← All vessels
MUSETTE
Passenger (Inspected) · Passenger Ship class · Built 1970s · USCG Southeast District (CGD-SE) · Other hulls named MUSETTE
MUSETTE is a 1974 passenger vessel (inspected). The Coast Guard has recorded 92 inspections since 1985, most recently in October 2025, along with 313 deficiencies — 3 with no resolution recorded —, 2 operational controls and 3 casualty investigations between 2011 and 2016.
Records from 1985 to 2025. Most recent: inspection, 6 October 2025.
- Built
- 1974
- Last inspected
- 6 October 2025
- Documentation
- Expired · documentation file of 10 September 2026
- Deficiencies
- 313 recorded · 3 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 3 investigations · 2011–2016
Identity
557957
WDB9800
48040
Flag
UNITED STATES
366983050
Maury page id
psix-48040
Inspections, by type
…with no type recorded13
Years with a record
37 calendar years (1985–2025)
The 92 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)93.6 ft × 29.0 ft × 9.5 ft
Registered tonnagegross 97 / net 66
ITC dimensions (L × B × D)93.6 ft × 29.0 ft × 9.5 ft
ITC tonnagegross 274 / net 119
BuilderBLOUNT MARINE CORP · WARREN, RI, UNITED STATES · built 1974
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNORFOLK, VA
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it97 - Regulatory (Subpart C or D), Gross Ton
274 - Convention (Subpart B), Gross Ton
66 - Regulatory (Subpart C or D), Net Ton
119 - Convention (Subpart B), Net Ton
274 - Convention (Subpart B), Gross Ton
66 - Regulatory (Subpart C or D), Net Ton
119 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDB9800MMSI 366983050 · active · compulsorily equipped · granted 1 October 2024, expires 13 October 2034
WAF7704MMSI not assigned · expired · compulsorily equipped · granted 1 November 1994, cancelled 27 November 2004
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 92
6 October 2025
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8247220
3 September 2025
Appeal
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8230291
19 August 2025
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8207170
17 March 2025
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8095150
4 February 2025
Appeal · Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8077475
6 January 2025
Deficiency Check · Examination of Repairs
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8058986
2 October 2024
Deficiency Check · Appeal · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8009258
2 October 2024
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8014152
15 August 2024
Deficiency Check · Examination of Repairs · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7979498
24 May 2023
COI Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7694534
2 May 2023
Damage Survey · Deficiency Check · In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7679279
18 June 2022
Administrative Inspection · Examination of Repairs · Damage Survey · Internal Structural Exam · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7489899
11 April 2022
COI Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7426361
21 March 2022
Damage Survey · Administrative Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7415821
10 June 2021
Internal Structural Exam · Drydock Exam · Deficiency Check · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7225361
7 June 2021
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7215518
4 January 2021
Administrative Inspection · In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7119750
26 October 2020
Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7084324
19 August 2019
Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6785248
10 July 2019
Internal Structural Exam · Spot Check · Drydock Exam · Examination of Repairs
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6743407
12 June 2018
Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6441901
18 July 2017
Drydock Extension · Internal Structural Exam · Spot Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6212512
7 April 2017
COI Inspection · DAPI Audit · Deficiency Check · MTSA Verification
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6119711
25 July 2016
Annual Inspection · DAPI Audit · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5952153
7 May 2016
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5894864
14 January 2016
DAPI Audit
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5804550
5 August 2015
Hull Examination · Examination of Repairs · Internal Structural Exam · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5206391
13 July 2015
MTSA Verification · Annual Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5183140
26 September 2011
Examination of Repairs · Drydock Exam · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4154862
9 September 2011
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4140020
15 August 2011
Damage Survey
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4116276
14 August 2011
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4120223
4 August 2011
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4105684
14 July 2009
MTSA Verification · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3534281
30 July 2008
Annual Inspection · MTSA Verification · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3283906
24 May 2007
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2936069
23 April 2007
COI Inspection · MTSA Verification
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2907102
26 July 2006
MTSA Verification · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2723949
7 September 2005
Hull Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2486445
22 June 2005
MTSA Verification · Annual Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2405144
13 August 2004
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2165232
21 July 2004
Annual Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2140142
30 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1971768
2 September 2003
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1894226
16 July 2003
Re-Inspection · Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1847669
20 May 2002
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1618539
26 April 2002
COI Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1609433
11 October 2001
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1407028
30 March 2001
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1433798
17 March 2000
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1378987
17 November 1999
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1045777
27 October 1999
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1375945
5 May 1999
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1446818
14 October 1998
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 83263
21 May 1998
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1446649
4 November 1997
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1118452
5 June 1997
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1110468
2 May 1997
Deficiency Check · Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1400568
20 February 1997
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1107414
25 September 1996
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 852571
29 July 1996
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1087188
3 May 1996
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1363701
28 November 1995
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 881351
25 April 1995
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1357194
4 May 1994
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 859728
19 April 1994
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1422364
5 August 1993
Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1153846
11 May 1993
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 831074
21 April 1993
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 841887
18 May 1992
Deficiency Check
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1259165
4 May 1992
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 956917
15 May 1991
Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1216619
14 May 1991
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 909169
26 April 1990
COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1216909
27 November 1989
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 906283
29 September 1989
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1195875
28 August 1989
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1340525
8 May 1989
COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 897726
24 April 1989
Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1031221
23 November 1988
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 895292
14 November 1988
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 891725
9 March 1988
COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1022747
1 December 1987
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1031643
20 August 1987
Examination of Repairs
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1338432
12 August 1987
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1009145
17 July 1987
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1326488
27 April 1987
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1018318
2 January 1987
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1316359
22 April 1986
Re-Inspection · Credit Drydock
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1308786
2 January 1986
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 996071
2 October 1985
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1300910
2 January 1985
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 978697
Deficiency record · 313
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Insulation wetted through (oil)
Issued 19 August 2025
Resolved
Fuel filters had considerable amount of water and drips/leaks
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 August 2025
Resolved
CG MI observed an exhaust leak on the port main engine exhaust located in the steering space
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 19 August 2025
Resolved
CG MI observed significant leakage from both main propulsion shafts at the through hull packing
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 19 August 2025
Resolved
46 CFR 177.13-1 Each vessel must meet the applicable requirements in Subchapter S of this chapter.
CG MI observed two forward windows on STBD side had missing/broken glass
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 19 August 2025
Resolved
46 CFR 182.20-5 (b) Gauges to indicate cooling water discharge temp.
STBD engine cooling water discharge gauge inop, repair/replace to the satisfaction of the CG Marine Inspector
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 19 August 2025
Resolved
46 CFR 120.432 Each vessel must have adequate emergency lighting fitted along the line of escape to the main deck from all passenger and crew accommodation spaces located below the main deck.
CG Marine inspector observed non functional emergency lighting in engine space. Check emergency lighting and repair replace as necessary
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 August 2025
Resolved
46 CFR 183.10-20 (k)Junction boxes, connection boxes, and outlet boxes...
Exposed wires on outlet, need stuffing tubes,
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 19 August 2025
Resolved
Inspection of all parts of the interior and exterior of the hull...
Multiple blkhd penetrations and bottom plate penetration with disabled bow thruster need plugs or stuffing
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 19 August 2025
Resolved
46 CFR 116.300 (c) Steel hull Vessels...
Excessive rust and cracking of 2nd deck above embarkation and steering gear frame stbd of keel. Repair/Replace to the satisfaction of G Marine inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 19 August 2025
Resolved
Each Life jacket must be marked with type 1 retro reflective material.
One child life jacket retro was degraded and peeling off. Repair/Replace to the satisfaction of CG Marine Inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 19 August 2025
Resolved
Placards containing instructions for the donning and use of the lifejackets aboard the vessel must be posted.
All type Lifejackets must have posted instructions.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 19 August 2025
Resolved
Each rescue boat and ring life buoy must be marked with Type II retro reflective material approved IAW 164.018 in subchapter Q of this chapter, or other standard specified by the commandant. The arrangement of the retro reflective material must be as specified by IMO Resolution A.658(16).
