Inspection history · 80
20 July 2007
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3001282
19 March 2007
Permit to Proceed
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2890421
5 January 2007
Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 2850762
5 January 2006
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2561686
9 November 2005
Annual Inspection · MTSA Verification
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2531438
10 October 2005
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2511396
14 December 2004
MTSA Verification · Periodic Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2258829
8 June 2004
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2077468
9 December 2003
MTSA Verification · Examination of Repairs · Annual Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1961269
18 August 2003
Examination of Repairs · Damage Survey
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1880028
2 July 2002
Annual Inspection · Internal Structural Exam
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1639304
12 April 2002
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1604045
29 March 2002
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1599012
27 March 2002
Damage Survey
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1598660
19 September 2001
COI Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1460571
25 April 2001
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1061822
12 January 2001
Re-Inspection · Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1420458
4 October 1999
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1042886
24 September 1999
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1397245
14 September 1999
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 677773
8 September 1999
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1119573
1 September 1999
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 199662
1 September 1999
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 217362
1 September 1999
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1442883
25 July 1999
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1106393
28 October 1998
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 502528
28 September 1998
Administrative
Administrative · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 804724
16 September 1998
Examination of Repairs
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 798929
7 September 1998
Re-Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1447863
7 April 1998
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 753558
6 April 1998
Type not recorded
No type recorded · MSD PEORIA · USCG Heartland District (CGD-H) · Activity 195498
26 September 1997
Hull Examination · COI Inspection
Physical examination · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 1421399
11 November 1996
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1413129
2 April 1996
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1078881
30 March 1996
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 162425
30 March 1996
Damage Survey
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1390232
7 February 1996
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1189679
23 January 1996
Permit to Proceed
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1459971
1 April 1995
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 477604
26 March 1995
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 78723
9 November 1994
Type not recorded
No type recorded · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 514862
22 April 1994
Deficiency Check
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1420858
26 January 1994
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1409069
21 November 1993
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 481801
1 November 1993
Damage Survey
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1147803
26 February 1993
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1148192
16 January 1993
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 540683
3 April 1992
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 453603
13 March 1992
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 956779
19 December 1991
Administrative
Administrative · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1264962
23 June 1991
Type not recorded
No type recorded · MSO CHICAGO · USCG Great Lakes District (CGD-GL) · Activity 513725
24 January 1991
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 909378
16 December 1990
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 512600
15 October 1990
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 916188
5 October 1990
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 518906
21 March 1990
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 509115
10 January 1990
Examination of Repairs
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 906518
13 December 1989
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1238480
31 October 1989
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 485712
5 May 1989
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 507156
25 October 1988
COI Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1202675
4 September 1988
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 471430
1 February 1988
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 492254
29 January 1988
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1021548
29 January 1988
MARPOL Annex II Examination
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1322599
4 May 1987
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 462162
21 April 1987
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1004062
2 March 1987
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 448177
2 March 1987
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1014851
19 January 1987
Examination of Repairs · Hull Examination
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1007148
18 November 1986
COI Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1326256
15 May 1986
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 524538
21 March 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 999596
21 January 1986
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 992416
2 March 1985
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 978212
9 February 1985
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 516668
1 December 1984
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1283813
27 November 1984
Type not recorded
No type recorded · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 535090
6 October 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 964980
8 December 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 967555
Construction/Loadline › Hull › Bottom Plating
Issued 8 June 2004
Resolved
Port transition knuckle crushed / fractured.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 June 2004
Resolution: 2'' x 3'' knuckle insert.
Construction/Loadline › Hull
Issued 13 August 2003
Resolved
Knuckle damaged from an earlier collision. LEGACY COMPONENT DESC: Hull Plating
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 22 August 2003
Resolved 16 August 2003
Resolution: Conducted repair check of the renewed knuckle plating 1/2"X6''X17''3", all sat.
