MAURY USCG vessel records Sign in
← All vessels

SOPHIL

SOPHIL is a 1975 tank ship. The Coast Guard has recorded 116 inspections since 1983, most recently in December 1997, along with 153 deficiencies.

Records from 1983 to 1997. Most recent: inspection, 3 December 1997.

Built
1975
Last inspected
3 December 1997
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

7366764 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
UNITED STATES
—
Maury page id
psix-47984

Inspections, by type

…with no type recorded46
Years with a record 14 calendar years (1983–1997)
The 116 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 29 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it17134 - Regulatory (Subpart C or D), Gross Ton
11886 - Regulatory (Subpart C or D), Net Ton
26562 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 116

3 December 1997 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 410836
3 December 1997 Tank Vessel Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1107630
7 April 1995 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1153470
18 January 1995 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1132321
1 December 1994 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 826570
30 November 1994 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1177222
25 November 1994 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 867156
17 November 1994 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 869415
14 November 1994 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 863898
26 August 1994 MARPOL Annex V Examination · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1175217
22 March 1994 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 857757
21 March 1994 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 855729
20 December 1993 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 153662
20 December 1993 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 221288
30 September 1993 Re-Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1466849
29 September 1993 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 540364
7 July 1993 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 359383
2 July 1993 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1156969
29 June 1993 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1158822
7 March 1993 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 356682
7 March 1993 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1144753
18 February 1993 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 356383
18 February 1993 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1144244
11 February 1993 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 652344
10 February 1993 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 89500
1 February 1993 Deficiency Check
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1141047
13 January 1993 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 652337
11 January 1993 Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 355660
11 January 1993 Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1133295
1 January 1993 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 103252
1 January 1993 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 834007
31 December 1992 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 534986
3 December 1992 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 445643
2 November 1992 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 169762
22 October 1992 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 941658
30 September 1992 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 354684
22 September 1992 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 935011
31 August 1992 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1267200
28 August 1992 COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1252363
5 May 1992 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1256790
4 January 1992 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 947939
5 December 1991 Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 941765
14 November 1991 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1253721
29 October 1991 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1252529
28 October 1991 Deficiency Check
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 939334
23 October 1991 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 935492
16 October 1991 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1250474
26 September 1991 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 935797
12 September 1991 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 937431
24 August 1991 Damage Survey
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1249380
17 August 1991 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 492224
6 July 1991 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 932330
6 July 1991 Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1213022
21 May 1991 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1327504
1 May 1991 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 906429
18 April 1991 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1214190
14 March 1991 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 934908
20 February 1991 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1243227
3 January 1991 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1239023
17 October 1990 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1238846
21 August 1990 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1234743
18 July 1990 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 914927
16 May 1990 Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 925805
24 April 1990 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1221166
20 March 1990 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1220293
9 March 1990 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1229799
22 February 1990 Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1237784
28 December 1989 Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1227746
9 November 1989 Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1040554
8 November 1989 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 910944
18 October 1989 Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1352480
25 June 1989 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 450886
25 June 1989 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1205192
19 June 1989 Deficiency Check
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1038829
6 June 1989 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1200294
14 April 1989 Deficiency Check
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 898179
22 March 1989 Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1345243
3 March 1989 Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1208335
24 February 1989 COI Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1350711
8 February 1989 Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1034636
10 December 1988 Deficiency Check
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 897688
24 November 1988 Examination of Repairs · Damage Survey
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1207057
6 November 1988 Damage Survey
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 898816
22 October 1988 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 521219
27 September 1988 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1351996
8 September 1988 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1350748
30 August 1988 Damage Survey
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1041028
26 June 1988 Re-Inspection · Hull Examination · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 902144
26 June 1988 MARPOL Annex II Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 902150
5 March 1988 Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 971363
12 February 1988 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1341456
28 January 1988 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1016185
26 January 1988 Deficiency Check
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1322242
3 October 1987 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1319548
21 September 1987 Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 528252
3 September 1987 Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1000553
25 June 1987 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1317179
13 March 1987 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1325798
3 March 1987 COI Inspection · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1015634
26 September 1986 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 522488
26 September 1986 Examination of Repairs
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1007205
2 September 1986 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 963736
19 May 1986 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 523037
28 December 1985 Examination of Repairs
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1294198
29 October 1985 Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 491984
30 August 1985 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 519921
30 August 1985 Damage Survey
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1294962
5 August 1985 Examination of Repairs
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1297476
12 July 1985 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1287783
15 June 1985 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 984935
15 May 1985 Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 984307
24 March 1985 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 301057
10 August 1984 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 974092
12 July 1984 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1280906
11 June 1984 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 516188
25 October 1983 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1275641

Deficiency record · 153

Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 3 December 1997 Resolved
PAINT SHIP NAME PROPERLY ON THE STERN.
Condition: Unknown
Due 4 December 1997
Resolved 5 October 2004
Resolution: 05OCT04: Due to age of requirement cleared deficiency to clean up Sector San [name withheld] Deficiencies List.
Navigation › Piloting/Steering › Gyro Compass
Issued 3 December 1997 Resolved
CONDUCT PROPER TEST OF AUTO PILOT ALARM.
Condition: Unknown
Due 2 January 1998
Resolved 5 October 2004
Resolution: 05OCT04: Due to age of requirement cleared deficiency to clean up Sector San [name withheld] Deficiencies List.
Lifesaving
Issued 3 December 1997 Resolved
CONDUCT FIRE AND BOAT DRILL.
Condition: Unknown
Due 4 December 1997
Resolved 10 December 1997
Fire Fighting
Issued 18 January 1995 Resolved
INSTALL A CLASS "A" FIRE DOOR WHERE PRESENTLY MISSING AT THE GALLEY FWD. ENTRANCE TO BE COMPLETED TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 18 January 1995
Resolved 18 January 1995
Engineering
Issued 18 January 1995 Resolved
REPAIR/REINSTALL DISCONNECTED WASTE HEAT BOILER EXHAUST STACK GAS THERMOCOUPLER AND DETERMINE LOCATION OF EXHAUST/SOOT LEAK AT MANHOLE, LOWERBOILER FLAT LEVEL. CLEAN BOILER FOR INTERNAL EXAM AND REPLACE LEAKING MANHOLE GASKET PRIOR TO OPERATING THE BOILER.
