Built
1945
Last inspected
13 October 2022
Documentation
Expired · NVDC file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 4 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 13 October 2022
Operational controls None recorded without a removal date
Years with a record 7 calendar years (2016–2022)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

7945405
WDN2094
Flag
UNITED STATES
Maury page id
psix-47978

Documentation record

Registered dimensions (L × B × D)109.1 ft × 33.2 ft × 9.1 ft
Registered tonnagegross 98 / net 67
ITC dimensions (L × B × D)109.1 ft × 33.2 ft × 9.1 ft
ITC tonnagegross 213 / net 63
BuilderCOMMERCIAL IRON · PORTLAND, OR, UNITED STATES · built 1945
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNOME, AK
Endorsements, as the file codes themcw_un, reg
DocumentationExpired · issued 30 June 2004
Service, as the file records itFreight Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it98 - Regulatory (Subpart C or D), Gross Ton
213 - Convention (Subpart B), Gross Ton
67 - Regulatory (Subpart C or D), Net Ton
63 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 16 inspections, each with its date, unit and type; 73 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; 1 other recorded name; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 16

13 October 2022 Deficiency Check · DAPI Audit · Initial Certification · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7572158
13 May 2021 Drydock Exam · Examination of Repairs · Internal Structural Exam · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7195688
3 December 2020 Administrative Inspection
Administrative · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 7105859
12 September 2019 Drydock Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6810666
1 May 2019 Drydock Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6673914
9 January 2019 Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6608230
23 October 2018 Periodic Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6566108
16 October 2017 DAPI Audit · Annual Inspection · Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 6289048
5 December 2016 Welding Related Inspections Qualification Testing · Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 6070033
26 August 2016 COI Inspection · Administrative Inspection
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5977255
29 April 2016 Deficiency Check
Physical examination · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5867637
18 April 2016 Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5859813
12 April 2016 Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5859806
11 April 2016 Deficiency Check
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5859803
6 April 2016 Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Detachment Sitka · USCG Arctic District (CGD-A) · Activity 5848528
13 January 2016 Administrative Inspection
Administrative · Sector Southeast Alaska · USCG Arctic District (CGD-A) · Activity 5797104

