Records from 1983 to 1999. Most recent: inspection, 11 December 1999.
Inspection history · 153
11 December 1999
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 435350
11 December 1999
Tank Vessel Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 811780
9 January 1997
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 399337
18 April 1995
Tank Vessel Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1405702
13 April 1995
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1157151
10 March 1995
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1172998
5 February 1995
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 46357
15 December 1994
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 373287
15 December 1994
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1151055
9 November 1994
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 523241
7 November 1994
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 869413
2 November 1994
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 61962
2 November 1994
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 866588
6 October 1994
Examination of Repairs
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1363112
5 October 1994
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1363111
4 October 1994
MARPOL Annex V Examination · Damage Survey
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1440867
3 October 1994
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 21283
29 September 1994
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 652357
28 September 1994
Hull Examination · Examination of Repairs
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1382842
26 September 1994
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 103917
24 September 1994
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 161160
12 September 1994
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 50517
6 September 1994
MARPOL Annex V Examination · Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1173773
23 August 1994
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 861488
19 August 1994
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 864343
26 July 1994
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1377240
24 May 1994
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1394121
23 May 1994
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 444011
20 May 1994
Re-Inspection · Examination of Repairs
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 860283
6 May 1994
Permit to Proceed
Administrative · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1396094
1 April 1994
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1166794
1 April 1994
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1426887
31 March 1994
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 110006
19 March 1994
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 143336
15 March 1994
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1415947
14 March 1994
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 148825
7 March 1994
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 444499
24 February 1994
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 853382
16 February 1994
Administrative
Administrative · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1163680
15 February 1994
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 853434
31 January 1994
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 851731
25 January 1994
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1165367
21 January 1994
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 852044
4 January 1994
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 850734
3 January 1994
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1382686
31 December 1993
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 454110
31 December 1993
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1159462
28 December 1993
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 4846
24 December 1993
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1389740
19 December 1993
Damage Survey
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1428303
18 December 1993
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 5163
16 December 1993
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 79407
13 December 1993
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1523
13 December 1993
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 76072
7 December 1993
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1012594
6 December 1993
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 652349
6 December 1993
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 652350
1 December 1993
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1448479
23 November 1993
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 144631
17 November 1993
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 843953
14 October 1993
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 834144
6 October 1993
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 149082
6 October 1993
Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 158668
6 October 1993
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 225644
6 October 1993
Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1356425
20 September 1993
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1149265
15 September 1993
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 467295
18 June 1993
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1157569
8 June 1993
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 151684
2 May 1993
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 49032
28 April 1993
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 835726
17 April 1993
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1354297
13 April 1993
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 839414
13 April 1993
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1145318
13 April 1993
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1153939
20 November 1992
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 76938
5 November 1992
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 652338
1 November 1992
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 172184
16 September 1992
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 436443
14 September 1992
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 38750
5 September 1992
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 50501
31 August 1992
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1268020
24 June 1992
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1263510
5 June 1992
Re-Inspection · Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 947420
5 May 1992
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 944837
28 April 1992
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 652327
7 April 1992
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 62665
7 April 1992
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 147135
21 January 1992
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 228078
21 January 1992
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 652332
16 January 1992
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 526073
9 January 1992
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 213648
12 September 1991
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 483994
23 May 1991
Examination of Repairs
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 926345
11 May 1991
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1239096
26 April 1991
Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1003105
17 April 1991
Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 910086
10 April 1991
COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1214978
6 January 1991
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 506005
14 September 1990
Examination of Repairs
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1233497
5 September 1990
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 929304
8 August 1990
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 920691
16 July 1990
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1215662
26 June 1990
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1213831
15 June 1990
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1227625
8 June 1990
Re-Inspection
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 906941
4 June 1990
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 513508
22 April 1990
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1216483
11 December 1989
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 918032
27 November 1989
Examination of Repairs
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1235890
17 November 1989
Damage Survey
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1225523
1 November 1989
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1319241
25 October 1989
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1204035
10 October 1989
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1320658
14 September 1989
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1319261
16 August 1989
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 512700
24 July 1989
Administrative
Administrative · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1280226
28 June 1989
Administrative
Administrative · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 893735
27 June 1989
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 893241
16 June 1989
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1345131
12 June 1989
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1350029
7 June 1989
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1197823
22 May 1989
Administrative
Administrative · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1202233
8 May 1989
Administrative
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1346275
18 April 1989
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 886813
7 April 1989
COI Inspection
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1197812
24 March 1989
Examination of Repairs
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1344303
1 December 1988
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 495088
1 December 1988
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 897551
7 November 1988
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1203700
31 October 1988
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 890186
19 October 1988
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1197302
7 October 1988
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1045386
3 August 1988
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1034559
29 July 1988
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1034796
19 July 1988
Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1043845
1 March 1988
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1026932
9 September 1987
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1002504
24 August 1987
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1339404
28 April 1987
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1017320
11 April 1987
COI Inspection · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1326632
27 June 1986
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 997446
13 June 1986
Re-Inspection
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 990596
6 June 1986
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 525092
5 June 1986
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1006590
1 December 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 437513
9 April 1985
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1291193
20 March 1985
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 981103
28 February 1985
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 978693
17 February 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 971125
18 February 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 965855
11 February 1983
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1279536
20 January 1983
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1275577
Electrical
Issued 9 January 1997
Resolved
REMOVE OR PROPERLY DEAD END ELECTRICAL WIRES BEHIND STARBOARD ELECTRICAL BAY LOCATED IN ENGINE CONTROL ROOM TO SATISFACTION OF CLASS SOCIETY OR COGNIZANT [name withheld] 60, CH. II, REG. 27.
Condition: Unknown
Due 13 December 1999
Resolved 13 December 1999
Deck/Cargo
Issued 9 January 1997
Resolved
PROVIDE PROPER EMERGENCY LIGHTERING EQUIPMENT IAW 33CFR 157.410 TO SATISFACTION OF COGNIZANT OCMI.
Condition: Unknown
Due 13 December 1999
Resolved 13 December 1999
Engineering
Issued 4 October 1994
Resolved
DEMONSTRATE THE PROPER OPERATION OF THE PORT MAIN ENGINE CLUTCHING MECHANISM TO THE SATISFACTION OF AN ATTENDING MARINE INSPECTOR PRIOR TO VESSEL'S DEPARTURE OF PORT OF ARCO CHERRY POINT. VESSEL'S AUTOMATION PROCEDURE AND MACHINERY MANUALS MUST BE ONBOARD BEFORE SAILING.
Condition: Unknown
Due 4 October 1994
Resolved 4 October 1994
Engineering
Issued 4 October 1994
Resolved
INSTALL MISSING PROTECTIVE GUARD COVERS FOR STARBOARD MAIN ENGINE OUTPUT SHAFT & BOILER FEED PUMP COUPLING LOCATED IN THE ENGINEROOM INCLUDING THE CORRECTION OF (7) OTHER ITEMS LISTED ON THE WORKLIST DTD 04OCT94 BY SEAMS TO THE SATISFACTION OF AN ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 4 October 1994
Resolved 4 October 1994
Engineering
Issued 28 September 1994
Resolved
Stern tube seal leaked oil upon floating from drydock. Properly repair or replace the stern tube seal to the satisfaction of the attending Marine Inspector prior to placing the vessel back in service.
