MAURY USCG vessel records
← All vessels

WILLIAM F. LISK

Built
1974
Last inspected
13 November 2024
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 13 November 2024
…with no type recorded1
Operational controls None recorded without a removal date
Years with a record 9 calendar years (2016–2024)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WCY8959
Flag
UNITED STATES
Maury page id
psix-48163

Documentation record

Registered dimensions (L × B × D)46.1 ft × 14.5 ft × 6.3 ft
Registered tonnagegross 33 / net 22
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSCARIANO BOATS INC · NEW ORLEANS, LA, UNITED STATES · built 1974
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portBOSTON, MA
Endorsements, as the file codes themcw_un
DocumentationValid · issued 6 August 2025 · expires 30 September 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it33 - Regulatory (Subpart C or D), Gross Ton
22 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 20 inspections, each with its date, unit and type; 24 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 20

13 November 2024 Annual Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8033344
21 October 2024 Internal Structural Exam · Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8022368
11 January 2024 Damage Survey · Examination of Repairs · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7848355
7 December 2023 Deficiency Check · Internal Structural Exam · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7828218
18 January 2023 Annual Inspection · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7615369
3 October 2022 Internal Structural Exam · Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7567320
7 September 2022 Deficiency Check · Damage Survey · Examination of Repairs
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7553695
7 September 2022 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7554305
17 December 2021 COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7369778
6 April 2021 Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7170946
14 October 2020 Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7077070
15 September 2020 Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7058290
19 December 2019 Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6875114
25 October 2019 Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6841855
12 December 2018 Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6593486
5 September 2018 Damage Survey · Hull Examination · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6533254
29 September 2017 Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6276360
17 August 2017 Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6243291
12 October 2016 Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6021964
21 September 2016 Deficiency Check · COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6004988