Life buoy on bridge has peeling retro reflective material, repair/replace to satisfaction of CG Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 19 August 2025
Resolved
Remote fuel shut off stations must be marked in clearly legible letters at least 25mm (1 inch) in height indicating the purpose of the valve and the direction of operation.
No markings, replace to satisfaction of CG Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 9 April 2025
No resolution recorded
Vessels contracted for on or after July 1, 1961, which carry more than 150 passengers shall meet the requirements of subpart 72.05 of Sub-chapter H of this chapter.
The minimum requirements for the bulkheads between the various spaces, where such bulkheads do not form the boundaries of main vertical zones, shall be as noted in table 72.05-10(e).
* Category 5 space adjacent to category 8 space require a B-0 boundary. Bulkheads of the “B” Class shall be constructed with approved incombustible materials and made intact from deck to deck (or to ceiling as provided in paragraph (h) of this section) and to shell or other boundaries. The following bulkheads were found to be constructed of combustible materials and do not meet fire boundary requirements:
- Aft bulkhead separating main deck dining area and the heads/freezer space.
- Forward bulkhead separating main deck dining area and the kitchen space
*Correct prior to next DD (30Sep2026).
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 9 April 2025
No resolution recorded
Bulkheads, linings, and ceilings may have a combustible veneer within a room not to exceed 2/28 of an inch in thickness. Bulkhead in front of forward bar found to have combustible framing and veneer attached.
*Correct prior to next DD (30Sep2026).
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 9 April 2025
No resolution recorded
All case furniture such as desks, wardrobes, dressing tables, bureaus, dressers, etc., shall be constructed entirely of approved incombustible materials; except that a combustible veneer not exceeding 1/8 inch may be used on the top surface of such articles. The following case furniture was found to be constructed of combustible material:
- Bar located next to forward stairwell.
- Life jacket storage lockers surrounding aft stairwells.
*Correct prior to next DD (30Sep2026).
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 2 October 2024
Resolved
A vessel must be operated in accordance with applicable
laws and regulations in such a manner as to afford
adequate precaution against hazards that might endanger
the vessel and the persons to be transported.
The below deficiencies provide objective evidence that the vessel is substandard and not proactively managing technical and operational requirements. Vessel must make correction to the below deficiencies and get underway with marine inspectors to perform satisfactory operational test and drills prior to any movement.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Emergency preparedness
Issued 2 October 2024
Resolved
The owner, charterer, master, or managing operator shall instruct each crew member, upon first being employed and prior to getting underway for the first time on a particular vessel and at least once every three months, as to the duties that the crew member is expected to perform in an emergency.
- Crew was unable to get bilge suction to work for 20 minutes.
- When testing fire pump, crew energized system with all fire hoses valves open and hoses laid out and unattended causing a wild hose incident.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 October 2024
Resolved
Junction boxes, connection boxes, and outlet boxes, for use in damp or wet locations shall be of watertight construction. The following locations were found to have unapproved outlets:
- Aft junction box with hard wired surge protectors for outlets
- Mast where decorative lights extension cord is installed
- Surge protector installed on stern of third deck
46 CFR 183.10-20(k)
(old T)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 October 2024
Resolved
Except as provided otherwise in this subpart, all electrical equipment, including controllers and distribution panels, shall be dripproof protected. Meaning that it is so constructed that uninsulated parts cannot be inadvertently touched.
- Electrical panel going down to engine room missing breaker or blank allowing uninsulated parts to be touched.
- Missing electric cover on pressure switch to fresh water system in forward engine room - CORRECTED ON THE SPOT
- Electrical cover missing starboard engine room
- Electrical cover on pump by sewage tank missing
46 CFR 182.25-5(b)
(old T)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 October 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. The following electrical shock hazards were identified:
- Open electrical jbox in bridge above the forward window at centerline
- Daisey chain of extension cords, surge protectors and decorative lighting on exterior of vessel
- Dead end wire above port engine - CORRECTED ON THE SPOT
- Open electrical jbox found on second deck in passenger space.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 October 2024
Resolved
lexible or portable cords and similar types cannot be used for permanently installed wiring. Permanently installed extension cords found in the following locations:
- on bridge powering air conditioner
- permanently installed decorative lighting on exterior of 3rd deck
- permanently installed fans on 2nd deck
46 CFR 183.10-20(a)(2)
(Old T)
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 2 October 2024
Resolved
Bilge suctions shall be fitted with suitable strainers having an open area not less than three times the area of the bilge pipe. The following discrepancies were identified for bilge strainers:
- Steering gear bilge suction strainer clogged
- Engine room bilge suction strainer broken
- Void next to bar bilge suction missing strainer
46 CFR 182.25-5(b)
(Old T)
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 2 October 2024
Resolved
All vessels shall be provided with not less than two avenues of escape from all general areas accessible to the passengers or where the crew may be quartered or normally employed, so, located that if one is not available the other may be. Means of escape from engine room blocked by tables and chairs. - CORRECTED ON THE SPOT
46 CFR 177.15-1(a)
(Old T)
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 2 October 2024
Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. Vessel is equipped with two indicators for separate spaces. Neither indicator is labeled.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 2 October 2024
Resolved
For portable fire extinguishers, the inspections, maintenance procedures and hydrostatic pressure tests required by Chapter 4 of NFPA 10, with the frequency specified by NFPA 10.The following deficiencies were identified with portable fire extinguishers:
- two fire extinguishers were found without an annual inspection approval by a qualified servicing facility. - CORRECTED ON THE SPOT
- Owner/Managing operator could not provide monthly inspection records required by NFPA10.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 2 October 2024
Resolved
An adult life jacket must be provided for each person carried on board a vessel. 18 Life jackets missing from required passenger count.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 2 October 2024
Resolved
Each life jacket, immersion suit, and ring life buoy must be marked in clearly legible block capital letters with the vessel's name. Vessel's name worn on ring life buoys
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 2 October 2024
Resolved
Each rescue boat and ring life buoy must be marked with Type II retroreflective material approved in accordance with § 164.018 in subchapter Q of this chapter. Retroreflective tape on ring buoys were found wasted.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 October 2024
Resolved
Connections must be made to battery terminals with permanent type connectors. Spring clips or other temporary type clamps are prohibited. Battery terminal connections are found to be made with wing nuts.
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 2 October 2024
Resolved
A vessel must be fitted with ground tackle and mooring lines necessary for the vessel to be safely anchored or moored. Anchor was found disassembled and not ready.
05 - Radio Communications › N/A - No Subsystem › Distress messages: obligations and procedures
Issued 2 October 2024
Resolved
A durable placard must be posted next to all radiotelephone installations with the emergency broadcast instructions and information, specific to the individual vessel. Emergency Broadcast Plaquard was found to be unreadable.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 2 October 2024
Resolved
Dry pipe vertical exhausts are permissible if suitably insulated. Propulsion engine's vertical exhaust piping leaving the manifold not properly isolated.
46 CFR 182.15-15(a)(1)
(Old T)
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 2 October 2024
Resolved
At each inspection for certification and at every other vessel inspection the bilges and other spaces may be examined to see that there is no excessive accumulation of oil, trash, debris, or other matter that might create a fire hazard, clog bilge pumping systems, or block emergency escapes. The following deficiencies were identified in the vessels bilges:
- Oil absorbent rags and trash found in engine room bilge
- Lazarette found to have debris from shipyard construction
- Ladder in aft void wasted
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 2 October 2024
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. The following unsafe practices were identified:
- Flammable liquids found stored in machinery spaces.
- Zip tie found sticking out of engine valve cover
- Bilge pump manifold valves labels not legible
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 2 October 2024
Resolved
Independent motors should be mounted on foundations as high as practicable above bilges. Raw water pump for air conditioning system found unmounted.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage discharge connection
Issued 2 October 2024
Resolved
When operating a vessel on a body of water where the discharge of untreated sewage is prohibited by the Environmental Protection Agency under 40 CFR 140.3, the operator must secure each Type III device in a manner which prevents discharge of sewage. Sewage overboard discharge valve in stern space not equipped with securing device.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 2 October 2024
Resolved
Vessels contracted for on or after July 1, 1961, which carry more than 150 passengers shall meet the requirements of subpart 72.05 of Sub-chapter H (Passenger Vessels) of this chapter.
