WILLIAM F. LISK is a 1974 passenger vessel (inspected). The Coast Guard has recorded 75 inspections since 1984, most recently in November 2024, along with 147 deficiencies and 1 casualty investigation in 2022.

Records from 1984 to 2024. Most recent: inspection, 13 November 2024.

Built
1974
Last inspected
13 November 2024
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WCY8959
Flag
UNITED STATES
367387380
Maury page id
psix-48163

Inspections, by type

…with no type recorded7
Years with a record 40 calendar years (1984–2024)
The 75 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)46.1 ft × 14.5 ft × 6.3 ft
Registered tonnagegross 33 / net 22
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSCARIANO BOATS INC · NEW ORLEANS, LA, UNITED STATES · built 1974
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portBOSTON, MA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 6 August 2025 · expires 30 September 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it33 - Regulatory (Subpart C or D), Gross Ton
22 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WCY8959MMSI 367387380 · active · compulsorily equipped · granted 5 December 2018, expires 22 February 2029
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 75

13 November 2024 Annual Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8033344
21 October 2024 Internal Structural Exam · Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 8022368
11 January 2024 Damage Survey · Examination of Repairs · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7848355
7 December 2023 Deficiency Check · Internal Structural Exam · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7828218
18 January 2023 Annual Inspection · Internal Structural Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7615369
3 October 2022 Internal Structural Exam · Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7567320
7 September 2022 Deficiency Check · Damage Survey · Examination of Repairs
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7553695
7 September 2022 Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7554305
17 December 2021 COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7369778
6 April 2021 Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7170946
14 October 2020 Annual Inspection · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7077070
15 September 2020 Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7058290
19 December 2019 Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6875114
25 October 2019 Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6841855
12 December 2018 Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6593486
5 September 2018 Damage Survey · Hull Examination · Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6533254
29 September 2017 Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6276360
17 August 2017 Damage Survey
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6243291
12 October 2016 Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6021964
21 September 2016 Deficiency Check · COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6004988
18 December 2015 Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5784536
10 October 2014 Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 5002993
22 May 2014 Deficiency Check
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4865185
26 July 2012 Deficiency Check · Administrative Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4391250
19 July 2012 Administrative Inspection
Administrative · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4383943
7 December 2011 Simplified Stability Test
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4203393
20 September 2011 COI Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 4150891
15 December 2010 Deficiency Check · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3900916
29 September 2010 Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3860307
17 December 2009 Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3651652
23 December 2008 Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3384066
25 September 2008 Hull Examination · Administrative Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3332152
27 November 2007 Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3104976
5 September 2006 COI Inspection · Hull Examination
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2769115
29 September 2005 Hull Examination · Administrative Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2504087
5 November 2004 Re-Inspection
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 2235245
7 November 2003 Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1943602
5 August 2003 In-Service Inspection · Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1867591
15 October 2002 Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1730631
11 February 2002 Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1485496
28 September 2001 Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1405270
10 August 2001 COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1412343
26 August 2000 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 167913
23 September 1999 Deficiency Check · Re-Inspection · Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1454737
26 August 1999 Drydock Extension
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 784510
17 June 1999 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 879209
29 April 1999 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1395170
11 August 1998 COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 800456
4 August 1997 COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 781937
4 August 1997 Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 784535
22 July 1997 COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1115606
18 February 1997 Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1464668
6 March 1996 Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1441132
30 June 1995 Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1417822
25 April 1995 Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1175860
7 March 1995 COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 834487
1 February 1994 Administrative
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 853548
1 February 1994 Re-Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1163233
27 December 1993 Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1161262
4 March 1993 Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1393907
26 February 1992 COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1008836
26 February 1992 Administrative
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1008839
26 September 1991 Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 940933
17 September 1990 Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1215235
6 August 1990 Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 910016
26 January 1990 Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 926531
11 September 1989 COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1349166
21 December 1988 Deficiency Check · Drydock Extension · Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1041834
15 October 1987 Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1013508
15 October 1987 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1317852
13 August 1987 Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1011758
9 December 1986 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1022787
25 September 1986 COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1008542
24 October 1985 Re-Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1307946
27 November 1984 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 977422

Deficiency record · 147

11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 November 2024 Resolved
At least one ring life buoy must be fitted with a lifeline. Neither of the two ring life buoys had a lifeline attached. Attach a lifeline to one ring life buoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 November 2024
Resolved 14 November 2024
Resolution: properly arranged w/line
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 November 2024 Resolved
Each distribution panel or switchboard must be totally enclosed and of the dead front type. The cover for the vessel's distribution panel was missing. Replace distribution panel cover.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 November 2024
Resolved 27 November 2024
Resolution: new cover fabricated and installed
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 7 December 2023 Resolved
There must be an individual holding an appropriate license or a valid MMC with endorsement as master in command of every inspected small passenger vessel. Master presented an expired MMC. Vessel had a secondary master onboard at time of inspection.
