Records from 1981 to 2002. Most recent: inspection, 13 August 2002.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 45
13 August 2002
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1660793
9 August 2002
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1654948
1 October 2001
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1457997
10 August 2001
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1440572
9 August 2000
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1401296
16 August 1999
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1116659
28 July 1999
COI Inspection · Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1466062
18 June 1998
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1472951
30 April 1998
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1396918
4 August 1997
Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1435969
16 August 1996
COI Inspection · Hull Examination
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1414682
22 August 1995
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1355443
1 December 1994
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1446149
8 September 1994
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 864723
23 August 1994
COI Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1438213
17 September 1993
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1149212
29 August 1993
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 825870
24 August 1993
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1434031
22 December 1992
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 830097
21 October 1992
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 935700
14 August 1992
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 938308
12 June 1992
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 952111
16 October 1991
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1249979
16 August 1991
COI Inspection · Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1257005
12 December 1990
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1211768
22 October 1990
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1226664
27 September 1990
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 927930
29 September 1989
COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1338470
24 August 1989
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1034090
14 June 1989
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1203445
8 November 1988
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 891092
1 November 1988
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1200854
30 September 1988
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1197202
16 February 1988
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1029208
28 October 1987
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1018232
16 July 1987
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1028414
11 November 1986
Deficiency Check
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1328088
16 September 1986
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1006747
10 September 1985
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1302219
15 August 1985
Credit Drydock
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1294822
8 September 1984
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1282063
19 July 1984
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1282026
6 September 1983
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 968516
2 September 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 972169
4 September 1981
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1275039
Deck/Cargo › Holds/Tanks
Issued 7 August 2002
Resolved
Clean bilge and make ready for inspection.
Due 9 August 2002
Resolved 9 August 2002
Resolution: Bilges cleaned and inspected satisfactorily.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 7 August 2002
Resolved
Provide training log according to 46 CFR 185.420 (c).
Condition: Improper/Lack of Maintenance
Due 7 September 2002
Resolved 9 August 2002
Resolution: Created new training log for vessel crew.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 7 August 2002
Resolved
Provide EPRIB test log in accordance with 46 CFR 185.728 (c).
Due 7 September 2002
Resolved 9 August 2002
Resolution: Created EBIRB log.
Lifesaving › Buoyant Apparatus
Issued 7 August 2002
Resolved
Replace reflective tape on buoyant apparatus. LEGACY COMPONENT DESC: Reflective Tape
Due 7 September 2002
Resolved 9 August 2002
Resolution: Tape replace with approved SOLAS tape.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 7 August 2002
Resolved
Restencil lifering on portside of pilot house with the name of the vessel in accordance with 46 CFR 185.604 (2) (b).
Due 7 September 2002
Resolved 9 August 2002
Resolution: Name restenciled.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 7 August 2002
Resolved
Label emergency escape outside and inside of engine room in accordance with 46 CFR 185.606.
Due 7 September 2002
Resolved 9 August 2002
Resolution: Escapes all properly labeled.
Fire Fighting › Means of Escape › Handrails/Handholds
Issued 7 August 2002
Resolved
Permantently attach emergency escape hatch cover in way of starboard side of engine room in accordance with 46 CFR 177.500 (h).
Due 7 September 2002
Resolved 9 August 2002
Resolution: Hatch cover was permantenly hatched by wire.
Engineering › Shafting/Propeller Arrangements › Stern Tube Lubrication/Sealing
Issued 7 August 2002
Resolved
Replace or repair excesive leaking in way of port/starboard packing gland.
Due 7 September 2002
Resolved 9 August 2002
Resolution: Leak no longer excessive.
Construction/Loadline › Structures › Machinery Space Opening
Issued 7 August 2002
Resolved
Repair dog IWO engine room watertight door forward.
Due 7 September 2002
Resolved 9 August 2002
Resolution: Dog replace and door functions properly.
Construction/Loadline › Structures › Machinery Space Opening
Issued 7 August 2002
Resolved
Repair/plug through hull fitting IWO engine room forward bulkhead.