Staterooms and public spaces of 500 square feet or less with combustible furnishings, and isolated storerooms adjacent to Machinery Spaces must have an A-60 structural fire protection boundry. The following deficiencies were identified regarding structural fire protection:
- Engine room has no structural fire protection boundry and has public spaces and storage rooms adjacent to the machinery space.
- Cable trunk located in air handler space not protected
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 2 October 2024
Resolved
An adult life jacket must be provided for each person carried on board a vessel. 18 Life jackets missing from required passenger count. Passenger count for vessel has been reduced to 382 passengers until deficiency is resolved.
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 2 October 2024
Resolved
Bilge suctions shall be fitted with suitable strainers having an open area not less than three times the area of the bilge pipe. Void next to bar's bilge suction missing strainer.
46 CFR 182.25-5(b)
(Old T)
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 15 August 2024
Resolved
Whenever damage or deterioration to hull plating that may affect the seaworthiness of a vessel is discovered or suspected, the cognizant OCMI may conduct an internal structural examination in any affected space and may require the vessel to be drydocked or taken out of service to assess the extent of the damage, and to effect permanent repairs. The OCMI may also decrease the drydock examination intervals to monitor the vessel's structural condition.
Starting January 5th, 2025 In accordance with the letter provided by the vessel owner agreeing that the vessel will not be allowed to carry passengers until proper repairs are made to the side shell identified on the provided UT report and areas around the rub rail identified by the attending marine inspector.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 24 May 2023
Resolved
46 CFR 176.25-10(b): At all inspections special attention shall be paid to insure that no fire hazards exist. Engine room had excessive oil, fuel, jacket water, rags, used oil buckets, new oil buckets extension cords, hoses, pumps and garbage throughout. Clean all flammable and combustible materials to CG Marine Inspector satisfaction.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 24 May 2023
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. MIs discovered that the ground fault detection system is inoperable. Vessel must repair ground fault detection system.
46 CFR 183.01-15(a)
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 24 May 2023
Resolved
Vessels shall be equipped with a suitable number of portable battery lights. Place portable battery light at operating station.
46 CFR 184.30-1(a)
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 24 May 2023
Resolved
All electrical installations shall be to the satisfaction of the [name withheld] missing covers for battery installations.
46 CFR 183.05-20(a)
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 24 May 2023
Resolved
Generators and motors shall be mounted as high as practicable above the bilges to avoid damage by splash or contact with low lying vapors. MI observed a starboard generator pumps were not mounted. Vessel shall mount/secure both pumps.
46 CFR 183.10-5(c)
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 24 May 2023
Resolved
Portable fire extinguishers shall be installed and located to the satisfaction of the [name withheld] all fire extinguishers with appropriate brackets.
46 CFR 181.30-10(b)
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 24 May 2023
Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment. Remove all unnecessary submersible power bilge pumps to minimalize the potential for oily water being inadvertently pumped directly overboard.
46 CFR 182.25-1(a)
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 24 May 2023
Resolved
Provide a minimum standard... of electrical installations and equipment that will result in a vessel that is reasonably safe from fire caused by and/or originating in electrical equipment and reasonable safe from electrical shock of personnel. Renew cover for fuse box in machinery space.
46 CFR 183.01-5
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 24 May 2023
Resolved
Gages to indicate engine cooling water discharge temperature... shall be provided for all propulsion engines and located so as to be in view of the operator. Renew temperature gage at operating station for the starboard engine.
46 CFR 182.20-5(b)
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 24 May 2023
Resolved
At each initial and subsequent inspection for certification and reinspection the marine inspector shall examine and test the main and auxiliary steering apparatus to the extent necessary to determine that its condition is satisfactory and that it is fit for the service intended. MI noticed chaffing on the hydraulic lines leading to the steering ram. Vessel needs to replace the chaffing gear and extend it to wholly cover the hydraulic lines.
46 CFR 176.25-35(a)
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 24 May 2023
Resolved
At each inspection... the marine inspector shall examine the bilges and other spaces to see that there is no accumulation of oil or other matter which may create a fire hazard. Remove oily water and clean bilges in machinery space.
46 CFR 176.30-1
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 May 2023
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 2 May 2023
Resolved
ANY VESSEL OF AT LEAST FIVE NET TONS WHICH ENGAGES IN COASTWISE TRADE ON THE NAVIGABLE WATERS OF THE UNITED STATES MUST HAVE A CETIFICATE OF DOCUMENTATION (COD) BEARING A VALID ENDORSEMENT APPROPRIATE FOR THE ACTIVITY WHICH ENGAGED. THE VESSELS COD EXPIRED 28 FEB 2023. PROVIDE A VALID CERTIFICATE OF DOCUMENTATION.
46 CFR 67.7
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 2 May 2023
Resolved
A CERTIFICATE OF INSPECTION (COI) MAY BE ... REVOKED BY THE COGNIZANT OCMI AT ANY TIME FOR NON-COMPLIANCE. THE VESSEL'S COI IS HEARBY REVOKED DUE TO THE COD, WHICH IS REQUIRED FOR COASTWIDE TRADE, BEING EXPIRED. ONCE THE VESSEL OBTAINS A VALID COD AND PASSES A COI RENEWAL INSPECTION THEY MAY RESUME OPERATIONS.
46 CFR 115.107, 46 CFR 67.7
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 18 June 2022
Resolved
Nothing in this subpart limits the marine inspector from conducting such tests or inspections he or she deems necessary to be assured of the vessel's seaworthiness. Vessel is required to conduct a full marine survey with UT shots and provide report attesting to the structural integrity of the vessel's hull. 46 CFR 176.500 (b)(1)(iv)
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 11 April 2022
Resolved
Each life jacket must be marked with Type I retro-reflective material approved I.A.W. 46 CFR 164.018. Many life jackets were found with deteriorated retro reflective material. Owner/operator must replace all deteriorated retro reflective materaial with Type I retro reflective tape.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 11 April 2022
Resolved
During testing of bilge pump and bilge piping system, found broken bilge pipe in engine room preventing satisfactory test of bilge pump an piping system. Make proper repairs.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 11 April 2022
Resolved
The fire hose station on 2nd deck is missing a nozzle. Provide a serviceable nozzle for fire hose station.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 11 April 2022
Resolved
Did not observe man overboard, fire, and security drills. Vessel must conduct satisfactory drills in the presence of USCG Marine Inspectors prior to the carriage of passengers.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 11 April 2022
Resolved
In storage void: PVC pipe for hydraulic steering going through aft bulk head starboard side is not outfitted with proper bulkhead penetration, missing metal sleeve. Install proper metal fittings in way of bulkhead penetrations.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 11 April 2022
Resolved
Found numerous plastic trash cans on vessel. Either provide proof existing plastic trash cans are non combustible or replace plastic trash cans with non combustible trash recepticles.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 11 April 2022
Resolved
The fire pump outlet shall be fitted with a pressure gage. Repair or install pressure gage on fire pump outlet side showing at least 60 psi of pressure when running.
09 - Working and Living Conditions › 091 - Living Conditions › Water, pipes, tanks
Issued 11 April 2022
Resolved
Observed water leaking from fresh water line in way of both forward and aft bulkheads in Steering gear room causing rust on botom plates. Make proper repairs to fresh water lines leading into heads from steering gear room to prevent rust.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 April 2022
Resolved
Found loose faceplates of electrical outlet taped up with duct tape located on 2nd deck in front of the DJ stand. Make proper repairs to electrical outlet.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 11 April 2022
Resolved
Replace retro reflective tape and 3-6 foot lanyard on ring buoy.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 21 March 2022
Resolved
Each vessel must be equipped with a public address system. The Public Address system is not operational on the first deck of the vessel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 March 2022
Resolved
Propulsion machinery shall be suitable in type and design for propulsion requirements of the hull in which it is installed. The vessel must complete repairs to the shaft saver to the satisfaction of the Coast Guard and complete a satisfactory propulsion test prior to sailing with passengers.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 2 July 2021
Resolved
All wiring and cables shall be suitable for marine service and for the particular installation used. Household extension cord is being used to power semi-submersible pump used for nuisance water. Remove extension cord and make permanent repairs.
