Records from 1998 to 2011. Most recent: inspection, 26 July 2011.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 28
26 July 2011
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4094923
21 July 2011
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3977353
15 September 2010
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3850344
24 March 2008
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3221069
28 February 2008
MARPOL Annex I Examination · Administrative Inspection · MTSA/ISPS Verification · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3155358
31 May 2007
Hull Examination · Internal Structural Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2976772
17 May 2007
MTSA/ISPS Verification · Administrative Inspection · Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2940211
7 May 2006
Cargo Tank Internal · Periodic Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2672306
26 September 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2501692
19 July 2005
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2432026
20 June 2005
Annual Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2390667
16 February 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2293985
18 October 2004
MTSA/ISPS Verification · In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2222991
14 October 2004
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2220840
25 May 2004
MARPOL Annex I Examination · Annual Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2077506
12 March 2004
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2023248
12 March 2004
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2023418
3 November 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1979592
12 June 2003
Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1816103
6 March 2003
MARPOL Annex I Examination
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1753352
14 November 2002
Deficiency Check
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1705864
21 October 2002
Annual Inspection
Physical examination · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1693708
18 October 2002
Type not recorded
No type recorded · MSU LAKE CHARLES · USCG Heartland District (CGD-H) · Activity 1693281
3 December 2001
Hull Examination · Re-Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 1431132
24 October 2000
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1427915
21 December 1999
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 811679
30 November 1999
Deficiency Check · Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1399237
6 November 1998
Inclining Experiment · Initial Certification · Initial Construction-Excluding Oversight
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1390865
Engineering › Bilge Water Management System › Strainer
Issued 31 May 2007
Resolved
Install new 4" check valve for the bilge/ballast seachest located in STBD side engine room.
Action required: 705 - Other - as specified
Due 27 June 2007
Resolved 27 June 2007
Construction/Loadline › Hull › Side Shell
Issued 31 May 2007
Resolved
Crop and insert approximately 24" x 18" of side shell where inset located on STBD aft corner knuckle.
Due 27 June 2007
Resolved 27 June 2007
Engineering › Pressure Vessel › Relief Valve
Issued 31 May 2007
Resolved
Provide test report for the dry bulk tanks relief valves.
Action required: 705 - Other - as specified
Due 27 June 2007
Resolved 27 June 2007
Engineering › Compressed Air System (start air) › Valve
Issued 6 June 2006
Resolved
Provide ASME pressure relief valves on both air bottles and the bulk cargo compressor.
Due 7 June 2006
Resolved 6 June 2006
Engineering › Generator (propulsion/auxiliary-electric) › Auto Transformer Circuitry
Issued 25 May 2004
Resolved
Repair fuel and water leak on stbd generator. Complete prior to operating generator. LEGACY COMPONENT DESC: Stbd Generator
Action required: 705 - Other - as specified
Resolved 10 June 2004
Resolution: Master sent fax attesting to repairs.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 25 May 2004
Resolved
Prove proper operation of switchboard ground fault system.
Action required: 705 - Other - as specified
Due 10 July 2004
Resolved 10 June 2004
Resolution: Master sent fax attesting to repairs.
Fire Fighting › Combustible Materials › Primary Deck Coverings
Issued 25 May 2004
Resolved
Remove fuel oil from Engine Room bilges. LEGACY COMPONENT DESC: Fuel Oil
Action required: 705 - Other - as specified
Due 10 July 2004
Resolved 25 June 2004
Resolution: Master sent fax attesting to repairs.
Engineering › Thrusters
Issued 21 October 2002
Resolved
Replace failed hose on starboard side of bow thruster unit. LEGACY COMPONENT DESC: Hose
Condition: Unknown
Due 21 November 2002
Resolved 14 November 2002
Resolution: New hose has been installed and witnessed under pressure with no leakage.
Lifesaving › Launching Appliances
Issued 21 October 2002
Resolved
Replace expired hydrostatic release on EPIRB. LEGACY COMPONENT DESC: Hydrostatic release
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 21 October 2002
Resolved 21 October 2002
Resolution: Received fax documenting purchase of hydro release.
