Records from 2016 to 2026. Most recent: inspection, 30 April 2026.
Inspection history · 21
30 April 2026
Deficiency Check · Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8367633
13 November 2025
Drydock Exam · Internal Structural Exam · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8267317
24 March 2025
Deficiency Check · COI Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8089690
15 May 2024
Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7912782
14 December 2023
Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7839283
8 June 2023
Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7709421
27 February 2023
In-Service Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7662827
25 May 2022
Deficiency Check · Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7523405
6 January 2022
Internal Structural Exam · Hull Examination
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7376438
28 April 2021
Annual Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7184571
1 April 2020
COI Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6930719
16 January 2020
Deficiency Check · Hull Examination
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6890654
21 October 2019
Administrative Inspection
Administrative · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6839011
9 April 2019
Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6658782
15 June 2018
Type not recorded
No type recorded · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6445300
14 June 2018
Damage Survey
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6448087
28 March 2018
Annual Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6380300
18 January 2018
Examination of Repairs · Hull Examination
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6339692
20 April 2017
Deficiency Check · Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6128901
21 April 2016
Deficiency Check · Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 5859308
16 February 2016
Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 5815763
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 30 April 2026
Resolved
Observed railing gaps exceeding more than 12 inches. Vessel is to add additional courses (able to withstand 200 lbs of pressure) to meet the requirements of less than 12 inches of gap/s.
46CFR177.920(g)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 June 2026
Resolution: images provided with sufficient line added to the courses. All SAT
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 30 April 2026
Resolved
Observed a non-rigid rescue ladder. Vessel is to have deployable rigid rescue ladder with an assist line, sufficient rung space/s, and the side of the hull for proper footing (capable of supporting at least 2 persons-370LBS).
46CFR175.118(c)(4)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 June 2026
Resolution: POC provided images of new ladder and tested with 2 persons. All SAT
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 March 2025
Resolved
Vessel was found to be missing an interlock on the shore power and generator circuit panel. Provide vessel with adequate means to prevent both circuits from being energized simultaneously.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 April 2025
Resolution: Received photo of interlock installed.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 15 May 2024
Resolved
Lifeline on two life floats and an inner line for securing the basket were wasted, replace with UV resistant line to ensure all components of the life floats are operational.
Action required: 17 - Rectify deficiencies prior to departure
Due 15 May 2024
Resolved 6 June 2024
Resolution: Rcvd evidence of the issue being fixed
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 15 May 2024
Resolved
Integrated smoke detectors were not integrated and did not all set each other off. Troubleshoot and ensure the smoke detectors were integrated.
Action required: 17 - Rectify deficiencies prior to departure
Due 15 May 2024
Resolved 15 May 2024
Resolution: Sent documentation that the systems are now operational.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 May 2024
Resolved
Shaft seal was leaking at a rate of one drop per second on the starboard side main shaft. Tighten packing glands to lesson or eliminate the leak.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 June 2024
Resolution: Rcvd video of shafts without leakage
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 15 May 2024
Resolved
Starboard side main engines guard was missing. Replace guard.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 June 2024
Resolution: Rcvd picture of gaurds in place.
05 - Radio Communications › N/A - No Subsystem › MF/HF Radio installation
Issued 25 May 2022
Resolved
A vessel must comply with the applicable requirements for any radio and Electronic Position Indicating Radiobeacon (EPIRB) installations, including
the requirements for a station license and installation certificates to be issued by the Federal Communications
Commission, as set forth in 47 CFR part 80.
Install a radio with DSC after installation. After installation have station certified buy an FCC certified technician.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2022
Resolved 24 June 2022
Resolution: O/O sent photo of rectified deficiency.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 May 2022
Resolved
Electrical equipment on a vessel must be installed and maintained to: (a) Provide services necessary for safety under normal and emergency conditions; (b) Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock; (c) Minimize accidental personnel contact with energized parts; and (d) Prevent electrical ignition of flammable vapors.
Clean up electrical wiring in the engine room and remove surge protector from under operation station.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 June 2022
Resolved 24 June 2022
Resolution: O/O sent photo of rectified deficiency.