Action required: 10 - Deficiency Rectified
Resolved 7 December 2023
Resolution: Vessel presented a second master with a valid credential. Corrected on the spot.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 7 December 2023 Resolved
Scantlings, materials, fastening, workmanship, and arrangements of each vessel are such as to provide for the safe operation in accordance with the terms of its certificate of inspection. Primary consideration shall be given to the provision of a seaworthy hull. Visible deterioration and damage was noted on the starboard quarter of the lazarette where the side shell meets the transom. Damage resulted in visible holes/pitting in the hull which is impairing its watertight envelope. O/O is to submit a repair action plan to the OCMI for approval and effect proper permanent repairs. 46CFR177.01-5 (OLD T)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 December 2023
Resolution: Verified adequate repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 December 2023 Resolved
Flexible hose shall be fabricated with an inner tube and a cover of synthetic rubber or other suitable material reinforced with wire braid. The hose cover shall be adjudged self-extinguishing per ASTM D1692. Port main engine fuel oil return hose was heavily deteriorated and rotted through the outer and inner sheathing. O/O is to submit a repair plan and renew the port engine fuel return hose to original construction standard or greater to the satisfaction of attending marine inspector. 182.20-40(a)(2)(ii) (Old T) 46CFR182.720(e) (New T)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 December 2023
Resolution: Verified replacement of return fuel hose with new one.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 December 2023 Resolved
Where flexibility is necessary a section of flexible metallic hose may be used. Non metallic hose may be used provided it is especially adapted to resist the action of oil, acid, and heat and has a wall thickness sufficient to prevent collapsing or panting. Port main engine exhaust hose flex joint was found to be heavily deteriorated and beyond its' service life. O/O to renew port main diesel engine exhaust flexible hose to satisfaction of attending marine inspector. 46CFR182.15-20(c) (Old T)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 December 2023
Resolution: Verified replacement of affected flexible joint.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 December 2023 Resolved
Deck rails must be designed and constructed to withstand a point load of 91 kilograms (200 pounds) applied at any point in any direction, and a uniform load of 74 kilograms per meter (50 pounds per foot) applied to the top rail in any direction. The point and uniform loads do not need to be applied simultaneously. Rails on passenger decks of a ferry or a vessel engaged in excursion trips, including but not limited to sightseeing trips, dinner and party cruises, and overnight cruises, must be at least 39.5 inches high. Port side forward deck rail weld at the gunwale was found broken and weld on top rail adjoining two rail sections was found cracked. O/O to submit repair proposal to OCMI for approval and make permanent repairs. 46CFR177.900(b) 46CFR177.900(d)(1) (New T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 December 2023
Resolved 19 December 2023
Resolution: Verified permanent repairs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 7 December 2023 Resolved
Exhaust gas must not leak from the piping or any connections. The piping must be properly supported by noncombustible hangers or blocks. Ship service generator aluminum exhaust pipe on the starboard outboard side of system was found to have a hole compromising the integrity of the pipe. O/O is to make permanent repairs to the exhaust pipe to the satisfaction of attending marine inspector. 46CFR182.430(b) (New T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 December 2023
Resolved 19 December 2023
Resolution: Verified installation of new exhaust piping.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 7 December 2023 Resolved
A submersible electric bilge pump conforming with this part may be used as a power bilge pump required by Table 182.520(a). Electrical submersible pump in engine room was found to not be permanently mounted and the suction hose assembly was made of collapsible hose. O/O is to permanently mount pump and install non-collapsible suction line to satisfaction on attending marine inspector. 46CFR182.520(e) New T
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 December 2023
Resolved 19 December 2023
Resolution: Verified permanent mounting of pump and installation of rigid discharge hose.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 December 2023 Resolved
Propulsion machinery shall be installed and maintained in such manner to afford adequate protection against machinery failure. Port main diesel engine was found to have a significant raw water cooling leak on pump flange housing. O/O is to effect proper repairs to raw water pump assembly. 46CFR182.01-5 (Old T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 December 2023
Resolved 19 December 2023
Resolution: Verified no leaking during operation of port engine.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 December 2023 Resolved
Each ring life buoy on a vessel must be approved in accordance with § 160.050 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.150. Port side ring life buoy was found to be beyond its' service life due to grab line deterioration and dry rot of buoy. O/O is to renew ring life buoy to satisfaction of attending marine inspector. 46CFR180.70(b)(1) (New T)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 December 2023
Resolved 19 December 2023
Resolution: Verified new life ring onboard, marked and stowed.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 7 September 2022 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull, protection against fire, means of escape in case of a sudden unexpected casualty, guards and rails in hazardous places, ventilation of enclosed spaces, and necessary facilities for passengers and crew. Marine Inspector attended a damage survey and noted two hull punctures on starboard side on the vessel. Fwd puncture located on stbd quarter measuring approx 1/2" x 1/2". Second puncture located just fwd of amidship approx 1" x 3/4". Submit temporary repair proposal to this office for OCMI approval prior to start of repair.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 September 2022
Resolved 8 September 2022
Resolution: Reviewed repair proposal. All sat. Verified adequate repairs.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 October 2020 Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Exposed wire in the third void space. Find the source for the wire, remove or have wire connected in accordance with regulations.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 October 2020
Resolved 23 October 2020
Resolution: Vessel removed cable.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 October 2020 Resolved
Each ring life buoy must be marked with Type II retroreflective material arranged in accordance with IMO Resolution A.658(16). No retroreflective material was on the life buoys. Have ring life buoys meet the applicable regulations.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Resolved 14 October 2020
Resolution: Vessel provided retro reflective material in accordance with regulations.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 19 December 2019 Resolved
A submersible electric bilge pump may be used as a power bilge pump required by Table 182.520(a) only on a vessel of not more than 19.8 meters (65 feet) in length carrying not more than 49 passengers, other than a ferry, provided that a positive shutoff valve is installed at the hull penetration. No valve installed at engine room electric submersible bilge pump hull penetration. Install valve at hull penetration.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2020
Resolved 3 January 2020
Resolution: Valve installed at hull penetration.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 19 December 2019 Resolved
Be installed with metal supports spaced not more than 610 millimeters (24 inches) apart, and in such a manner as to avoid chafing and other damage. Wiring on port and stbd side of void #2 and engine room not completely supported and resting on metal frames creating a potential chaffing hazard. Provide wire supports as required.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2020
Resolved 3 January 2020
Resolution: Wires properly supported as required in all identified locations.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 19 December 2019 Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, heavy weather, or man overboard conditions. Posted procedures do not match equipment used (rescue ladder) and crew actions during man overboard drill. Updated emergency instructions to match equipment used and procedures followed by crew.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 January 2020
Resolved 3 January 2020
Resolution: Emergency instructions updated to utilize equipment and procedures followed by the crew.
