SANTA CHIARA

SANTA CHIARA is a 1975 tank ship. The Coast Guard has recorded 105 inspections since 1982, most recently in May 1995, along with 117 deficiencies.

Records from 1982 to 1995. Most recent: inspection, 17 May 1995.

Built
1975
Last inspected
17 May 1995
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

7366350 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
UNITED STATES
—
Maury page id
psix-47989

Inspections, by type

…with no type recorded57
Years with a record 14 calendar years (1982–1995)
The 105 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 31 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it17157 - Regulatory (Subpart C or D), Gross Ton
11855 - Regulatory (Subpart C or D), Net Ton
27668 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 105

17 May 1995 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 378517
17 May 1995 Tank Vessel Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1380207
13 April 1995 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 848065
9 March 1995 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 444199
17 February 1995 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 455889
13 February 1995 COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1370995
3 February 1995 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 81445
3 February 1995 Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1426998
20 January 1995 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1027370
5 January 1995 Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1165859
17 December 1994 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1470402
9 December 1994 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 836183
29 November 1994 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1356907
12 November 1994 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1407394
11 November 1994 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 372253
1 November 1994 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1177034
14 October 1994 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 128895
29 September 1994 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1177834
9 August 1994 Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1172970
11 July 1994 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1136650
26 May 1994 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1018759
9 May 1994 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1168861
25 April 1994 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 473678
17 April 1994 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 95082
17 April 1994 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 217060
31 March 1994 Re-Inspection
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 858933
7 March 1994 MARPOL Annex V Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1165164
9 February 1994 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 466066
13 January 1994 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 497284
2 November 1993 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 521094
18 October 1993 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 509626
13 September 1993 Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 834666
5 June 1993 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1158931
24 May 1993 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 91530
27 April 1993 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 357793
15 March 1993 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1415806
10 March 1993 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 833126
9 March 1993 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1144255
5 March 1993 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1143034
19 February 1993 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 117652
14 December 1992 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 463251
26 October 1992 Hull Examination · Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1259545
31 August 1992 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 955399
27 July 1992 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 955852
23 July 1992 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 225962
18 June 1992 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 957130
16 June 1992 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 351417
13 May 1992 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 652323
5 May 1992 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 944835
8 April 1992 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 460630
30 March 1992 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1397803
16 March 1992 Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1265824
13 March 1992 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 111244
2 January 1992 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 491557
26 December 1991 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 157836
26 December 1991 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 161557
26 December 1991 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 229922
16 April 1991 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 460369
26 March 1991 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1211038
20 March 1991 Hull Examination · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1239549
7 January 1991 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 931264
6 December 1990 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1211606
9 November 1990 Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 921399
21 October 1990 Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 908115
21 September 1990 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 900835
31 August 1990 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 929997
25 August 1990 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 509784
25 August 1990 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1214837
24 February 1990 Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 502214
20 February 1990 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 900922
7 February 1990 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1226474
6 November 1989 Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1031347
28 August 1989 COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 894908
28 August 1989 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1000979
27 July 1989 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1044267
14 April 1989 Deficiency Check
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 902174
18 March 1989 Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 502008
24 February 1989 Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1350620
11 January 1989 Examination of Repairs
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 888919
20 December 1988 Damage Survey
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1032916
8 November 1988 Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1200991
18 October 1988 Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1197315
30 September 1988 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1194936
21 September 1988 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1043842
25 August 1988 Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1040012
24 May 1988 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1044167
2 May 1988 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 515630
14 November 1987 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 513897
25 September 1987 Deficiency Check
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1009441
24 August 1987 Hull Examination · COI Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1312827
14 August 1987 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1340805
23 July 1987 Permit to Proceed
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1021310
9 January 1987 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1004046
9 January 1987 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1312142
28 October 1986 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1325974
8 May 1986 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 308671
15 April 1986 Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 488484
18 September 1985 Damage Survey
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 990610
3 August 1985 Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 521902
3 August 1985 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 990089
22 July 1985 COI Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1288608
28 June 1985 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1291476
4 November 1984 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1286890
24 June 1983 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 973870
15 April 1982 Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 971031

Deficiency record · 117

Lifesaving
Issued 13 February 1995 Resolved
REPLACE/REPAIR NON-VITAL ALARM LIGHTS IN THE ENGINEROOM
Condition: Unknown
Due 13 March 1995
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Engineering
Issued 13 February 1995 Resolved
REPAIR/REPLACE LEAKING/DEFECTIVE AMOT VALVES ON L.O. COOLERS ON #2 SSDG. (BOTTOM O-RINGS LEAKING IN WAY OF PILLS)
Condition: Unknown
Due 13 March 1995
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Engineering
Issued 13 February 1995 Resolved
CONDUCT HYDRO AND ALL AUTOMATION INCLUDING SETTING SAFETIES ON THE AUX BOILER DURING YARD PERIOD. PRIOR TO SAILING ALL POWER SHALL BE SECURED TO THE BOILER AND ALL FUEL LINES PHYSICALLY BLANKED OFF UNTILL PROPER REPAIRS ARE MADE.