Fire Fighting › Structural Fire Protection - General
Issued 21 October 2002
Resolved
Replace Rox Blocks in gyro room. LEGACY COMPONENT DESC: Structural Bulkhead Construction
Condition: Unknown
Due 21 November 2002
Resolved 14 November 2002
Resolution: Rox blox has been reinstalled.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 21 October 2002
Resolved
Survey first aid kits for expired contents.
Condition: Improper/Lack of Maintenance
Due 21 November 2002
Resolved 21 October 2002
Resolution: Received fax verifying replacement of expired contents.
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 3 December 2001
Resolved
ADD 2 INCH EXTENTION TO LAST PIPING RUN IN PAINT LOCKER CO2 SYSTEM. LEGACY COMPONENT DESC: Piping
Condition: Unknown
Action required: 705 - Other - as specified
Due 3 January 2002
Resolved 5 December 2001
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Emergency Shut-down
Issued 3 December 2001
Resolved
REPAIR FUEL OIL CARGO PUMP RMOTE SHUT DOWN.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2002
Resolved 5 December 2001
Communications › Internal Communications System › Sound-powered Telephone
Issued 3 December 2001
Resolved
REPAIR SOUND POWERED PHONE LIGHT AND BELL IN RUDDER ROOM.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 3 January 2002
Resolved 4 December 2001
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 3 December 2001
Resolved
POST FUEL OIL AND LIQUID MUD TRANSFER PROCEDURES AT OPERATING STATION.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 January 2002
Resolved 4 December 2001
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 3 December 2001
Resolved
RENEW RETR-REFLECTIVE TAPE ON MAIN DECK LIFEBUOY.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 January 2002
Resolved 4 December 2001
Construction/Loadline › Hull
Issued 3 December 2001
Resolved
C&R INSET IWO FORWARD PORT BOW ABOVE KEEL. 32"X40"X3/8" INSERT WILL
MEET KEEL PLATE AND EXTEND UP 32 INCHES.
LEGACY COMPONENT DESC: Hull Plating
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 3 January 2002
Resolved 3 December 2001
Resolution: C&R INSET IWO FORWARD PORT BOW ABOVE KEEL. 32"X40"X3/8" INSERT WILL
MEET KEEL PLATE AND EXTEND UP 32 INCHES.
Communications › Radio Communications › Radiotelephone Transceiver (2-27.5 MHz)
Issued 3 December 2001
Resolved
REPAIR SINGLE SIDE BAND.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Due 3 January 2002
Resolved 4 December 2001
Construction/Loadline › Structures › Door
Issued 3 December 2001
Resolved
ADJUST WATER TIGHT DOORS THROUGH OUT VESSEL AND BOW HATCH.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 January 2002
Resolved 4 December 2001
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 3 December 2001
Resolved
PROVIDE AND INSTALL SEWAGE VENT FLAME SCREEN AND RENEW SEWAGE VENT FLAME SCREENS ON EXHAUST STACKS.
Condition: Unknown
Action required: 705 - Other - as specified
Due 3 January 2002
Resolved 4 December 2001
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 3 December 2001
Resolved
REPAIR EXHAUST LAGGING ON BOTH MAIN ENGINES. LEGACY COMPONENT DESC: Piping (exhaust)
Condition: Unknown
Action required: 705 - Other - as specified
Due 3 January 2002
Resolved 4 December 2001
Engineering › Fuel Oil Service System › Filter
Issued 3 December 2001
Resolved
PROVIDE AND INSTALL METAL PLUGS IN RACOR FILTER BOTTOMS FOR PORT GENERATOR AND STARBOARD MAIN ENGINE.
Condition: Unknown
Action required: 705 - Other - as specified
Due 3 January 2002
Resolved 4 December 2001
Communications › Internal Communications System › Engine Order Telegraph System
Issued 3 December 2001
Resolved
REPAIR LOUD HAILER SPEAKER IN RUDDER ROOM.
Condition: Unknown
Action required: 705 - Other - as specified
Due 3 January 2002
Resolved 4 December 2001
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 3 December 2001
Resolved
REPAIR PORT AFT MAIN DECK LIFEBUOY WATER LIGHT.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 January 2002
Resolved 4 December 2001
Lifesaving › Line-Throwing Appliances › Lines
Issued 3 December 2001
Resolved
PROVIDE AN AUXILIARY LINE FOR LINE THROWING APPLIANCE IAW 46 CFR 133.170.