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 19 December 2019 Resolved
The master shall conduct sufficient drills and give sufficient instructions to make sure that all crew members are familiar with their duties during emergencies that necessitate abandoning ship or the recovery of persons who have fallen overboard. Drill not logged in previous 3 months due to vessel inactivity. Crew demonstrated and logged drill during inspection.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 19 December 2019
Resolved 19 December 2019
Resolution: Crew demonstrated and logged drill during inspection
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 19 December 2019 Resolved
At least one ring life buoy must be fitted with a lifeline. If more than one ring life buoy is carried, at least one must not have a lifeline attached. No lifeline attached to life ring. Vessel rep installed lifeline prior to completion of inspection.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 19 December 2019
Resolved 19 December 2019
Resolution: Vessel rep installed lifeline prior to completion of inspection
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 12 December 2018 Resolved
Each bilge suction line shall be provided with a check valve at some accessible point in the bilge line. Forward bilge suction line not fitted with a check valve.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 December 2018
Resolved 28 December 2018
Resolution: Check Valve installed.
Construction/Loadline › Hull › Side Shell
Issued 29 September 2017 Resolved
Crop and renew affected area on the forward starboard bow to good metal, to the satisfaction of the attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 29 October 2017
Resolved 3 November 2017
Resolution: Vessel rep. repaired damaged area to the satisfaction of a CG Marine Inspector.
Communications › Alarms/Indicators › Bilge Alarm
Issued 21 September 2016 Resolved
Prove proper operation of LAZ bilge alarm.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 5 October 2016
Resolved 30 September 2016
Resolution: Replaced float.
Electrical › Electrical Distribution System (service) › Wiring
Issued 21 September 2016 Resolved
Instal bonding wire to fuel tank fill piping.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 5 October 2016
Resolved 30 September 2016
Resolution: Bonding installed.
Engineering › Fuel Oil Service System › Vent Pipe
Issued 21 September 2016 Resolved
Relocate fuel vent pipe to exterior of ventillation housing for engineroom.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 5 October 2016
Resolved 30 September 2016
Resolution: Pipe relocated outside vent housing.
Engineering › Freshwater System (jacketwater cooling) › Hose
Issued 18 December 2015 Resolved
Port and STBD engine exhaust cooling hoses and port engine inlet cooling hose are dry rotted. Replace in kind.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 January 2016
Resolved 22 December 2015
Resolution: Corrected to the satisfaction of the attending Coast Guard Marine Inspector by replacing hoses in kind.
Engineering › Steering Gear System › Rudder Stock
Issued 10 October 2014 Resolved
Rudder tubes were wasted, need to provide repair proposal to address the issue.
Action required: 705 - Other - as specified
Due 6 November 2014
Resolved 16 October 2014
Resolution: Rudder tubes were cut out, replaced and welded in.
Construction/Loadline › Hull › Longitudinal Frame
Issued 10 October 2014 Resolved
Support frame needs to be repaired in forward most void, repair support frame.
Action required: 705 - Other - as specified
Due 6 November 2014
Resolved 6 November 2014
Resolution: Broken stitch welds were ground out and re-welded to the satisfaction of attending USCG Marine Inspector.
Engineering › Lubricating Oil Storage/Transfer System › Cooler
Issued 10 October 2014 Resolved
Coupling corrosion in stbd keel cooler valve, Prove operation of keel cooler valves and address corrosion issue.
Action required: 705 - Other - as specified
Due 6 November 2014
Resolved 6 November 2014
Resolution: Couplings noted in hull exam were replaced in kind. Operational test of the keel cooler systems was satisfactory.
Engineering › Sea-water System (primary cooling) › Sea Chest
Issued 10 October 2014 Resolved
Provide adequate strainers for all through hull valves.
Action required: 705 - Other - as specified
Due 6 November 2014
Resolved 6 November 2014
Resolution: Two valves were inaccessible due to the keel cooler location on the exterior of the hull; the vessel rep was unable to install screens on the outside of the vessel. Vessel reps elected to install sea strainers in line on the piping system inside vsl.