46 CFR 183.10-20(a)
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 2 July 2021
Resolved
Each Vessel that carries more than 49 passengers must comply with watertight subdivision.
During inspection marine inspectors found epoxy patches on forward and aft bulkhead in the engine room. Provide repair plan to the CG and do not begin repairs until plan has been approved.
Top of watertight bulkhead between storage room and engine room from sewage tank to overboard on starboard side is missing weld seam.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 10 June 2021
Resolved
repair hole in hull on the starboard side of the galley near the vent pipe for the void.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 June 2021
Resolved
The bilge suctions shall be fitted with suitable strainers having an open area not less than three times the area of the bilge pipe. Bilge piping in Void # 1, # 2 and Lazzarete missing strainer. Install appropriate strainers. 46cfr182.25-5(b)
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 7 June 2021
Resolved
At all inspections special attention shall be paid to ensure no fire hazards exist. Clean up oil residue from engine room bilge and clean and inspect the port fuel filter housing. 46CFR176.25-10(b)
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 7 June 2021
Resolved
All electrical installations shall be to the satisfaction of the [name withheld] lens covers on starboard bathroom light fixtures. 46 CFR 183.01-15(a)
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Other (MARPOL Annex IV)
Issued 7 June 2021
Resolved
The marine inspector shall examine all accessible parts of the vessel’s hull, machinery, and equipment to be assured that they are in satisfactory condition. Salt water supply pump to flush toilets is excessively leaking. 46CFR176.10-5(b)
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 7 June 2021
Resolved
Each life preserver carried must have at least 200sq. cm of retroreflective material attached on its front side and 200sq cm on its backside. Replaced all retroreflective tape on faded and damaged life jackets. 46CFR180.25-25
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 June 2021
Resolved
…each battery without an expiration date indicated on it or for which the owner or managing operator does not have a record of the expiration date, used in an item of lifesaving equipment, must be replaced during the annual inspection. Replace batteries on life buoy lights. (46CFR122.726(e)
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 7 June 2021
Resolved
Abandon ship and man overboard drills and training shall be logged. Produce record of previous drills conducted. (46CFR122.520(g)
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 7 June 2021
Resolved
Each vessel must meet the applicable requirements in Subchapter S of this chapter. Submit repair proposal and make permanent repairs to the port side shell in the aft compartment. 46CFR177.13-1
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 7 June 2021
Resolved
The number and identification of the items stowed inside, and their size, must be marked in clearly legible letters and numbers on each container for life jackets. Mark all containers containing life jackets with quantity and type. (46CFR180.25-15(b)
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 4 January 2021
Resolved
Observed corrosion of deck in way of port side main entrance, male head on port side aft main deck, and deck where deep coolers are located on aft main deck. Crop and renew to good materiall.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 4 January 2021
Resolved
Observed evidence of deck corrosion along perimeter of main deck under carpet. Remove carpet and decorative side panels along perimeter of main deck for further Coast Guard inspection.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 26 October 2020
Resolved
A power-driven fire pump shall be installed on each mechanically propelled "L" vessel. Vessel's fire pump is inoperable.
46 CFR 114.110(c)
46 CFR 181.10-1(a) (Old T-L)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 26 October 2020
Resolved
A vessel must be provided with a satisfactory arrangement for draining any watertight compartment unable to prove proper operation of bilge pump and system.
46 CFR 114.110(c)
46 CFR 182.25-1(a) (OLD T-L)
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 26 October 2020
Resolved
Vessel shall be in compliance with the required standards. observed holes in the aft engine room bulkhead leading to the steering compartment and the bulkhead between the steering compartment and the lazarette.
46 CFR 114.110(c)
46 CFR 176.254 (OLD T-L)
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 26 October 2020
Resolved
At least one ring buoy must be fitted with a floating waterlight. Waterlight was not operational.
46 CFR 117.70(d)
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 26 October 2020
Resolved
The name of a vessel must be marked on lifesaving equipment. Ring buoys are not marked with vessel name.
46 CFR 122.604
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 26 October 2020
Resolved
The minimum number of portable fire extinguishers required must not be less than the minimum amount required by table 181.30-1(a). The operating station did not have required fire extinguisher.
46 CFR 114.100(c)
46 CFR 181.30-1(a)
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 26 October 2020
Resolved
Portable fire extinguishers shall be installed and located to the satisfaction of the Officer in Charge, Marine Inspection.
46 CFR 114.110(c)
46 CFR 181.30-10(b)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 October 2020
Resolved
All wiring and cables shall be suitable for marine service and for the particular installation used. Observed several light installations not designed for marine service.
46 CFR 114.110(c)
46 CFR 183.10-20(a)
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 19 August 2019
Resolved
A power-driven fire pump shall be installed on each mechanically propelled "L" vessel. Vessel's fire pump is inoperable. - 46CFR181.10-1(a)
"Old TL"
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 19 August 2019
Resolved
The master shall conduct drills and give instructions as necessary to ensure that all crew members are familiar with their duties. There is no record that Man-Overboard and Fire drills were conducted within the past year. Conduct drills prior to carrying passengers. - 46CFR185.25-10
"Old TL"
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 August 2019
Resolved
Batteries shall be secured against shifting with the motion of the boat. Battery for the (#2) generator located in the centerline of the engine room is not secured and can freely slide across the deck. Secure battery to the satisfaction of the Marine Inspector. - 46CFR183.05-20(b)
"Old TL"
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 19 August 2019
Resolved
An ammeter shall be provided that can be used for measuring the current of each generator that is in operation. Ammeters on board do not properly measure the current of each generator. 2nd ammeter appears to measure both generators. - 46CFR183.10-5(g)
"Old TL"
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 19 August 2019
Resolved
A vessel must carry either a first-aid kit approved under approval series 160.041 or a kit with equivalent contents and instructions. First-aid kit had multiple expired items. - 46CFR121.710
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 19 August 2019
Resolved
All self-propelled vessels must be fitted with a Federal Communications Commission type accepted general marine radar system for surface navigation with a radar screen mounted at the primary operating station. Vessel's marine radar is not properly connected and is inoperable. Vessel is limited to a Lakes, Bays, and Sounds route until radar is operable. - 46CFR121.404
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 19 August 2019
Resolved
Each vessel certificated to operate on a limited coastwise route within three miles of land in warm water, and is equipped with an FCC type accepted Category 1 406 MHz EPIRB installed to float free and automatically activate, is not required to carry survival craft. Vessel removed EPIRB and does not have any survival craft. Vessel is limited to a Lakes, Bays, and Sounds route within one mile of shore until an EPIRB is properly installed to the satisfaction of the Marine Inspector. - 46CFR117.205(d)
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 12 June 2018
Resolved
Exhaust gas must not leak from the piping or any connection. Observed evidence of an exhaust leak on the forward end of the starboard main exhaust silencer. Closer inspection revealed scale rust, severe deterioration of, and holes in the exhaust piping where it meets the silencer. 46 CFR 119.430 - 30c
Electrical › Electric Supply System (service) › Battery Installation
Issued 12 June 2018
Resolved
Connections must be made to battery terminals with permanent type connectors. Spring clips or other temporary type clamps are prohibited. Replace the battery within the 32vdc system that has a melted post; replace the 32vdc battery jumpers and ensure proper connections are made at every battery connection onboard. 46 CFR 120.350 - 30c
Electrical › Electric Supply System (service) › Battery Installation
Issued 12 June 2018
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Permanently mount the 73kw generator battery switch; repair or replace voltmeters 1 and 2 on 32 volt DC system; repair or replace AC voltmeter cover. 46 CFR 120.350 - 16c
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 12 June 2018
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules. Secure the lamp base in the stern light housing prior to operating between sunset and sunrise. 46 CFR 120.420 - 705c
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 12 June 2018
Resolved
An adult life jacket must be provided for each person carried on board a vessel and in addition, a number of child-size life jackets equal to at least 10% of the number of persons permitted on board must be provided, or such greater number as necessary to provide a life jacket for each person being carried that is smaller than the lower size limit of the adult life jackets provided to meet this section. Replace 30 adult life jackets and 3 child life jackets. 46 CFR 117.71 - 701c
Lifesaving › Hand Flares › Expired
Issued 12 June 2018
Resolved
A vessel on an oceans, coastwise, limited coastwise, or Great Lakes route must carry six hand red flare distress signals approved in accordance with §160.021 in subchapter Q of this chapter and six hand orange smoke distress signals approved in accordance with §160.037 in subchapter Q of this chapter. Provide 3 additional orange and 2 additional red signal flares. 46 CFR 117.68 - 701c
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 12 June 2018
Resolved
Each child size life jacket must be stowed in a location that is appropriately marked and separated from adult life jackets so the child size life jackets are not mistaken for adult life jackets. Mark stowage location
for child life jackets. 46 CFR 117.78 - 701c
Electrical › Electrical Distribution System (service) › Cable
Issued 11 April 2017
Resolved
SECURE ELECTRICAL CABLES WITH METALLIC CLAMPS. 46CFR183.05-50.