Deficiency record · 73

04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 13 October 2022 Resolved
Conduct Fire, abandon ship and Man overboard drills underway with US Coast Guard before cargo operations
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 13 October 2022 Resolved
Conduct underway sea trials with US coast Guard before Cargo
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 13 October 2022 Resolved
Adjust Engine room door from rudder room so all dogs work correctly and door seats correctly
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 13 October 2022 Resolved
Install guards over all rotating machinery in Engine room. Both Mains are missing shaft guards and pulley guards.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 13 October 2022 Resolved
Install missing lagging on both Main engine mufflers and readjust all lagging that is loose and misaligned allowing contact with hot metal.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 13 October 2022 Resolved
Install installation on overhead in the Engine room where it has been removed for repairs and work.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 13 October 2022 Resolved
Repair oil leak on Starboard main engine oil filter housing.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 October 2022 Resolved
Provide Non-Conducting matting suitable for the specific switchboard voltage must be installed for personnel protection at the front and rear of the switchboard and must extend the entire length of, and be of sufficient width to suit, the operating space.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 October 2022 Resolved
Provide blocking and bracing for Port generator Battery to prevent shifting.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 13 October 2022 Resolved
Clear all items in the emergency exit pathway in the generator room on the Starboard side on the tank tops.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 October 2022 Resolved
Provide wire and piping support for wiring and pipping in the Generator room starboard side by emergency escape scuttle.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 13 October 2022 Resolved
Remove garden hose from generator room starboard side fwd goose neck.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 October 2022 Resolved
Remove dead-end wiring from overhead by starboard generator and by Air compressors
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 October 2022 Resolved
Remove all extension cords pluged in to powers strips by washer and dryer.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 13 October 2022 Resolved
Prove proper operation of the following alarms and shutdowns for the Main engines. Starboard main engnie, low and high oil level, Both engines Low lube oil shutdown and over speed shut downs.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 13 October 2022 Resolved
Prove proper operation of the following Alarms and Shutdowns for both Generators. Low lube oil alarm and shut down, high jacket water alarm and over speed shutdown.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 October 2022 Resolved
Prove bilge pump takes suction of water from rudder room space.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 13 October 2022 Resolved
Repair broken hand rail by starboard main engine.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 13 October 2022 Resolved
Make emergency escape hatch in Generator room water tight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 November 2022
Resolved 11 September 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 13 October 2022 Resolved
Replace gasket in emergency escape hatch in berthing area adjust dogs and make watertight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 November 2022
Resolved 11 September 2025
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 13 October 2022 Resolved
Provide 2 5 gallon jugs of AFFF before carrying package cargo under 49 CFR.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
01 - Certificates & Documentation › 012 - Crew Certificates › Training and qualification MLC - Personnel safety training
Issued 13 October 2022 Resolved
Provide crew that has completed all required training as per 49 CFR 172 and record of training required by 49 CFR 172.704(d) is keep on board for each crew member.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 13 October 2022 Resolved
Prove proper operation of fire pump while using both fire hoses.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 13 October 2022 Resolved
Install batteries in all UL list smoke detectors on board.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
09 - Working and Living Conditions › 091 - Living Conditions › Lighting (Accommodation)
Issued 13 October 2022 Resolved
Provide light for each Berth.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 October 2022 Resolved
Submit final as build electrical drawings for AC, DC and Alarm systems to MSC for review and CC Sector Anchorage in 30 days.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 November 2022
Resolved 23 December 2022
Resolution: sent to MSC
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 13 October 2022 Resolved
Prior to carrying flammable gas (propane) the provide and post No Smoking/ Open flame as PER 49 CFR 176.220.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 13 October 2022 Resolved
Service all expired Portable Fire extinguisher.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 13 October 2022 Resolved
The following operational and navigational requirements must be completed: 1) Ships whistle must be functional 2) Vessel must be equipped with a sound signaling Bell 3) The compass must be swung and a deviation card provided 4) The radar needs its heading aligned 5) Steering system must be calibrated.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
14 - Pollution Prevention › N/A - No Subsystem › VGP: General
Issued 13 October 2022 Resolved
All containment areas must be equipped with a mechanical means of closing each drain.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 October 2022 Resolved
The following auxiliary related requirements must be completed: 1) Local/Remote fuel shutdown labels & test 2) Flame screens for all vents 3) Vent cover wedges
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 September 2025
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 13 October 2022 Resolved