Deficiency record · 24

11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 November 2024 Resolved
At least one ring life buoy must be fitted with a lifeline. Neither of the two ring life buoys had a lifeline attached. Attach a lifeline to one ring life buoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 November 2024
Resolved 14 November 2024
Resolution: properly arranged w/line
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 November 2024 Resolved
Each distribution panel or switchboard must be totally enclosed and of the dead front type. The cover for the vessel's distribution panel was missing. Replace distribution panel cover.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 November 2024
Resolved 27 November 2024
Resolution: new cover fabricated and installed
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 7 December 2023 Resolved
There must be an individual holding an appropriate license or a valid MMC with endorsement as master in command of every inspected small passenger vessel. Master presented an expired MMC. Vessel had a secondary master onboard at time of inspection.
Action required: 10 - Deficiency Rectified
Resolved 7 December 2023
Resolution: Vessel presented a second master with a valid credential. Corrected on the spot.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 7 December 2023 Resolved
Scantlings, materials, fastening, workmanship, and arrangements of each vessel are such as to provide for the safe operation in accordance with the terms of its certificate of inspection. Primary consideration shall be given to the provision of a seaworthy hull. Visible deterioration and damage was noted on the starboard quarter of the lazarette where the side shell meets the transom. Damage resulted in visible holes/pitting in the hull which is impairing its watertight envelope. O/O is to submit a repair action plan to the OCMI for approval and effect proper permanent repairs. 46CFR177.01-5 (OLD T)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 December 2023
Resolution: Verified adequate repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 December 2023 Resolved
Flexible hose shall be fabricated with an inner tube and a cover of synthetic rubber or other suitable material reinforced with wire braid. The hose cover shall be adjudged self-extinguishing per ASTM D1692. Port main engine fuel oil return hose was heavily deteriorated and rotted through the outer and inner sheathing. O/O is to submit a repair plan and renew the port engine fuel return hose to original construction standard or greater to the satisfaction of attending marine inspector. 182.20-40(a)(2)(ii) (Old T) 46CFR182.720(e) (New T)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 December 2023
Resolution: Verified replacement of return fuel hose with new one.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 December 2023 Resolved
Where flexibility is necessary a section of flexible metallic hose may be used. Non metallic hose may be used provided it is especially adapted to resist the action of oil, acid, and heat and has a wall thickness sufficient to prevent collapsing or panting. Port main engine exhaust hose flex joint was found to be heavily deteriorated and beyond its' service life. O/O to renew port main diesel engine exhaust flexible hose to satisfaction of attending marine inspector. 46CFR182.15-20(c) (Old T)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 December 2023
Resolution: Verified replacement of affected flexible joint.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 December 2023 Resolved
Deck rails must be designed and constructed to withstand a point load of 91 kilograms (200 pounds) applied at any point in any direction, and a uniform load of 74 kilograms per meter (50 pounds per foot) applied to the top rail in any direction. The point and uniform loads do not need to be applied simultaneously. Rails on passenger decks of a ferry or a vessel engaged in excursion trips, including but not limited to sightseeing trips, dinner and party cruises, and overnight cruises, must be at least 39.5 inches high. Port side forward deck rail weld at the gunwale was found broken and weld on top rail adjoining two rail sections was found cracked. O/O to submit repair proposal to OCMI for approval and make permanent repairs. 46CFR177.900(b) 46CFR177.900(d)(1) (New T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 December 2023
Resolved 19 December 2023
Resolution: Verified permanent repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 7 December 2023 Resolved
Exhaust gas must not leak from the piping or any connections. The piping must be properly supported by noncombustible hangers or blocks. Ship service generator aluminum exhaust pipe on the starboard outboard side of system was found to have a hole compromising the integrity of the pipe. O/O is to make permanent repairs to the exhaust pipe to the satisfaction of attending marine inspector. 46CFR182.430(b) (New T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 December 2023
Resolved 19 December 2023
Resolution: Verified installation of new exhaust piping.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 December 2023 Resolved
A submersible electric bilge pump conforming with this part may be used as a power bilge pump required by Table 182.520(a). Electrical submersible pump in engine room was found to not be permanently mounted and the suction hose assembly was made of collapsible hose. O/O is to permanently mount pump and install non-collapsible suction line to satisfaction on attending marine inspector. 46CFR182.520(e) New T
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 December 2023
Resolved 19 December 2023
Resolution: Verified permanent mounting of pump and installation of rigid discharge hose.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 December 2023 Resolved
Propulsion machinery shall be installed and maintained in such manner to afford adequate protection against machinery failure. Port main diesel engine was found to have a significant raw water cooling leak on pump flange housing. O/O is to effect proper repairs to raw water pump assembly. 46CFR182.01-5 (Old T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 December 2023
Resolved 19 December 2023
Resolution: Verified no leaking during operation of port engine.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 December 2023 Resolved
Each ring life buoy on a vessel must be approved in accordance with § 160.050 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.150. Port side ring life buoy was found to be beyond its' service life due to grab line deterioration and dry rot of buoy. O/O is to renew ring life buoy to satisfaction of attending marine inspector. 46CFR180.70(b)(1) (New T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 December 2023
Resolved 19 December 2023
Resolution: Verified new life ring onboard, marked and stowed.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 7 September 2022 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull, protection against fire, means of escape in case of a sudden unexpected casualty, guards and rails in hazardous places, ventilation of enclosed spaces, and necessary facilities for passengers and crew. Marine Inspector attended a damage survey and noted two hull punctures on starboard side on the vessel. Fwd puncture located on stbd quarter measuring approx 1/2" x 1/2". Second puncture located just fwd of amidship approx 1" x 3/4". Submit temporary repair proposal to this office for OCMI approval prior to start of repair.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 September 2022
Resolved 8 September 2022
Resolution: Reviewed repair proposal. All sat. Verified adequate repairs.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 October 2020 Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Exposed wire in the third void space. Find the source for the wire, remove or have wire connected in accordance with regulations.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 October 2020
Resolved 23 October 2020
Resolution: Vessel removed cable.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 October 2020 Resolved
Each ring life buoy must be marked with Type II retroreflective material arranged in accordance with IMO Resolution A.658(16). No retroreflective material was on the life buoys. Have ring life buoys meet the applicable regulations.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 14 October 2020
Resolution: Vessel provided retro reflective material in accordance with regulations.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 December 2019 Resolved
A submersible electric bilge pump may be used as a power bilge pump required by Table 182.520(a) only on a vessel of not more than 19.8 meters (65 feet) in length carrying not more than 49 passengers, other than a ferry, provided that a positive shutoff valve is installed at the hull penetration. No valve installed at engine room electric submersible bilge pump hull penetration. Install valve at hull penetration.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2020
Resolved 3 January 2020
Resolution: Valve installed at hull penetration.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 19 December 2019 Resolved
Be installed with metal supports spaced not more than 610 millimeters (24 inches) apart, and in such a manner as to avoid chafing and other damage. Wiring on port and stbd side of void #2 and engine room not completely supported and resting on metal frames creating a potential chaffing hazard. Provide wire supports as required.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2020
Resolved 3 January 2020
Resolution: Wires properly supported as required in all identified locations.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 19 December 2019 Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, heavy weather, or man overboard conditions. Posted procedures do not match equipment used (rescue ladder) and crew actions during man overboard drill. Updated emergency instructions to match equipment used and procedures followed by crew.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2020
Resolved 3 January 2020
Resolution: Emergency instructions updated to utilize equipment and procedures followed by the crew.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 19 December 2019 Resolved
The master shall conduct sufficient drills and give sufficient instructions to make sure that all crew members are familiar with their duties during emergencies that necessitate abandoning ship or the recovery of persons who have fallen overboard. Drill not logged in previous 3 months due to vessel inactivity. Crew demonstrated and logged drill during inspection.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 19 December 2019
Resolved 19 December 2019
Resolution: Crew demonstrated and logged drill during inspection
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 19 December 2019 Resolved
At least one ring life buoy must be fitted with a lifeline. If more than one ring life buoy is carried, at least one must not have a lifeline attached. No lifeline attached to life ring. Vessel rep installed lifeline prior to completion of inspection.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 19 December 2019
Resolved 19 December 2019
Resolution: Vessel rep installed lifeline prior to completion of inspection
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 12 December 2018 Resolved
Each bilge suction line shall be provided with a check valve at some accessible point in the bilge line. Forward bilge suction line not fitted with a check valve.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 December 2018
Resolved 28 December 2018
Resolution: Check Valve installed.
Construction/Loadline › Hull › Side Shell
Issued 29 September 2017 Resolved
Crop and renew affected area on the forward starboard bow to good metal, to the satisfaction of the attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 29 October 2017
Resolved 3 November 2017
Resolution: Vessel rep. repaired damaged area to the satisfaction of a CG Marine Inspector.
Communications › Alarms/Indicators › Bilge Alarm
Issued 21 September 2016 Resolved
Prove proper operation of LAZ bilge alarm.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 October 2016
Resolved 30 September 2016
Resolution: Replaced float.
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 September 2016 Resolved
Instal bonding wire to fuel tank fill piping.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 5 October 2016
Resolved 30 September 2016
Resolution: Bonding installed.
Engineering › Fuel Oil Service System › Vent Pipe
Issued 21 September 2016 Resolved
Relocate fuel vent pipe to exterior of ventillation housing for engineroom.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 5 October 2016
Resolved 30 September 2016
Resolution: Pipe relocated outside vent housing.

Ownership record