Condition: Unknown
Due 28 September 1994
Resolved 28 September 1994
Construction/Loadline
Issued 28 September 1994
Resolved
Make permanent repairs to indications found in no. 5 port and stbd wing ballast tanks and no. 4 center ballast tank. Repairs shall be made to the satisfaction of the attending Marine Inspector prior to placing the vessel back in service.
Condition: Unknown
Due 28 September 1994
Resolved 28 September 1994
Construction/Loadline
Issued 28 September 1994
Resolved
Make permanent repairs to fractures found in the after stbd cofferdam side shell longitudinals no. 4 and 5 at frame 72. Repairs shall be made to the satisfaction of the attending Marine Inspector prior to placing the vessel in service.
Condition: Unknown
Due 28 September 1994
Resolved 28 September 1994
Construction/Loadline
Issued 28 September 1994
Resolved
Make permanent repairs to, or replace, the following sea valves: main sea suction gate; fire pump sea chest gate; machine shop clappers (2); pumproomsea suction ovbd gate; doppler transducer gate; fwd cofferdam eductor clapper.
Condition: Unknown
Due 28 September 1994
Resolved 28 September 1994
Construction/Loadline
Issued 28 September 1994
Resolved
Make permanent repairs to the fracture found in the bulkhead between the fwd void space and the slop tank. Repairs shall be made to the satisfactionof the attending Marine Inspector prior to placing the vessel in service.
Condition: Unknown
Due 28 September 1994
Resolved 28 September 1994
Electrical
Issued 28 September 1994
Resolved
Replace 24 cable retaining clips in the bow thruster room and ensure all cable runs in space are securely mounted.
Condition: Unknown
Due 28 September 1994
Resolved 28 September 1994
Deck/Cargo
Issued 28 September 1994
Resolved
Make permanent repairs to indications found in no. 1-3 and 5-7 center cargooil tanks, no. 3 and 4 port and stbd wing cargo tanks and no. 6 and 7 port wing cargo tanks. Repairs shall be made to the satisfaction of the attending Marine Inspector prior to placing the vessel back in service.
Condition: Unknown
Due 28 September 1994
Resolved 28 September 1994
Construction/Loadline
Issued 19 August 1994
Resolved
PROPERLY AFFIX VSL'S NAME ON TRANSOM.
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Fire Fighting
Issued 19 August 1994
Resolved
RENEW FOREPEAK FIRE HOSE STATION DOORS.
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Fire Fighting
Issued 19 August 1994
Resolved
RENEW SELF CLOSURE DEVICE FOR PRT MACH CASING FSD 5-79-0.
Condition: Unknown
Due 19 August 1994
Resolved 25 August 1994
Electrical
Issued 19 August 1994
Resolved
PROVIDE SUITABLE RUBBER MATTING IWO E/R CONTROL RM (MIN. OF 450V PROTECTION).
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Electrical
Issued 19 August 1994
Resolved
PROVIDE GLOBE FOR LIGHT ON EXTERIOR OF AFT BLKH OF PILOT HOUSE.
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Electrical
Issued 19 August 1994
Resolved
RENEW BURNED OUT FLUORESCENT LIGHTS THROUGH OUT E/R.
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Fire Fighting
Issued 19 August 1994
Resolved
RENEW SELF CLOSURE DEVICE FOR PRT MACH. CASING FIRE SCREEN DOOR 5-79-0.
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Lifesaving
Issued 19 August 1994
Resolved
SECURE OIL BUCKETS IN E/R.
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Fire Fighting
Issued 19 August 1994
Resolved
PROPERLY MARK WARNING ON FWD PAINT LKR AS A SPACE PROTECTED BY CO2.
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Engineering
Issued 19 August 1994
Resolved
RENEW "RED HANDED" PIPING IWO RED. GR. L.O. COOL. O/B (STB SIDE).
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Electrical
Issued 19 August 1994
Resolved
COVER ELEC. BX. (JUNCTION) LOCATED 2' ABOVE S.W. SERVICE PUMP #2 CONTROL BXIN E/R.
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Lifesaving
Issued 19 August 1994
Resolved
REMOVE EXCESS OIL FROM E/R BILGES.
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Construction/Loadline
Issued 19 August 1994
Resolved
PROPERLY BLANK/CONNECT 1" LINE OFF STERN TUBE COMPARTMENT SEA CHEST SEA VALVE.
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Electrical
Issued 19 August 1994
Resolved
RENEW ARMOR CABLE ELEC. WIRE LOCATED PRT SIDE OF SHAFT BEARING AFT OF WT BLKH #104.
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Electrical
Issued 19 August 1994
Resolved
MAKE PROPER SPLICES AT ELEC. BX. LOCATED AFT OF EMRERG FIRE/FOAM PUMP CONTROL.
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Lifesaving
Issued 19 August 1994
Resolved
PROPERLY STOW (IN SPACE PROTECTED BY FIXED FIRE FIGHTING) PETROLEUM PRODUCTS IN STEERING SPACE.
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Electrical
Issued 19 August 1994
Resolved
PROVIDE LIGHT CAGES IN FOLLOWING SPACES: PUMP RM (X3), WINDLASS RM, BOSN STORES, FWD PAINT LKR (X2), AND IN STERN TUBE COMPARTMENT.
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Lifesaving
Issued 19 August 1994
Resolved
PROVIDE OPERABLE WATER LIGHTS FOR RING BUOYS AT #6 STB CARGO TNK, FIRE STATION #2 AND ON FORE PEAK.
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Lifesaving
Issued 19 August 1994
Resolved
SECURE HYDRAULIC OIL DRUMS IN BOSN STORES.
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Engineering
Issued 19 August 1994
Resolved
CORRECT EXCESSIVE LEAKAGE IWO STB D. GEN. S.W. PUMP.
Condition: Unknown
Due 19 August 1994
Resolved 19 August 1994
Documentation
Issued 26 July 1994
Resolved
PROVIDE ANNUAL ENDORSEMENT ON SAFETY CONSTUCTION CERTIFICATE.
Condition: Unknown
Due 26 July 1994
Resolved 27 July 1994
Documentation
Issued 26 July 1994
Resolved
BRING THE VESSEL INTO CLASS; INCLUDING CURRENT HULL AND MACHINERY SURVEYS._x001C__x001C_ _x001C_ _x001C_
Condition: Unknown
Due 26 July 1994
Resolved 27 July 1994
Fire Fighting
Issued 24 May 1994
Resolved
RESET THE FIRE/BILGE/BALLAST PUMP RELIEF VALVE TO SYSTEM DESIGN PRESSURE OF150 PSIG, AND PROVE OPERATION OF SAME.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Construction/Loadline
Issued 24 May 1994
Resolved
MAKE PERMANENT REPAIRS TO HOLED OVERBOARD DISCHARGE PIPING IN WAY OF FIRE/BILGE/BALLAST MANIFOLD.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Engineering
Issued 20 May 1994
Resolved
REMOVE EXHAUST GAS BOILER SAFETIES AND OPEN FOR INSPECTION AT CERTIFIED FACILITY. HAVE SERVICED AND PROVIDE COPY OF SERVICING REPORT.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Documentation
Issued 20 May 1994
Resolved
REVISE OIL TRANSFER PROCEDURES TO MEET THE REQUIREMENTS OF 33 CFR 155.720.