Condition: Unknown
Due 31 October 1995
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Electrical
Issued 29 November 1994 Resolved
Make repairs to and demonstrate proper operation of #1 ships service generator.
Condition: Unknown
Due 29 November 1994
Resolved 29 November 1994
Documentation
Issued 12 November 1994 Resolved
PROVIDE LEGIBLE REPLACEMENT PLANS FOR THOSE POSTED IN THE STAIRWELL ON THE O2 LEVEL.
Condition: Unknown
Due 12 November 1994
Resolved 12 November 1994
Deck/Cargo
Issued 12 November 1994 Resolved
OPEN AND MAKE AVAILABLE FOR INSPECTION, ALL CARGO TANKS IN WAY OF THE DEDICATED CLEAN WATER BALLAST TANKS. POSSIBLE BULKHEAD LEAK. VESSEL NOT TO DISCHARGE BALLAST OR LOAD CARGO UNTIL SOURCE OF CARGO IN TANKS IS DETERMINED TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 12 November 1994
Resolved 12 November 1994
Engineering
Issued 12 November 1994 Resolved
RENEW OIL SOAKED LAGGING ON TURBO INTAKES FOR BOTH MDE'S UNDER CRANKCASE VENT VACUUM PUMPS.
Condition: Unknown
Due 12 November 1994
Resolved 12 November 1994
Engineering
Issued 12 November 1994 Resolved
RENEW HOLED SALT WATER CROSS OVER DISCHARGE PIPE AT SKIN VALVE.
Condition: Unknown
Due 12 November 1994
Resolved 12 November 1994
Accommodation/Occupational Safety
Issued 12 November 1994 Resolved
RENEW HOLED MSD TANK OVERBOARD DISCHARGE LINE IN ENGINEROOM.
Condition: Unknown
Due 12 November 1994
Resolved 12 November 1994
Fire Fighting
Issued 12 November 1994 Resolved
PROVIDE LEGIBLE FIRE PLAN AND POST IN STAIRWELL ON MAIN DECK LEVEL.
Condition: Unknown
Due 12 November 1994
Resolved 12 November 1994
Lifesaving
Issued 29 September 1994 Resolved
PROVIDE COPIES OF C.G. APPROVED PLANS FOR CURRENT LIFEBOAT INSTALLATION OF PORT/STBD LIFEBOATS, INCLUDING CRADLE AND SKATES DETAILS.
Condition: Unknown
Due 29 September 1994
Resolved 29 September 1994
Engineering
Issued 9 May 1994 Resolved
DEMONSTRATE PROPER OPERATION OF WASTE HEAT BOILER AFT SAFETY VALVE AND UPONCOMPLETION HAVE LOCAL [name withheld] NLT 25JUN94.
Condition: Unknown
Due 9 May 1994
Resolved 9 May 1994
Unknown
Issued 31 March 1994 Resolved
REPLACE PLUG AND THREADED DRAIN PIPE TO THE STBD FEFUELING AT SEA CONNECTIONS. (BOTH HAVE RUSTED THREADS THUS RENDERING THEM INCAPABLE OF PLUGGING THE DRAIN).