Lifesaving › Lifebuoys › Serviceable
Issued 11 April 2017
Resolved
REPLACE 02 LIFE RING BUOYS AT DECK 02. 46CFR180.30-1
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 11 April 2017
Resolved
REPLACE 07 ADULT AND 02 CHILDREN'S LIFEJACKETS. REDUCE PASSENGER COUNT TO 390 (ADULTS). 46CFR180.30-1
Stability › Watertight Integrity › General
Issued 11 April 2017
Resolved
SECURE PENETRATION, PORT SIDE, ON BULKHEAD IN ENGINE COMPARTMENT. 46CFR177313-1
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 11 April 2017
Resolved
SECURELY MOUNT JET/HEAD PUMPS IN ENGINE ROOM. 46CFR176.25-1
Communications › Radio Communications › EPIRB
Issued 25 July 2016
Resolved
Hydrostatic release for EPIRB is expired. Replace adeqautely. Limited to LBS route.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 25 July 2016
Resolved
First Aid kit needs to be replaced with kit taht meets required specs IAW 46 CFR 160.041
Navigation › Piloting/Steering › Marine Charts
Issued 25 July 2016
Resolved
Provide current charts and Nav Rules.
Engineering › Diesel Engine (propulsion-reduction gear) › Nozzle, Injection (fuel injection)
Issued 25 July 2016
Resolved
Renew fuel hose on port side main diesel engine, between strainers and engine.
Engineering › Fuel Oil Service System › Gauge
Issued 25 July 2016
Resolved
Renew vacuum gauge on port side main diesel engine fuel strainers.
Engineering › Freshwater System (jacketwater cooling) › Suction Strainer
Issued 25 July 2016
Resolved
Renew port sea strainer for 73Kw generator.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 25 July 2016
Resolved
Blank off opened pop-out on starboard side distribution panel in engine room.
Deck/Cargo › Marine Portable Tanks › Securing Device
Issued 25 July 2016
Resolved
Make permanent installation for water tank in engine room in way of pumps.
Pollution Prevention/Response › Prevention Equipment › Sewage System Tank
Issued 25 July 2016
Resolved
Crop and renew holes on port side of sewage holding tank.
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 25 July 2016
Resolved
Starboard side engine is shifting by 1/4 inch. Adjust engine mounts to prevent shifting.
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 25 July 2016
Resolved
Blank off old sewage discharge piping, as close to bulkhead as practicable.
Construction/Loadline › Hull › Side Shell
Issued 25 July 2016
Resolved
Side shell port side aft kitchen in way of midwell, make temporary repair. Correct at next dry dock.
Construction/Loadline › Penetrations › Gasket
Issued 25 July 2016
Resolved
Seal port side aft kitchen window.
Construction/Loadline › Hull › Keel Plate
Issued 25 July 2016
Resolved
Wasted frame in storage room at keel. Itemis to be corrected at next dry dock. Vessel is limited to lakes, bays, and sounds route until repair is made.
Construction/Loadline › Hull › Side Shell
Issued 5 August 2015
Resolved
Descale all corroded areas of side shell and make available for inspection.
Engineering › Steering Gear System › Rudder Bearing
Issued 5 August 2015
Resolved
Remove port strut bearings and make available for inspection.
Construction/Loadline › Hull › Bottom Plating
Issued 5 August 2015
Resolved
Descale lazarette bilge and UT bottom plate every 12" in grid pattern.
Engineering › Bilge Water Management System › Strainer
Issued 5 August 2015
Resolved
Renew bilge strainer in lazarette.
Construction/Loadline › Hull › Bracket
Issued 5 August 2015
Resolved
Renew deteriorated hangers for sewage piping in lazarette.
Construction/Loadline › Structures › Door
Issued 5 August 2015
Resolved
Renew aft weathertight door.
Accommodation/Occupational Safety › Refrigeration (air conditioning) › General
Issued 5 August 2015
Resolved
Renew as original support column in mechanical air conditioning room.
Construction/Loadline › Hull › Transverse Frame
Issued 5 August 2015
Resolved
Renew wasted frame starboard side engine room aft of starboard main engine.
Engineering › Bilge Water Management System › Eductor
Issued 5 August 2015
Resolved
Descale and gauge aft bilge well in engine room.
Electrical › Electric Supply System (service) › Cable
Issued 5 August 2015
Resolved
Provide chafe protection for hot water heater wiring.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 5 August 2015
Resolved
Provide guard for starboard main diesel engine belt drive.
Construction/Loadline › Structures › End Bulkhead
Issued 5 August 2015
Resolved
Provide permanent seal on forward steering space bulkhead. Currently an expandable rubber plug is being utilized.
Construction/Loadline › Structures › Superstructure
Issued 5 August 2015
Resolved
Provide repair proposal for fractured plexi-glass panel fixed into stem of vessel.
Engineering › Steering Gear System › Rudder
Issued 5 August 2015
Resolved
Clad weld hole in starboard rudder tube.
Construction/Loadline › Hull › Weld
Issued 5 August 2015
Resolved
Weld following holes: 2 port and 2 starboard side in galley, starboard side 2nd window aft of sliding door, 1/4" holes surrounding all salon windows.
Construction/Loadline › Structures › Door
Issued 5 August 2015
Resolved
Bring side shell doors in compliance with 46 CFR 171.124 of Old "T" regulations.
Construction/Loadline › Structures › Superstructure
Issued 5 August 2015
Resolved
Bring salon windows in compliance with 46 CFR 116.433.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 13 July 2015
Resolved
Provide updated NAV Rules
Lifesaving › Hand Flares › Quantity
Issued 13 July 2015
Resolved
Provide 3 orange or 3 red flares
Electrical › Electrical Distribution System (service) › Wiring
Issued 13 July 2015
Resolved
Provide cover for open electrical panel at operation station (Helm)
Stability › Watertight Integrity › General
Issued 13 July 2015
Resolved
Make forward void below galley watertight (02 openings) below galley mop sink.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 26 September 2011
Resolved
Replace worn Port and Starboard shaft bearings.
Construction/Loadline › Hull › Side Shell
Issued 26 September 2011
Resolved
Make repairs to cracked port main diesel engine exhaust piping and wasted side shell.
Stability › Weathertight Integrity › General
Issued 26 September 2011
Resolved
Repair or replace wasted and holed aft weather tight door.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 26 September 2011
Resolved
Identify circuit breakers in aft main deck panel board.
Construction/Loadline › Hull › Transverse Frame
Issued 26 September 2011
Resolved
Crop and renew wasted and holed transverse frame in lararette port side aft #2.
Construction/Loadline › Structures › Deck Plating
Issued 26 September 2011
Resolved
Crop and renew wasted and holed deck plate in aft female head.
Construction/Loadline › Hull › Stringer
Issued 26 September 2011
Resolved
Crop and renew wasted and holed transverse stringer in lazarette.