Condition: Unknown
Due 20 May 1994
Resolved 20 May 1994
Accommodation/Occupational Safety
Issued 20 May 1994
Resolved
PROPERLY LABEL PORT AND STARBOARD MACERATOR PUMPS.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Lifesaving
Issued 20 May 1994
Resolved
PROVIDE PILOT LADDER PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Navigation
Issued 20 May 1994
Resolved
CONDUCT STEERING GEAR TEST PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Construction/Loadline
Issued 20 May 1994
Resolved
PROVE WTDs WATERTIGHT PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Lifesaving
Issued 20 May 1994
Resolved
CHANGE FUEL IN BOTH LIFEBOATS PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Lifesaving
Issued 20 May 1994
Resolved
CONDUCT BOAT DRILL PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Fire Fighting
Issued 20 May 1994
Resolved
CONDUCT FIRE DRILL PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Lifesaving
Issued 20 May 1994
Resolved
PROVIDE L/B RADIO FOR INSPECTION PRIOR TO SAILING
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Navigation
Issued 20 May 1994
Resolved
PROVE OPERATION OF RANGE & MAST LIGHT PRIOR TO SAILING
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Lifesaving
Issued 20 May 1994
Resolved
PROVIDE 12 CURRENT DATE RED HAND HELD FLARES & 2 SMOKES, PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Lifesaving
Issued 20 May 1994
Resolved
MAKE NECESSARY REPAIRS TO VARIOUS GENERAL ALARM BELLS & PROVE OPERATION PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Electrical
Issued 20 May 1994
Resolved
PROVIDE COVER FOR ELECTRICAL PLUG OUTLET IN WAY OF 01-78-1, PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Electrical
Issued 20 May 1994
Resolved
PROPERLY WIRE E-LIGHTING IN HOSPITAL, PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Lifesaving
Issued 20 May 1994
Resolved
PROVIDE CURRENT MEDICINES & REMOVE EXPIRED MEDICINES IN HOSPITAL, PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Lifesaving
Issued 20 May 1994
Resolved
PROVIDE ALL REQUIRED EQUIPMENT FOR LIFEBOAT 1 PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Lifesaving
Issued 20 May 1994
Resolved
PROVIDE ALL REQUIRED EQUIPMENT FOR LIFEBOAT 2 PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Fire Fighting
Issued 20 May 1994
Resolved
REATTACH SHAFT GUARD ON SHAFT ALLEY FIRE PUMP.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Fire Fighting
Issued 20 May 1994
Resolved
MAKE PERMANENT REPAIRS TO LEAKING NIPPLE ON PRIMING LINE FOR SHAFT ALLEY FIRE PUMP.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Construction/Loadline
Issued 20 May 1994
Resolved
PROVE PROPER OPERATION OF MANUAL CONTROLS FOR SHAFT ALLEY WATERTIGHT DOOR.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Fire Fighting
Issued 20 May 1994
Resolved
PROVIDE SET PRESSURE INFO FOR MAIN FIRE PUMP RELIEF VALVE.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Engineering
Issued 20 May 1994
Resolved
PROVE PROPER OPERATION OF THE AUDIBLE ALARM AT THE LOCAL PANEL FOR THE AUXILIARY BOILER.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Construction/Loadline
Issued 20 May 1994
Resolved
PROPERLY LABEL THE MANUAL CONTROL DIRECTIONS FOR THE SHAFT ALLEY WTD.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Engineering
Issued 20 May 1994
Resolved
REPAIR #8 CYLINDER LEAK ON STBD MAIN ENGINE.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Engineering
Issued 20 May 1994
Resolved
REBRACKET FUEL OIL SUPPLY LINE ON #2 CYLINDER, STARBOARD MAIN ENGINE.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Engineering
Issued 20 May 1994
Resolved
MAKE REPAIRS TO AND PROVE PROPER OPERATION OF THE GEAR DRIVEN CONTROLLABLE PITCH PROPELLER PUMP. CONDUCT TESTS OF AUTOMATION ITEM # 17.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Engineering
Issued 20 May 1994
Resolved
RENEW LEAKING SEAL ON THE GEAR DRIVEN REDUCTION GEAR LUBE OIL PUMP AND PROVE PROPER OPERATION.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Engineering
Issued 20 May 1994
Resolved
RENEW MISSING PYROMETERS ON THE #2 & 5 CYLINDERS ON THE #2 SHIPS SERVICE DIESEL GENERATOR.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Engineering
Issued 20 May 1994
Resolved
CLEAN EXCESS OIL FROM BOTH DIESEL GENERATOR FUEL OIL GALLERIES.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Engineering
Issued 20 May 1994
Resolved
TEST ALL BLUE ROTATING BEACON ALARMS.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Engineering
Issued 20 May 1994
Resolved
INSTALL SIGHTGLASS GUARDS ON THE JACKET WATER EXPANSION TANKS.
Condition: Unknown
Due 24 May 1994
Resolved 24 May 1994
Deck/Cargo
Issued 20 May 1994
Resolved
PROVIDE 30X30 FLAME SCREEN FOR 3C BALLAST TANK
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Construction/Loadline
Issued 20 May 1994
Resolved
PROVIDE HANDLE FOR PORT BALLAST TANK VENT.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Fire Fighting
Issued 20 May 1994
Resolved
REPAIR F.S.D. 1-90-2 PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Engineering
Issued 20 May 1994
Resolved
PROVE PROPER OPERATION OF THE AUXILIARY BOILER HIGH PRESSURE STEAM CUTOUT ALARM AT THE ENGINE ROOM CONSOLE.
Condition: Unknown
Due 17 June 1994
Resolved 27 May 1994
Lifesaving
Issued 20 May 1994
Resolved
PROVE OPERATION OF L/B 1 EMBARKATION LIGHT SWITCH PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Deck/Cargo
Issued 20 May 1994
Resolved
PROVIDE APPROVED PLANS OR REMOVE TEMPORARY PUMP INSTALLED IN CARGO PUMP ROOM PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Construction/Loadline
Issued 20 May 1994
Resolved
PUMP OUT & PROVIDE PUMP ROOM FOR INSPECTION PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Fire Fighting
Issued 20 May 1994
Resolved
UPDATE FIRE CONTROL PLAN
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Electrical
Issued 20 May 1994
Resolved
PROVE OPERATION OF DECK LIGHTING PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Deck/Cargo
Issued 20 May 1994
Resolved
TEST & LOG 1.5 HYDROSTATIC TEST OF MAWPFOR CARGO HOSES & PIPING PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Deck/Cargo
Issued 20 May 1994
Resolved
TEST CARGO EMERGENCY SHUTDOWNS PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Lifesaving
Issued 20 May 1994
Resolved
CONDUCT DECK WALK PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Lifesaving
Issued 20 May 1994
Resolved
PROVIDE GENERAL ALARM BELLS IN PUMP ROOM OR REPOSITION GENERAL ALARM LIGHTSSO TO BE COMPLETELY VISIBLE PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Electrical
Issued 20 May 1994
Resolved
SECURE LOOSE WIRES IN VARIOUS LOCATIONS PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Lifesaving
Issued 20 May 1994
Resolved
REMOVE PORTIBLE GAS GRILL FROM VSL PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Lifesaving
Issued 20 May 1994
Resolved
PROVE OPERATION OF LIFEBOAT 1 PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Accommodation/Occupational Safety
Issued 20 May 1994
Resolved
MAKE PERMANENT REPAIRS OR REPLACE HOT WATER STORAGE TANK(FOR HOUSE SERVICE)IN THE ENGINEROOM WHERE PATCHED.