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Electrical
Issued 31 March 1994 Resolved
REPLACE NUMEROUS WASTED ELECTRICAL CABLE SUPPORT BRACKETS BENEATH THE 01 WXDECK OVERHANG FORWARD OF THE HOUSE. TEMPORARY REPAIRS WILL BE SATISFACTORY UNTIL PERMANENT REPAIRS CAN BE COMPLETED DURING NEXT DRYDOCK IN NOV94.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Deck/Cargo
Issued 31 March 1994 Resolved
REPLACE THE FOLLOWING FLAME SCREENS: FO VENT 01 WX DECK AFT OF HOUSE, 7 FTTALL FO VENT ON FANTAIL, #1P CARGO TANK, #3S CARGO TANK, #6P CARGO TANK AND#7S CARGO TANK.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Lifesaving
Issued 31 March 1994 Resolved
REPLACE THREE SAFETY CHAINS AND CLIPS ON 01 WX DECK AFT ADJACENT TO THE STBD FISH DAVIT.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Lifesaving
Issued 31 March 1994 Resolved
REPLACE THE SUPPORT PLATE AT AFT END OF THE CATWALK TO THE 01 WX DECK AFTMOST FISH DAVIT.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Lifesaving
Issued 31 March 1994 Resolved
REPLACE THE LOWEST LIFE RAIL AT THE AFT MOST FISH DAVIT (END OF CATWALK, 01LEVEL)-STBD RAIL.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Accommodation/Occupational Safety
Issued 31 March 1994 Resolved
REPLACE TWO DOGS ON THE NATURAL VENT COVER ON THE STBD SIDE OF THE BOSN STORES HOUSE.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Engineering
Issued 31 March 1994 Resolved
CLEAN THE FLAME SCREEN OF THE 3 FT TALL FO VENT ON THE STBD MAIN WX DECK AFT.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Engineering
Issued 31 March 1994 Resolved
ENSURE THE BALL VALVES IN THE VENT ON THE STBD MAIN WX DECK ADJACENT TO THEDOUBLE DOORS AND THE 3 IN. VENT ON THE PORT OUTBOARD SIDE OF THE MAIN DECK (HOUSE AREA) ARE FREE TO OPERATE. (MAY BE RUSTED IN PLACE).
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Construction/Loadline
Issued 31 March 1994 Resolved
REPLACE THE GASKET ON WX DECK DOOR WEA 01-79-1.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Lifesaving
Issued 31 March 1994 Resolved
REMOVE/COVER OPEN CANS OF THINNER IN THE PAINT LOCKER.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Construction/Loadline
Issued 31 March 1994 Resolved
Make permanent repairs to salt water flushing line to ballast discharge monitor at next drydock.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Construction/Loadline
Issued 31 March 1994 Resolved
REPLACE SIX BROKEN DOGS TO THE VENT COVER TO "CLOSURE 01-4-1 NAT SUPP" ON BOW.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Construction/Loadline
Issued 31 March 1994 Resolved
REPLACE COVER AND BALL VALVE FOR THE VENT PIPE ON THE PORT BOW.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Fire Fighting
Issued 31 March 1994 Resolved
REPLACE HINGES ON DOOR OF FIRE STATION 11. (ON BOW)
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Deck/Cargo
Issued 31 March 1994 Resolved
REPLACE NUMEROUS WASTED BOLTS ON CARGO PIPING EXPANSION JOINTS ON THE CARGODECK.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Deck/Cargo
Issued 31 March 1994 Resolved
REPLACE PORT FORE AND AFT AND THE STBD AFT TURNBUCKLES OF THE FORWARD MAST STAYS.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Electrical
Issued 31 March 1994 Resolved
PROVIDE DOOR WITH LATCH AND IDENTIFY THE CIRCUIT BREAKERS IN THE ELECTRICALDISTRIBUTION PANEL IN THE MAIN DECK ATHWARTSHIPS PASSAGEWAY.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Lifesaving
Issued 31 March 1994 Resolved
REPLACE THREE WASTED/HOLED LIFERAILS ADJACENT TO PASSAGE DOOR 02-79-0.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Lifesaving
Issued 31 March 1994 Resolved
REPAIR CRACKED PORT GUNWALE OF THE STARBOARD LIFEBOAT (CRACKED AT OAR LOCKS). REPAIR CRACKED BOW GUNWALE (PORT AND STBD).
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Lifesaving
Issued 31 March 1994 Resolved
REPAIR CRACKED STBD GUNWALE OF THE PORT LIFEBOAT. (CRACKED WHERE THE GUNWALE MEETS THE SEAT).
