Records from 2013 to 2019. Most recent: inspection, 23 January 2019.
Engineering › Shafting/Propeller Arrangements › Propeller (controllable pitch)
Issued 9 March 2017
No resolution recorded
When vessel energizes the port CPP pump there is a loss of hydraulic fluid from port prop.
Condition: Improper Installation
Action required: 705 - Other - as specified
Lifesaving › Launching Appliances › Davit
Issued 16 December 2016
Resolved
Rescue boat davit had not been serviced as required.
Action required: 17 - Rectify deficiencies prior to departure
Due 30 December 2016
Resolved 19 December 2016
Deck/Cargo › Cargo Transfer (solid) › General
Issued 16 December 2016
Resolved
Cargo crane must have required tests completed prior to cargo operations.
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 December 2016
Resolved 19 December 2016
Lifesaving › Rescue Boat › Propulsion Engine
Issued 16 December 2016
Resolved
Fuel hose fitting is damaged and leaks fuel. Replace fitting.
Action required: 705 - Other - as specified
Due 30 December 2016
Resolved 19 December 2016
Resolution: Vessel replaced entire fuel hose assembly, all sat.
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 December 2016
Resolved
Wiring on the bridge is unsupported throughout the bridge and presents a trip hazard near the navigation console. Organize wiring and use proper metal supports.
Action required: 705 - Other - as specified
Due 30 December 2016
Resolved 19 December 2016
Electrical › Electrical Distribution System (service) › Panelboard
Issued 16 December 2016
Resolved
Distribution panels in the galley and engine room need labels and blank covers.
Action required: 705 - Other - as specified
Due 30 December 2016
Resolved 19 December 2016
Pollution Prevention/Response › Prevention Equipment › Oily Water Separator (15 ppm)
Issued 16 December 2016
Resolved
Oily water separator did not function correctly when tested. OWS was brand new and had just been installed. OWS company rep attended and determined the issue was caused by operator error by the chief engineer.
Action required: 705 - Other - as specified
Due 16 December 2016
Resolved 19 December 2016
Construction/Loadline › Structures › Transverse Bulkhead
Issued 8 February 2016
Resolved
#13 Port Ballast tank, crop and renew 3" vertical angle, second frame aft.
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 1 March 2016
Construction/Loadline › Structures › Manhole
Issued 8 February 2016
Resolved
#13 port ballast tank, crop and renew manhole on second frame
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 1 March 2016
Construction/Loadline › Hull › Longitudinal Frame
Issued 8 February 2016
Resolved
#11 port ballast tank, replace longitudinal inboard stiffner #2 from the top.
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 1 March 2016
Construction/Loadline › Hull › Transverse Frame
Issued 8 February 2016
Resolved
#20 port stern ballast tank, renew 1 inboard angle in the third frame.
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 1 March 2016
Construction/Loadline › Hull › Stiffener
Issued 8 February 2016
Resolved
#22 starboard ballast tank, crop and renew baffle between 1st and 2nd frames.
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 1 March 2016
Construction/Loadline › Hull › Transverse Frame
Issued 8 February 2016
Resolved
#5 port ballast tank, crop and renew stiffner along first frame.
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 1 March 2016
Engineering › Compressed Air System (start air) › Receiver/Bottle
Issued 8 February 2016
Resolved
Pressure vessel under deck plating in passageway needs to be blanked off and taken out of service.
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 1 March 2016
Construction/Loadline › Hull › Longitudinal Frame
Issued 8 February 2016
Resolved
Bilge frame under main passageway needs to be cropped and renewed.
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 1 March 2016
Construction/Loadline › Structures › Deck Plating
Issued 8 February 2016
Resolved
Deck plating needs to be cropped and renewed. Tow pins had been removed and wood blocks were inserted as temporary repairs.
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 1 March 2016
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 8 February 2016
Resolved
Crop and renew two inserts in bulkhead steel inside the void under the pantry. Original thickness is 5/16", took UT readings to determine size of cutout.
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 1 March 2016
Construction/Loadline › Hull › Longitudinal Frame
Issued 8 February 2016
Resolved
Replace 3 angles on inboard frame inside the rudder room void.
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 1 March 2016
Construction/Loadline › Structures › Deck Plating
Issued 8 February 2016
Resolved
Crop and renew 18" by 18" section of deck plating above #22 starboard tank due to a pinhole and corroded deck plate.
Action required: 705 - Other - as specified
Due 25 March 2016
Resolved 1 March 2016
Engineering › Shafting/Propeller Arrangements › Propeller (controllable pitch)
Issued 8 February 2016
Resolved
The CPP system has an unsecured oil leak under the water. The inspection was canceled due to the leak. The vessel must return to drydock to correct the issue.
Action required: 17 - Rectify deficiencies prior to departure
Due 1 January 2017
Resolved 16 December 2016
Resolution: The vessel made repairs to the CPP system. Corrected the leak while in drydock. The system held pressure and no leak was observed after the vessel returned to the water. Completed pitch test.