Condition: Unknown
Due 20 May 1994
Resolved 20 May 1994
Accommodation/Occupational Safety
Issued 20 May 1994
Resolved
MAKE PERMANENT REPAIRS TO THE HOLED AND PATCHED SECTION OF SEWAGE OVERBOARDPIPING, JUST AFT OF THE CHECKVALVE (THRU HULL PENETRATION) IN THE STBD SIDEOF THE ENGINE ROOM AT THE VESSEL'S NEXT DRYDOCKING.
Condition: Unknown
Due 20 May 1994
Resolved 20 May 1994
Deck/Cargo
Issued 20 May 1994
Resolved
REPAIR SOFT PATCHES IN SLOP LINE PRIOR TO SAILING.
Condition: Unknown
Due 26 May 1994
Resolved 26 May 1994
Engineering
Issued 20 May 1994
Resolved
POP EXHAUST GAS SAFETY VALVES WHILE UNDERWAY. LOG RESULTS AND MAIL COPY TO MSO SAN FRAN. ATTN: [name withheld].
Condition: Unknown
Due 17 June 1994
Resolved 27 May 1994
Engineering
Issued 20 May 1994
Resolved
SEAL EXHAUST GAS BOILER SAFETY VALVES AT NEXT U. S. PORT OF CALL.
Condition: Unknown
Due 17 June 1994
Resolved 27 May 1994
Engineering
Issued 20 May 1994
Resolved
REPAIR CRACKED BRACKET FOR THE JACKET WATER COOLER SUPPORT ON THE #2 SHIPS SERVICE DIESEL GENERATOR.
Condition: Unknown
Due 17 June 1994
Resolved 27 May 1994
Fire Fighting
Issued 20 May 1994
Resolved
RESET BOTH FIREPUMP RELIEF VALVES TO 150 PSI. (DRAWING INDICATES SYSTEM OPERATING PSI IS 150 PSI)
Condition: Unknown
Due 17 June 1994
Resolved 27 May 1994
Engineering
Issued 6 May 1994
Resolved
MAKE TEMPORARY REPAIRS TO HOT WELL TANK FOR AUXILIAR AND WASTE HEAT BOILERSTO PRECLUDE LEAKAGE. PERMANENT REPAIRS TO BE CONDUCTED AT NEXT DRYDOCK.
Condition: Unknown
Due 6 May 1994
Resolved 6 May 1994
Engineering
Issued 6 May 1994
Resolved
RENEW THE GAUGE FOR THE CONTROLLABLE PITCH PROPELLER "HUB SERVO OIL PRESSURE".
Condition: Unknown
Due 6 May 1994
Resolved 6 May 1994
Engineering
Issued 6 May 1994
Resolved
MAKE REPAIRS TO, CONNECT, AND PROVE OPERATION OF REACH RODS FOR FUEL OIL MANIFOLD VALVES IN WAY OF ENGINEROOM, PORT SIDE, FORWARD.
Condition: Unknown
Due 6 May 1994
Resolved 6 May 1994
Engineering
Issued 6 May 1994
Resolved
SUBMIT A REPAIR PROPOSAL FOR THE 14" MAIN DIESEL ENGINE SALT WATER COOLING CROSS-CONNECTION PIPING. THE PRESENT TEMPORARY CEMENT PATCH (BOX) APPEARS TO BE LEAKING. PROPOSAL AND RELATED REPAIRS TO BE COMPLETED PRIOR TO DEPARTURE FROM THE PORT OF SAN DIEGO, CA.
Condition: Unknown
Due 6 May 1994
Resolved 6 May 1994
Engineering
Issued 6 May 1994
Resolved
MAKE REPAIRS TO THE OILY WATER SEPARATOR TRANSFER PUMP AND PROVE OPERATION OF SAME.
Condition: Unknown
Due 6 May 1994
Resolved 6 May 1994
Engineering
Issued 6 May 1994
Resolved
REPAIR JACKET WATER LEAK IN WAY OF #5 CYLINDER HEAD, PORT MAIN DIESEL ENGINE.
Condition: Unknown
Due 6 May 1994
Resolved 6 May 1994
Engineering
Issued 6 May 1994
Resolved
REPAIR JACKET WATER LEAK IN WAY OF #7 CYLINDER HEAD FOR #1 GENERATOR PRIME MOVER.
Condition: Unknown
Due 6 May 1994
Resolved 6 May 1994
Engineering
Issued 1 April 1994
Resolved
REPAIR ELECTRICAL CONTROL TO VESSEL'S CONTROLLABLE PITCH PROPELLER TO THE SATISFACTION OF ATTENDING CG MARINE INSPECTOR PRIOR TO GETTING UNDERWAY.
Condition: Unknown
Due 1 April 1994
Resolved 1 April 1994
Engineering
Issued 31 January 1994
Resolved
PROVIDE A WRITTEN PLAN TO [name withheld] TO ENSURE THAT THE MACHINERY EXHAUST SYSTEMS WILL BE OPERATED AND MAINTAINED IN SUCH A MANNER THAT SPARKS WILL NOT EFFUSE FROM THE STACK. NOTE, VSL HAD A FIRE ON DECK INVOLVING CARGO HOSES FROM A STACK SPARK, DEC 93, SDCMS.
Condition: Unknown
Due 31 January 1994
Resolved 31 January 1994
Electrical
Issued 3 January 1994
Resolved
COVER ELECTRICAL JUNCTION BOX ON TOP OF CPP SERVO BOX (IN BETWEEN MDE'S)._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 January 1994
Resolved 3 January 1994
Electrical
Issued 3 January 1994
Resolved
REPAIR INOPERATIVE S.W. COOLING AUXILIARY PUMP FOR SHIP SERVICE GENERATOR. FOUND IMPELLER MISSING AND THE PUMP HOUSING (CASING) OPENED._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 January 1994
Resolved 3 January 1994
Engineering
Issued 3 January 1994
Resolved
CHECK AND MAKE REPAIR IF NEEDED, FLEX OUPLING IN WAY OF STARBOARD MDE JUST BELOW THE FLYWHEEL. FLEX COUPLING SHOWS SIGN OF BURSTING (BULGING IN THE FRONT SIDE)._x001C_ _x001C_
Condition: Unknown
Due 3 January 1994
Resolved 3 January 1994
Engineering
Issued 3 January 1994
Resolved
REPLACE HANDRAIL IN WAY OF STARBOARD AFT MDE CLUTCH.
Condition: Unknown
Due 3 January 1994
Resolved 3 January 1994
Engineering
Issued 3 January 1994
Resolved
RENEW S.W. SEAL/COOLING LINE TO PUMP PACKING OF PORT CIRCULATING COOLING PUMP (MDE) DUE TO SEVERAL PIN HOLE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 3 January 1994
Resolved 3 January 1994
Engineering
Issued 19 December 1993
Resolved
PRIOR TO DEPARTURE, DEMONSTRATE PROPER OPERATION OF SHIP'S SERVICE DIESEL GENERATORS' SAFETIES, ALARMS, AND SHUTDOWNS, INCLUDING OVERSPEEDS, LOW LUBEOIL PRESSURE, HIGH JACKET WATER TEMPERATURE, AND REVERSE POWER RELAYS.
Condition: Unknown
Due 19 December 1993
Resolved 19 December 1993
Accommodation/Occupational Safety
Issued 19 December 1993
Resolved
RENEW HANDRAIL/GUARD IN WAY OF PORT HAWSEPIPE.