Provide a updated Stability Analysis to MSC to account for 4 crew members and 16 person in addition to crew for a Max of 20 total persons on a exposed waters. COI is reduced to a total of 4 persons on on board until vessel receives a update Stability Letter.
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 October 2022
Resolved 11 November 2022
Resolution: updated analysis sent to msc
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 23 October 2018 Resolved
Repair leaking gasket on fire pump and prove operation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 9 January 2019
Resolution: Verified seal was repaired and witnessed an operational satisfactory test.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 23 October 2018 Resolved
Replace FWD fire station hose with 75' hose due to holes
Action required: 60 - Rectify deficiencies prior to movement
Resolved 9 January 2019
Resolution: Verified the hose was renewed.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 23 October 2018 Resolved
Provide up to date charts onboard
Action required: 60 - Rectify deficiencies prior to movement
Resolved 9 January 2019
Resolution: Verified up-to-date charts were provided the the primary area of operation.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 October 2018 Resolved
Replace port bridge wing lifebuoy
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 9 January 2019
Resolution: Verified the lifebuoy was renewed.
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 23 October 2018 Resolved
Reinstall both port and starboard embarkation lights for the life rafts
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 January 2019
Resolution: Verified embarkation lights were provided and witnessed a satisfactory operational test.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 23 October 2018 Resolved
Replace all expired items on both first aid kits
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 June 2022
Resolution: all sat
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 October 2018 Resolved
Install non-conducting mats or grates in the rear of the electrical switch board in the generator space
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 January 2019
Resolution: Verified non-conductive matting was provided at the front and back of the main switchboard.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 23 October 2018 Resolved
Reinstall lagging on port main engine
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 January 2019
Resolution: Verified lagging was provided.
09 - Working and Living Conditions › 091 - Living Conditions › Record of inspection
Issued 23 October 2018 Resolved
Vessel shall conduct and log week and semi-annually testing of the emergency light and power systems onboard
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 29 June 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 October 2018 Resolved
Provide limit switched on power operated steering system to prevent the rudder from hitting the rudder stops
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 6 July 2022
Resolution: all sat
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 23 October 2018 Resolved
Replace missing bulbs in e-lights in steering space
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 January 2019
Resolution: Verified described elights were provided with a bulb and properly functioned.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 October 2018 Resolved
Prove proper operation of local starting of steering pumps
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 6 July 2022
Resolution: all sat
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 23 October 2018 Resolved
Make emergency escape hatch in port aft berthing water tight
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 9 January 2019
Resolution: Verified hatched was serviced and able to maintain watertight integrity.
Fire Fighting › Fire Main › Condition
Issued 19 October 2017 Resolved
Make permit repairs to leaks in fire main and confirm satisfactory condition of the rest of the fire main.
Action required: 60 - Rectify deficiencies prior to movement
Due 19 October 2017
Resolved 23 October 2018
Resolution: Vessel has repaired all pipping
Electrical › Electric Generation Source (service) › Panelboard
Issued 19 October 2017 Resolved
Make permit repairs to Electrical system due to salt water leaking from the fire main
Action required: 60 - Rectify deficiencies prior to movement
Due 19 October 2017
Resolved 18 January 2018
Resolution: Vessel has installed the rebuilt voltage regulator for the 100K generator. Conducted load test on 100k generator by running all electric equipment onboard for 15 minutes test sat.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 16 October 2017 Resolved
Prove proper annual servicing of all portable extinguishers at least once every 12 months
Action required: 60 - Rectify deficiencies prior to movement
Resolved 3 November 2017
Resolution: Vesssel serviced all portable extinguishers
Stability › Watertight Integrity › General
Issued 16 October 2017 Resolved
Prove proper operation of all water and weather tight door and hatches.
Action required: 705 - Other - as specified
Due 30 October 2017
Resolved 23 October 2018
Resolution: Vessel repiared all water and weather tight doors and hatches
Engineering › Freshwater Generation System › Piping
Issued 16 October 2017 Resolved
Fix pinhole leak on potable water piping in engine room starboard side overhead.
Action required: 705 - Other - as specified
Due 30 October 2017
Resolved 7 November 2017
Resolution: Vessel repaired potable water pipe in engineroom
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 16 October 2017 Resolved
Install guard on starboard main engine.
Action required: 705 - Other - as specified
Due 30 October 2017
Resolved 3 November 2017
Resolution: Vesseel installed guards on all engines
Engineering › Diesel Engine (propulsion-direct drive) › Exhaust Manifold
Issued 16 October 2017 Resolved
Vessel must make permanent repairs to exhaust leaks on both main engines.
Action required: 705 - Other - as specified
Due 30 October 2017
Resolved 23 October 2018
Resolution: vessel has made repairs to both main engine exhaust systems
Fire Fighting › Miscellaneous Items › Insulation (Penetration of Oil/Oil Vapors)
Issued 16 October 2017 Resolved
Replace oil covered exhaust lagging on starboard generator.
Action required: 705 - Other - as specified
Due 30 October 2017
Resolved 3 November 2017
Resolution: Vessel installed new exhaust lagging on starboard generator.
