the lazerette bilge alarm.
Communications › Public Address System › Loudspeaker
Issued 30 January 2018 Resolved
Prove proper operation of public address system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 January 2018
Resolution: Owner installed new speaker and proved proper operation.
Fire Fighting › Remote Fuel Shutoff › General
Issued 9 March 2017 Resolved
Prove proper operation of fuel shutoff valves.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 March 2017
Resolution: Proved proper operation of the fuel valves.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 9 March 2017 Resolved
Prove proper operation of the engine shutdowns with the fire system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 March 2017
Resolution: Proved proper operation of the engine shutdowns with the fire system.
Communications › Alarms/Indicators › Fire Alarm
Issued 9 March 2017 Resolved
Install UL approved smoke detector in the turtle room.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 March 2017
Resolution: Installed a UL approved detector in the turtle room.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 9 March 2017 Resolved
Remove all unauthorized power strips.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 March 2017
Resolution: Removed all power strips.
Lifesaving › Lifefloat › Markings
Issued 9 March 2017 Resolved
Stencil max persons on lifefloat.
Due 9 April 2017
Resolved 30 March 2017
Resolution: Properly labeled lifefloat.
Lifesaving › Lifefloat › Painter
Issued 9 March 2017 Resolved
Properly rig lifefloat as discussed with CGMI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 March 2017
Resolution: Properly rigged the lifefloat.
Communications › Radio Communications › Radiotelephone Transceiver (2-27.5 MHz)
Issued 9 March 2017 Resolved
Prove proper operation of the MF radio.
Due 9 April 2017
Resolved 30 March 2017
Resolution: Proved proper operation of MF radio.
Engineering › Bilge Water Management System › Valve
Issued 5 August 2016 Resolved
Prove proper operation of valve for bilge pump discharge, port side engine room on side shell.
Due 31 August 2016
Resolved 19 August 2016
Resolution: Proved proper operation of bilge valve.
Construction/Loadline › Hull › Side Shell
Issued 5 August 2016 Resolved
Submit repair plan for loose FRP tabs IWO port side engine room near the chine.
Due 31 August 2016
Resolved 19 August 2016
Resolution: Submitted repair plan and properly repaired the blisters.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 5 August 2016 Resolved
Replace or properly repair patched SSDG engine exhaust as discussed with CGMI.
Due 31 August 2016
Resolved 19 August 2016
Resolution: Properly repaired the SSDG exhaust.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 5 August 2016 Resolved
Replace STBD main engine exhaust as discussed with CGMI.
Due 31 August 2016
Resolved 19 August 2016
Resolution: Replaced the STBD engine exhaust.
Engineering › Bilge Water Management System › Valve
Issued 5 August 2016 Resolved
Cap sluice valve going from the forward engine room to the fwd compartment.
Due 31 August 2016
Resolved 19 August 2016
Resolution: Capped sluice vaive.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 5 August 2016 Resolved
Double hose clammp all exhaust in the lazerette.
Due 31 August 2016
Resolved 19 August 2016
Resolution: All hoses double clamped.
Construction/Loadline › Hull › Bottom Plating
Issued 5 August 2016 Resolved
Repair blisters on bottom plate as discussed with CGMI.
Due 31 August 2016
Resolved 19 August 2016
Resolution: Properly repaired both blisters.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 29 May 2016 Resolved
Vessel's route is restricted to Limited Coastwise.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 3 June 2016
Resolution: Vessel's route is reinstated.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 29 May 2016 Resolved
Vessel engine room and lazarette space must be thoroughly clean of oil recidues.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 June 2016
Resolved 3 June 2016
Resolution: Spaces are clean.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 29 May 2016 Resolved
Vessel's port and starboard fuel tanks must be emptied and isolated until starboard fuel tank is back in service.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2016
Resolved 3 June 2016
Resolution: Tanks are empty and isolated.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 29 May 2016 Resolved
Vessel must submit replacement proposal for starboard fuel tank for approval. Prior to CDD
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2016
Resolved 5 August 2016
Resolution: Received plans for new fuel tank. plans approved
Engineering › Steering Gear System › Hydraulic Hose
Issued 29 May 2016 Resolved
Steering gear hydraulic lines going thru engine room bulkhead must be repair/replace using approved hoses, fittings, and thru hull fittings.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 3 June 2016
Resolution: Steering hoses ere replaced with SAE J1942-1
Stability › Watertight Integrity › General
Issued 29 May 2016 Resolved
. All penetrations b/w engine room and lazarette space must be properly repair using approved fittings and materials. PTCDD
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 September 2016
Resolved 19 August 2016
Resolution: All penetrations have been properly sealed.
Documentation › Logs/Records › Operational Procedures for Engines or Equipment
Issued 29 May 2016 Resolved
Vessel must submit detail fuel consumption plan.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 June 2016
Resolved 2 June 2016
Resolution: Vessel submitted detailed fuel combustion plan for trips to Bahamas. The vessel will have sufficient fuel for a round trip.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 11 April 2016 Resolved
Renew ring life buoy line with 60' of 5/16" buoyant line.
Due 30 April 2016
Resolved 29 April 2016
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Number
Issued 11 April 2016 Resolved
Ensure vessel is equipped with 4 B-II portable fire extinguishers.
Due 30 April 2016
Resolved 29 April 2016
Electrical › Electrical Distribution System (service) › Panelboard
Issued 11 April 2016 Resolved
Install missing blanks in electrical panel and install a means to close panel above the entrance to the engineroom.
Due 30 April 2016
Resolved 29 April 2016

Casualty record · 5

12 August 2003Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 dead · activity 1886892
24 February 2008Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 dead · activity 3154376
26 January 2011Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 3938255
31 May 2016Routine · role: Acknowledged Pollution Source · activity 5892757
23 May 2017Routine · role: Involved in a Marine Investigation (non-casualty) · serious marine incident, as classified · 1 dead · activity 6256977
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.