Condition: Unknown
Due 19 December 1993
Resolved 19 December 1993
Electrical
Issued 19 December 1993
Resolved
MAKE REPAIRS TO BROKEN FUSES (2), LOOSE WIRING, AND INSTALL A BLANK IN THE MAIN DECK LIGHTING PANEL, NO. L118.
Condition: Unknown
Due 19 December 1993
Resolved 19 December 1993
Engineering
Issued 19 December 1993
Resolved
REPAIR WATER/STORM DAMAGE AND PROVE OPERATION OF BOW THRUSTER SYSTEM.
Condition: Unknown
Due 19 December 1993
Resolved 19 December 1993
Construction/Loadline
Issued 19 December 1993
Resolved
MAKE PERMANENT REPAIRS TO HINGES AND DOGS FOR NEWLY INSTALLED HATCH COVER IN WAY OF FORECASTLE.
Condition: Unknown
Due 19 December 1993
Resolved 19 December 1993
Engineering
Issued 19 December 1993
Resolved
PRIOR TO DEPARTURE, REMOVE PLASTIC TIE WRAPS ON BOTH SHIP'S SERVICE DIESEL GENERATOR PRIME MOVER GOVERNOR REMOTE ELECTRICAL SHUTDOWNS AND PROVE PROPEROPERATION OF SAME.
Condition: Unknown
Due 19 December 1993
Resolved 19 December 1993
Accommodation/Occupational Safety
Issued 19 December 1993
Resolved
RENEW FORWARD CATWALK IN WAY OF NO. 1 CARGO TANKS.
Condition: Unknown
Due 19 December 1993
Resolved 19 December 1993
Engineering
Issued 19 December 1993
Resolved
INSTALL MISSING LAGGING ON WASTE HEAT BOILER IN WAY OF PREVIOUS REPAIRS.
Condition: Unknown
Due 17 January 1994
Resolved 19 December 1993
Lifesaving
Issued 19 December 1993
Resolved
PRIOR TO DEPARTURE, REPLACE DAMAGED RING BUOY IN WAY OF FORECASTLE.
Condition: Unknown
Due 19 December 1993
Resolved 19 December 1993
Construction/Loadline
Issued 19 December 1993
Resolved
MAKE PERMANENT REPAIRS TO WASTED WATERTIGHT BULKHEAD #27 (AFTER BULKHEAD OFFORECASTLE, MAIN DECK) IN WAY OF CABLE PENETRATIONS.
Condition: Unknown
Due 19 December 1993
Resolved 19 December 1993
Fire Fighting
Issued 19 December 1993
Resolved
PRIOR TO DEPARTURE, REPLACE MISSING FIRE HOSE IN WAY OF FORECASTLE FIRE STATION.
Condition: Unknown
Due 19 December 1993
Resolved 19 December 1993
Accommodation/Occupational Safety
Issued 19 December 1993
Resolved
RENEW MISSING HANDRAIL COURSE BETWEEN PIPERAIL AND FORWARD CHOCK, STARBOARDSIDE.
Condition: Unknown
Due 17 January 1994
Resolved 19 December 1993
Accommodation/Occupational Safety
Issued 19 December 1993
Resolved
MAKE REPAIRS TO HANDRAIL AT STARBOARD SIDE BRAWL OPENING BETWEEN CARGO TANKS #2 AND #3.
Condition: Unknown
Due 17 January 1994
Resolved 19 December 1993
Accommodation/Occupational Safety
Issued 19 December 1993
Resolved
REPLACE MISSING CATWALK GRID IN WAY OF #6 PORT CARGO TANK.
Condition: Unknown
Due 17 January 1994
Resolved 19 December 1993
Engineering
Issued 6 October 1993
Resolved
PROVIDE DOCUMENTATION FOR THE CERTIFICATION OF THE WELDERS AND THE APPROVEDPROCEDURE USED FOR THE CASING REPAIRS TO THE WASTE HEAT BOILER. MAKE BOILER AVAIABLE FOR INTERNAL EXAMINATION. HYDRO TEST TO 125% OF MAWP_x001C_
Condition: Unknown
Due 6 October 1993
Resolved 6 October 1993
Fire Fighting
Issued 13 April 1993
Resolved
PROVIDE A COPY OF THE FOAM ANALYSIS.
Condition: Unknown
Due 19 April 1993
Resolved 19 April 1993
Fire Fighting
Issued 13 April 1993
Resolved
UPDATE FIRE CONTROL PLAN (NO. 1 FORWARD FUEL OIL TANK NOW A VOID).
Condition: Unknown
Due 19 April 1993
Resolved 19 April 1993
Lifesaving
Issued 13 April 1993
Resolved
DEMONSTRATE PROPER OPERATION OF EXPOSURE SUIT INHALATION VALVES.
Condition: Unknown
Due 15 April 1993
Resolved 15 April 1993
Deck/Cargo
Issued 13 April 1993
Resolved
PROVIDE UPDATED DRAGER TUBES.
Condition: Unknown
Due 19 April 1993
Resolved 19 April 1993
Lifesaving
Issued 13 April 1993
Resolved
PRIOR TO DEPARTURE FROM SAN FRANCISCO BAY TO SEA, PROPERLY INSTALL LIFERAFTS.
Condition: Unknown
Due 19 April 1993
Resolved 19 April 1993
Accommodation/Occupational Safety
Issued 13 April 1993
Resolved
REPAIR TRIPPING HAZARD IN DECK OUTSIDE STARBOARD AFT "E" LOCKER.
Condition: Unknown
Due 19 April 1993
Resolved 19 April 1993
Lifesaving
Issued 13 April 1993
Resolved
PRIOR TO DEPARTURE FROM SAN FRANCISCO BAY TO SEA, REMOVE OIL FROM THE NO. 2LIFEBOAT BILGES AND LIFEBOAT LAUNCH DECK.
Condition: Unknown
Due 19 April 1993
Resolved 19 April 1993
Accommodation/Occupational Safety
Issued 13 April 1993
Resolved
PROVIDE PROPER CHAIN SNAP SAFETY RAILING LIFELINE HOOKS.
Condition: Unknown
Due 19 April 1993
Resolved 19 April 1993
Construction/Loadline
Issued 13 April 1993
Resolved
REPAIR BALLAST VENT VALVE HANDLE ON NO. 4 CENTER.
Condition: Unknown
Due 19 April 1993
Resolved 19 April 1993
Construction/Loadline
Issued 13 April 1993
Resolved
PRIOR TO THE DEPARTURE FROM SAN FRANCISCO BAY TO SEA, PROVIDE ONE STANDARD DISCHARGE CONNECTION AS REQUIRED BY 33 CFR 155.430.
Condition: Unknown
Due 19 April 1993
Resolved 19 April 1993
Deck/Cargo
Issued 13 April 1993
Resolved
REPAIR DRAIN VALVE ELBOW ON STARBOARD CONTAINMENT DRIP PAN.
Condition: Unknown
Due 19 April 1993
Resolved 19 April 1993
Engineering
Issued 13 April 1993
Resolved
REPLACE ALL 4 S/W EXPANSION JOINTS FOR MAIN ENGINE SALT WATER COOLING.
Condition: Unknown
Due 13 April 1993
Resolved 13 April 1993
Electrical
Issued 13 April 1993
Resolved
PROVE OPERATION OF EMERGENCY GENERATOR J/W ALARM SWITCH. CIRCUITRY FROM SWITCH TO ALARM HAS BEEN PROVEN SATISFACTORY.