Construction/Loadline › Hull › Hull Plating
Issued 26 September 2011
Resolved
Descale and make available for inspection wasted bottom plate in lazarette IWO bilge strainer.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 26 September 2011
Resolved
Seal open pipe entrance in steering compartment forward center bulkhead.
Stability › Weathertight Integrity › General
Issued 26 September 2011
Resolved
Reseal 2nd aft main deck window.
Engineering › Lubricating Oil Service System › Manifold
Issued 26 September 2011
Resolved
Make repairs to port MDE manifold oil leak.
Engineering › Freshwater System (piston cooling) › Hose
Issued 26 September 2011
Resolved
Replace wasted port MDE coolant hose, outboard side.
Construction/Loadline › Hull › Transverse Frame
Issued 26 September 2011
Resolved
Crop and renew wasted and holed aft transverse frame in engine room.
Construction/Loadline › Hull › Transverse Frame
Issued 26 September 2011
Resolved
Crop and renew wasted and holed transverse frame in forward engine room.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 26 September 2011
Resolved
Provide circuit breaker blanks in starboard switchboard.
Electrical › Electrical Distribution System (service) › Cable
Issued 26 September 2011
Resolved
Remove or properly terminate dead ended cable starboard side of black water tank.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 26 September 2011
Resolved
Make repairs to holed piping in black water tank.
Construction/Loadline › Structures › Deck Plating
Issued 26 September 2011
Resolved
Crop and renew wasted and holed main deck aft of port side gangway below windows.
Construction/Loadline › Hull › Hull Plating
Issued 26 September 2011
Resolved
Paint draft marks forward hull.
Construction/Loadline › Hull › Bottom Plating
Issued 26 September 2011
Resolved
De-scale lazarette and engine room and make deck available for inspection.
Lifesaving › Lifebuoys › Approval
Issued 14 July 2009
Resolved
Provide 03 ring buoys IAW 46 CFR 160.050, two on 2nd deck and 01behind pilot house.
Engineering › Bilge Water Management System › Strainer
Issued 14 July 2009
Resolved
Provide strainer for bilge suction line in lazarette.
Stability › Watertight Integrity › General
Issued 14 July 2009
Resolved
Make E/R fwd and aft bulkhead's and steering compartment aft bulkhead watertight.
Operations/Management › Drills/Instruction › Flooding Mitigation
Issued 14 July 2009
Resolved
Provide operating instructions in E/R for bilge and fire pump systems.
Engineering › Bilge Water Management System › Manifold
Issued 14 July 2009
Resolved
Label bilge lines.
Electrical › Electrical Distribution System (service) › Wiring
Issued 14 July 2009
Resolved
Properly secure electrical wire on 2nd deck forward for rope lighting.
Communications › Visual Communication › Warning Sign (gangway)
Issued 14 July 2009
Resolved
Mark emergency escape hatch "Emergency Exit, Keep Clear" with 2" high legible letters.
Navigation › Piloting/Steering › Magnetic Compass
Issued 14 July 2009
Resolved
Mount compass at primary operating station.
Communications › Alarms/Indicators › Bilge Alarm
Issued 14 July 2009
Resolved
Properly install bilge high water alarm in bow thruster void.
Stability › Watertight Integrity › General
Issued 14 July 2009
Resolved
Make PVC penetration in beverage compartment aft bulkhead stbd side meet 46 CFR 182.40-1(a).
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 30 July 2008
Resolved
Mount portable fire extinguishers: foward compartment main deck and bridge.
Electrical › Lighting (service) › Lighting Fixture
Issued 30 July 2008
Resolved
Replace light cover for light in mechanical room.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 30 July 2008
Resolved
Lable breaker box in mechanical room.
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 30 July 2008
Resolved
Correct name of vessel on stern.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 30 July 2008
Resolved
Make proper repairs to leaking exhaust pipe on port main engine.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 30 July 2008
Resolved
Replace hydro static release for EPIRB prior to 8/31/2008.
Documentation › Markings/Placards › Lifejacket Placard
Issued 30 July 2008
Resolved
Post lifejacket donning placard on main deck aft.
Fire Fighting › Ventilation Systems › Ducts
Issued 30 July 2008
Resolved
Label fire dampers.
Lifesaving › Hand Flares › Quantity
Issued 30 July 2008
Resolved
p[rovide 3 day and 3 night flares (6 total).
Fire Fighting › Fire Pumps › Pressure
Issued 30 July 2008
Resolved
Provide drive belt for fire pump and prove proper operation.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 23 April 2007
Resolved
Replace battery and broken retaining clip on water light for starboard ring buoy.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 23 April 2007
Resolved
Secure all galley equipment.
Stability › Watertight Integrity › General
Issued 23 April 2007
Resolved
Replace broken port light glass located on bow stem (port and starboard).
Electrical › Lighting (service) › Lighting Fixture
Issued 23 April 2007
Resolved
Cover or replace bulbs in galley overhead lighting fixtures.
Communications › Radio Communications › EPIRB
Issued 23 April 2007
Resolved
Prove proper operation of EPIRB. EPIRB was found dismantled during inspection. Vessel limited to rivers route until EPIRB repaired.
Engineering › Bilge Water Management System › Valve
Issued 23 April 2007
Resolved
Properly mark/label remote shut-off valve for bilge suction forward of collision bulkhead.
Fire Fighting › Miscellaneous Items › Waste Receptacles
Issued 23 April 2007
Resolved
Remove all plastic or unapproved trash receptacles.
Construction/Loadline › Structures › Deck Plating
Issued 23 April 2007
Resolved
Make proper repairs to seal deck plating in bar in main deck.
Fire Fighting › Fire Hydrants › Material
Issued 23 April 2007
Resolved
Provide spanner wrench for #1 fire station.
Construction/Loadline › Structures › Deck Plating
Issued 23 April 2007
Resolved
Make proper repairs to deck plating around PVC piping in both restrooms.
Personnel › Training › First Aid/CPR
Issued 23 April 2007
Resolved
Provide proof of CPR training for 50% of crew.
Stability › Watertight Integrity › General
Issued 23 April 2007
Resolved
Make proper repairs to port side window main deck.
Engineering › Fuel Oil Service System › Hose
Issued 23 April 2007
Resolved
Double clamp fuel hoses found on main engines and generators.
Documentation › Certificates/Documents › FCC SSL
Issued 26 July 2006
Resolved
Provide valid Radio Safety Certificate.
Documentation › Certificates/Documents › FCC SSL
Issued 26 July 2006
Resolved
Provide valid Bridge to Bridge Radio Certificate.
Documentation › Manifests/Lists › Muster List/Emergency Instructions
Issued 26 July 2006
Resolved
Post current Station Bill
Communications › Radio Communications › EPIRB
Issued 26 July 2006
Resolved
Properly mount EPIRB and provide EPIRB log.
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 26 July 2006
Resolved
Conduct EAP training for crew.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 26 July 2006
Resolved
Repair lagging on starboard MDE exhaust.
Engineering › Bilge Water Management System › Strainer
Issued 26 July 2006
Resolved
Provide screens on bilge suction for engineroom and void under galley.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 26 July 2006
Resolved
Repair retaining clip on waterlight.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 26 July 2006
Resolved
Replace expired and missing items from first aid kit.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 26 July 2006
Resolved
Provide 24 additional life jackets with proper markings.
Navigation › Collision/Grounding Avoidance › Navigation Bridge Visibility
Issued 26 July 2006
Resolved
Replaced 2 cracked windows in pilot house.
Lifesaving › Hand Flares › Quantity
Issued 26 July 2006
Resolved
Provide 3 red night and 3 orange smoke hand flares.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 26 July 2006
Resolved
Properly mark vessel name on life rings.
Engineering › Generator (propulsion/auxiliary-electric) › Battery
Issued 8 September 2005
Resolved
Repair loose battery box on starboard side, located on deck, in engine compartment.
Engineering › Diesel Engine (propulsion-direct drive) › Governor
Issued 8 September 2005
Resolved
Due to heat reflector placed between starboard main engine and governor, review area to determine if dry exhaust piping in that area is causing temperature to rise above normal working condition.
Electrical › Electric Supply System (service) › Battery Installation
Issued 22 June 2005
Resolved
Properly secure centerline generator battery box to the deck.