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Fire Fighting
Issued 31 March 1994 Resolved
Repair/Replace damaged fire hoze nozzle, secure spud chains and clean applicators to fire stations in engine room.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Electrical
Issued 31 March 1994 Resolved
REPLACE WASTED ELECTRICAL CONDUIT TO RECEPTACLE AND THE STBD BOW.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Lifesaving
Issued 31 March 1994 Resolved
PROVIDE THE FOLLOWING EQUIPMENT FOR THE PORT LIFEBOAT: TWO HEAVING LINES, SAIL NEEDLES, ASPIRIN, TWO STERILE EYEWASHES, TWENTY THREE PROVISIONS, TWO FIRE EXTINGUISHER BRACKETS, AND RECHARGE ONE FIRE EXTINGUISHER. LABEL THE KEROSENE AND STORM OIL CONTAINERS.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Engineering
Issued 31 March 1994 Resolved
Hydrostatically test repairs to waste heat boiler piping in presence of USCG inspector IAW 46 CFR 50.05-10.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Accommodation/Occupational Safety
Issued 31 March 1994 Resolved
REPLACE THE TOP BOLTS SECURING THE WX DECK LADDERS AFT OF THE HOUSE ON THE FOLLOWING LADDERS: STBD 01-02, 02-03, 03-04, 04-05 AND PORT 05-BRIDGE DECK.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Accommodation/Occupational Safety
Issued 31 March 1994 Resolved
PROVIDE A VALVE HANDLE FOR THE HOSPITAL SHOWER.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Deck/Cargo
Issued 31 March 1994 Resolved
PROVIDE ADDITIONAL BOTTLES OF CALIBRATION GAS FOR THE COMBUSTIBLE GAS METERS.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Lifesaving
Issued 31 March 1994 Resolved
PROVIDE THE FOLLOWING EQUIPMENT FOR THE STBD LIFEBOAT: 2 STERILE EYEWASHES,2 60 FT FLOATING HEAVING LINES, ONE FIRE EXTINGUISHER, SAIL NEEDLES, PALM, FIRE EXTINGUISHER BRACKETS, AND LABEL THE KEROSENE AND STORM OIL CONTAINERS.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Engineering
Issued 31 March 1994 Resolved
LABEL ALL WEATHER DECK VENTS.
Condition: Unknown
Due 31 March 1994
Resolved 31 March 1994
Accommodation/Occupational Safety
Issued 5 March 1993 Resolved
RENEW AS ORIGINAL VENT DUCTING FOR STEERING GEAR ROOM FROM TOP OF DECK HOUSE ON FANTAIL (INSIDE) TO STEERING GEAR ROOM.
Condition: Unknown
Due 5 March 1993
Resolved 5 March 1993
Engineering
Issued 5 March 1993 Resolved
PROVE PROPER OPERATION OF F/O PURIFIOR #2.
Condition: Unknown
Due 5 March 1993
Resolved 5 March 1993
Deck/Cargo
Issued 5 March 1993 Resolved
MAKE PERMANENT REPAIRS TO PORTSIDE "4A" MANIFOLD CONTAINMENT. VESSEL MAY NOT DISCHARGE FROM THIS MANIFOLD UNTIL COMPLETION OF REPAIRS.
Condition: Unknown
Due 4 June 1993
Resolved 4 June 1993
Deck/Cargo
Issued 5 March 1993 Resolved
GAS FREE AND MAKE AVAILABLE #6P CARGO TANK FOR USCG MARINE ISPECTOR TO INSPECT SIDE SHELL DAMAGE AT NEXT U.S. PORT.
Condition: Unknown
Due 19 March 1993
Resolved 19 March 1993
Electrical
Issued 5 March 1993 Resolved
RENEW AS ORIGINAL BATTERY CELL CAPS ON EMERGENCY BATTERIES LOCATED IN EMERGENCY GENERATOR ROOM. PRIOR TO DEPARTURE FROM JACKSONVILLE BUT NOT LATER THAN 15MAR93.
Condition: Unknown
Due 4 June 1993
Resolved 4 June 1993
Engineering
Issued 5 March 1993 Resolved
MAKE AUXILARY BOILER READY FOR FIRESIDE AND WATERSIDE INSPECTION PRIOR TO DEPARTURE FROM JACKSONVILLE BUT NO LATER THAN 15MAR93.
Condition: Unknown
Due 4 June 1993
Resolved 4 June 1993
Lifesaving
Issued 5 March 1993 Resolved
PROVE PROPER OPERATION OF STBD LIFEBOAT ENGINE PRIOR TO SAILING ON A FOREIGN VOYAGE.
Condition: Unknown
Due 19 March 1993
Resolved 19 March 1993
Fire Fighting
Issued 5 March 1993 Resolved
PROVIDE DOCUMENTATION OF SATISFACTORY HYDRO FOR FLEX LOOPS AND HOSE FOR ENGINEROOM BV EXTINGUISHER AND FOAM PUMPROOM BV EXTINGUISHER, PRIOR TO DEPARTURE FROM JACKSONVILLE. BUT NO LATER THAN 15MAR93.
Condition: Unknown
Due 19 March 1993
Resolved 19 March 1993
Construction/Loadline
Issued 5 March 1993 Resolved
PROVE PROPER OPERATION OF AUTOMATIC MACHINERY SPACE AND SHAFT ALLEY BILGE WELL PUMPING SYSTEM IAW AUTOMATION PROCEDURES. PRIOR TO DEPARTURE FROM JACKSONVILLE BUT NO LATER THAN 15MAR93.