Condition: Unknown
Due 13 April 1993
Resolved 13 April 1993
Electrical
Issued 13 April 1993
Resolved
MAKE REPAIRS TO SHORE TIE JUNCTION BOX (STERN).
Condition: Unknown
Due 13 April 1993
Resolved 13 April 1993
Documentation
Issued 13 April 1993
Resolved
SHOW THAT PROPER OIL RECORD BOOK ENTRIES ARE BEING MADE.
Condition: Unknown
Due 13 April 1993
Resolved 13 April 1993
Accommodation/Occupational Safety
Issued 13 April 1993
Resolved
REPLACE AND PROVE OPERATION OF S/S AIR RCVR AND BOTH START AIR RCVR RELIEFS.
Condition: Unknown
Due 13 April 1993
Resolved 13 April 1993
Fire Fighting
Issued 13 April 1993
Resolved
MAKE REPAIRS TO, AND PROVE OPERATION OF AUTOMATION TEST PROCEDURE #13. 8 OF10 LIMITS FOR FIRE PUMP START UP ARE NOT WORKING AND ARE JUMPED OUT.
Condition: Unknown
Due 13 April 1993
Resolved 13 April 1993
Fire Fighting
Issued 13 April 1993
Resolved
INSTALL PROPER WARNING SIGN AT CO2 ALARM IN ENG ROOM.
Condition: Unknown
Due 13 April 1993
Resolved 13 April 1993
Documentation
Issued 13 April 1993
Resolved
AMEND AUTOMATION TEST PROCEDURES, ITEM #12 (AUTO BILGE PUMPS), TO REFLECT ACTUAL VSL CONDITION. AMENDMENT MUST BE SUBMITTED FOR APPROVAL.
Condition: Unknown
Due 13 April 1993
Resolved 13 April 1993
Accommodation/Occupational Safety
Issued 13 April 1993
Resolved
STENCIL AT BOTH SEWAGE DISCHARGE CONTROLLERS "NO DISCHARGE OF SEWAGE WITHIN3 MILES OF U.S. COAST".
Condition: Unknown
Due 13 April 1993
Resolved 13 April 1993
Engineering
Issued 13 April 1993
Resolved
LIFT WASTE HEAT BLR SAFETIES AT SEA AND LOG RESULTS (LIFT/SEAT PSI).
Condition: Unknown
Due 13 April 1993
Resolved 13 April 1993
Engineering
Issued 13 April 1993
Resolved
MAKE REFRACTORY REPAIRS TO AUXILIARY BOILER.
Condition: Unknown
Due 13 April 1993
Resolved 13 April 1993
Electrical
Issued 13 April 1993
Resolved
INSTALL MISSING LIGHT COVERS AS FOLLOWS: 1) STBD SIDE AFT OF SSDG. 2) IWOSTART AIR RCVR. 3) 2 EACH IN STACK SPACE/MACHINERY CASING.
Condition: Unknown
Due 13 April 1993
Resolved 13 April 1993
Accommodation/Occupational Safety
Issued 13 April 1993
Resolved
REPLACE SEAL ON #2 SEWAGE PUMP.
Condition: Unknown
Due 13 April 1993
Resolved 13 April 1993
Engineering
Issued 13 April 1993
Resolved
PROVE OPERATION OF AUXILIARY BLR REMOTE SHUTDOWN.
Condition: Unknown
Due 13 April 1993
Resolved 13 April 1993
Unknown
Issued 10 April 1991
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 10 April 1991
Resolved 10 April 1991
Engineering
Issued 10 April 1991
Resolved
WASTE HEAT BOILER NOT TO BE PLACED IN SERVICE UNTIL SATISFACTORY HYDROSTATIC TEST AND PROPER OPERATION IS PROVED INCLUDING REMOVAL AND_x001C_ EXAMINATION OF MOUNTS._x001C_ _x001C_
Condition: Unknown
Due 10 April 1991
Resolved 10 April 1991
Accommodation/Occupational Safety
Issued 10 April 1991
Resolved
PROVE PROPER OPERATION OF SHIP SERVICE AND CONTROL AIR RECEIVER RELIEF VALVES._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 10 April 1991
Resolved 10 April 1991
Accommodation/Occupational Safety
Issued 10 April 1991
Resolved
PROVE PROPER OPERATION OF POTABLE WATER HEAD TANK RELIEF VALVE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 10 April 1991
Resolved 10 April 1991
Construction/Loadline
Issued 10 April 1991
Resolved
PROVE PROPER OPERATION AND MARKING OF STEERING COMPARTMENT SECONDARY MEANS OF ESCAPE.
Condition: Unknown
Due 10 April 1991
Resolved 10 April 1991
Engineering
Issued 8 June 1990
Resolved
[name withheld] AND SEAL WASTE HEAT BOILER SAFETY RELIEF VALVES WHEN VESSEL IS UNDERWAY AND SEND TO [name withheld] A LETTER OF COMPLIANCE.
Condition: Unknown
Due 8 June 1990
Resolved 8 June 1990
Unknown
Issued 8 June 1990
Resolved
REPAIR/REPLACE INOPERABLE THREE-WAY SWITCH FOR THE OILY WATER SEPARATOR.
Condition: Unknown
Due 8 June 1990
Resolved 8 June 1990
Unknown
Issued 8 June 1990
Resolved
REPLACE INOPERABLE SAFETY RELIEF VALVE FOR THE SHIP'S SERVICE AIR RECEIVER.
Condition: Unknown
Due 8 June 1990
Resolved 8 June 1990
Fire Fighting
Issued 8 June 1990
Resolved
PROVIDE FOAM ANALYSIS OF FIRE FIGHTING FOAM. IF UNACCEPTABLE, REPLACE ALL FOAM IN FOAM TANK.
Condition: Unknown
Due 8 June 1990
Resolved 8 June 1990
Fire Fighting
Issued 8 June 1990
Resolved
PROVIDE COPY OF SERVICING REPORT FOR ALL FIXED, SEMIPORTABLE, AND PORTABLE FIRE FIGHTING EQUIPMENT.
Condition: Unknown
Due 8 June 1990
Resolved 8 June 1990
Construction/Loadline
Issued 17 November 1989
Resolved
MAKE PERMANENT REPAIRS IN WAY OF THE DAMAGED SIDE SHELL PLATES IN NO.7 STBDCARGO TANK. DETERMINATION ON THE EXTENT OF THE REPAIRS WILL BE MADE BY THE COGNIZANT OCMI OR HIS REPRESENTATIVE. THE NO.7 WING TANK (STBD) IS NOT TO BE USED FOR PRODUCT UNTIL PERMANENT REPAIRS HAVE BEEN MADE.
Condition: Unknown
Due 17 November 1989
Resolved 17 November 1989
Deck/Cargo
Issued 10 October 1989
Resolved
ADMINISTRATIVE CG-835. REFERENCE SEALIFT ARTIC, PROVIDED AS INSTALLED COASTGUARD APPROVED PLANS FOR TANK STRIPPING PIPING.
Condition: Unknown
Due 10 October 1989
Resolved 10 October 1989
Engineering
Issued 10 October 1989
Resolved
SET AND SEAL WASTE HEAT BOILER SAFETY RELIEF VALVE.