Due 7 September 2002
Resolved 9 August 2002
Resolution: Fitting plugged.
Engineering › Diesel Engine (propulsion-reduction gear) › Crankshaft
Issued 7 August 2002
Resolved
Install port, center, and starboard shaft tachs IAW 46 CFR 182.410 (b).
Due 7 September 2002
Resolved 9 August 2002
Resolution: Technican replaced missing shaft tachs, and working properly.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 7 August 2002
Resolved
Repair lube oil leak to starboard engine pressure guage.
Due 7 September 2002
Resolved 9 August 2002
Resolution: Leak repaired.
Fire Fighting › Fire Pumps › Capacity
Issued 7 August 2002
Resolved
Prove proper operation of fire pump pressure guage at the pump to read 60 PSI IAW 46 CFR 181.10-1 (C) OLD T.
Due 7 September 2002
Resolved 9 August 2002
Resolution: Pressure read 58psi, with good pressure from the fire hose.
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 7 August 2002
Resolved
Provide at the operating station visual and audible alarm to indicate bilge high water alarm IAW 46 CFR 182.530.
Due 7 September 2002
Resolved 9 August 2002
Resolution: Alarm installed and working properly.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 7 August 2002
Resolved
Install light cover fixture IWO main deck head.
Due 7 September 2002
Resolved 9 August 2002
Resolution: Fixture installed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 August 2002
Resolved
Install metal wire ties IWO pilot house IAW 46 CFR 183.340 (4).
Due 7 September 2002
Resolved 9 August 2002
Resolution: Installed.
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 7 August 2002
Resolved
Prior to getting underway provide sufficient number of lifejackets onboard IAW vessels COI.
Due 7 August 2002
Resolved 9 August 2002
Resolution: Correct number of lifejackets onboard.
Lifesaving › Buoyant Apparatus
Issued 7 August 2002
Resolved
Properly stow buoyant apparatus IAW 46 CFR 180.137 (f). LEGACY COMPONENT DESC: Stowage
Due 7 September 2002
Resolved 9 August 2002
Resolution: Installed correct spacers.
Construction/Loadline › Penetrations
Issued 7 August 2002
Resolved
Drill stop and reweld fracture IWO starboard aft galley void. LEGACY COMPONENT DESC: Weld
Due 9 September 2002
Resolved 10 September 2002
Resolution: Completed to satisfaction of marine inspector.
Construction/Loadline › Penetrations
Issued 7 August 2002
Resolved
Drill stop and reweld fracture IWO starboard forward void. LEGACY COMPONENT DESC: Weld
Due 9 September 2002
Resolved 10 September 2002
Resolution: Completed to the satisfaction of marine inspector.
Construction/Loadline › Penetrations
Issued 7 August 2002
Resolved
Drill stop and reweld fracture IWO starboard aft center void. LEGACY COMPONENT DESC: Weld
Due 9 September 2002
Resolved 10 September 2002
Resolution: Completed to the satisfaction of marine inspector.
Construction/Loadline › Penetrations
Issued 7 August 2002
Resolved
Drill stop and reweld fractures (2) IWO portside forward void. LEGACY COMPONENT DESC: Weld
Due 9 September 2002
Resolved 10 September 2002
Resolution: Completed to the satisfaction of marine inspector.
Documentation › Certificates/Documents
Issued 7 August 2002
Resolved
Vessel operating under expired COI. LEGACY COMPONENT DESC: Certificate of Inspection
Action required: 17 - Rectify deficiencies prior to departure
Due 7 August 2002
Resolved 9 August 2002
Resolution: Issued COI.
Documentation
Issued 1 October 2001
Resolved
PROVIDE EVIDENCE TO [name withheld] OF THE ISSUANCE OF A VALID SAFETY RADIO CERTIFICATE.