Condition: Unknown
Due 18 January 1995
Resolved 18 January 1995
Electrical
Issued 14 November 1994 Resolved
REPLACE MISSING ELECTRICAL COVER ON #2 REFRIGERATION COMPRESSOR PRESSURE SWITCH.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Electrical
Issued 14 November 1994 Resolved
RELAMP ALL LIGHTS IN THE EMERGENCY ESCAPES: ENGINE CONTROL ROOM AND SHAFT ALLEY.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Construction/Loadline
Issued 14 November 1994 Resolved
REPLACE ALL MISSING BOLTS TO THE DOUBLE BOTTOM COVER LOCATED IN THE SHAFT ALLEY.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Lifesaving
Issued 14 November 1994 Resolved
REMOVE PAINT AND OTHER FLAMABLES FROM THE BOILER FLAT IN THE ENGINE ROOM. STORE PROPERLY.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Electrical
Issued 14 November 1994 Resolved
REMOVE TEMPORARY MODIFCATIONS TO SCAVENGING AIR CONTROL SYSTEM ON #2 SHIP SERVICE GENERATOR AND PROVE PROPER OPERATION OF THE SAME.
Condition: Unknown
Due 21 November 1994
Resolved 21 November 1994
Accommodation/Occupational Safety
Issued 14 November 1994 Resolved
REPAIR LEAKING FLANGE IN THE PIPING AFT OF THE REDUCTION GEAR, LOWER LEVEL OF THE ENGINE ROOM.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Engineering
Issued 14 November 1994 Resolved
REMOVE IMPROPER SPACERS ON THE FUEL RACK ON THE PORT MAIN ENGINE. PROVE PROPER OPERATION OF THE SAME.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Construction/Loadline
Issued 14 November 1994 Resolved
CAP IMPROPER OVERFLOW PIPING ON THE DOUBLE BOTTOM TANK TOP COVER LOCATED INTHE SHAFT ALLEY AND UNDER THE OILY WATER SEPERATOR, LOWER LEVEL OF THE ENGINE ROOM.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Electrical
Issued 14 November 1994 Resolved
REPAIR ALL WIRING IMPROPERLY CONNECTED TO BOTH SHIP SERVICE GENERATORS. REMOVE ALL WIRE NUTS AND MAKE CONNECTIONS PERMANENT.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Construction/Loadline
Issued 14 November 1994 Resolved
REPAIR DISTORTED WATERTIGHT DOOR LEADING TO PUMPROOM, PORTSIDE, MAINDECK. HOSETEST TO PROVE WATERTIGHT INTEGRITY OF DOOR.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Deck/Cargo
Issued 14 November 1994 Resolved
REPAIR DETERIORATED RUBBER BOOT ON THE PUMPROOM VENTILATION FAN, O1 DECK, STARBOARD SIDE.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Lifesaving
Issued 14 November 1994 Resolved
REPAIR BROKEN RUDDER STOP ON THE PORT LIFEBOAT.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Fire Fighting
Issued 14 November 1994 Resolved
REPAIR VENTILATION CLOSURE IN EMERGENCY GENERATOR ROOM. PROVE PROPER OPERATION FROM COMPLETELY OPENED TO COMPELTELY CLOSED.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Electrical
Issued 14 November 1994 Resolved
REPAIR LIGHTING FIXTURE ABOVE EMERGENCY GENERATOR SWITCHBOARD PANELS IN EMERGENCY GENERATOR ROOM. REMOVE WIRE NUTS AND MAKE ALL WIRING CONNECTIONSPERMANENT.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Electrical
Issued 14 November 1994 Resolved
REPLACE ALL MISSING EXPLOSION PROOF LIGHTING GUARDS LOCATED IN THE PUMPROOM. (6 TOTAL)
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Accommodation/Occupational Safety
Issued 14 November 1994 Resolved
REPAIR WASTED VENTILATION DUCTING IN LADDERWAY TO AFTER STEERING.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Navigation
Issued 14 November 1994 Resolved
REPAIR WIRING LEADING FROM TELEHPONE IN THE EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 21 November 1994
Resolved 21 November 1994
Lifesaving
Issued 14 November 1994 Resolved
REPAIR INOPERATIVE WATERLIGHT LOCATED AT AFTERMOST RING LIFEBUOY STATION, MAINDECK, PORTSIDE. INSTALL PROPER HOLDER FOR SAME.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Electrical
Issued 14 November 1994 Resolved
REPAIR ALL INOPERATIVE LIGHTING FIXTURES THROUGHOUT THE SHIP.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Lifesaving
Issued 14 November 1994 Resolved
CLEAN BILGES IN THE ENGINEROOM OF EXCESSIVE OIL.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Electrical
Issued 14 November 1994 Resolved
REPAIR ALL TEMPORARY MODIFICTIONS TO #1 SHIP SERVICE GENERATOR AND PROVE PROPER OPERATION OF THE SAME.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Deck/Cargo
Issued 14 November 1994 Resolved
REPAIR OR REPLACE FLAME SCREENS ON THE FOLLOWING TANKS: #1 CENTER, _x001C_ #2 CENTER AND #7 CENTER.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Lifesaving
Issued 14 November 1994 Resolved
REPAIR WIRING AND REPLACE BROKEN GLASS TO SECURITY ALARM, MAINDECK, STARBOARD SIDE.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Construction/Loadline
Issued 14 November 1994 Resolved
REPAIR DISTORTED HATCH COVER LEADING TO AFTER LINE LOCKLER/AFTER STEERING. PROVE WATERTIGHT ITEGRITY OF HATCH.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Lifesaving
Issued 14 November 1994 Resolved
REMOVE ALL ITEMS STORED IN THE EMERGENCY ESCAPE LOCATED IN THE ENGINE CONTROL ROOM.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Lifesaving
Issued 14 November 1994 Resolved
PROPERLY SECURE ALL FREON, OXYGEN, AND ACETYLENE COMPRESSED GAS BOTTLES.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Electrical
Issued 14 November 1994 Resolved
REPAIR OIL LEAKS ON #1 SHIP SERVICE GENERATOR.