Condition: Unknown
Due 10 October 1989
Resolved 10 October 1989
Electrical
Issued 12 June 1989
Resolved
REPAIR/REPLACE BLOWER ON #2 SSDG. VESSEL IS REQUIRED TO HAVE A TUG ASSIST FROM OZOL TO PILOT STATION SAN FRANCISCO AND FROM PILOT STATION LOS ANGELES TO LONG BEACH.
Condition: Unknown
Due 12 June 1989
Resolved 12 June 1989
Accommodation/Occupational Safety
Issued 7 April 1989
Resolved
REPLACE THE WASTED VENT LINE ON TOP OF THE PILOTHOUSE PORT SIDE.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Electrical
Issued 7 April 1989
Resolved
PROPERLY REMOUNT THE ELECTRICAL OUTLETS AT THE STEM OF THE VESSEL, AND ON THE PORT AND STARBOARD SIDES ON TOP OF THE MIDSHIP HOUSE.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Accommodation/Occupational Safety
Issued 7 April 1989
Resolved
REPLACE GASKETS AND CHANNELS FOR THE FOLLOWING: A) NATURAL EXHAUST CLOSURE 01-9-2 ON THE FORECASTLE B) NATURAL SUPPLY CLOSURE 01-26-2 ON THE FORECASTLE C) NATURAL SUPPLY CLOSURE 1-27-1 ON THE FORECASTLE.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Electrical
Issued 7 April 1989
Resolved
PROPERLY REATTACH THE LOOSE CABLES ON THE 01 DECK PORT SIDE FORWARD, AND ONTHE FORWARD SIDE OF THE MIDSHIP HOUSE.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Navigation
Issued 7 April 1989
Resolved
REPAIR SOUND POWERED TELEPHONES ON THE 01 DECK FORWARD HOUSE BULKHEAD AND ON THE FORECASTLE BY THE STEM.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Construction/Loadline
Issued 7 April 1989
Resolved
PERMANENTLY WELD THE TEMPORARY ACCESS PLATE ON THE PORT EMBARKATION DECK.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Unknown
Issued 7 April 1989
Resolved
CONDUCT OPERATIONAL TESTING OF THE WASTE HEAT BOILER DURING UNDERWAY, SET AND SEAL SAFETY RELIEF VALVES, AND SEND A LETTER TO [name withheld], CA CERTIFYING SATISFACTORY TESTING OF THE BOILER, SETTING AND SEALING OF THE SAFETY RELIEF VALVES.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Accommodation/Occupational Safety
Issued 7 April 1989
Resolved
REPLACE THE CLOSURE AND HINGES FOR THE NATURAL AIR SUPPLY VENT ON THE AFTERPORT SIDE OF THE MIDSHIP HOUSE.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Accommodation/Occupational Safety
Issued 7 April 1989
Resolved
REPLACE THE CHANNEL AND GASKET FOR THE NATURAL VENTILATION COVERS ON THE PORT AND STARBOARD AFTER SIDES OF THE MIDSHIP HOUSE.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Accommodation/Occupational Safety
Issued 7 April 1989
Resolved
REPLACE MISSING AND WASTED RAILS ON TOP OF THE MIDSHIP HOUSE, AND ON THE MIDSHIP STARBOARD SIDE OF THE WEATHERDECK.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Engineering
Issued 7 April 1989
Resolved
REPLACE MISSING COVER FOR THE GOOSENECK VENT ON THE PORT SIDE OF THE FORECASTLE.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Documentation
Issued 7 April 1989
Resolved
PROVIDE CURRENT COPIES OF ALL APPLICABLE CFR'S.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Fire Fighting
Issued 7 April 1989
Resolved
FREE UP THE NOZZLE ADJUSTMENTS ON ALL FOAM MONITORS.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Fire Fighting
Issued 7 April 1989
Resolved
PROVIDE FOAM ANALYSIS OF FIREFIGHTING FOAM. IF UNACCEPTABLE REPLACE ALL FOAM IN FOAM TANK.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Lifesaving
Issued 7 April 1989
Resolved
REPLACE WASTED SOLAS COVER ON THE STARBOARD LIFEBOAT.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Lifesaving
Issued 7 April 1989
Resolved
DEMONSTRATE PROPER SUSPENSION, FLOATATION AND RELEASE TEST FOR THE PORT LIFEBOAT.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Engineering
Issued 7 April 1989
Resolved
CONDUCT INTERNAL EXAMINATION OF THE SHIP'S SERVICE AIR RECEIVER AND THE CONTROL AIR RECEIVER IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Fire Fighting
Issued 7 April 1989
Resolved
OBTAIN AND POST IN A WATERTIGHT CONTAINER, A COPY OF THE FIRE CONTROL PLAN ON THE STARBOARD SIDE OF THE VESSEL.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Accommodation/Occupational Safety
Issued 7 April 1989
Resolved
REPAIR THE WARNING LIGHTS FOR THE REEFER BOXES.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Lifesaving
Issued 7 April 1989
Resolved
REPAIR BROKEN DOGS ON THE PROVISION LOCKERS ON THE PORT LIFEBOAT.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Deck/Cargo
Issued 7 April 1989
Resolved
REMOVE THE OBSOLETE PUMP SHUTDOWN STENCILS ON THE PORT AND STARBOARD FORWARD SIDES OF THE HOUSE.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Lifesaving
Issued 7 April 1989
Resolved
PROVIDE ADEQUATE ILLUMINATION IN WAY OF ALL LIFERAFT AND LIFEBOAT EMBARKATION AREAS. ILLUMINATION MUST BE TIED INTO THE EMERGENCY LIGHTING BOARD.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Lifesaving
Issued 7 April 1989
Resolved
DEMONSTRATE PROPER WEIGHT TEST ON THE PORT LIFEBOAT DAVITS.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Deck/Cargo
Issued 7 April 1989
Resolved
OPEN ALL CARGO HOLD ULLAGES, DOME COVERS, AND P/V VALVES FOR INSPECTION.
Condition: Unknown
Due 7 April 1989
Resolved 7 April 1989
Electrical
Issued 1 December 1988
Resolved
REPAIR AND PROVE PROPER OPEERATION OF EMERGENCY DIESEL GENERATOR.
Condition: Unknown
Due 1 December 1988
Resolved 1 December 1988
Accommodation/Occupational Safety
Issued 7 October 1988
Resolved
CLEAN STACK AND FLAME SCREENS ON ALL ENGINE EXHAUST.
Condition: Unknown
Due 7 October 1988
Resolved 7 October 1988
Accommodation/Occupational Safety
Issued 7 October 1988
Resolved
CLEAN UP EXCESS OIL IN AFTER STEERING COMPARTMENT.
Condition: Unknown
Due 7 October 1988
Resolved 7 October 1988
Accommodation/Occupational Safety
Issued 7 October 1988
Resolved
CLEAN UP EXCESS OIL IN LOWER LEVEL OF ENGINE ROOM.
Condition: Unknown
Due 7 October 1988
Resolved 7 October 1988
Deck/Cargo
Issued 7 October 1988
Resolved
SHOW OPERATIONAL TEST OF BOTH THE CARGO AND BILGE MONITORS.
Condition: Unknown
Due 7 October 1988
Resolved 7 October 1988
Fire Fighting
Issued 7 October 1988
Resolved
REPLACE OR REPAIR MOTOR ON THE FIRE AND BILGE PUMP.
Condition: Unknown
Due 7 October 1988
Resolved 7 October 1988
Engineering
Issued 19 July 1988
Resolved
PROVE OPERATION OF BILGE PUMP START/STOP FROM ENGINE ROOM CONSOLE.