Engineering › Diesel Engine (auxiliary)
Issued 22 August 2002
Resolved
Install fan guard between generator and prime mover.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 23 August 2002
Engineering › Diesel Engine (auxiliary)
Issued 22 August 2002
Resolved
Hard pipe fuel supply to prime mover so length does not exceed 30 in. IAW 46 CFR 56.60-25(b)(4)
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 23 August 2002
Engineering › Steam Boiler (auxiliary/waste heat)
Issued 22 August 2002
Resolved
Replace lagging and shielding on TFH piping. LEGACY COMPONENT DESC: Piping
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 23 August 2002
Construction/Loadline › Structures
Issued 22 August 2002
Resolved
Repair trunk ladder - port/stern
Action required: 705 - Other - as specified
Resolved 23 August 2002
Engineering › Diesel Engine (auxiliary)
Issued 22 August 2002
Resolved
Repair mounting bolts for generator mount to bed. LEGACY COMPONENT DESC: Bedplate
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 23 August 2002
Engineering › Diesel Engine (auxiliary)
Issued 22 August 2002
Resolved
Install pulley for prime mover emergency shutdown at engine instead of running cable through lift eye.
Action required: 705 - Other - as specified
Resolved 23 August 2002
Deck/Cargo › Holds/Tanks
Issued 22 August 2002
Resolved
Replace all missing and worn gaskets on hatches to voids and cargo tanks. LEGACY COMPONENT DESC: Hatch
Action required: 705 - Other - as specified
Resolved 23 August 2002
Construction/Loadline › Structures
Issued 22 August 2002
Resolved
Ensure all gooseneck vents have vent screens without holes and not restricted by paint or tape.
Action required: 705 - Other - as specified
Resolved 23 August 2002
Deck/Cargo › Holds/Tanks
Issued 22 August 2002
Resolved
Clean vent screens on PV Valves LEGACY COMPONENT DESC: Valve, Pressure Vacuum Relief
Action required: 705 - Other - as specified
Resolved 23 August 2002
Pollution Prevention/Response › Prevention Equipment
Issued 22 August 2002
Resolved
Reattach containment box under starboard cargo transfer pipe flanges (2 bolts missing). LEGACY COMPONENT DESC: Fixed Containment
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 23 August 2002
Construction/Loadline › Structures
Issued 22 August 2002
Resolved
Replace missing dogs and make dogs usable. LEGACY COMPONENT DESC: Scuttle
Action required: 705 - Other - as specified
Resolved 23 August 2002
Pollution Prevention/Response › Prevention Equipment
Issued 22 August 2002
Resolved
Make plugs for coaming containment available. LEGACY COMPONENT DESC: Drains/Scuppers (means of closure)
Action required: 705 - Other - as specified
Resolved 23 August 2002
Construction/Loadline › Structures
Issued 22 August 2002
Resolved
Remove fuel tank on stern that is not in use.
Action required: 705 - Other - as specified
Resolved 23 August 2002
Construction/Loadline › Hull
Issued 2 July 2002
Resolved
Make repairs to fractured framing/supports in #2 stbd hopper void from centerline to stbd side as needed. Also, secure ladder into #2 stbd. LEGACY COMPONENT DESC: Stiffener
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 22 August 2002
Construction/Loadline › Hull
Issued 2 July 2002
Resolved
Make repairs/crop-renew in #3 P/S hopper void, as marked, #3P 8-11 bays from fwd bulkhead on centerline as marked, #3P 16-19 bays from fwd bulkhead on centerline as marked, #3P 7-9 bays from aft bulkhead on centerline as marked, #3S Crop & renew 04 angles under cargo tank as marked. LEGACY COMPONENT DESC: Side Shell
Action required: 705 - Other - as specified
Resolved 22 August 2002
Construction/Loadline › Hull
Issued 2 July 2002
Resolved
Crop & insert to good steel holed deck in #1 stbd void. LEGACY COMPONENT DESC: Hull Plating
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 22 August 2002
Construction/Loadline › Hull
Issued 2 July 2002
Resolved
#2P - Make repairs to bent and/or fractured framing & supports in #2P void from centerline to port side as marked. LEGACY COMPONENT DESC: Stiffener
Condition: Unknown
Action required: 705 - Other - as specified
Due 22 August 2002
Resolved 22 August 2002
Construction/Loadline › Hull
Issued 2 July 2002
Resolved
Bowrake - Make repairs to 4 broken welds (marked) on supports. Also, crop & renew wasted deck support along centerline. LEGACY COMPONENT DESC: Stiffener
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 22 August 2002
Construction/Loadline › Hull
Issued 2 July 2002
Resolved
Insert between bow rake and #1 void - repair 10 pinholes in weld. LEGACY COMPONENT DESC: Weld
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 31 July 2002
Resolution: Inspectors A. Gross and M. Kicklighter attended vessel on 31 Jul 02 and hose tested insert. Test sat.