Condition: Unknown
Due 17 November 1994
Resolved 21 November 1994
Unknown
Issued 26 August 1994 Resolved
PROVE PROPER OPERATION OF 3 GEN ALARM BELLS LOCATED ON FORWARD HOUSE AT NEXT US PORT OR NEXT USCG VISIT, BUT NOT LATER THAN 20NOV94.
Condition: Unknown
Due 26 August 1994
Resolved 26 August 1994
Engineering
Issued 26 August 1994 Resolved
PROVE PROPER OPERATION OF WASTE HEAT BOILERS SAFETY VALVES, LOG RESULTS ANDHAVE VALVES SEALED AT NEXT US PORT OF USCG VISIT, BUT NOT LATER THAN 20NOV94.
Condition: Unknown
Due 26 August 1994
Resolved 26 August 1994
Deck/Cargo
Issued 30 September 1993 Resolved
PROVIDE DOCUMENTARY PROOF OF CARGO PIPING HYDROSTATIC TEST TO 150 PERCENT MAWP(225 PSI).
Condition: Unknown
Due 30 September 1993
Resolved 30 September 1993
Engineering
Issued 18 February 1993 Resolved
WELD REPAIR AND ATTACH PULLEY BRACKETS FOR HAND RELIEVING GEAR FOR WASTE HEAT BOILER RELIEF VALVES (2).
Condition: Unknown
Due 18 February 1993
Resolved 18 February 1993
Engineering
Issued 18 February 1993 Resolved
SUBSEQUENT TO REPAIRS, PROVE PROPER OPERATIONS OF WASTE HEAT RELIEF VALVE (2) HAND RELIEVING GEAR.
Condition: Unknown
Due 18 February 1993
Resolved 18 February 1993
Electrical
Issued 1 January 1993 Resolved
RENEW OUTSIDE ARMOURED CABLE ON FORE AND AFT BOAT DAVIT LIMIT SWITCHES ON PORT AND STARBOARD BOAT DAVITS.
Condition: Unknown
Due 1 January 1993
Resolved 1 January 1993
Electrical
Issued 1 January 1993 Resolved
INSTALL MISSING HARDWARE ON CONDUIT RUN OUTBOARD OF OUTBOARD GENERATOR FOR GENERATOR SENSOR WIRING.
Condition: Unknown
Due 1 January 1993
Resolved 1 January 1993
Engineering
Issued 1 January 1993 Resolved
EFFECT PERMANENT REPAIRS TO CRACKED SALT WATER PIPING IN WAY OF INBOARD GENERATOR LUBE OIL COOLER DISCHARGE LINE.
Condition: Unknown
Due 1 January 1993
Resolved 1 January 1993
Engineering
Issued 1 January 1993 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 1 January 1993
Resolved 4 January 1993
Engineering
Issued 1 January 1993 Resolved
REPAQIR BLOWER AIR INTAKE SHUT-OFF VALVE LINKAGE ON OUTBOARD GENERATOR.
Condition: Unknown
Due 1 January 1993
Resolved 4 January 1993
Engineering
Issued 1 January 1993 Resolved
REPAIR AND PROVE PROPER OPERATION OF INBOARD AND OUTBOARD SHIP SERVICE GENERATOR LUBE OIL SUMP LEVEL INDICATORS.
Condition: Unknown
Due 1 January 1993
Resolved 1 January 1993
Construction/Loadline
Issued 1 January 1993 Resolved
EFFECT PERMANENT REPAIRS TO STARBOARD FIRE PUMP SEA CHEST IN WAY OF PRESENTLY INSTALLED CONCRETE FORMED AND POURED AROUND SEACHEST VENT LINE ONUPPER SEACHEST PLATING. REPAIRS TO BE COMPLETED DURING NEXT SCHEDULED DRYDOCKING.
Condition: Unknown
Due 1 January 1993
Resolved 1 January 1993
Deck/Cargo
Issued 1 January 1993 Resolved
CONDUCT HYDROSTATIC TEST OF CARGO PIPING AT 1 1/2 TIMES MAWP PRIOR TO CARGOTRANSFER OPERATIONS OR OTHERWISE PROVIDE DOCUMENTATION THAT TEST HAS BEEN PERFORMED WITHIN THE LAST TWELVE MONTHS._x001C_ _x001C_
Condition: Unknown
Due 4 January 1993
Resolved 4 January 1993
Engineering
Issued 1 January 1993 Resolved
RENEW MISSING AND FAILED HIGH PRESSURE FUEL PUMP FUEL RETURN LINES ON OUTBOARD GENERATOR PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 1 January 1993
Resolved 4 January 1993
Engineering
Issued 1 January 1993 Resolved
REPAIR OUTBOARD GENERATOR AFT PEDESTAL BEARING LUBE OIL SUPPLY AND RETURN LINE OIL LEAKS PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 1 January 1993
Resolved 4 January 1993
Engineering
Issued 1 January 1993 Resolved
REMOVE ACCUMULATED FUEL IN WAY OF FUEL OIL STRAINER COFFERDAM AND REPAIR LEAKS ON STRAINER ASSEMBLY PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 1 January 1993
Resolved 4 January 1993
Navigation
Issued 1 January 1993 Resolved
REPAIR AND PROVE PROPER OPERATION OF ENGINE ORDER TELEGRAPH PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 1 January 1993
Resolved 4 January 1993
Engineering
Issued 1 January 1993 Resolved
REPAIR EXHAUST LEAKS ON EXHAUST FLANGES OF STARBOARD MAIN DIESEL ENGINE FROM TURBOCHARGER OUTLET TO MUFFLER.
Condition: Unknown
Due 1 January 1993
Resolved 1 January 1993
Electrical
Issued 1 January 1993 Resolved
CLEAN AND REMOVE DEBRIS FROM INBOARD GENERATOR PRE-LUBE PUMP POWER PANEL AND PROPERLY WIRE.
Condition: Unknown
Due 1 January 1993
Resolved 1 January 1993
Engineering
Issued 1 January 1993 Resolved
REPAIR AND PROVE PROPER OPERATION OF INBOARD AND OUTBOARD SHIP SERVICE GENERATOR LUBE OIL TEMPERATURE GAUGES.
Condition: Unknown
Due 1 January 1993
Resolved 1 January 1993
Engineering
Issued 1 January 1993 Resolved
REPAIR AND PROVE PROPER OPERATION OF INBOARD AND OUTBOARD SHIP SERVICE GENERATOR JACKET WATER TEMPERATURE GAUGES.