Condition: Unknown
Due 4 June 1993
Resolved 4 June 1993
Engineering
Issued 5 March 1993 Resolved
RENEW AS ORIGINAL CRACKED VALVE COVER ON PORT MAIN DIESEL ENGINE.
Condition: Unknown
Due 19 March 1993
Resolved 19 March 1993
Electrical
Issued 5 March 1993 Resolved
RENEW AS ORIGINAL HIGH J/W TEMP GAGE FOR EMERGENCY GENERATOR PRIOR TO DEPARTURE FROM JACKSONVILLE BUT NOT LATER THAN 15MAR93.
Condition: Unknown
Due 19 March 1993
Resolved 19 March 1993
Accommodation/Occupational Safety
Issued 5 March 1993 Resolved
RENEW AS ORIGINAL THE FOLLOWING VENT DUCKS IN THE ENGINEROOM INBOARD OF A/CUNITS, STBD SIDE LOWER LEVEL AFT OF J/W PUMPS, PORTSIDE LOWER LEVEL AFT OF AUXILIARY S/W PUMP, PORTSIDE LOWER LEVEL ABOVE AUXILIARY S/W PUMP,_x001C_ PORTSIDE OUTBOARD PRIMING PUMPS.
Condition: Unknown
Due 19 March 1993
Resolved 19 March 1993
Accommodation/Occupational Safety
Issued 5 March 1993 Resolved
RENEW AS ORIGINAl THE FOLLOWING VENT DUCTS FROM DAMPER TO BELL MOUTH SCREENIN THE ENGINEROOM PORTSIDE OUTBOARD OF REDUCTION GEAR, STBD SIDE OUTBOARD MDE TURBO, STBD SIDE INBOARD OF BOILER HOTWELL, 2 SUPPLY LOUVERS INBOARD OF#2 S/S GENERATOR.
Condition: Unknown
Due 19 March 1993
Resolved 19 March 1993
Electrical
Issued 5 March 1993 Resolved
PROVE PROPER OPERATION OF EMERGENCY LIGHTING IN SHAFT ALLEY ESCAPE TRUNK. PER 46 CFR 112.15 (OLD "J").
Condition: Unknown
Due 19 March 1993
Resolved 19 March 1993
Electrical
Issued 5 March 1993 Resolved
PROVE PROPER OPERATION OF EMERGENCY LIGHTING IN SHAFT ALLEY. PER 46 CFR 112.15 (OLD "J").
Condition: Unknown
Due 19 March 1993
Resolved 19 March 1993
Lifesaving
Issued 5 March 1993 Resolved
VESSEL MUST COMPLETE WORKLIST FOR ISSUANCE OF COI. VESSEL MAY NOT MOVE FROM BERTH PRIOR TO ISSUANCE OF NEW COI.
Condition: Unknown
Due 18 March 1993
Resolved 18 March 1993
Lifesaving
Issued 5 March 1993 Resolved
VESSEL MUST COMPLETE WORKLISTS FOR ISSUANCE OF COI. VESSEL MAY NOT LOAD ANY CARGO OR LEAVE THE PORT OF NY. UNTIL A NEW COI IS ISSUED. EMERGENCY GENERATOR MUST BE REPAIRED PRIOR TO SHIFTING BERTHS/ANCHORING.
Condition: Unknown
Due 18 March 1993
Resolved 18 March 1993
Deck/Cargo
Issued 27 July 1992 Resolved
EFFECT PERMANENT REPAIRS TO PORT CARGO BOOM._x001C_ _x001C_ REQUIREMENT ISSUED BY MIAMS ON 18JUN92, WAS REMOVED IN ERROR.
Condition: Unknown
Due 27 July 1992
Resolved 27 July 1992
Deck/Cargo
Issued 18 June 1992 Resolved
REPAIR AFT STBD. MOORING WINCH.
Condition: Unknown
Due 18 June 1992
Resolved 18 June 1992
Fire Fighting
Issued 18 June 1992 Resolved
FREE UP DEFLECTOR LINKAGE ON FWD. FIRE MONITOR AND MONITOR LOCATED JUST FWDOF HOUSE PORT SIDE.
Condition: Unknown
Due 18 June 1992
Resolved 18 June 1992
Deck/Cargo
Issued 18 June 1992 Resolved
EFFECT PERMANENT REPAIRS TO PORT CARGO BOOM.