Engineering › Bilge Water Management System › Valve
Issued 22 June 2005
Resolved
Install positive shutoff valve at the skin of the hull, inboard side, for engine room submersible pump overboard discharge.
Engineering › Diesel Engine (propulsion-reduction gear) › Bedplate
Issued 22 June 2005
Resolved
Replace or repair port main engine inboard motor mounts forward and aft.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 22 June 2005
Resolved
Submit gauging report for forward engine room bulkhead in way of bilge bottom during next availability.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 22 June 2005
Resolved
Provide required charts, light list, coast pilot. tide and current references prior to carrying passengers.
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 21 July 2004
Resolved
Provide verification that MIS form has been submitted
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 21 July 2004
Resolved
Provide Aspirin and Antispectic swabs in first aid kit.
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 July 2004
Resolved
Remove dead ended cable in galley
Construction/Loadline › Penetrations › Pipe Flange
Issued 21 July 2004
Resolved
Make all penetrations water tight that go through water tight bulkheads
Fire Fighting › Means of Escape › Escape Route Signs
Issued 21 July 2004
Resolved
[name withheld] escape hatches in engine room
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 July 2004
Resolved
Replace flexible cable with boat cable of proper size in engine
Electrical › Electric Generation Source (service) › Generator
Issued 21 July 2004
Resolved
Provide plans for review of installation and wiring of new Deere genset including attachment to main switch board and portable cables system.
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 July 2004
Resolved
Provide metal supports for all electrical cables in the overhead of Engine room and store room
Engineering › Steering Gear System › Differential Assembly
Issued 21 July 2004
Resolved
Check on steering system approval. Changed from cable to hydrulic system.
Construction/Loadline › Structures
Issued 15 September 2003
Resolved
Crop and renew interior deck plate as marked around the stair tower. LEGACY COMPONENT DESC: Deck Plating
Construction/Loadline › Hull
Issued 9 September 2003
Resolved
Crop and renew hull plate fwd of port shaft log as marked. 2'x4' LEGACY COMPONENT DESC: Bottom Plating
Construction/Loadline › Hull
Issued 9 September 2003
Resolved
Crop and renew hull plate fwd of starboard shaft log as marked. 2'x6' LEGACY COMPONENT DESC: Bottom Plating
Construction/Loadline › Hull
Issued 9 September 2003
Resolved
Crop and renew bottom plate in way of the engine room on port side. 8'x12' bottom and 2'x12' of side plate. LEGACY COMPONENT DESC: Bottom Plating
Engineering › Bilge Water Management System
Issued 2 September 2003
Resolved
Prove proper operation of bilge pumping system LEGACY COMPONENT DESC: Piping
Construction/Loadline › Structures
Issued 2 September 2003
Resolved
Crop and renew wasted deck plate in mens head around toilet. 3'x4' LEGACY COMPONENT DESC: Deck Plating
Deck/Cargo › Mooring/Anchoring
Issued 2 September 2003
Resolved
Renew wasted deck cleat at starboard stern.
Construction/Loadline › Structures
Issued 2 September 2003
Resolved
Renew broken windows at bow main deck. LEGACY COMPONENT DESC: Superstructure
Construction/Loadline › Structures
Issued 2 September 2003
Resolved
Crop and renew deck plating at starboard main deck enterance. 3'x4' LEGACY COMPONENT DESC: Deck Plating
Construction/Loadline › Hull › Stiffener
Issued 2 September 2003
Resolved
Crop and renew wasted stiffeners in lazerette.
Operations/Management › Drills/Instruction
Issued 16 July 2003
Resolved
Provide additional training to crew members on vessels emergency systems
Construction/Loadline › Markings
Issued 16 July 2003
Resolved
Change name on vessels bow to reflect correct name as documentated LEGACY COMPONENT DESC: Vessel Name/Home Port
Documentation › Certificates/Documents › Certificate of Inspection
Issued 16 July 2003
Resolved
Ensure COI is posted I.A.W 176.302
Communications › Radio Communications
Issued 16 July 2003
Resolved
Provide radio emergency broadcast placard
Engineering › Freshwater System (jacketwater cooling) › Valve
Issued 16 July 2003
Resolved
Provide isolation valve for non-integral keel cooler LEGACY COMPONENT DESC: keel cooler isolation valve
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 16 July 2003
Resolved
Properly mark all lifejackets with correct vessels name
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 16 July 2003
Resolved
Replace retro-reflective tape on 19 PFD's
Communications › Alarms/Indicators › Bilge Alarm
Issued 16 July 2003
Resolved
Provide high level bilge alarm in steering compartment. Rudder post extends beyond deepest load waterline, owner will install high level alarm during dry-dock LEGACY COMPONENT DESC: Bilge Alarm
Operations/Management › Lifesaving
Issued 16 July 2003
Resolved
Provide adequate means for retrieval of MOB
Operations/Management › Drug and Alcohol Testing
Issued 26 April 2002
Resolved
Provide drug program contract agreement with the maritime consortium and the last three years of MIS, EAP, and requirements for a serious marine incident. LEGACY COMPONENT DESC: MIS Submission
Lifesaving › Lifejacket/PFD (General)
Issued 26 April 2002
Resolved
Provide 106 adult and 15 children PFD's LEGACY COMPONENT DESC: Condition
Accommodation/Occupational Safety › Occupational Safety
Issued 26 April 2002
Resolved
Properly Mark emergency escape from E/R on main deck.
Communications › Radio Communications
Issued 26 April 2002
Resolved
Prior to operate in Limited Coastwise route, provide 406 Mhz EPIRB. LEGACY COMPONENT DESC: EPIRB
Navigation › Collision/Grounding Avoidance
Issued 26 April 2002
Resolved
Properly raise and install masthead light to allow proper arc of visivility LEGACY COMPONENT DESC: Navigation Lights
Engineering › Fuel Oil Storage/Transfer System
Issued 26 April 2002
Resolved
Replace Parker 381-8 Hoses from Racor filters with approved SAE J 1942 suitable for fuel service ( not hydraulic). LEGACY COMPONENT DESC: Hose
Engineering › Sea-water System (primary cooling)
Issued 26 April 2002
Resolved
Replace/Repair second valve in from sea chest in the E/R (leaking).. LEGACY COMPONENT DESC: Valve
Engineering › Diesel Engine (propulsion-direct drive)
Issued 26 April 2002
Resolved
Repair leak on STBD MDE Exhaust and clean up oil accumulated in bilges. LEGACY COMPONENT DESC: Silencer (exhaust)
Engineering › Fuel Oil Storage/Transfer System
Issued 26 April 2002
Resolved
Remove plastic tubing and provide proper marine gauge for fuel tanks. LEGACY COMPONENT DESC: Gauge
Electrical › Electric Supply System (service)
Issued 26 April 2002
Resolved
Remove wing nuts from batteries and replace with adequate connections. LEGACY COMPONENT DESC: Battery Installation
Accommodation/Occupational Safety
Issued 11 October 2001
Resolved
Provide checkvalve for newly installed sink in forward compartment.
Navigation
Issued 11 October 2001
Resolved
Properly plug through hole next to hydraulic hose for new steering system in steering room.
Electrical
Issued 11 October 2001
Resolved
Provide checkvalve for generator in engine room.
Navigation
Issued 11 October 2001
Resolved
REMOVE OLD STEEL PIPE FROM OLD WIRE STEERING SYSTEM AND PROPERLY PLUG THROUGH HULLS.
Construction/Loadline
Issued 5 May 1999
Resolved
install and prove proper operation of blige high level alarm.
Fire Fighting
Issued 5 May 1999
Resolved
provide proof of procurement of new replacement fire hose.
Lifesaving
Issued 5 May 1999
Resolved
provide first aid kit IAW 46cfr160.041
Documentation
Issued 5 May 1999
Resolved
provide proof of procurement of current copy of 46cfr subchapter k
Lifesaving
Issued 5 May 1999
Resolved
vessel is limited to carrage of 357 adult, 34 child passengers pending proof of porcurement of sufficinent lifejackets to bring total of 404_x001C_ adult and 41 child,s.