Condition: Unknown
Due 1 January 1993
Resolved 1 January 1993
Electrical
Issued 1 January 1993 Resolved
INSTALL PROPER "TEE" COVERS ON STARBOARD MAIN DIESEL ENGINE PYROMETER WIRING HARNESS CONDUIT.
Condition: Unknown
Due 1 January 1993
Resolved 1 January 1993
Navigation
Issued 1 January 1993 Resolved
REMOVE SPILLED HYDRAULIC OIL FROM AFTER STEERING IN WAY OF STEERING GEAR COFFERDAM PRIOR TO GEETING UNDERWAY.
Condition: Unknown
Due 1 January 1993
Resolved 4 January 1993
Construction/Loadline
Issued 1 January 1993 Resolved
REMOVE FUEL AND LUBE OIL FROM ENGINE ROOM BILGES PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 1 January 1993
Resolved 4 January 1993
Engineering
Issued 1 January 1993 Resolved
REPAIR FUEL LEAKS ON INBOARD GENERATOR FUEL PUMP RELIEF VALVE PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 1 January 1993
Resolved 4 January 1993
Electrical
Issued 1 January 1993 Resolved
REMOVE DEAD-ENDED WIRE RUN FORWARD OF THE STARBOARD MAIN DIESEL ENGINE.
Condition: Unknown
Due 1 January 1993
Resolved 1 January 1993
Engineering
Issued 28 August 1992 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 28 August 1992
Resolved 28 August 1992
Engineering
Issued 23 October 1991 Resolved
PROVE TO THE SATISFACTION OF THE COAST GUARD INSPECTOR THAT ALL EIGHT (8) NON-METALLIC EXPANSION JOINTS HAVE BEEN REPLACED. SIX (6) REPLACED TWO (2) REMAINING TO BE REPLACED.
Condition: Unknown
Due 23 October 1991
Resolved 23 October 1991
Engineering
Issued 23 October 1991 Resolved
REASSEMBLE SAFETY VALVES ON THE WASTE HEAT BOILER TO ALLOW MARINE INSPECTORTO SEAL VALVES.
Condition: Unknown
Due 23 October 1991
Resolved 23 October 1991
Electrical
Issued 16 October 1991 Resolved
PROVE PROPER OPERATION OF #1 AND #2 SHIP SERVICE DIESEL GENERATORS. PROVE PROPER OPERATION OF OVERSPEED, HIGH JACKET WATER AND LOW LUBRICATING OIL PRESSURE TRIPPING DEVICE ON BOTH SS DG.S.
Condition: Unknown
Due 12 November 1991
Resolved 12 November 1991
Electrical
Issued 16 October 1991 Resolved
REPAIR AS ORIGINAL CONDITION AND PROVE PROPER OPREATION OF REDUCTION GEARS,SPECIFICALLY
Condition: Unknown
Due 12 November 1991
Resolved 12 November 1991
Engineering
Issued 16 October 1991 Resolved
REPAIR AS ORIGINAL EXHAUST SYSTEM ON BOTH PORT AND STARBOARD MAIN DIESEL ENGINES. DEMONSTRATE TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTORTHAT NO LEAKS EXIST IN THE FLANGES, MANIFOLDS, PIPINGS AND MAIN EXHAUST RISERS WHERE EXHAUST GAS TEMPERATURE IS TAKEN.
Condition: Unknown
Due 12 November 1991
Resolved 12 November 1991
Lifesaving
Issued 16 October 1991 Resolved
PRIOR TO VESSEL DEPARTURE REMOVE OIL FROM SHAFT ALLEY BILGES, & ENGINEROOM BILGES. REMOVE OIL FROM ENGINEROOM DECKS. WIPE UP ALL SURFACES OF ROTATING MACHINERY, REMOVE OILY RAGS AND OILY SLOPS FROM AROUND ENTIRE ENGINEROOM. PROPERLY STOW DRUMS OF LUBE OIL, REFRIGERATION STORAGE GAS
Condition: Unknown
Due 12 November 1991
Resolved 12 November 1991
Engineering
Issued 16 October 1991 Resolved
REPAIR OR RENEW ALL LEAKING BLOW DOWN VALVES ON #1 & #2 MDE.
Condition: Unknown
Due 14 November 1991
Resolved 14 November 1991
Lifesaving
Issued 16 October 1991 Resolved
PROVE PROPER OPERATION OF AUDIBLE AND VISUAL ALARM IN ENGINE.
Condition: Unknown
Due 8 November 1991
Resolved 8 November 1991
Engineering
Issued 16 October 1991 Resolved
REPACK FEED PUMP TO CORRECT EXCESSIVE LEAKAGE.
Condition: Unknown
Due 8 November 1991
Resolved 8 November 1991
Deck/Cargo
Issued 16 October 1991 Resolved
VESSEL IS PROHIBITED FROM CARRY OUT CARGO OPERATIONS, LEAVING PORT OF NEW YORK OR OPERATING UNDER ITS OWN POWER (PROPULSION) WITHOUT MIO NY APPROVAL.
Condition: Unknown
Due 12 November 1991
Resolved 12 November 1991
Fire Fighting
Issued 16 October 1991 Resolved
PROVE PROPER OPERATION OF EMERGENCY FIRE PUMP. IAW 46CFR 34.10._x001C_ DON'T HAVE ENOUGH WATER PRESSURE ON MONITOR (FOAM).
Condition: Unknown
Due 8 November 1991
Resolved 8 November 1991
Fire Fighting
Issued 16 October 1991 Resolved
RENEW OR REPAIR MOTOR ACTIVATED DISCH. VALVE FOR MAIN FIRE PUMP/BILGE PUMP.MOTOR ACTIVATION DISCONNECTED HAS TO USE PIPE WRENCH TO OPEN AND CLOSED THIS REQUIREMENT MAST COMPLY WITH 46CFR56.50-1(G)(I).
Condition: Unknown
Due 8 November 1991
Resolved 8 November 1991
Electrical
Issued 16 October 1991 Resolved
PROVIDE RUBBER MAT IN FRONT AND BACK OF MAIN ELECTRICAL SWITCHBOARD.