Condition: Unknown
Due 18 June 1992
Resolved 18 June 1992
Deck/Cargo
Issued 18 June 1992 Resolved
FREE UP AND PROVE OPERATION OF ANCHOR WINDLASS PORT AND STARBOARD.
Condition: Unknown
Due 18 June 1992
Resolved 18 June 1992
Lifesaving
Issued 18 June 1992 Resolved
PROVIDE PLUG FOR STBD. LIFE BOAT.
Condition: Unknown
Due 18 June 1992
Resolved 18 June 1992
Deck/Cargo
Issued 16 March 1992 Resolved
Provide documentation attesting to the satisfactory hydrostatic test of thevessel's cargo piping.
Condition: Unknown
Due 16 March 1992
Resolved 16 March 1992
Engineering
Issued 20 March 1991 Resolved
TEST OPERATION OF STBD MAIN DIESEL ENGINE OVERSPEED TRIP. LOG RESULTS.
Condition: Unknown
Due 20 March 1991
Resolved 20 March 1991
Engineering
Issued 20 March 1991 Resolved
TEST OPERATION OF TWO WASTED HEAT BOILER SAFETY VALVES. LOG RESULTS.
Condition: Unknown
Due 20 March 1991
Resolved 20 March 1991
Unknown
Issued 21 October 1990 Resolved
REPAIR AND PROVE PROPER OPERATION OF OILY WATER SEPARATOR.
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Unknown
Issued 21 October 1990 Resolved
PROVIDE EFFECTIVE CLOSURE FOR MAIN ENGINE ROOM VENTILATION SYSTEM OR INSTALL FIRE DAMPERS
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Unknown
Issued 21 October 1990 Resolved
INSTALL MISSING BREAKERS FOR ELECTRIC PANELS L109 AND P211
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Unknown
Issued 21 October 1990 Resolved
STENCIL LIFERAFT STATIONS (ALL) WITH STATION NUMBER AND LIFERAFT CAPACITIES; ALSO, ADJUST TENSION FOR ALL HYDRO RELEASING MECHANISMS.
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Unknown
Issued 21 October 1990 Resolved
PROVIDE A FUEL SHUTOFF VALVE FOR BOTH LIFEBOATS AT THE FUEL TANK AND MARK LOCATION OF SAME
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Unknown
Issued 21 October 1990 Resolved
REPAIR COMPASS FOR MOTOR LIFEBOAT #2
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Unknown
Issued 21 October 1990 Resolved
REPAIR WIRING AND RE-STUFF ENTRY TO #2 LIFEBOAT EMBARKATION LIGHTING
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Unknown
Issued 21 October 1990 Resolved
RE-ROUTE WIRE FALLS FROM DRUM TO AFT DAVIT OR REMOVE STAND PIPE SO THAT THEFALLS DO NOT CHAFF AGAINST THE PIPE AND FREE-UP SHEAVE OF AFT DAVIT WHERE FALL IS LED FROM THE FORWAQRD DAVIT SO THAT IT MOVES FREELY
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Unknown
Issued 21 October 1990 Resolved
MAKE PERMANENT REPAIRS TO WIRE STUFFING TUBES LOCATED AT THE BASE OF THE MAST ON THE FLYING BRIDGE
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Unknown
Issued 21 October 1990 Resolved
PROVIDE ONBOARD AN APPROPRIATE TRAINING MANUAL FOR LIFESAVING AND FIREFIGHTING EQUIPMENT ONBOARD THE VESSEL
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Unknown
Issued 21 October 1990 Resolved
REPAIR THE AUDIBLE ALARM FOR THE ENGINE ORDER TELEGRAGH POWER FAILURE ALARM
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Unknown
Issued 21 October 1990 Resolved
REPAIR LIGHTING IN ESCAPE TRUNK FROM CONTROL ROOM
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Unknown
Issued 21 October 1990 Resolved
INSTALL SCHRATER VALUE FOR PORTABLE WATER SURGE TANK
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Unknown
Issued 21 October 1990 Resolved
REPAIR REMOTE BOILER WATER LEVEL INDICATORS (2)
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Unknown
Issued 21 October 1990 Resolved
REPAIR LEAK IN CHECK VALVE IN MAIN SALT WATER LINE TO MAIN ENGINE COOLERS
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Unknown
Issued 21 October 1990 Resolved
FIND AND REPAIR LEAK (OIL) ON INBOARD DIESEL GENERATOR IN WAY OF FLYWHEEL
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Unknown
Issued 21 October 1990 Resolved
PROVIDE FOAM ANALYSIS REPORT TO MSO PORT ARTHUR, TX
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Unknown
Issued 21 October 1990 Resolved
HYDROSTATICALLY TEST CARGO PIPING AND FUEL TRANSFER HOSES
Condition: Unknown
Due 21 October 1990
Resolved 21 October 1990
Construction/Loadline
Issued 25 August 1990 Resolved
RECONDITION/RENEW THE KNIFE EDGES ON ALL(21) CARGO AND BALLAST TANK ULLAGESMAKING THEM LEAK TIGHT.