Construction/Loadline › Hull
Issued 2 July 2002
Resolved
11 p/u welds in #1 port wing tank as marked. LEGACY COMPONENT DESC: Stiffener
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 22 August 2002
Construction/Loadline › Hull
Issued 2 July 2002
Resolved
4 p/u welds in #1 stbd wing tank as marked. LEGACY COMPONENT DESC: Stiffener
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 22 August 2002
Construction/Loadline › Hull
Issued 2 July 2002
Resolved
6 p/u welds in stern rake as marked. LEGACY COMPONENT DESC: Stiffener
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 22 August 2002
Construction/Loadline › Hull
Issued 2 July 2002
Resolved
Weld corner bracket on stbd side of stern rake. LEGACY COMPONENT DESC: Bracket
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 22 August 2002
Construction/Loadline › Hull
Issued 2 July 2002
Resolved
Air/water test welds on inserts on Port sponson tank (1 between #2 void, 2 on deck), and all new bottom knuckle.
Hose test bottom knuckle 08 Jul 02 sat (M. Marlow, M. Kicklighter, R. Mayer). Hose tested inserts in Port Sponson on deck 09 Aug 02 (G. Winters, M. Kicklighter).
LEGACY COMPONENT DESC: Weld
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 9 August 2002
Construction/Loadline › Hull
Issued 2 July 2002
Resolved
Resolve issue with binding angle with USCG, as discussed. LEGACY COMPONENT DESC: Hull Plating
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 22 August 2002
Engineering › Steam Boiler (auxiliary/waste heat)
Issued 2 July 2002
Resolved
Submit plans for new thermal fluid heater and increased diesel fuel tank size to the USCG MSC for approval.
Action required: 705 - Other - as specified
Resolved 2 December 2002
Construction/Loadline › Hull
Issued 10 April 2002
Resolved
Renew all knuckle palte or prove knuckle meets minimum scantlings, Prior to loading cargo. LEGACY COMPONENT DESC: Hull Plating
Condition: Damaged By Earlier Event
Due 10 May 2002
Resolved 22 August 2002
Construction/Loadline › Structures
Issued 10 April 2002
Resolved
Conduct an Internal Structural Examination. prior to loading cargo.
Due 10 May 2002
Resolved 2 December 2002
Construction/Loadline › Hull
Issued 10 April 2002
Resolved
Repair stress fractures on Port and Stbd main deck at the void 1/2 bulkhead, prior to loading cargo. LEGACY COMPONENT DESC: Hull Plating
Due 10 May 2002
Resolved 22 August 2002
Construction/Loadline › Hull
Issued 10 April 2002
Resolved
Renew wasted and holed gunwale plate void 2 Port, prior to loading cargo.
Due 10 May 2002
Resolved 22 August 2002
Engineering › Steam System (auxiliary)
Issued 10 April 2002
Resolved
Prove proper operation of the thermal fluid heater and open for inspection, prior to operating the system.
Condition: Damaged By Earlier Event
Due 10 May 2002
Resolved 2 December 2002
Construction/Loadline › Hull
Issued 27 March 2002
Resolved
Make permanent repairs in way of breach of hull prior to operation, to the satisfaction of attending Coast Guard Marine Inspector. LEGACY COMPONENT DESC: Bottom Plating
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 March 2002
Resolved 10 April 2002
Resolution: Plate renewed in Void 3 stbd.