Condition: Unknown
Due 14 November 1991
Resolved 14 November 1991
Engineering
Issued 16 October 1991 Resolved
MAKE PROPER PIPING REPAIRS TO ALFA LUBE OIL PURIFIERS ON LOWER LEVEL ENGINEROOM PORT SIDE. (REMOVE SOFT PIPES AND HOSE CLAMPS).
Condition: Unknown
Due 16 October 1991
Resolved 16 October 1991
Engineering
Issued 16 October 1991 Resolved
PROVE PROPER OPERATION OF OVERSPEED TRIP ON #1 MDE. ALL OF THE ABOVE REQUIREMENTS (1-6)MUST BE COMPLETED TO THE SATISFACTION OF AN ATTENDING USCG MARINE INSPECTOR NLT 23 OCT 91.
Condition: Unknown
Due 8 November 1991
Resolved 8 November 1991
Construction/Loadline
Issued 16 October 1991 Resolved
CLEAN BILGES TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR. _x001C_
Condition: Unknown
Due 14 November 1991
Resolved 14 November 1991
Electrical
Issued 16 October 1991 Resolved
PROVE PROPER OPERATIONS OF EMERGENCY DIESEL GENERATOR INCLUDING SHUTDOWNS.
Condition: Unknown
Due 12 November 1991
Resolved 12 November 1991
Construction/Loadline
Issued 16 October 1991 Resolved
PROVE PROPER OPERATION OF ENGINE ROOM BILGE PUMP.
Condition: Unknown
Due 12 November 1991
Resolved 12 November 1991
Fire Fighting
Issued 16 October 1991 Resolved
PROVE PROPER OPERATION OF FIRE/FOAM PUMP IN SHAFT ALLEY FROM ALL CONTROL STATIONS.
Condition: Unknown
Due 12 November 1991
Resolved 12 November 1991
Fire Fighting
Issued 16 October 1991 Resolved
REPLACE AND/OR SERVICE ALL EXPENDED OR MISSING PORTABLE FIRE EXTINGUISHERS IN MACHINE SPACE.
Condition: Unknown
Due 12 November 1991
Resolved 12 November 1991
Engineering
Issued 26 September 1991 Resolved
PROVIDE DOCUMENTATION ON ALL MAIN SEA SERVICE PIPING NON-METALLIC EXPANSIONJOINTS SHOWING DATE OF MANUFACTURE AND DATE OF INSTALLATION._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 September 1991
Resolved 26 September 1991
Engineering
Issued 26 September 1991 Resolved
REPLACE ALL AUXILIARY SERVICE PIPING NON-METALLIC EXPANSION JOINTS.
Condition: Unknown
Due 26 September 1991
Resolved 26 September 1991
Deck/Cargo
Issued 12 September 1991 Resolved
MAKE REPAIRS TO THE BLUE CARGO PUMP AND TEST TO THE SATISFACTION OF A MARINE INSPECTOR PRIOR TO THE NEXT CARGO TRANSFER USING THE BLUE PUMP
Condition: Unknown
Due 12 September 1991
Resolved 12 September 1991
Deck/Cargo
Issued 12 September 1991 Resolved
MAKE REPAIRS TO THE STACY VALVE PORT SIDE PUMP ROOM AND REINSTALL PIPING.
Condition: Unknown
Due 12 September 1991
Resolved 12 September 1991
Engineering
Issued 24 August 1991 Resolved
Provide documentation on all main sea service piping non-metallic expansionjoints showing date of manufacture and date of installation._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 24 August 1991
Resolved 24 August 1991
Engineering
Issued 24 August 1991 Resolved
Replace all auxiliary service piping non-metallic expansion joints.
Condition: Unknown
Due 24 August 1991
Resolved 24 August 1991
Engineering
Issued 6 July 1991 Resolved
SET THE SAFETY VALVES ON THE WASTE HEAT BOILER AT SEA. VALVES ARE TO BE SETAT OR BELOW 60 PSI. A LOG ENTRY IS TO BE MADE IN THE ENGINE ROOM LOG GIVINGTHE LIFT AND THE SET PRESSURES. AT THE NEXT U.S. PORT A USCG MARINE INSPECTOR IS TO BE NOTIFIED SO THAT THE SAFETY VALVES CAN BE SEALED.
Condition: Unknown
Due 6 July 1991
Resolved 6 July 1991
Engineering
Issued 20 February 1991 Resolved
INSTALL MISSING AIR ACTIVATED, REMOTE CONTROL, EMERGENCY SHUT OFF VALVE IN DIESEL GENERATOR LOW FUEL TANK SUCTION. EXISTING MANUAL VALVE TO REMAIN INCLOSED POSITION IN THE INTERIM.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Engineering
Issued 20 February 1991 Resolved
REPAIR STBD MDE CRANKCASE VACUUM GAUGE TRANSDUCER. NO SPACE ON BOARD.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Unknown
Issued 20 February 1991 Resolved
PROVIDE CG APPROVED LIFERAFTS COMPLYING WITH 46CFR33.05-3, AND 46 CFR 160.051.SOLAS "A" PACK CERT. LIFERAFTS MAY BE UTILIZED UNTIL COMPLIANCE WITH REQUIREMENTS BUT NO LATER THAN 15 APRIL 1991.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Accommodation/Occupational Safety
Issued 20 February 1991 Resolved
STRIP INSULATION FROM AND MAKE AVAILABLE FOR INSPECTION, ENGINE ROOM MAIN SUPPLY VENTILATION IN STACK, AND UPTAKE, 0-2 LEVEL AND UP. GAUGE AS REQUIRED BY ATTENDING USCG INSPECTOR. MAKE PERMANENT REPAIRS TO SUPPLY DUCTING IN UPTAKES AT 0-3 LEVEL.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Engineering
Issued 20 February 1991 Resolved
REPAIR DISTORTED UPPER CHAMBER INNER SHELL PLATING IN WASTE HEAT BOILER. REPAIR TO BE MADE BY INSERT USING USCG APPROVED WELD PROCEDURE & CERTIFIED WELDERS. REPAIR TO SATISFACTION OF ATTENDING USCG INSPECTOR. HYDRO TEST TO90 PSI WHICH IS 1.5 X MAWP. BOILER PASSED 90 PSI HYDRO W/TEMP REPAIR.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Electrical
Issued 20 February 1991 Resolved
REMOVE OR DEAD-END IN A JUNCTION BOX ARMORED CABLE RUNS WHERE CURRENTLY_x001C_ BARE-ENDED AT AFT END OF MAIN DECK RACEWAY AND IN MAINDECK ENTRANCE TO STEERING GEAR COMPARTMENT IAW 46CFR111.60-17 (a) & (b).