Condition: Unknown
Due 9 October 2001
Resolved 9 October 2001
Unknown
Issued 1 October 2001
Resolved
VESSEL IS LIMITED TO THE GULF OF MEXICO WITHIN 100 MILES OF LAND UNTIL ITEM#1 IS SATISFIED.
Condition: Unknown
Due 15 October 2001
Resolved 9 October 2001
Unknown
Issued 10 August 2001
Resolved
Unknown Component - Unknown Cause/Condition
Condition: Unknown
Due 15 October 2001
Resolved 1 October 2001
Unknown
Issued 10 August 2001
Resolved
Unknown Component - Unknown Cause/Condition
Condition: Unknown
Due 15 October 2001
Resolved 1 October 2001
Lifesaving
Issued 28 July 1999
Resolved
PROVIDE RECORD FOR CREW TRAINING PER 46 CFR 185.520
Condition: Unknown
Due 28 August 1999
Resolved 1 September 1999
Navigation
Issued 28 July 1999
Resolved
PROVIDE CURRENT COMPASS DEVATION CARD 46 CFR 184.402
Condition: Unknown
Due 28 August 1999
Resolved 1 September 1999
Fire Fighting
Issued 28 July 1999
Resolved
PROVIDE FOAM APPLICATOR PRIOR TO THE CARRAGE OF PORTABLE TANKS THAT ARE NOTGAS FREE.
Condition: Unknown
Due 28 August 1999
Resolved 1 September 1999
Electrical
Issued 28 July 1999
Resolved
INSTALL ADDITIONAL EMERGENCY LIGHTING PER 46 CFR 183.432
Condition: Unknown
Due 28 August 1999
Resolved 1 September 1999
Lifesaving
Issued 28 July 1999
Resolved
PROVIDE PASSENGER ORENTATION BRIEF PER 46 CFR 185.503
Condition: Unknown
Due 28 August 1999
Resolved 1 September 1999
Deck/Cargo
Issued 22 August 1995
Resolved
FUEL VENT SCREEN WORN THIN WHERE BALL VALVE RESTS ON SCREEN; REPLACE WITH 30 X 30 MESH.
Condition: Unknown
Due 5 September 1995
Resolved 23 September 1995
Engineering
Issued 23 August 1994
Resolved
REPAIR NO.1 GENERATOR HIGH JACKET WATER TEMPERATURE AND LOW LUB OIL PRESSURE SHUTDOWNS.
Condition: Unknown
Due 20 September 1994
Resolved 20 September 1994
Engineering
Issued 23 August 1994
Resolved
REPAIR LEAKING OIL PAN DRAIN VALVE NO.1 MAIN ENGINE.
Condition: Unknown
Due 20 September 1994
Resolved 20 September 1994
Engineering
Issued 23 August 1994
Resolved
REPAIR NO.3 MAIN ENGINE REDUCTION GEAR GAUGE LINE.
Condition: Unknown
Due 20 September 1994
Resolved 20 September 1994
Engineering
Issued 23 August 1994
Resolved
REPAIR NO.2 GENERATOR LOW LUB OIL PRESSURE SHUTDOWN.
Condition: Unknown
Due 20 September 1994
Resolved 20 September 1994
Navigation
Issued 23 August 1994
Resolved
PROVIDE CURRENT COPY OF COAST PILOT.
Condition: Unknown
Due 20 September 1994
Resolved 20 September 1994
Construction/Loadline
Issued 23 August 1994
Resolved
INSTALL CHAIN OR WIRE TO SECURE ENGINROOM /DECK HATCH
Condition: Unknown
Due 20 September 1994
Resolved 20 September 1994
Construction/Loadline
Issued 23 August 1994
Resolved
REPAIR DECK HATCH TO STERN COMPARTMENT SO IT IS WATERTIGHT.
Condition: Unknown
Due 20 September 1994
Resolved 20 September 1994
Lifesaving
Issued 23 August 1994
Resolved
REPLACE RUBBER HOSES IN FUEL VENT LINES TO HARD PIPE.