Engineering › Reduction Gearing/Clutches › Bearing, Line Shaft
Issued 10 October 2014 Resolved
Port through hull cutlass bearing needs to be replaced.
Action required: 705 - Other - as specified
Due 6 November 2014
Resolved 16 October 2014
Resolution: Bearing replaced to satisfaction attending MI.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 19 July 2012 Resolved
CHANGE THE VESSEL'S NAME ON THE HULL, DOCUMENTS, LICENSES, LIFESAVING EQUIPMENT, AIS, LOGS, PLANS, ETC. TO CORRESPOND TO RECENTLY ISSUED CERTIFICATE OF DOCUMENTATION.
Due 2 August 2012
Resolved 26 July 2012
Resolution: All above items have changed properly.
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 30 November 2010 Resolved
Retroreflective tape was wasted on 26 PFD's
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 January 2011
Resolved 26 January 2011
Resolution: Retroreflective tape was replaced on 26 PFD''s
Engineering › Diesel Engine (propulsion-direct drive) › Injector (fuel injection)
Issued 30 November 2010 Resolved
Fuel lines running to generator were under heavy vibration and were not properly clamped in place with two hose clamps and fuel hoses were not of approved type for service.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 January 2011
Resolved 26 January 2011
Resolution: Installed and pressure tested all flex fuel hoses. New hose is of approved type for service and installed properly.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 30 November 2010 Resolved
Marine Sanitation Device overboard discharge was not secured. The MSD is not currently in operation or being used, It is however, piped for use. Vessel rep is going to secure the MSD by disconnecting the piping to the holding tank.
Action required: 705 - Other - as specified
Due 31 January 2011
Resolved 26 January 2011
Resolution: Marine Sanitation Device overboard discharge was not secured. Secured the MSD by disconnecting the piping to the holding tank and capping it off. The MSD is not currently in operation or being used.
Communications › Alarms/Indicators › Bilge Alarm
Issued 17 December 2009 Resolved
Repair inoperative bilge high leval alarms system.
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 December 2009
Resolved 29 September 2010
Resolution: ALARMS TEST SAT.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 17 December 2009 Resolved
Replace missing door from breaker box in pilot house.
Due 17 December 2009
Resolved 29 September 2010
Resolution: BREAKER PANEL DOOR REPLACED.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 17 December 2009 Resolved
Replace 8 type 1 adult life jackets and 1 type 1 child size life jacket.
Due 17 December 2009
Resolved 29 September 2010
Resolution: LIFEJACKETS COUNTED IN FULL AS REQUIRED.
Engineering › Sea-water System (primary cooling) › Pump
Issued 23 December 2008 Resolved
Make permanent repairs to port MDE circ pump
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 December 2008
Resolved 11 May 2009
Resolution: Circulating pump was rebuilt
Construction/Loadline › Structures › Scuttle
Issued 29 September 2008 Resolved
Replace the foward and aft hatch covers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 17 October 2008
Resolved 17 December 2009
Resolution: The forpeak and lazzerette hatches have been replaced sat.
Lifesaving › Lifebuoys › Serviceable
Issued 27 November 2007 Resolved
Replace the aft lif ring.
Condition: Unknown
Action required: 705 - Other - as specified
Due 3 December 2007
Resolved 4 December 2007
Construction/Loadline › Hull › Hull Plating
Issued 27 November 2007 Resolved
Repair the hole in the transum under the rug rail.
Condition: Unknown
Action required: 705 - Other - as specified
Due 3 December 2007
Resolved 4 December 2007
Navigation › Collision/Grounding Avoidance › Radar
Issued 27 November 2007 Resolved
Prove proper operation of the radar.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 December 2007
Resolved 4 December 2007
Electrical › Electrical Distribution System (emergency) › Wiring
Issued 27 November 2007 Resolved
Remove wire nuts from the electric bilge pump in the engine room and make a proper connection.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 3 December 2007
Resolved 4 December 2007
Engineering › Diesel Engine (propulsion-direct drive) › Valve
Issued 5 September 2006 Resolved
Renew spool piece 1 1/2 inch ball valve exhaust starboard.
Condition: Unknown
Action required: 705 - Other - as specified
Due 22 September 2006
Resolved 21 September 2006
Engineering › Sea-water System (primary cooling) › Piping
Issued 5 September 2006 Resolved
renew generator cooling pipe bracket
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 September 2006
Resolved 21 September 2006
Engineering › Fuel Oil Service System › Valve
Issued 5 September 2006 Resolved
free up port fuel reach rod valve handle
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 September 2006
Resolved 21 September 2006
Engineering › Diesel Engine (propulsion-direct drive) › Air Cleaner
Issued 5 September 2006 Resolved
Replace screen on port exhaust intake
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 September 2006
Resolved 21 September 2006
Construction/Loadline › Penetrations › Gasket
Issued 5 September 2006 Resolved
Seal wire run bulkhead penetrations in CO2 room
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 22 September 2006
Resolved 21 September 2006
Engineering › Fuel Oil Storage/Transfer System › Vent Pipe
Issued 5 September 2006 Resolved
Raise fuel vent line for fuel tank and secure bracket stbd side aft
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 22 September 2006
Resolved 21 September 2006
Construction/Loadline › Hull › Weld
Issued 29 September 2005 Resolved
Prove satisfactory water test on insert in side shell. port side.