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Electrical
Issued 20 February 1991 Resolved
BLANK-OFF OPEN SPACES IN ANCHOR WINDLASS POWER PANEL P415 IN ANCHOR WINDLASS MACHINERY ROOM._x001C_ _x001C_
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Fire Fighting
Issued 20 February 1991 Resolved
RENEW DISCHARGE VALVES ON PAINT LOCKER CO2 SYSTEM CYLINDERS AND RECHARGE BOTTLES WITH CO2. NO FLAMMABLE MATERIALS ARE TO BE STORED IN THE PAINT LOCKER UNTIL VALVES ARE RENEWED AND THE BOTTLES RECHARGED.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Deck/Cargo
Issued 20 February 1991 Resolved
CONDUCT 1 1/2 MAWP HYDROSTATIC TEST OF CARGO PIPING AND ALL OIL TRANSFER HOSES IAW 33 CFR 156.170(A), (C)(4) & (F)(2).
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Accommodation/Occupational Safety
Issued 20 February 1991 Resolved
RENEW POWER VENTILATION DUCTING IN EMERGENCY GENERATOR ROOM WHERE CURRENTLYWASTED AWAY.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Engineering
Issued 20 February 1991 Resolved
REPLACE BELLOWS TYPE EXPANSION JOINT ON PORT M.D.E. EXHAUST UPTAKE ABOVE SILENCER. A TEMPORARY STEEL SPOOL PIECE HAS BEEN INSTALLED.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Engineering
Issued 20 February 1991 Resolved
REPAIR PORT AND STARBOARD MDE INBOARD TURBOCHARGER TACHOMETERS ON CONSOLE.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Electrical
Issued 20 February 1991 Resolved
REPAIR SMALL COOLING WATER LEAKS ON BOTH SSDG'S. SOME TUBING JUMPER LINES ARE LEAKING.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Engineering
Issued 20 February 1991 Resolved
OPEN AND REMOVE ALL BOILER MOUNTINGS FROM AUXILIARY AND WASTE HEAT BOILERS FOR USCG 4YR AND 8YR INSPECTIONS. WRITTEN EXTENSION REQUEST RECEIVED AND EXTENSIONS GRANTED UNTIL 30 JUNE 1991.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Engineering
Issued 20 February 1991 Resolved
REPAIR #1 & #2 SSDG L.O. SUMP LEVEL INDICATORS.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Engineering
Issued 20 February 1991 Resolved
REPAIR P & S M.D.E. L.O. SUMP LEVEL INDICATORS.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Lifesaving
Issued 20 February 1991 Resolved
RENEW KEEL BOLTS AND CONDUCT AIR PRESSURE TEST OF FLOATATION COMPARTMENTS ON BOTH PORT AND STARBOARD LIFEBOATS.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Accommodation/Occupational Safety
Issued 20 February 1991 Resolved
PERMANENTLY REPAIR SUPPLY VENT ELBOW DUCTING IN EMERGENCY GENERATOR ROOM WITH AT LEAST 11 USCG STEEL. DUCTING IS TEMPORARILY REPAIRED WITH PLASTIC FLEXIBLE DUCTING.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Fire Fighting
Issued 20 February 1991 Resolved
ADJUST FIRE SCREEN DOOR 1-90-2 IN STAIRTOWER ON GALLEY DECK SO THAT IT IS _x001C_COMPLETELY SELF-CLOSING IAW 46CFR32.57-10(D)(4).
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Electrical
Issued 20 February 1991 Resolved
REINSTALL INNER COVER IN ELECTRICAL PANEL L102 IN STAIRTOWER ON GALLEY DECK.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Engineering
Issued 20 February 1991 Resolved
REPAIR/REPLACE INBOARD STARTING AIR RECEIVER RELIEF VALVE WHICH CHATTERS AND IS UNRELIABLE.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Engineering
Issued 20 February 1991 Resolved
THE [name withheld], SET AND SEAL THE WASTE HEAT BOILER SAFETY RELIEF VALVE AT NOT MORE THAN 60 PSI, WHILE UNDERWAY. RESULTS SHALL BE LOGGED AND A COPY OF THE RELIEF PRESSURE AND MACHINERY LOG ENTRY SENT TO USCG MIO NEW YORK.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Engineering
Issued 20 February 1991 Resolved
REPAIR #2 SSDG J.W. TEMPERATURE HIGH ALARM. SWITCH IS BAD WITH NO SPARE ONBOARD.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Fire Fighting
Issued 20 February 1991 Resolved
REPAIR PNEUMATIC ACTIVATOR ON FIRE/BILGE/BALLAST PUMP DISCHARGE TO FIREMAIN. REMOTE CONTROLS ARE INOPERATIVE. _x001C_ _x001C_
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Engineering
Issued 20 February 1991 Resolved
REPAIR #1 SSDG L.O. TEMPERATURE GAUGE ON THE CONSOLE. UNIT IS INOPERATIVE DUE TO A BAD RTD. NO SPARE IS ON BOARD.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Engineering
Issued 20 February 1991 Resolved
REPAIR/REPLACE REGULATOR CONTROLS FOR 35LB STEAM SUPPLY REGULATOR AND SHOW THAT EVAPORATOR IS OPERATIONAL.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Engineering
Issued 20 February 1991 Resolved
REPLACE/RE-INSTALL PIPING SUCH THAT F.O. PRIMARY STRAINER GIVES PRESSURE DIFFERENTIAL ALARMS.
Condition: Unknown
Due 20 February 1991
Resolved 20 February 1991
Fire Fighting
Issued 20 March 1990 Resolved
PROVIDE FOAM ANALYSIS REPORT TO [name withheld].
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Engineering
Issued 6 June 1989 Resolved
CONDUCT OVERSPEED TRIP ON STARBOARD MAIN ENGINE NO LATER THAN COMPLIANCE DATE, TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 6 June 1989
Resolved 6 June 1989
Documentation
Issued 6 June 1989 Resolved
SUBMIT REVISION TO DEDICATED CLEAN BALLAST OPERATIONS MANUAL TO INCORPORATEMODIFICATIONS TO BALLAST AND NEW SLOP TANK INSTALLATION TO G-MSC NO LATER THAN COMPLIANCE DATE.