Engineering
Issued 12 January 2001
Resolved
INSTALL FUEL-OIL CUTOFF VALVE, IN CARGO PUMP PRIME MOVER SUPPLY LINE, AS CLOSE TO THE PRIME MOVER CARBURETOR AS POSSIBLE IN ACCORDANCE WITH 46 CFR 56.50-75(a).
Condition: Unknown
Due 12 January 2001
Resolved 30 January 2001
Construction/Loadline
Issued 12 January 2001
Resolved
REPLACE WATERTIGHT GASKET ON THE #2 PORT WING TANK WITH NEW WATERTIGHT GASKET.
Condition: Unknown
Due 12 January 2001
Resolved 30 January 2001
Construction/Loadline
Issued 12 January 2001
Resolved
REPLACE BRASS NUTS ON HATCH COVER TIE DOWN STUDS, FOR #1, #2, #3 PORT WING VOIDS, WITH DOGS.
Condition: Unknown
Due 12 January 2001
Resolved 30 January 2001
Construction/Loadline
Issued 12 January 2001
Resolved
GOUGE AND REWELD BILGE KNUCKLE SEAM IN #1 PORT WING VOID. PROVE PROPER WATERTIGHT INTEGRITY OF WELD TO ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 12 January 2001
Resolved 30 January 2001
Deck/Cargo
Issued 24 September 1999
Resolved
CONDUCT SATISFACTORY TEST OF THERMAL FLUID HEATER PRIOR TO OPERATION
Condition: Unknown
Due 24 September 1999
Resolved 24 September 1999
Navigation
Issued 24 September 1999
Resolved
AFFIX STBD BOW LIGHT SCREEN TO MEET INLAND NAVIGATION RULES PRIOR TO NIGHT TIME OPERATION OR REDUCED VISIBILITY OPERATION OR N.L.T. 24 OCT 99.
Condition: Unknown
Due 24 September 1999
Resolved 24 September 1999
Construction/Loadline
Issued 1 September 1999
Resolved
Renew missing dogs on hatch void covers; (04) total. Item to be completed NLT 15 Sep 99.
Condition: Unknown
Due 1 September 1999
Resolved 1 September 1999
Fire Fighting
Issued 1 September 1999
Resolved
Provide inspected fire extinguishing equipment in compliance with vessel COI. Item to be completed prior to transferring cargo or NLT 15 Sep 99.
Condition: Unknown
Due 1 September 1999
Resolved 1 September 1999
Deck/Cargo
Issued 7 September 1998
Resolved
INVESTIGATE AND CORRECT SOURCE OF LEAKAGE INTO #3STBD VOID PRIOR TO CONDUCTING OPERATIONS.
Condition: Unknown
Due 8 September 1998
Resolved 8 September 1998
Construction/Loadline
Issued 7 September 1998
Resolved
MAKE 2ND HACTH FWD OF STERN OF VESSEL PORTSIDE WATER TIGHT. PROVE SAME TO_x001C_ SATISFACTION OF MARINE INSPECTOR.
Condition: Unknown
Due 8 September 1998
Resolved 8 September 1998
Construction/Loadline
Issued 11 November 1996
Resolved
Remove all cargo from double bottom void spaces. Upon removal of cargo, make the vsl ready for an internal structural exam. This requirement is tobe completed to the satisfaction of the attending U.S. Coast Guard Inspector. To be completed prior to vsl leaving the Port of Greenville, MS
Condition: Unknown
Due 11 November 1996
Resolved 11 November 1996
Construction/Loadline
Issued 30 March 1996
Resolved
PORT BOW VOID BILGE KNUCKLE IS FRACTURED AND HOLED APPROXIMATELY 8'0" X 1'6", 2'-3' ABOVE THE WATERLINE. GAS FREE THE VESSEL AND MAKE PERMANENT REPAIRS TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR PRIOR TOLOADING THE NEXT CARGO.