Condition: Unknown
Due 25 August 1990
Resolved 25 August 1990
Construction/Loadline
Issued 25 August 1990 Resolved
INSTALL COVERS TO THE SUPPLY VENTS LOCATED OUTSIDE THE SHIP STORES ENTRANCEDOORS ON THE PORTSIDE.
Condition: Unknown
Due 25 August 1990
Resolved 25 August 1990
Lifesaving
Issued 25 August 1990 Resolved
INSTALL NEW PA SPEAKER HORN LOCATED AT THE NO.2 LIFEBOAT STATION, TEST AND REPAIR THE ENTIRE PUBLIC ADDRESS SYSTEM AS NEEDED.
Condition: Unknown
Due 25 August 1990
Resolved 25 August 1990
Fire Fighting
Issued 25 August 1990 Resolved
RENEW ALL NUTS AND BOLTS ON THE FOLLOWING FIRE MAIN STATIONS, NOS.2-5-11-13-14-15-17-18-19 AND 23.
Condition: Unknown
Due 25 August 1990
Resolved 25 August 1990
Fire Fighting
Issued 25 August 1990 Resolved
RENEW THE 3" SUPPLY LINES TO THE FOLLOWING FIRE MAIN STATIONS, NOS. 2-3-13-14-15-17-18.
Condition: Unknown
Due 25 August 1990
Resolved 25 August 1990
Engineering
Issued 28 August 1989 Resolved
OPERATIONALLY TEST WASTE HEAT BOILER SAFETY VALVES (2), LOG LIFTING AND SEATING PRESSURES, AND PROVIDE COPY OF LOG ENTRY TO COGNIZANT OCMI.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Construction/Loadline
Issued 28 August 1989 Resolved
INSTALL POLLUTION PLACARDS AT LOCAL CONTROLS FOR BILGE PUMP AND OILY WATER SEPARATOR.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Deck/Cargo
Issued 28 August 1989 Resolved
MODIFY PUMP ROOM PIPING AS PER COAST GUARD APPROVED PLANS, EXAMINED 20 APRIL 1989.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Construction/Loadline
Issued 28 August 1989 Resolved
REPAIR OR REPLACE HANDRAILS AROUND PORT AND STARBOARD HAWSEPIPES.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Fire Fighting
Issued 28 August 1989 Resolved
REMOUNT DOORS TO FIRE STATION #15.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Navigation
Issued 28 August 1989 Resolved
REPAIR SOUND POWERED PHONE AT BOW LOOK OUT STATION.
Condition: Unknown
Due 28 August 1989
Resolved 28 August 1989
Fire Fighting
Issued 18 October 1988 Resolved
SUBMIT FOR ANALYSIS THE FIXED FIREFIGHTING FOAM SAMPLE AND PROVIDE RESULTS TO THE OFFICER IN CHARGE, MARINE INSPECTION.
Condition: Unknown
Due 18 October 1988
Resolved 18 October 1988
Lifesaving
Issued 18 October 1988 Resolved
PROVIDE FOR THE PORT AND STBD LIFEBOATS LANTERNS AND ILLUMINATION OIL. PROVIDE FOR THE STBD LIFEBOAT THE HAND HELD RED FLARES WITH A WATERPROOF CONTAINER.
Condition: Unknown
Due 18 October 1988
Resolved 18 October 1988
Electrical
Issued 18 October 1988 Resolved
RENEW THE LEAKING OIL SEAL FOR THE NO. 1 SHIP SERVICE GENERATOR.
Condition: Unknown
Due 18 October 1988
Resolved 18 October 1988
Accommodation/Occupational Safety
Issued 18 October 1988 Resolved
RENEW THE DECK AIR PIPE AND CONDENSATE RETURN PIPE IN WAY OF THE DECK CROSSOVER MANIFOLD, STBD SIDE, WHERE RED HAND IS APPLIED.
Condition: Unknown
Due 18 October 1988
Resolved 18 October 1988
Deck/Cargo
Issued 18 October 1988 Resolved
CONDUCT HYDROSTATIC TEST OF OIL TRANSFER HOSES PRIOR TO USE.