Condition: Unknown
Due 6 June 1989
Resolved 6 June 1989
Electrical
Issued 6 June 1989 Resolved
PROVIDE AND INSTALL RECEPTICAL AND PLUG FOR SHORT RUN PORTABLE ELECTRICAL CABLE FOR TEMPORARY SECURITY LIGHTING, OR MAKE SECURITY LIGHTING A PERMA- NENT INSTALLATION. REPLACE PLASTIC TIES ON STANCHION WITH METAL FASTENERS. CIRCUIT FOR ON DECK SECURITY LIGHTING SHALL BE DE-ENERGIZED WHILE UNDERWAY.
Condition: Unknown
Due 6 June 1989
Resolved 6 June 1989
Unknown
Issued 6 June 1989 Resolved
PROVIDE AS BUILT PLANS FOR MODIFICATIONS COMPLETED THIS DATE TO G-MSC NO LATER THAN THE COMPLIANCE DATE.
Condition: Unknown
Due 6 June 1989
Resolved 6 June 1989
Accommodation/Occupational Safety
Issued 24 February 1989 Resolved
FREE UP ALL DOGS ON VENTILATION COVERS ON THE WEATHER DECKS TO THE SATISFACTION OF THE ATTENDING U.S. COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 24 February 1989
Resolved 24 February 1989
Electrical
Issued 24 February 1989 Resolved
REPLACE EMERGENCY GENERATOR HYDRAULIC START GAUGE AND ELECTRIC WIRE FOR JACKET WATER HEATER. THIS REQUIREMENT TO BE COMPLETED TO THE SATISFACTION OF THE ATTENDING U. S. COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 24 February 1989
Resolved 24 February 1989
Engineering
Issued 24 February 1989 Resolved
PROVIDE EVIDENCE OF PROPER OPERATION OF THE WASTE HEAT BOILER SAFETY VALVESTO [name withheld] PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 24 February 1989
Resolved 24 February 1989
Fire Fighting
Issued 24 February 1989 Resolved
REPAIR AND TEST FIRE DETECTION SYSTEM SENSOR DIRECTLY ABOVE MAIN ENGINE TO THE SATISFACTION OF THE ATTENDING U.S. COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 24 February 1989
Resolved 24 February 1989
Lifesaving
Issued 24 February 1989 Resolved
CONDUCT WEIGHT TEST ON STARBOARD LIFEBOAT TO THE SATISFACTION OF THE ATTENDING U.S. COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 24 February 1989
Resolved 24 February 1989
Electrical
Issued 24 February 1989 Resolved
REPLACE ALL EMERGENCY BATTERIES WITH LOW HYDROMETER READINGS TO THE SATISFACTION OF THE ATTENDING U.S. COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 24 February 1989
Resolved 24 February 1989
Engineering
Issued 24 February 1989 Resolved
PROVE PROPER OPERATION OF REMOTE FUEL OIL SHUT OFF VALVES NUMBERS 15 AND 18. THE REQUIREMENT IS TO BE COMPLETED TO THE SATISFACTION OF THE COG- NIZANT OCMI PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 24 February 1989
Resolved 24 February 1989
Fire Fighting
Issued 24 February 1989 Resolved
PROVIDE WRITTEN RESULTS OF FOAM ANALYSIS TO THE SATISFACTION OF THE ATTEND-ING U. S. COAST GUARD MARINE INSPECTOR PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 24 February 1989
Resolved 24 February 1989
Deck/Cargo
Issued 24 February 1989 Resolved
PROVE ADEQUATE CARGO PUMPROOM AIR EXCHANGE REQUIRED BY 46 CFR 32.60.20(C) TO THE SATISFACTION OF THE ATTENDING U.S. COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 24 February 1989
Resolved 24 February 1989
Deck/Cargo
Issued 24 February 1989 Resolved
CLEAN ALL PRESSURE VACUUM VALVES ON ALL CARGO TANKS TO THE SATISFACTION OF THE ATTENDING U.S. COAST GUARD MARINE INSPECTOR PRIOR TO COMPLIANCE DATE.
Condition: Unknown
Due 24 February 1989
Resolved 24 February 1989
Accommodation/Occupational Safety
Issued 24 February 1989 Resolved
REPLACE WASTED VENT SCREEN GUARDS ON GOOSENECK VENTILATION ON WEATHER DECK TO THE SATISFACTION OF THE ATTENDING U.S. COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 24 February 1989
Resolved 24 February 1989
Electrical
Issued 10 December 1988 Resolved
REPLACE JACKET WATER HEATER ON EMERGENCY GENERATOR WITH A UL APPROVED FOR MARINE USE HEATER AND A USCG APPROVED TYPE "A" HOSE.
Condition: Unknown
Due 10 December 1988
Resolved 10 December 1988
Engineering
Issued 6 November 1988 Resolved
SUBMIT REVISED AUTOMATION TEST PROCEDURE ALONG WITH DRAWINGS SHOWING MODIFICATIONS TO PROVIDE POSITIVE SHUTDOWN OF MAIN ENGINE IN THE EVENT OF TOTAL POWER LOSS TO MARINE SAFETY CENTER.
Condition: Unknown
Due 6 November 1988
Resolved 6 November 1988
Electrical
Issued 6 November 1988 Resolved
EMERGENCY GENERATOR TO BE TESTED PRIOR TO PORT ENTRY.
Condition: Unknown
Due 6 November 1988
Resolved 6 November 1988
Engineering
Issued 6 November 1988 Resolved
PROVE PROPER OPERATION OF PORT MAIN ENGINE OVERSPEED TRIP.
Condition: Unknown
Due 6 November 1988
Resolved 6 November 1988
Engineering
Issued 6 November 1988 Resolved
PROVE PROPER OPERATION OF STBD MAIN ENGINE.