Condition: Unknown
Due 30 March 1996
Resolved 30 March 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Crop to good metal and renew as original the deck longitudinal in stern void at manhole, stbd side.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Crop to good metal and renew as original the deck longitudinal in #5 stbd wing void, stbd side.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Electrical
Issued 23 January 1996
Resolved
In thermal fluid heater house, port side bulkhead, fwd electrical panel in vicinity of generator, blank off empty spaces and label circuit breakers.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Electrical
Issued 23 January 1996
Resolved
Replace renewable link fuses with one time fuses in generator jumper panel box on port side of thermal fluid heater house.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Engineering
Issued 23 January 1996
Resolved
Remove thermal fluid heater aft inspection port for viewing of heating coils and refractory by USCG marine inspector._x001C_
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Engineering
Issued 23 January 1996
Resolved
Prove proper operation of thermal fluid heater and conduct operational testing of safety controls in presence of marine inspector.
Condition: Unknown
Due 24 January 1996
Resolved 9 February 1996
Engineering
Issued 23 January 1996
Resolved
Prove proper operation of generator and remote shutdown in presence of USCGmarine inspector.
Condition: Unknown
Due 24 January 1996
Resolved 9 February 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Make permanent repairs to 7 pinhole leaks and one 3" crack in stbd sideshell at #4 bay where marked in bow rake and one pinhole in port sideshell at deck lap in #2 bay.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Make permanent repairs to aft diagonal in bow rake, midbay, stbd of manhole. Diagonal is broken, midway section.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Refit/weld #7 & 8 stbd web frames at #4 bay in bow rake.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Replace as original #1 & 3 horizontal stiffener stbd side in bow rake.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Repair/replace bottom side long stbd side in bow rake.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Repair/replace transverse deck beam at bottom of ladder stbd side in bow rake.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Replace/renew corner brackets on stbd side in bow rake.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Repair/replace diagonal beams as needed throughout bow rake.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Repair/replace 1st transverse overhead beam on portside in bow rake.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Make bow rake safe for workers by certified marine chemist. Heard water leaking. Uncertain of location of leak. Bow rake to be inspected by USCG marine inspector after certified safe for workers by marine chemist._x001C_
Condition: Unknown
Due 25 January 1996
Resolved 9 February 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Repair/replace #2 & 3 horizontal stiffeners port side in bow rake._x001C_
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Repair/replace top side longitudinal port side in bow rake.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Repair/replace gussets port side as needed.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Repair 3" diameter hole in stbd center push knee.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Make permanent repairs to aft diagonal in bow rake, midbay, port of manhole. Diagonal is fractured and bent.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Accommodation/Occupational Safety
Issued 23 January 1996
Resolved
Crop and renew wasted ladder in #4 port manhole.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Deck/Cargo
Issued 23 January 1996
Resolved
Prove proper operation of cargo pump engine and remote shutdown in presenceof USCG marine inspector.
Condition: Unknown
Due 24 January 1996
Resolved 9 February 1996
Deck/Cargo
Issued 23 January 1996
Resolved
Gas free and clean in #4 port wing void in way of manhole to ascertain source of cargo leakage. Make permanent repairs to be inspected by USCG marine inspectors.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Construction/Loadline
Issued 23 January 1996
Resolved
Crop and renew upper 3 corner brackets port side aft corner in #5 port wingvoid.
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Accommodation/Occupational Safety
Issued 23 January 1996
Resolved
Renew ladder in way of #5 port wing void._x001C_
Condition: Unknown
Due 23 January 1996
Resolved 23 January 1996
Navigation
Issued 26 January 1994
Resolved
REPAIR NAVIGATION LIGHT WIRING IN BOW VOID. CENTER LIGHT - REPLACE OLD SECTION OF WIRE, NEW WIRE TO BE SPLICED IN JUNCTION BOX. P/S LIGHTS - ADD JUNCTION BOXES, EXISTING WIRE TO BE SPLICED WITHIN THE JUNCTION BOXES.
Condition: Unknown
Due 26 January 1994
Resolved 26 January 1994
Engineering
Issued 26 January 1994
Resolved
STENCIL BULKHEAD ADJACENT TO DIESEL FUEL TANK VENT SO AS TO INDICATE THE LOCATION OF THE VENT.