Accommodation/Occupational Safety › Heating › Piping
Issued 16 October 2017 Resolved
Install or adjust exhaust lagging on all engines to prevent personal from touching hot exhaust piping.
Action required: 705 - Other - as specified
Due 30 October 2017
Resolved 3 November 2017
Resolution: Vessel has installed or adjust exhaust lagging on all engines
Fire Fighting › Fire Hoses › Condition
Issued 16 October 2017 Resolved
Replace leaking fire hose on main cargo deck.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 3 November 2017
Resolution: Vessel has replaced fire hose
Fire Fighting › Nozzles › Condition
Issued 16 October 2017 Resolved
Prove proper operation of fire nozzles and applicators onboard.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 3 November 2017
Resolution: All fire nozzles and applicators onboard are working properly
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 16 October 2017 Resolved
Prove proper marking on fire ax, lifebuoys, and emergency lighting.
Action required: 705 - Other - as specified
Due 30 October 2017
Resolved 3 November 2017
Resolution: fire ax, lifebuoys, and emergency lighting are properly marked
Operations/Management › Drills/Instruction › Abandon Ship
Issued 16 October 2017 Resolved
Conduct U/W drills, man overboard and fire drill with CG inspectors.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 3 November 2017
Resolution: Conducted drills with crew all sat.
Deck/Cargo › Cargo Condition › Other Cargo Type
Issued 16 October 2017 Resolved
Vessel must provide onboard additional fire protections onboard the vessel before carriage of portable tanks as listed on COI as per 49CFR176.315
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 October 2017
Resolved 23 October 2018
Resolution: Vessel has not hauled LPG bottles in the last year, Company will provide additional fire protection if they rcvd. a contract for LPG bottles and will contact the CG to show prove of additional equipment is onboard.
Engineering › Freshwater System (jacketwater cooling) › Hose
Issued 16 October 2017 Resolved
Replace worn/wasted flex hoses on engines.
Action required: 705 - Other - as specified
Due 13 November 2017
Resolved 18 January 2018
Resolution: Vessel has replaced all worn and wasted hoses
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 16 October 2017 Resolved
Make permanent repairs to bulkhead between the engine-room and the generator space watertight.
Action required: 705 - Other - as specified
Due 31 May 2018
Resolved 9 January 2019
Resolution: Verified the tranverse watertight bulkhead and it's penetrations were properly sealed and watertight.
Electrical › Electric Generation Source (emergency) › Power Requirement
Issued 16 October 2017 Resolved
Prove proper operation of all emergency power onboard the vessel.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 November 2017
Resolution: Vessel has installed new emergency batteries all tested sat.
Construction/Loadline › Structures › Door
Issued 3 April 2017 Resolved
Make flush deck accommodation space emergency escape hatch watertight.
Action required: 705 - Other - as specified
Due 1 May 2017
Resolved 25 May 2017
Resolution: Witnessed new gasket properly installed and hatch functioning properly.
Fire Fighting › Fire Pumps › Pressure
Issued 26 August 2016 Resolved
Provide fire pump which can produce required pressure and flow rate at upcoming drydock exam. Temporarily authorized to use two (02) portable pumps to charge fire main.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 October 2016
Resolved 29 March 2017
Resolution: Verified instalation of new fire pump and witnessed an operational test. Test Sat.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 26 August 2016 Resolved
Demonstrate operation of emergency lighting system onboard vessel.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 August 2016
Resolution: Emergency batteries were dead. Batteries were replaced and emergency lighting functioned properly.
Navigation › Piloting/Steering › Marine Charts
Issued 26 August 2016 Resolved
Provide up to date nautical charts for areas the vessel operates in.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 October 2016
Resolved 3 April 2017
Resolution: Verified charts were corrected up to the latest notice to mariners.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 26 August 2016 Resolved
Install Structural Fire protection on the berthing room emergency egress IAW NVIC 9-97.
Action required: 705 - Other - as specified
Due 2 January 2017
Resolved 3 April 2017
Resolution: Verified the installation of the equivalent of A-60 insulation for steel was applied to the indentified hatches.
Construction/Loadline › Hull › Bottom Plating
Issued 6 April 2016 Resolved
Crop and renew the damaged section of main vertical keel in the #1 void. 46 CFR 92
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2016
Resolved 18 April 2016
Engineering › Sea-water System (primary cooling) › Sea Chest
Issued 6 April 2016 Resolved
Blank off the 2 unused valves in the portside sea chest. 46 CFR 56
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2016
Resolved 11 April 2016
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 6 April 2016 Resolved
Repair/replace the MSD overboard valve. 46 CFR 56
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2016
Resolved 12 April 2016
Construction/Loadline › Hull › Bottom Plating
Issued 6 April 2016 Resolved
CConduct U/T gauging in the following areas: Bow head log, around the damaged main vertical keel in the #1 void, the main vertical keel in the #2 void, in the pre-existing sea chest on the port side, pitted hull plating in the vicinity of the rub rail, and the hull plating and main vertical keel on the stern and conduct any necessary repairs.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2016
Resolved 18 April 2016
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 6 April 2016 Resolved
Provide means for the escape hatch from the stateroom to open easily. 46 CFR 92.10
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2016
Resolved 26 August 2016
Resolution: [name withheld] and [name withheld] witnessed proper operation of escape hatch during COI inspection.
Engineering › Sea-water System (primary cooling) › Piping
Issued 6 April 2016 Resolved
Repair the leak in the starboard keel cooler. 46 CFR 92
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 May 2016
Resolved 18 April 2016

Recorded names · 1

GLACIER (2006). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.