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 December 2005
Resolved 31 August 2006
Resolution: Satisfactory water tested insert at the port side side shell . All Sat.
Engineering › Reduction Gearing/Clutches › Gear
Issued 29 September 2005 Resolved
Make repairs to port reduction gear
Action required: 705 - Other - as specified
Due 1 December 2005
Resolved 31 August 2006
Resolution: Repairs made to port side reduction gear. All Sat.
Construction/Loadline › Hull
Issued 7 November 2003 Resolved
Repair cracks in the aft port and starboard side rub rails. LEGACY COMPONENT DESC: Collision Strap
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 24 December 2003
Accommodation/Occupational Safety › Occupational Safety
Issued 7 November 2003 Resolved
Repair the various cracks in the hand rails on the stern. LEGACY COMPONENT DESC: Deck Rail
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 24 December 2003
Communications › Radio Communications
Issued 7 November 2003 Resolved
Provide a current FCC Radiotelephone safety certificate. LEGACY COMPONENT DESC: Radiotelephone Transceiver (2-27.5 MHz)
Condition: Unknown
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 2 January 2004
Navigation › Piloting/Steering
Issued 7 November 2003 Resolved
Repair/Replace light in compass. LEGACY COMPONENT DESC: Magnetic Compass
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 24 December 2003
Construction/Loadline › Hull
Issued 7 November 2003 Resolved
Repair 1/2" hole in hull on the starbaord side in void 3 above frame #2up from the cime, 1' foward of engine room bulkhead. LEGACY COMPONENT DESC: Hull Plating
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 November 2003
Resolved 24 December 2003
Construction/Loadline › Penetrations
Issued 7 November 2003 Resolved
Replace or remove plastic through hull fitting in void space 3 above frame #2 above the cime, 1' foward of the engine room bulkhead. LEGACY COMPONENT DESC: Pipe Flange
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 14 November 2003
Resolved 24 December 2003
Electrical › Electrical Distribution System (service)
Issued 7 November 2003 Resolved
Properly mount electrical wire, port side in void space 3. LEGACY COMPONENT DESC: Wiring
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 24 December 2003
Construction/Loadline › Structures
Issued 7 November 2003 Resolved
Repair/Plug small holes in foward bulkhead in the engine room. LEGACY COMPONENT DESC: Transverse Bulkhead
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 24 December 2003
Construction/Loadline › Structures
Issued 7 November 2003 Resolved
Provide chaffing gear for wiring through Foward engine room bulkhead.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 December 2003
Resolved 24 December 2003
Lifesaving › Lifebuoys
Issued 7 November 2003 Resolved
Replace short life ring line with 60' of line. LEGACY COMPONENT DESC: Buoyant Lifeline
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 14 November 2003
Resolved 24 December 2003
Lifesaving › Rigid Liferafts
Issued 5 August 2003 Resolved
Properly restow lifefloats in a float free arrangement and properly make up lines, pennents, and painter. Properly install paddles and provide waterlight.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 August 2003
Resolved 26 August 2003
Resolution: Lifefloats permanently removed and route limited to no more than 1 mile from shore, at owner''s request.
Construction/Loadline
Issued 28 September 2001 Resolved
Provide plans for permanent repairs to the aft rails.
Condition: Unknown
Due 10 November 2001
Resolved 11 February 2002
Resolution: Approved plans and new rails installed.
Engineering
Issued 10 August 2001 Resolved
At next credit dry-dock exam, properly remove and make proper repairs to the raw water suction for the port exhaust at the valve.
Condition: Unknown
Due 30 September 2001
Resolved 5 October 2001
Construction/Loadline
Issued 23 September 1999 Resolved
REPAIR WELDS IN LAZARETTE, AFT PORT SIDE.
Condition: Unknown
Due 1 November 1999
Resolved 10 November 1999
Lifesaving
Issued 23 September 1999 Resolved
REPLACE LIFERING.
Condition: Unknown
Due 1 November 1999
Resolved 10 November 1999
Construction/Loadline
Issued 23 September 1999 Resolved
PLUG HOLE IN HULL WHERE THERE USED TO BE A THROUGH HULL FITTING, STBD SIDE ENGINEROOM.
Condition: Unknown
Due 1 November 1999
Resolved 10 November 1999
Construction/Loadline
Issued 23 September 1999 Resolved
MAKE LAZARETTE WATERTIGHT HATCH WATERTIGHT.
Condition: Unknown
Due 1 November 1999
Resolved 10 November 1999
Electrical
Issued 23 September 1999 Resolved
PROVIDE COVER FOR AFT BATTERY BOX IN ENGINEROOM.
Condition: Unknown
Due 1 November 1999
Resolved 10 November 1999
Electrical
Issued 23 September 1999 Resolved
PROVIDE GUARDS FOR TWO CENTERLINE LIGHTS IN ENGINEROOM.
Condition: Unknown
Due 1 November 1999
Resolved 10 November 1999
Construction/Loadline
Issued 23 September 1999 Resolved
LABEL BILGE MANIFOLD.