Condition: Unknown
Due 18 October 1988
Resolved 18 October 1988
Electrical
Issued 18 October 1988 Resolved
INSTALL BLANKS IN THE CIRCUIT BREAKER PANEL L105.
Condition: Unknown
Due 18 October 1988
Resolved 18 October 1988
Electrical
Issued 25 August 1988 Resolved
REMOVE THE RED HAND PATCH ON THE SALT WATER COOLING INLET TO THE LUBE OIL COOLER ON THE #2 GENERATOR. REPAIRS, IF NECESSARY, TO BE DETERMINED BY A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 25 August 1988
Resolved 25 August 1988
Deck/Cargo
Issued 25 August 1988 Resolved
MAKE OPERABLE AND TEST THE CARGO MONITOR AND CONTROL SYSTEM.
Condition: Unknown
Due 25 August 1988
Resolved 25 August 1988
Engineering
Issued 25 August 1988 Resolved
MAKE OPERABLE AND TEST THE OIL-WATER SEPARATOR.
Condition: Unknown
Due 25 August 1988
Resolved 25 August 1988
Engineering
Issued 25 August 1988 Resolved
REPAIR ALL OIL LEAKS STBD MAIN ENGINE IN VICINITY OF FLYWHEEL.
Condition: Unknown
Due 25 August 1988
Resolved 25 August 1988
Electrical
Issued 25 August 1988 Resolved
MAKE PERMANENT REPAIRS TO THE FIBERGLASS PATCH ON THE FRESH WATER COOLING LINE TO CYLINDERS ON THE #2 GENERATOR.
Condition: Unknown
Due 25 August 1988
Resolved 25 August 1988
Electrical
Issued 25 August 1988 Resolved
REPAIR ALL OIL LEAKS IN VICINITY OF THE LUBE OIL COOLER ON THE #2 GENERATOR.
Condition: Unknown
Due 25 August 1988
Resolved 25 August 1988
Electrical
Issued 25 August 1988 Resolved
REMOVE THE RED HAND PATCH ON THE SALT WATER COOLING INLET TO THE LUBE OIL COOLER ON THE #1 GENERATOR. REPAIRS, IF NECESSARY, TO BE DETERMINED BY A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 25 August 1988
Resolved 25 August 1988
Electrical
Issued 24 August 1987 Resolved
MAKE PERMANENT REPAIRS AND DEMONSTRATE AUTOMATIC START FEATURE OF THE EMERGENCY GENERATOR. THE ABOVE ITEM SHALL BE COMPLETED TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 24 August 1987
Resolved 24 August 1987
Engineering
Issued 28 October 1986 Resolved
RENEW IN KIND THE THIRD TUBE FROM THE REAR WALL ON THE AUXILIARY BOILER, NO LATER THAN 31 JANUARY 1987. UPON RENEWAL, A 1 1/4 HYDRO 168 PSIG SHALL BE CONDUCTED IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 28 October 1986
Resolved 28 October 1986
Engineering
Issued 22 July 1985 Resolved
CONDUCT OPERATIONAL TEST OF STBD MAIN DIESEL ENGINE OVERSPEED TRIP IN THE PRESCENCE OF A CG MARINE INSPECTOR.
Condition: Unknown
Due 22 July 1985
Resolved 22 July 1985
Fire Fighting
Issued 4 November 1984 Resolved
PROVIDE A FIRE CONTROL PLAN PERMANENTLY STORED IN A PROMINENTLY MARKED WEATHERTIGHT ENCLOSURE OUTSIDE THE DECKHOUSE.
Condition: Unknown
Due 4 November 1984
Resolved 4 November 1984
Fire Fighting
Issued 4 November 1984 Resolved
PROVE OPERATION OF ENGINEROOM FIRE PUMP RELIEF VALVE.
Condition: Unknown
Due 4 November 1984
Resolved 4 November 1984
Fire Fighting
Issued 4 November 1984 Resolved
PROVIDE DOCUMENTATION OF ANNUAL SERVICING OF ALL PORTABLE, SEMI-PORTABLE AND FIXED FIRE EXTINGUISHING SYSTEMS.
Condition: Unknown
Due 4 November 1984
Resolved 4 November 1984
Lifesaving
Issued 4 November 1984 Resolved
PROVIDE DOCUMENTATION OF ANNUAL SERVICING OF INFLATABLE LIFERAFTS AND HYDROSTATIC RELEASES.
Condition: Unknown
Due 4 November 1984
Resolved 4 November 1984

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.