Condition: Unknown
Due 26 January 1994
Resolved 26 January 1994
Engineering
Issued 26 January 1994
Resolved
REPLACE MISSING LAGGING ON THERMAL FLUID HEATER PIPING.
Condition: Unknown
Due 26 January 1994
Resolved 26 January 1994
Construction/Loadline
Issued 26 January 1994
Resolved
REMOVE OIL WATER SLOPS IN VOID SPACE LOCATED UNDER THE THERMAL FLUID HEATERCOMPARTMENT.
Condition: Unknown
Due 26 January 1994
Resolved 26 January 1994
Deck/Cargo
Issued 26 January 1994
Resolved
REMOVE SLOP OIL AND WATER FROM CONTAINMENT AREA LOCATED AROUND VESSEL'S CARGO PUMP.
Condition: Unknown
Due 26 January 1994
Resolved 26 January 1994
Electrical
Issued 13 December 1989
Resolved
REPAIR OR REMOVE ELECTRICAL PLUG AT AFT STBD CORNER OF TANK TOP. 46 CFR 111.60
Condition: Unknown
Due 13 December 1989
Resolved 13 December 1989
Deck/Cargo
Issued 13 December 1989
Resolved
MAKE PERMANENT REPAIRS TO PUMP ENGINE EMERGENCY SHUTDOWN CABLE. 46 CFR 32.50-35
Condition: Unknown
Due 13 December 1989
Resolved 13 December 1989
Deck/Cargo
Issued 13 December 1989
Resolved
INSTALL FLAME SCREENS IN VENTS FOR DIESEL DECK TANK AND DAY TANK ON OPEN DECK ON STERN OF VESSEL. 46 CFR 32.55
Condition: Unknown
Due 13 December 1989
Resolved 13 December 1989
Construction/Loadline
Issued 13 December 1989
Resolved
MAKE STBD PUMP VOID AVAILABLE FOR INSPECTION INTERNALLY DUE TO POSSIBLE PRODUCT IN VOID BOTTOM. INSPECTION TO BE DONE BY A USCG MARINE INSPECTOR. 46 CFR 31.10-17
Condition: Unknown
Due 13 December 1989
Resolved 13 December 1989
Construction/Loadline
Issued 13 December 1989
Resolved
MAKE REPAIRS TO SEVERAL FRACTURES TO SIDE PLATING AT PORT AND STBD BOW RAKEFWD CORNERS. REPAIRS TO BE APPROVED AND COMPLETED TO SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 13 December 1989
Resolved 13 December 1989
Construction/Loadline
Issued 13 December 1989
Resolved
MAKE REPAIRS TO FRACTURED WELDS IN INSERT ON DECK STBD SIDE FWD END OF #1S WING VOID.
Condition: Unknown
Due 13 December 1989
Resolved 13 December 1989
Construction/Loadline
Issued 13 December 1989
Resolved
MAKE REPAIRS TO FRACTURE AT #3P WING VOID MANHOLE AT GUNWALE IN SIDE SHELL.REPAIRS TO BE MADE TO SATISFACTION OF ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 13 December 1989
Resolved 13 December 1989
Electrical
Issued 25 October 1988
Resolved
REPLACE SHORE TIE ELECTRICAL CONNECTION (RECEPICLE) ON STERN OF GENERATOR HOUSE.
Condition: Unknown
Due 25 October 1988
Resolved 25 October 1988
Construction/Loadline
Issued 25 October 1988
Resolved
REMOVE PRODUCT, OR WASTE OIL, FROM #2S WING VOID AND PROVE ADJACENT TANK TIGHT.
Condition: Unknown
Due 25 October 1988
Resolved 25 October 1988
Deck/Cargo
Issued 2 March 1987
Resolved
PROVIDE EVIDENCE THAT THE PIPING HAS BEEN TESTED IN THE PAST YEAR OR TEST CARGO PIPING @ 1.5 TIMES THE MAWP.