Condition: Unknown
Due 1 November 1999
Resolved 10 November 1999
Electrical
Issued 23 September 1999 Resolved
REMOVE ALL DEADENDED WIRES IN ENGINEROOM.
Condition: Unknown
Due 1 November 1999
Resolved 10 November 1999
Accommodation/Occupational Safety
Issued 23 September 1999 Resolved
REPPLACE FORWARD PORT WINDOW IN ACCOMODATION SPACE.
Condition: Unknown
Due 1 November 1999
Resolved 10 November 1999
Construction/Loadline
Issued 23 September 1999 Resolved
PROVIDE GAUGUNG REPORT.
Condition: Unknown
Due 1 November 1999
Resolved 10 November 1999
Construction/Loadline
Issued 29 April 1999 Resolved
Install check valves in each bilge line in compts or at manifold. Install bilge strainer 3x area of suction line in each suction line.
Condition: Unknown
Due 29 April 1999
Resolved 29 April 1999
Lifesaving
Issued 11 August 1998 Resolved
PROVIDE A CERTIFIED WEAK LINK FOR THE LIFE FLOAT INSTALLATION.
Condition: Unknown
Due 11 August 1998
Resolved 18 August 1998
Lifesaving
Issued 11 August 1998 Resolved
REPLACE RING BUOY FLOATLIGHT BATTERY.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Electrical
Issued 11 August 1998 Resolved
MOUNT FLASHLIGHT AT ENTRANCE TO ENGINEROOM.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Documentation
Issued 11 August 1998 Resolved
PROVIDE OIL POOLUTION PREVENTION PLACARD.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Construction/Loadline
Issued 11 August 1998 Resolved
INSTALL BILGE HIGH LEVEL ALARMS IN ALL COMPARTMENTS CONTAINING THROUGH-HULLFITTINGS BELOW THE DEEPEST LOAD WATERLINE.
Condition: Unknown
Due 11 August 1998
Resolved 18 August 1998
Lifesaving
Issued 11 August 1998 Resolved
LABEL LIFE PRESERVER STORAGE LOCKER.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Accommodation/Occupational Safety
Issued 11 August 1998 Resolved
PROVIDE PROTECTION OVER LOW OVERHEAD AT ACCESS TO ENTRANCE TO HEAD.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Lifesaving
Issued 11 August 1998 Resolved
PROVIDE LIFE LFOAT WITH FLOAT LIGHT FOR 50% CAPACITY FOR L,B & S ROUTE.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Accommodation/Occupational Safety
Issued 11 August 1998 Resolved
INSTALL CHAINS TO PREVENT PASSENGER ACCESS TO FOC'SLE DECK.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Construction/Loadline
Issued 11 August 1998 Resolved
REPAINT NAME OF VESSEL ON TRANSOM.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Electrical
Issued 11 August 1998 Resolved
REPLACE GLOBE IN LIGHT FIXTURE OVER GENERATOR.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Construction/Loadline
Issued 11 August 1998 Resolved
PROVIDE HAND BILGE/FIRE PUMP.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Construction/Loadline
Issued 11 August 1998 Resolved
MAKE WATERTIGHT THE OLD OVERBOARD DISCHARGE PIPE IN THE PORT SIDE SHELL OF THE SECOND SPACE.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Fire Fighting
Issued 11 August 1998 Resolved
POST OPERATING INSTRUCTIONS AT LOCAL CONTROL OF FIXED FIRE EXTINGUISHING SYSTEM.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Accommodation/Occupational Safety
Issued 11 August 1998 Resolved
PROVE PROPER OPERATION OF WASH BASIN IN HEAD.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Lifesaving
Issued 11 August 1998 Resolved
MOVE LIFE PRESERVER DONNING INSTRUCTIONS INTO POSITION MORE CONSPICOUS TO PASSENGERS.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Fire Fighting
Issued 11 August 1998 Resolved
INSTALL FIRE DETECTION SYSTEM IN MACHINERY SPACE.
Condition: Unknown
Due 11 August 1998
Resolved 18 August 1998
Documentation
Issued 11 August 1998 Resolved
PROVIDE CURRENT FCC RADIO STATION LICENSE AND RADIOTELEPHONY CERTIFICATE.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Electrical
Issued 11 August 1998 Resolved
LABEL EMERGENCY LIGHTING FIXTURES IN ACCOMODATION SPACES.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Electrical
Issued 11 August 1998 Resolved
PROPERLY END WIRING AND PLACE COVERS OVER PA FIXTURES IN ACCOMODATION SPACEAND ON BRIDGE.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Construction/Loadline
Issued 22 July 1997 Resolved
PROVIDE PROPOSAL/PLAN TO BRING VESSEL INTO COMPLIANCE WITH SALT WATER OPERATION DRYDOCK SCHEDULE (2 YRS). NOT LATER THAN 22 AUG 97.
Condition: Unknown
Due 22 August 1997
Resolved 11 August 1997
Engineering
Issued 22 July 1997 Resolved
REPLACE FLAME SCREEN ON FUEL TANK VENT.
Condition: Unknown
Due 22 July 1997
Resolved 22 July 1997
Accommodation/Occupational Safety
Issued 22 July 1997 Resolved
SECURE SALT WATER SUPPLY PUMP FOR MSD.