Condition: Unknown
Action required: 705 - Other - as specified
Due 3 January 2002
Resolved 3 January 2002
Lifesaving › Line-Throwing Appliances
Issued 16 November 2001
Resolved
PROVIDE TWO ADDITIONAL IMPULSE GUNS.
Condition: Unknown
Action required: 705 - Other - as specified
Due 3 January 2002
Resolved 5 December 2001
Construction/Loadline
Issued 24 October 2000
Resolved
PMS hinges to WTD, 01 deck port forward. (WTD access to crew spaces.)
Condition: Unknown
Due 24 October 2000
Resolved 24 October 2000
Lifesaving
Issued 24 October 2000
Resolved
Stencil PFD with vessel's name.
Condition: Unknown
Due 24 October 2000
Resolved 24 October 2000
Navigation
Issued 24 October 2000
Resolved
Adjust/align the port and starboard steering repeaters located in the aft steering room.
Condition: Unknown
Due 24 October 2000
Resolved 24 October 2000
Electrical
Issued 24 October 2000
Resolved
Provide protective matting for the front and rear of emergency switchboard.
Condition: Unknown
Due 24 October 2000
Resolved 24 October 2000
Navigation
Issued 24 October 2000
Resolved
Ensure proper operation of fog light. Installed light is a non-marine light fixture.
Condition: Unknown
Due 24 October 2000
Resolved 24 October 2000
Engineering
Issued 24 October 2000
Resolved
Provide verification of proper operation of engine automated systems.
Condition: Unknown
Due 24 October 2000
Resolved 24 October 2000
Electrical
Issued 24 October 2000
Resolved
Replace/repair emergency generator hertz meter.
Condition: Unknown
Due 24 October 2000
Resolved 24 October 2000
Construction/Loadline
Issued 24 October 2000
Resolved
Repair stuffing tube to aft deck halogen wiring for lights.
Condition: Unknown
Due 24 October 2000
Resolved 24 October 2000
Deck/Cargo
Issued 30 November 1999
Resolved
Provide proof of pressure tests on the pressure relief valves (4) on dry bulk tanks.
Condition: Unknown
Due 30 November 1999
Resolved 30 November 1999
Deck/Cargo
Issued 30 November 1999
Resolved
Stencil or mark fuel/oil and hazmat hoses in accordance with 33 CFR 154.500.
Condition: Unknown
Due 30 November 1999
Resolved 30 November 1999
Electrical
Issued 30 November 1999
Resolved
Remove or provide junction box for dead end wire in electronics room, 2nd deck, and properly mount company (HESS) radio set.
Condition: Unknown
Due 30 November 1999
Resolved 30 November 1999
Deck/Cargo
Issued 30 November 1999
Resolved
Provide proof of hydrostatic test on fuel/oil and hazmat hoses.
Condition: Unknown
Due 30 November 1999
Resolved 30 November 1999
Engineering
Issued 30 November 1999
Resolved
Provide proof of test for engineering automation test procedures.
Condition: Unknown
Due 30 November 1999
Resolved 30 November 1999
Engineering
Issued 30 November 1999
Resolved
Post oil pollution placard.
Condition: Unknown
Due 30 November 1999
Resolved 30 November 1999
Accommodation/Occupational Safety
Issued 30 November 1999
Resolved
Post marpol V placard, (garbage placard).
Condition: Unknown
Due 30 November 1999
Resolved 30 November 1999
Lifesaving
Issued 30 November 1999
Resolved
Replace torn retro-reflective tape on all ring lifebuoys.
Condition: Unknown
Due 30 November 1999
Resolved 30 November 1999
Lifesaving
Issued 6 November 1998
Resolved
Provide proper liferaft launching instructions for type onboard vessl this is for ops/trainging manual.
Condition: Unknown
Due 6 November 1998
Resolved 6 November 1998
Navigation
Issued 6 November 1998
Resolved
Provide GMDSS installation report.
Condition: Unknown
Due 6 November 1998
Resolved 6 November 1998
Lifesaving
Issued 6 November 1998
Resolved
Install protective guards on open areas leading to shafts at forward end ofbulk room by steps leading to catwalk, port and starboard.
Condition: Unknown
Due 6 November 1998
Resolved 6 November 1998