Condition: Unknown
Due 2 March 1987
Resolved 2 March 1987
Deck/Cargo
Issued 2 March 1987
Resolved
REPAIR OR REPLACE PRESSURE GAUGE ON DISCHARGE SIDE OF CARGO PIPING.
Condition: Unknown
Due 2 March 1987
Resolved 2 March 1987
Electrical
Issued 18 November 1986
Resolved
PROVIDE AND INSTALL INSULATION ON THE GENERATOR EXHAUST SYSTEM. REPAIRS TO BE MADE AT NEXT GAS FREE CONDITION OF VESSEL OR PRIOR TO ASSIGNED COMPLIANCE DATE.
Condition: Unknown
Due 18 November 1986
Resolved 18 November 1986
Electrical
Issued 18 November 1986
Resolved
REWIRE THE VENT FAN ELECTRIC START SWITCH BOX AT NEXT GAS FREE CONDITION OF VESSEL OR PRIOR TO ASSIGNED COMPLIANCE DATE.
Condition: Unknown
Due 18 November 1986
Resolved 18 November 1986
Deck/Cargo
Issued 18 November 1986
Resolved
REPLACE ALL PRESSURE-VACUUM VALVES AT NEXT GAS FREE CONDITION OF VESSEL OR PRIOR TO ASSIGNED COMPLIANCE DATE.
Condition: Unknown
Due 18 November 1986
Resolved 18 November 1986
Construction/Loadline
Issued 18 November 1986
Resolved
MAKE TEMPORARY REPAIRS TO THE STARBOARD BOW RAKE SIDE SHELL SIX FEET BACK FROM HEADLOG UNTIL PERMANENT REPAIRS CAN BE MADE AT NEXT GAS FREE CONDITIONOF VESSEL OR PRIOR TO ASSIGNED COMPLIANCE DATE.
Condition: Unknown
Due 18 November 1986
Resolved 18 November 1986
Construction/Loadline
Issued 18 November 1986
Resolved
MAKE TEMPORARY REPAIRS TO THE PORT BOW RAKE SIDE SHELL BETWEEN SIX FEET ANDEIGHT FEET BACK FROM HEADLOG UNTIL PERMANENT REPAIRS CAN BE MADE AT NEXT GAS FREE CONDITION OF VESSEL OR PRIOR TO ASSIGNED COMPLIANCE DATE.
Condition: Unknown
Due 18 November 1986
Resolved 18 November 1986
Deck/Cargo
Issued 18 November 1986
Resolved
OPEN THERMAL FLUID HEATER FOR INTERNAL EXAM BY A COAST GUARD MARINE INSPECTOR. REPAIRS TO BE MADE AT NEXT GAS FREE CONDITION OF VESSEL OR PRIOR TO ASSIGNED COMPLIANCE DATE.
Condition: Unknown
Due 18 November 1986
Resolved 18 November 1986
Deck/Cargo
Issued 18 November 1986
Resolved
OPEN AIR RECEIVER FOR INTERNAL EXAM BY A COAST GUARD MARINE INSPECTOR. REPAIRS TO BE MADE AT NEXT GAS FREE CONDITION OF VESSEL OR PRIOR TO ASSIGNED COMPLIANCE DATE.
Condition: Unknown
Due 18 November 1986
Resolved 18 November 1986
Electrical
Issued 18 November 1986
Resolved
PROVIDE AND INSTALL ELECTRICAL PANEL BOX BLANK FOR GENERATOR SWITCH BOARD. REPAIRS TO BE MADE AT NEXT GAS FREE CONDITION OF VESSEL OR PRIOR TO ASSIGNED COMPLIANCE DATE.
Condition: Unknown
Due 18 November 1986
Resolved 18 November 1986
Deck/Cargo
Issued 18 November 1986
Resolved
RENEW RELIEF VALVE ON THE AIR RECEIVER. REPAIRS TO BE MADE AT NEXT GAS FREE CONDITION OF VESSEL OR PRIOR TO ASSIGNED COMPLIANCE DATE.
Condition: Unknown
Due 18 November 1986