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Lifesaving
Issued 22 July 1997 Resolved
PROVIDE DONNING INSTRUCTIONS FOR EACH TYPE LIFEJACKET ONBOARD.
Condition: Unknown
Due 22 July 1997
Resolved 22 July 1997
Lifesaving
Issued 22 July 1997 Resolved
PROPERLY RE-STENCIL ALL LIFEJACKET STOWAGE AREAS.
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Accommodation/Occupational Safety
Issued 22 July 1997 Resolved
RE-ATTACH LADDER LEADING TO ENGINEROOM.
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Documentation
Issued 22 July 1997 Resolved
PROVIDE RADIO OPERATORS LICENSE.
Condition: Unknown
Due 22 July 1997
Resolved 22 July 1997
Construction/Loadline
Issued 22 July 1997 Resolved
REMOVE ALL RUBBER HOSES AND PVC PIPING AND VALVES FROM BILGE PIPING SYSTEM AND MANIFOLD AND REPLACE WITH HARD PIPE.
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Engineering
Issued 22 July 1997 Resolved
REMOVE ALL OIL FROM ENGINE ROOM BILGES.
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Engineering
Issued 22 July 1997 Resolved
REPAIR EXHAUST COOLING WATER LEAKS IN ENGINE ROOM.
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Navigation
Issued 22 July 1997 Resolved
SECURE MASTHEAD LIGHT.
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Accommodation/Occupational Safety
Issued 22 July 1997 Resolved
RESECURE FIXED SEATING IN PASSENGER COMPARTMENT.
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Navigation
Issued 22 July 1997 Resolved
SECURE STERN LIGHT WHERE IT PENETRATES THE TRANSOM AND MAKE WATER TIGHT.
Condition: Unknown
Due 22 July 1997
Resolved 22 July 1997
Accommodation/Occupational Safety
Issued 22 July 1997 Resolved
RESECURE DECK HEATERS IN PASSENGER COMPARTMENT.
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Accommodation/Occupational Safety
Issued 22 July 1997 Resolved
REPLACE BROKEN WINDOW IN PASSENGER COMPARTMENT. (PORT SIDE 2ND WINDOW AFT).
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Accommodation/Occupational Safety
Issued 22 July 1997 Resolved
REPAIR BROKEN/MISSING DECK RAIL STARBOARD SIDE AFT.
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Accommodation/Occupational Safety
Issued 22 July 1997 Resolved
REPAIR BROKEN DECK RAIL PORT SIDE MIDSHIP AND FORWARD.
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Electrical
Issued 22 July 1997 Resolved
SECURE LIGHT FIXTURE STARBOARD SIDE WX DECK AFT.
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Construction/Loadline
Issued 22 July 1997 Resolved
PROVIDE SUCTION AND DISCHARGE HOSES FOR HAND PORTABLE PUMP.
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Engineering
Issued 22 July 1997 Resolved
RESTENCIL EMERGENCY FUEL SHUTOFFS.
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Lifesaving
Issued 22 July 1997 Resolved
STENCIL RING BUOY WITH VESSEL NAME.
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Lifesaving
Issued 22 July 1997 Resolved
REPAIR/REPLACE INOPERATIVE WATERLIGHTS.(02)
Condition: Unknown
Due 22 July 1997
Resolved 22 July 1997
Navigation
Issued 22 July 1997 Resolved
PROVIDE CURRENT NAVIGATIONAL CHART FOR OPERATING AREA.
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Accommodation/Occupational Safety
Issued 22 July 1997 Resolved
REPAIR/REPLACE ALL SAFETY LINES AT ALL ENTRY AND EXIT POINTS TO THE VESSEL.
Condition: Unknown
Due 29 July 1997
Resolved 11 August 1997
Construction/Loadline
Issued 6 March 1996 Resolved
The exhaust hoses for MDE's were not double clamped as required._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 13 March 1996
Resolved 1 November 1996
Electrical
Issued 6 March 1996 Resolved
The wiring to the MSD was not a proper marine grade wire as required._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 13 March 1996
Resolved 1 November 1996
Engineering
Issued 6 March 1996 Resolved
The flame screen on the fuel tank vent was corroded._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 13 March 1996
Resolved 1 November 1996
Navigation
Issued 6 March 1996 Resolved
The anchor light was malfuntioning._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 13 March 1996
Resolved 1 November 1996
Lifesaving
Issued 7 March 1995 Resolved
Provide approved B/A to cover 15 persons.
Condition: Unknown
Due 6 March 1996
Resolved 28 April 1995
Navigation
Issued 27 December 1993 Resolved
INSTALL FIXED SOUND PRODUCING DEVICE ON THE VESSEL.
Condition: Unknown
Due 8 February 1994
Resolved 8 February 1994
Navigation
Issued 4 March 1993 Resolved
Demonstrate operation of anchor light independent of running lights.
Condition: Unknown
Due 4 March 1993
Resolved 4 March 1993
Lifesaving
Issued 4 March 1993 Resolved
Provide documentation of approval of life float.