Condition: Unknown
Due 20 September 1994
Resolved 20 September 1994
Documentation
Issued 23 August 1994
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 20 September 1994
Resolved 20 September 1994
Electrical
Issued 24 August 1993
Resolved
INSTALL MACHINERY GUARDS AROUND BOTH DIESEL GENERATOR MAIN CRANKSHAFT PULLEYS.
Condition: Unknown
Due 25 October 1993
Resolved 25 October 1993
Lifesaving
Issued 24 August 1993
Resolved
RENEW EXISTING EPIRB WITH ENHANCED SATELLITE DETECTION CAPABILITY ONE PER NVIC 9-92 REQUIREMENTS.
Condition: Unknown
Due 25 October 1993
Resolved 25 October 1993
Lifesaving
Issued 24 August 1993
Resolved
RENEW ALL GRABLINES AND 100 FOOT TAG LINES ASSOCIATED WITH ALL LIFEFLOATS DUE TO WEATHER AND UV DETERIORATION.
Condition: Unknown
Due 24 August 1993
Resolved 24 August 1993
Construction/Loadline
Issued 24 August 1993
Resolved
REPAIR BROKEN WELDS, BROKEN FREE AND TWISTED FRAMING, AND BROKEN BRACKETS LOCATED STBD SIDE STERN WRAP AREA.
Condition: Unknown
Due 25 October 1993
Resolved 25 October 1993
Construction/Loadline
Issued 24 August 1993
Resolved
REPAIR NUMEROUS CRACKS IN LONGITUDINAL AND TRANSVERSE FRAMING INTERSECTIONSIN ENGINE ROOM BILGE AS DISCUSSED WITH MASTER.
Condition: Unknown
Due 25 October 1993
Resolved 25 October 1993
Construction/Loadline
Issued 24 August 1993
Resolved
REPAIR CRACK IN CENTER OF CENTERLINE MAIN DIESEL ENGINE FORWARD TRANSVERSE FRAME.
Condition: Unknown
Due 25 October 1993
Resolved 25 October 1993
Engineering
Issued 24 August 1993
Resolved
INSTALL MACHINERY GUARD ON CENTERLINE MAIN DIESEL ENGINE MAIN CRANKSHAFT PULLY.
Condition: Unknown
Due 25 October 1993
Resolved 25 October 1993
Documentation
Issued 16 August 1991
Resolved
OBTAIN AND POST FCC LICENSES IN WHEEL HOUSE.
Condition: Unknown
Due 16 August 1991
Resolved 16 August 1991
Documentation
Issued 16 August 1991
Resolved
OBTAIN AND POST STABILITIY LTR IN WHEELHOUSE.
Condition: Unknown
Due 19 September 1991
Resolved 19 September 1991
Lifesaving
Issued 16 August 1991
Resolved
INSTALL RESCUE BOAT ON BOARD
Condition: Unknown
Due 19 September 1991
Resolved 19 September 1991
Construction/Loadline
Issued 16 August 1991
Resolved
REPAIR BROKEN WELDS ON LADDER GOING DOWN TO ENGINE ROOM.
Condition: Unknown
Due 19 September 1991
Resolved 19 September 1991
Construction/Loadline
Issued 16 August 1991
Resolved
PAINT DRAFT MARKS ON VESSEL'S HULL
Condition: Unknown
Due 19 September 1991
Resolved 19 September 1991
Electrical
Issued 27 September 1990
Resolved
REPAIR LIGHT FIXTURES IN CREW SPACE.
Condition: Unknown
Due 27 September 1990
Resolved 27 September 1990
Accommodation/Occupational Safety
Issued 27 September 1990
Resolved
PROVIDE E/R AIR SUPPLY AND E/R BILGE EXHAUST.
Condition: Unknown
Due 27 September 1990
Resolved 27 September 1990
Documentation
Issued 27 September 1990
Resolved
OBTAIN RADIO OPERATIONS LICENSE FOR MEMBER OF CREW.