Documentation
Issued 5 May 1999
Resolved
provid training logbook
Documentation
Issued 5 May 1999
Resolved
log drills in vessel bridge log.
Navigation
Issued 5 May 1999
Resolved
vessel restricted to daylight fair weather operations pending procurment ofcompass light.
Documentation
Issued 5 May 1999
Resolved
post emergancy broadcast placard on bridge, COI inpublic area, station billand emergancy instruction in public area.
Construction/Loadline
Issued 5 May 1999
Resolved
provide proper hull markings.
Documentation
Issued 5 May 1999
Resolved
provide proof of valid great lakes agreement and marine radio operators permit.
Unknown
Issued 5 June 1997
Resolved
Conduct a credit drydock examination to the satisfaction of the attending Coast Guard marine inspector prior to operating in salt water.
Navigation
Issued 2 May 1997
Resolved
Provide the following: current operating area charts, Nav-Rules, emergencybroadcast placard, lifejacket donning placard and a FCC Great Lakes Agreement.
Lifesaving
Issued 2 May 1997
Resolved
Install retroreflective tape on (2) ring buoys by pilot house and renew waterlight tether.
Engineering
Issued 2 May 1997
Resolved
Renew port main diesel engine fuel return hose.
Electrical
Issued 2 May 1997
Resolved
Remove dead end cables from void below pilot house.
Engineering
Issued 2 May 1997
Resolved
Provide flame screens for both fuel tank vents.
Fire Fighting
Issued 2 May 1997
Resolved
Prior to operating vessel outside of the Chicago Harbor Breakwall provide and mount a marine type bracket for pilot house B1 extinguisher.
Construction/Loadline
Issued 2 May 1997
Resolved
Properly seal bulkhead penetration around air conditioning feed water piping through forward engine room bulkhead.
Accommodation/Occupational Safety
Issued 2 May 1997
Resolved
Properly mark storage area #3 escape scuttle and remove storage shelves blocking it.
Electrical
Issued 2 May 1997
Resolved
Properly install wiring to air conditioning feed water pump.
Construction/Loadline
Issued 2 May 1997
Resolved
Mark permanent draft marks fore and aft on both side of hull, paint in contrasting colors.
Construction/Loadline
Issued 2 May 1997
Resolved
Mark, in contrasting colors, a minimum free board measurement of 3 ft. 7 5/8 in. on the hull at midships both port and starboard.
Navigation
Issued 2 May 1997
Resolved
Prove operation of air receiver relief valve, and clean receiver label plate.
Lifesaving
Issued 20 February 1997
Resolved
Prior to carrying passengers, but no later than 30 June 1997, conduct operational test of installed rescue hoist.
Documentation
Issued 3 May 1996
Resolved
Prove that most recent stability test/letter accounts for newly installed 50 ft long by 12 ft high upper deck sun canopy or conduct new stability test including new canopy.
Lifesaving
Issued 3 May 1996
Resolved
Repair 7 life preservers and relabel 10 child life preservers as indicated by CG marine inspector.
Electrical
Issued 3 May 1996
Resolved
Prove proper operation of electronic frequency meter.
Lifesaving
Issued 3 May 1996
Resolved
Develop and install satisfactory inter-ship communication system; communication system to be effective between pilothouse and man overboard rescue station and between pilothouse and engineroom entryway._x001C_
Lifesaving
Issued 3 May 1996
Resolved
Develop and install improved rescue system for man overboard rescue drills as discussed by CG marine inspector.
Construction/Loadline
Issued 3 May 1996
Resolved
Remove furniture atop engine room emergency escape hatch and keep hatch clear from all objects at all times.
Documentation
Issued 3 May 1996
Resolved
Schedule appointment with Coast Guard Drug and Alcohol Testing Coordinator to verify vessel drug and alcohol testing program is satisfactory.
Lifesaving
Issued 3 May 1996
Resolved
Prior to carriage of passengers, remove combustable liquids in storage compartment.
Lifesaving
Issued 19 April 1994
Resolved
Obtain one life ring buoy.
Lifesaving
Issued 19 April 1994
Resolved
Post PFD stowage placards at appropriate locations (2) throughout vessel.
Fire Fighting
Issued 19 April 1994
Resolved
Obtain new hand fire pump to replace defective one.
Electrical
Issued 21 April 1993
Resolved
PROVE PROPER INSTALLATION AND OPERATION OF NEW SHIP'S SERVICE GENERATOR.
Fire Fighting
Issued 21 April 1993
Resolved
PROVE ANNUAL SEVICING OF ALL PORTABLE FIRE EXTINGUISHERS.
Lifesaving
Issued 4 May 1992
Resolved
REPLACE ALL PENDANTS ON ALL 10 EACH BUOYANHT APPARATUS.
Lifesaving
Issued 4 May 1992
Resolved
PROVIDE 2 EACH WATERLIGHTS FOR 2 EACH BOUYANT APPARATUS THAT ARE MISSING WATERLIGHTS.
Lifesaving
Issued 4 May 1992
Resolved
PROVIDE A PAINTER AND A WEAK LINK FOR 10 EACH BUOYANT APPARATUS, OR GROUP OF BOUYANT APPARATUS.
Lifesaving
Issued 14 May 1991
Resolved
PROVIDE 1 EACH WATERLIGHT FOR BUOYANT APPARATUS, TO REPLACE INOPERATIVE WATERLIGHT.
Lifesaving
Issued 14 May 1991
Resolved
PROVIDE 5 EACH ORANGE SMOKE DAYTIME DISTRESS SIGNALS AND 3 EACH RED FLARE NIGHTTIME DISTRESS SIGNALS.
Electrical
Issued 14 May 1991
Resolved
PROVE PROPER OPERATION OF SHIP'S SERVICE GENERATOR MAIN CIRCUIT BREAKER.
Documentation
Issued 29 September 1989
Resolved
PROVIDE PROOF OF VALID FCC GREAT LAKES AGREEMENT.
Lifesaving
Issued 29 September 1989
Resolved
PROVIDE ONE CLASS C EPIRB TO BE INSTALLED IN A READILY ACCESSIBLE LOCATION, AT OR NEAR THE PRINCIPAL STEERING STATION.
Accommodation/Occupational Safety
Issued 2 January 1987
Resolved
RENEW THE CRACKED CENTERLINE FORWARD WINDOW IN THE PILOT HOUSE.
Lifesaving
Issued 2 January 1987
Resolved
PROVIDE ON BOARD -18- ADULT AND -5- CHILD TYPE I LIFE PRESERVERS.
Navigation
Issued 2 January 1987
Resolved
RENEW THE PORT AND STARBOARD RUNNING LIGHT "PIG TAIL" CORDS.
Electrical
Issued 2 January 1987
Resolved
INSTALL A PROPER WEATHERTIGHT PLUG AND RECEPTICAL FOR THE DECORATIVE EXTERIOR LIGHTS ON THE MAST.
Accommodation/Occupational Safety
Issued 2 January 1987
Resolved
PROVIDE A DECK WRENCH FOR THE EMERGENCY ESCAPE HATCHES FOR THE ENGINE ROOM AND THE STOREROOM.
Lifesaving
Issued 2 January 1987
Resolved
PROVIDE FOR THE THREE BUOYANT APPARATUS MISSING THE APPROVED ELECTRIC FLOATLIGHTS SAME LIGHTS WITH MINIMUM 18 FT. LANYARDS.
Lifesaving
Issued 2 January 1987
Resolved
REMOVE OR COVER THE NAME "VIKING QUEEN" FROM THE CHILD PFD'S.
Fire Fighting
Issued 2 January 1987
Resolved
PROVIDE A SUITABLE MARINE BRACKET FOR THE DRY CHEMICAL FIRE EXTINGUISHER FOR THE STOREROOM.
Casualty record · 3
14 August 2011Routine · role: Involved in a Marine Casualty · activity 4120223
2 April 2012Routine · role: Involved in a Marine Casualty · activity 4284569
7 May 2016Routine · role: Involved in a Marine Casualty · activity 5894864
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National