Condition: Unknown
Due 4 March 1993
Resolved 4 March 1993
Lifesaving
Issued 26 September 1991 Resolved
PROVIDE 6 ORANGE SMOKE FLARES._x001C_
Condition: Unknown
Due 26 September 1991
Resolved 26 September 1991
Navigation
Issued 26 September 1991 Resolved
PROVIDE CURRENT CHARTS OF THE AREA.
Condition: Unknown
Due 26 September 1991
Resolved 26 September 1991
Documentation
Issued 26 September 1991 Resolved
PROVIDE MARPOL V STICKER.
Condition: Unknown
Due 26 September 1991
Resolved 26 September 1991
Engineering
Issued 26 September 1991 Resolved
PROVIDE LAGGING FOR UNCOOLED PORTION OF EXHAUST RISER.
Condition: Unknown
Due 26 September 1991
Resolved 26 September 1991
Electrical
Issued 26 September 1991 Resolved
PROVIDE LABELS FOR ELECTRICAL FUSE PANEL.
Condition: Unknown
Due 26 September 1991
Resolved 26 September 1991
Electrical
Issued 11 September 1989 Resolved
INSTALL VOLTMETER, AMPMETER AND FREQUENCY METER FOR VESSEL'S 110VAC GENERATOR
Condition: Unknown
Due 11 September 1989
Resolved 11 September 1989
Navigation
Issued 11 September 1989 Resolved
POST STABILITY LTR ON VESSEL
Condition: Unknown
Due 11 September 1989
Resolved 11 September 1989
Unknown
Issued 15 October 1987 Resolved
PROVIDE THE FOLLOWING CHARTS & PUBLICATIONS: CHARTS OF AREA OF OPERATION; LIGHT LIST; NOTICE TO MARINERS; TIDE TABLES; CURRENT TABLES, AND 46CFR PARTS 166-199.
Condition: Unknown
Due 15 October 1987
Resolved 15 October 1987
Construction/Loadline
Issued 13 August 1987 Resolved
CLOSE OFF AND MAKE WATERTIGHT OLD BOLT HOLES IN SHEER STRAKE FROM RUB RAIL.
Condition: Unknown
Due 13 August 1987
Resolved 13 August 1987
Construction/Loadline
Issued 13 August 1987 Resolved
CROP AND RENEW APPROXIMATELY 3' OF SHEER STRAKE WHERE WASTED IN WAY OF RUB RAIL. AREA OF CONCERN IS IN NR2 COMPARTMENT IN WAY OF HOLDING TANK. TEMPORARY REPAIRS SHALL BE MADE AS SOON AS POSSIBLE TO MAINTAIN WATERTIGHT INTEGRETITY. TEMPORARY REPAIRS PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 13 August 1987
Resolved 13 August 1987
Engineering
Issued 13 August 1987 Resolved
PROVIDE CG APPROVED FUEL HOSES FOR ALL FUEL LINES TO MAIN PROPULSION AND DIESEL GENERATOR. ALSO INSTALL FUEL SHUT OFF CLOSE TO FUEL FILTERS ON ALL THREE DIESEL ENGINES.
Condition: Unknown
Due 13 August 1987
Resolved 13 August 1987
Construction/Loadline
Issued 13 August 1987 Resolved
PROVIDE MEANS OF SECURING FORWARD HATCH COVER.
Condition: Unknown
Due 13 August 1987
Resolved 13 August 1987
Construction/Loadline
Issued 13 August 1987 Resolved
RENEW/REPAIR BROKEN STRINGER IN STEERING COMPARTMENT. FIRST STRINGER ON PORT SIDE IS BROKEN.
Condition: Unknown
Due 13 August 1987
Resolved 13 August 1987
Construction/Loadline
Issued 13 August 1987 Resolved
MAKE STERNLIGHT IN TRANSOM WATERTIGHT.
Condition: Unknown
Due 13 August 1987
Resolved 13 August 1987
Unknown
Issued 25 September 1986 Resolved
RENEW/REPAIR AS NECESARY THE STERN LIGHT. ABOVE REQUIREMENT IS TO BE COMPLETED TO THE SATISFACTION OF A MARINE INSPECTOR NOT LATER THAN 25OCT86.
Condition: Unknown
Due 25 September 1986
Resolved 25 September 1986
Lifesaving
Issued 27 November 1984 Resolved
D-5 PROVIDE SIX ORANGE AND SIX RED FLARES.
Condition: Unknown
Due 27 November 1984
Resolved 27 November 1984
Construction/Loadline
Issued 27 November 1984 Resolved
D-1 REPAIR FWD HATCH COVER.
Condition: Unknown
Due 27 November 1984
Resolved 27 November 1984
Lifesaving
Issued 27 November 1984 Resolved
D-2 REPAIR OR REPLACE RINGBUOY.
Condition: Unknown
Due 27 November 1984
Resolved 27 November 1984
Fire Fighting
Issued 27 November 1984 Resolved
D-3 HAVE FIRE EXTINGUISHERS SERVICED.
Condition: Unknown
Due 27 November 1984
Resolved 27 November 1984
Engineering
Issued 27 November 1984 Resolved
D-4 LABEL EMERGENCY FUEL SHUT OFFS.
Condition: Unknown
Due 27 November 1984
Resolved 27 November 1984

Casualty record · 1

7 September 2022Routine · role: Involved in a Marine Casualty · activity 7554305
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.