11 - Life Saving Appliances › N/A - No Subsystem › Radio life-saving appliances
Issued 28 April 2021
Resolved
Each item of lifesaving equipment with an expiration date on it must be replaced if the expiration date has passed. EPIRB NOAA registration expired date DEC 2020.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2021
Resolved 10 May 2021
Resolution: Received documentation of renewal.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 28 April 2021
Resolved
STBD Propulsion shaft seal packing excessive water leak. Make necessary repairs in accordance with Manufacturers instructions.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2021
Resolved 10 May 2021
Resolution: Corrected deficiency; witnessed by USCG MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 28 April 2021
Resolved
Generator oil sending unit leaking. Make necessary repairs in accordance with Manufacturers instructions.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2021
Resolved 10 May 2021
Resolution: Corrected deficiency; witnessed by USCG MI.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for radio personnel
Issued 1 April 2020
Resolved
Provide proof of a Marine Radio Operators permit for all Licensed mariners.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2020
Resolved 15 April 2020
Resolution: MI's shown new permit
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 1 April 2020
Resolved
Ensure proper waterlight lanyard is installed on ring life buoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 April 2020
Resolved 15 April 2020
Resolution: Verified lanyard installed
10 - Safety of Navigation › N/A - No Subsystem › Magnetic compass
Issued 1 April 2020
Resolved
Repair magnetic compass light
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2020
Resolved 15 April 2020
Resolution: Verified repaired light
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 April 2019
Resolved
Provide 04 fuel hoses with double hose clamps at both ends.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 April 2019
Resolved 23 April 2019
Resolution: Vessel rep provided all fuel hoses with double hose clamps.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 April 2019
Resolved
Provide lazarette with bilge suction line and cut-off valve.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 April 2019
Resolved 23 April 2019
Resolution: Vessel rep installed bilge suction and valve in lazarette.
Lifesaving › Lifefloat › Netting
Issued 28 March 2018
Resolved
1. Make repairs to lifefloat netting
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 March 2018
Resolved 28 April 2018
Resolution: Life float netting fixed
Electrical › Electric Generation Source (service) › Panelboard
Issued 28 March 2018
Resolved
2. Provide voltmeter, ammeter, and herzt gauge for electrical installations operating at potentials of 50 volts or more. (Generator)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 April 2018
Resolved 21 May 2018
Resolution: Ammeter , voltmeter, and hertz gauge .
Construction/Loadline › Hull › Side Shell
Issued 28 March 2018
Resolved
Make repairs on wood planking IWO starboard
aft quarter/corner.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 April 2018
Resolved 24 April 2018
Engineering › Bilge Water Management System › Hose
Issued 28 March 2018
Resolved
Replace flexible suction line for lazzerette
bilge manifold.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 April 2018
Resolved 24 May 2018
Construction/Loadline › Structures › Ventilators
Issued 28 March 2018
Resolved
Make repairs to port and starboard gunwahle corners (not structural but potential for downflooding)
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 April 2018
Resolved 24 May 2018
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 28 March 2018
Resolved
Properly label fuel fills
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 April 2018
Resolved 24 May 2018
Electrical › Electric Generation Source (service) › Circuit Breaker
Issued 20 April 2017
Resolved
provide blanks for swithcboard in E/R
Action required: 705 - Other - as specified
Due 20 May 2017
Resolved 19 May 2017
Resolution: Provided blanks for switchboard in E/R
Electrical › Electric Supply System (service) › Cable
Issued 20 April 2017
Resolved
Remove battery cable from bilges.
Action required: 705 - Other - as specified
Due 20 May 2017
Resolved 19 May 2017
Resolution: Secured battery cables above bilges.
Electrical › Electrical Distribution System (service) › Wiring
Issued 20 April 2017
Resolved
Cap or remove deadend wire from forward starboard sider E/R.
Action required: 705 - Other - as specified
Due 20 May 2017
Resolved 19 May 2017
Resolution: Caped deadend wire from FWD starboard side E/R
Lifesaving › Lifefloat › Float-free Link
Issued 20 April 2017
Resolved
Provide 02 weak links for life floats with proper tag.
Action required: 705 - Other - as specified
Due 20 May 2017
Resolved 19 May 2017
Resolution: Provided 02 new weak links with proper tags.
Lifesaving › Lifefloat › Serviceable
Issued 20 April 2017
Resolved
Make repair to upper 12 man life float IAW manufactures instructions.
Action required: 705 - Other - as specified
Due 20 May 2017
Resolved 19 May 2017
Resolution: Repaired 12 man life float IAW with manufacture's instructions.
Lifesaving › Lifefloat › Platform
Issued 21 April 2016
Resolved
Clean up/organize primary lifesaving stowage area. Prove all items are float free
Action required: 705 - Other - as specified
Due 28 April 2016
Resolved 28 April 2016
Resolution: Checked lifefloat stowage area. Area all clean and organized, lifefloats installed properly and float free.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 21 April 2016
Resolved
Provide means to secure ventilation to machinery space
Action required: 705 - Other - as specified
Due 28 April 2016
Resolved 28 April 2016
Resolution: Attended vessel and verified there is a means to secure ventilation to the E/R.