Condition: Unknown
Due 6 November 1988
Resolved 6 November 1988
Engineering
Issued 6 November 1988 Resolved
MASTER TO NOTIFY EACH CAPTAIN OF THE PORT 24 HOURS PRIOR TO ARRIVAL THAT THE VESSEL IS OPERATING IN SINGLE ENGINE MODE AND ATTEST TO THE RELIABILITY OF THE AUTOMATION, MAIN PROPULSION, AND SHIPS GENERATORS.
Condition: Unknown
Due 6 November 1988
Resolved 6 November 1988
Deck/Cargo
Issued 30 August 1988 Resolved
PRIOR TO USE FOR CARGO OPERATIONS, OPERATIONALLY TEST THE PRIME MOVERS FOR CARGO PUMP #1, CARGO PUMP #2, AND STRIPPING PUMP #2 IN THE PRESENCE OF A COAST GUARD INSPECTOR.
Condition: Unknown
Due 30 August 1988
Resolved 30 August 1988
Deck/Cargo
Issued 30 August 1988 Resolved
PROVIDE ON BOARD COPIES OF COAST GUARD APPROVED PUMPROOM PIPING DRAWINGS AND INSTALL THE DRAIN MANIFOLD FOR THE LOWPOINT DRAIN LINES AS SHOWN ON THEAPPROVED DRAWINGS,OR SUBMIT ALTERNATIVE PROPOSAL FOR REVIEW.
Condition: Unknown
Due 30 August 1988
Resolved 30 August 1988
Deck/Cargo
Issued 30 August 1988 Resolved
PRIOR TO NEXT CARGO LOADING OPERATION, REMOVE SPOOL PIECES AND INSTALL 2" VALVES IN 3 OF 4 LOWPOINT DRAIN LINES FOR MAIN CARGO PIPING. ABOVE LINES LOCATED IN PUMPROOM BILGES IN WAY OF FORWARD BULKHEAD NEAR AMIDSHIPS.
Condition: Unknown
Due 30 August 1988
Resolved 30 August 1988
Construction/Loadline
Issued 5 March 1988 Resolved
CROP AND RENEW SIDE SHELL BETWEEN FRAME 33 TO FRAME 28, TWO (2) FEET BELOW SHEER STRAKE 15' X 7'.
Condition: Unknown
Due 5 March 1988
Resolved 5 March 1988
Construction/Loadline
Issued 5 March 1988 Resolved
CROP AND RENEW FRAME 32 IN DAMAGE AREA, HEIGHT 123" AND DEEP 65".
Condition: Unknown
Due 5 March 1988
Resolved 5 March 1988
Construction/Loadline
Issued 5 March 1988 Resolved
CROP AND RENEW FRAME 31 IN DAMAGE AREA, HEIGHT 123" X 65" DEEP.
Condition: Unknown
Due 5 March 1988
Resolved 5 March 1988
Construction/Loadline
Issued 5 March 1988 Resolved
CROP AND RENEW TO THREE (3) LONGTITUDINALS BETWEEN FRAME 32 AND FRAME 31.
Condition: Unknown
Due 5 March 1988
Resolved 5 March 1988
Construction/Loadline
Issued 5 March 1988 Resolved
CROP AND RENEW TOP THREE (3) LONGTITUDINALS BETWEEN FRAME 31 AND 29.
Condition: Unknown
Due 5 March 1988
Resolved 5 March 1988
Construction/Loadline
Issued 5 March 1988 Resolved
CROP AND RENEW #2 AND #3 LONGTITUDINALS BETWEEN FRAME 32 AND FRAME 33.
Condition: Unknown
Due 5 March 1988
Resolved 5 March 1988
Engineering
Issued 26 January 1988 Resolved
PROVE SATISFACTORY DATA ENTRY ENTRY INTO BELL & DATA LOGGER. NOTE: BELL ENTRIES ARE CORRECT BUT DATA FIGURES ARE CURRENTLY ERRONEOUS.
Condition: Unknown
Due 26 January 1988
Resolved 26 January 1988
Engineering
Issued 3 March 1987 Resolved
HYDROSTATICALLY TEST THE AUXILIARY BOILER TO 1 1/4 TIMES THE MAXIMUM ALLOWABLE WORKING PRESSURE OF 250 PSIG.
Condition: Unknown
Due 3 March 1987
Resolved 3 March 1987
Engineering
Issued 3 March 1987 Resolved
DEMONSTRATE PROPER OPERATION OF THE ENGINE ROOM BELL AND DATA LOGGER OR REPLACE THE SYSTEM WITH A NEW INSTALLATION.
Condition: Unknown
Due 3 March 1987
Resolved 3 March 1987
Engineering
Issued 3 March 1987 Resolved
SET AND LOG WASTE HEAT BOILER RELIEF VALVES (LIFT AND SET PRESSURES) AND HAVE THEM SEALED BY A COAST GUARD INSPECTOR AT THE FIRST U.S. PORT.
Condition: Unknown
Due 3 March 1987
Resolved 3 March 1987
Engineering
Issued 3 March 1987 Resolved
DEMONSTRATE THE HIGH BILGE ALARM FOR THE PUMP ROOM AT THE FIRST U.S. PORT.
Condition: Unknown
Due 3 March 1987
Resolved 3 March 1987
Engineering
Issued 3 March 1987 Resolved
DEMONSTRATE NO. 9 AND NO. 10 (ALL ITEMS) OF THE APPROVED AUTOMATION TEST PROCEDURE (MAIN ENGINES) AT THE FIRST U.S. PORT.
Condition: Unknown
Due 3 March 1987
Resolved 3 March 1987
Lifesaving
Issued 3 March 1987 Resolved
DEMONSTRATE THE FOUR FLASHING LIGHTS FOR THE GENERAL ALARM SYSTEM IN THE ENGINE ROOM AT THE FIRST U.S. PORT.
Condition: Unknown
Due 3 March 1987
Resolved 3 March 1987
Fire Fighting
Issued 3 March 1987 Resolved
DEMONSTRATE THE OPERATION OF THE FIRE AND FOAM PUMP AT THE FIRST U.S. PORT.
Condition: Unknown
Due 3 March 1987
Resolved 3 March 1987
Electrical
Issued 5 August 1985 Resolved
SUBMIT SERVICING REPORT OF REPAIRS TO GENERATOR NO. 1 BY 5 SEPTEMBER 1985.
Condition: Unknown
Due 5 August 1985
Resolved 5 August 1985

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.