Condition: Unknown
Due 27 September 1990
Resolved 27 September 1990
Engineering
Issued 29 September 1989
Resolved
IMPROPER SETTING OF RELIEF VALVE FOR PORT AIR RECEIVER.
Condition: Unknown
Due 29 September 1989
Resolved 29 September 1989
Construction/Loadline
Issued 24 August 1989
Resolved
INSTALL A SCREW-DOWN VALVE JUST AFT OF THE COLLISION BULKHEAD IN THE FOREPEAK FILL LINE.
Condition: Unknown
Due 24 August 1989
Resolved 24 August 1989
Construction/Loadline
Issued 14 June 1989
Resolved
MAKE PERMANENT REPAIRS TO TEMPORARY CRACK REPAIR, PORTSIDE 6" BELOW MAIN DECK IN WAY OF THE FORE PEAK TANK.
Condition: Unknown
Due 14 June 1989
Resolved 14 June 1989
Construction/Loadline
Issued 14 June 1989
Resolved
MAKE PERMANENT REPAIRS TO REMOVE UNUSED NIPPLE PENETRATING THE COLLISION BULKHEAD, 2" BELOW THE MAIN DECK.
Condition: Unknown
Due 14 June 1989
Resolved 14 June 1989
Construction/Loadline
Issued 14 June 1989
Resolved
MAKE PERMANENT REPAIRS TO CRACKED WELD IN WAY OF THE HULL INSERT, STBD SIDEIN THE FORE PEAK TANK, FWD OF COLLISION BULKHEAD.
Condition: Unknown
Due 14 June 1989
Resolved 14 June 1989
Lifesaving
Issued 1 November 1988
Resolved
INSTALL A WEAKLINK ON THE LIFEFLOAT PAINTER.
Condition: Unknown
Due 1 November 1988
Resolved 1 November 1988
Lifesaving
Issued 1 November 1988
Resolved
INSTALL RETROREFLECTIVE MATERIAL ON THE 3 LIFEFLOATS AND 3 RING BUOYS.
Condition: Unknown
Due 1 November 1988
Resolved 1 November 1988
Navigation
Issued 16 July 1987
Resolved
RELOCATE SIDE LIGHTS TO A POSITION AFT OF THE MASTHEAD LIGHT.
Condition: Unknown
Due 16 July 1987
Resolved 16 July 1987
Accommodation/Occupational Safety
Issued 16 September 1986
Resolved
PROVIDE PLACECARD FOR SEWAGE OVERBOARD VALVE INDICATING THAT IT IS ILLEGAL TO PUMP SEWAGE OVERBOARD WITHIN THREE MILES OF U.S. COAST LINE.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Documentation
Issued 16 September 1986
Resolved
PROVIDE PROOF OF CURRENT CERTIFICATION OF DOCUMENTATION.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Navigation
Issued 16 September 1986
Resolved
REPLACE RUBBER HOSE TRANSITION OF LUBE OIL FILL PIPE.
Condition: Unknown
Due 16 September 1986
Resolved 16 September 1986
Construction/Loadline
Issued 19 July 1984
Resolved
MAKE PERMANENT REPAIRS TO THE ENGINE ROOM EMERGENCY ESCAPE DECK HATCH TO MAKE PROPERLY OPERABLE.
Condition: Unknown
Due 19 July 1984
Resolved 19 July 1984
Accommodation/Occupational Safety
Issued 19 July 1984
Resolved
MAKE PERMANENT REPAIRS TO THE AIR CONDITIONING ELECTRICAL SYSTEM TO PREVENTTRIPPING OF THE CIRCUIT BREAKERS.
Condition: Unknown
Due 19 July 1984
Resolved 19 July 1984
Construction/Loadline
Issued 6 September 1983
Resolved
MAKE PERMANENT REPAIRS TO HULL ON PORT BOW, APPROIMATELY 18 INCHES BY 40 INCHES PRIOR TO 25OCT83.
Condition: Unknown
Due 6 September 1983
Resolved 6 September 1983