Condition: Unknown
Due 19 July 1988
Resolved 19 July 1988
Electrical
Issued 19 July 1988
Resolved
REMOVE DISCONNECTED REMOTE MACHINERY STOP PANEL FROM O-3 LEVEL STARBOARD PASSAGEWAY.
Condition: Unknown
Due 19 July 1988
Resolved 19 July 1988
Electrical
Issued 19 July 1988
Resolved
PROVE OPERATION OF ALL REMOTE MACHINERY SHUTDOWNS.
Condition: Unknown
Due 19 July 1988
Resolved 19 July 1988
Lifesaving
Issued 19 July 1988
Resolved
PROVIDE USCG WITH INFORMATION (DATES) AS TO WHEN LIFEBOAT FALLS WERE LAST END FOR ENDED. IN ADDITION, PROVIDE A COPY OF WIRE ROPE CERTIFICATION AND INFO AS TO WHERE RENEWAL/END FOR ENDING WAS ACCOMPLISHED, OR RENEW FALLS.
Condition: Unknown
Due 19 July 1988
Resolved 19 July 1988
Lifesaving
Issued 19 July 1988
Resolved
EFFECT PERMANENT REPAIR TO LINE THROWING APPLIANCE STOWAGE BOX (WASTED).
Condition: Unknown
Due 19 July 1988
Resolved 19 July 1988
Fire Fighting
Issued 19 July 1988
Resolved
INSTALL A MEANS OF ESCAPE (I.E. KICKOUT PANEL OR OUTWARD OPENING DOOR) FROMCO2 ROOM. CURRENTLY LOWER W.T. DOOR SWINGS INWARD.
Condition: Unknown
Due 19 July 1988
Resolved 19 July 1988
Engineering
Issued 19 July 1988
Resolved
TEST WASTEHEAT BOILER SAFETY VALVES AT SEA AND LOG LIFTING AND SEATING PRESSURE. AT NEXT U.S. PORT HAVE MARINE INSPECTOR EXAMINE LOG ENTRY AND SEAL VALVES.
Condition: Unknown
Due 19 July 1988
Resolved 19 July 1988
Engineering
Issued 19 July 1988
Resolved
PROVE OPERATION OF CRANKCASE OIL MIST DETECTOR ON STARBOARD MAIN ENGINE.
Condition: Unknown
Due 19 July 1988
Resolved 19 July 1988
Engineering
Issued 19 July 1988
Resolved
INSTALL PROPER RELIEF VALVE WITH HAND RELIEVING GEAR ON CONTROL AIR RECEIVER.
Condition: Unknown
Due 19 July 1988
Resolved 19 July 1988
Engineering
Issued 1 March 1988
Resolved
MAKE WASTE HEAT EXCHANGER AVAILABLE FOR INSPECTION NOT LATER THAN 30MAY1988(OFFICE ISSUED 835).
Condition: Unknown
Due 1 March 1988
Resolved 1 March 1988
Engineering
Issued 1 March 1988
Resolved
PROVIDE A COPY OF THE PROCEDURE USED TO REPAIR THE WASTE HEAT EXCHANGER ON 25JAN88 IN ST. THEO, GREECE. (OFFICE ISSUED 835)
Condition: Unknown
Due 1 March 1988
Resolved 1 March 1988
Engineering
Issued 11 April 1987
Resolved
REPAIR WATERLEAK IN OIL CONTENT MONITOR PUMP ROOM SIDE.
Condition: Unknown
Due 11 April 1987
Resolved 11 April 1987
Construction/Loadline
Issued 11 April 1987
Resolved
REPLACE MISSING STUDS AS NECESSARY ON MANHOLE COVERS A) SEVERAL IN DECKHOUSE MAIN DECK CROSS SHIPS PASSAGE B) PORT AND STBD AFT FUEL OIL TANKSC) FWD AND AFT, PORT AND STBD COFFERDAMS.
Condition: Unknown
Due 11 April 1987
Resolved 11 April 1987
Deck/Cargo
Issued 11 April 1987
Resolved
REPAIR MASTER CARGO PUMP SHUTDOWN SWITCH IN PUMPROOM MN DK.
Condition: Unknown
Due 11 April 1987
Resolved 11 April 1987
Lifesaving
Issued 11 April 1987
Resolved
REPLACE BROKEN GLASS ON GENERAL ALARM BOX OUTSIDE OF EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 11 April 1987
Resolved 11 April 1987
Engineering
Issued 11 April 1987
Resolved
PROVIDE A GATE VALVE ON PAINT LOCKER KEROSENE TANK.
Condition: Unknown
Due 11 April 1987
Resolved 11 April 1987
Engineering
Issued 11 April 1987
Resolved
REPLACE ALL INOPERABLE ALARM BULBS ON BRIDGE CONSOLE.
Condition: Unknown
Due 11 April 1987
Resolved 11 April 1987
Engineering
Issued 11 April 1987
Resolved
REPAIR & TEST BRIDGE ENGINE ORDER TELEGRAPH POWER FAILURE ALARM.
Condition: Unknown
Due 11 April 1987
Resolved 11 April 1987
Construction/Loadline
Issued 11 April 1987
Resolved
CROP TO GOOD METAL & RENEW PUMP ROOM VENTILATION DUCT, 1ST LEVEL UP FROM BOTTOM, PORT SIDE.
Condition: Unknown
Due 11 April 1987
Resolved 11 April 1987
Lifesaving
Issued 11 April 1987
Resolved
REPAIR #1 LIFEBOAT TRANSMISSION AND DEMONSTRATE OPERATION.
Condition: Unknown
Due 11 April 1987
Resolved 11 April 1987
Engineering
Issued 11 April 1987
Resolved
REPAIR AND DEMONSTRATE OPERATION OF ENGINE ROOM BILGE OILY WATER SEPERATOR.
Condition: Unknown
Due 11 April 1987
Resolved 11 April 1987
Electrical
Issued 11 April 1987
Resolved
REHANG ELECTRICAL WIRES, RELAMP & REPLACE GUARDS AS NECESSARY IN LOWER LEVEL OF BOW THRUSTER ROOM.
Condition: Unknown
Due 11 April 1987
Resolved 11 April 1987
Lifesaving
Issued 13 June 1986
Resolved
PROVIDE THREE ADDITIONAL EXPOSURE SUITS TO SATISFY REQUIRED COMPLEMENT OF 42 SUITS.
Condition: Unknown
Due 13 June 1986
Resolved 13 June 1986
Lifesaving
Issued 13 June 1986
Resolved
STENCIL EXPOSURE SUITS WITH NAME OF VESSEL.
Condition: Unknown
Due 13 June 1986
Resolved 13 June 1986
Electrical
Issued 20 March 1985
Resolved
RENEW WASTED WIRING CONDUIT IN CENTER LINE WIRING TRUNK AT MIDSHIP KING POST SECTION. WIRING IS FOR KING POST & DECK LIGHTS.
Condition: Unknown
Due 20 March 1985
Resolved 20 March 1985
Fire Fighting
Issued 20 March 1985
Resolved
REPLACE GOUR (4) MISSING 100 LB CO2 CYLINDERS IN FIXED FIRE SYSTEM. NEW CYLINDERS TO BE CORRECT WEIGHT & SIZE FOR SHIPS SYSTEM.
Condition: Unknown
Due 20 March 1985
Resolved 20 March 1985