Records from 1998 to 2008. Most recent: inspection, 15 December 2008.
Inspection history · 85
15 December 2008
Damage Survey · Administrative Inspection · In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3380118
21 August 2008
Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3305028
22 May 2008
Administrative Inspection · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3187011
10 March 2008
Periodic Inspection · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3150391
21 February 2008
In-Service Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3151365
28 December 2007
COI Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3093236
22 May 2007
Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2910333
30 March 2007
Damage Survey · Examination of Repairs · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2898647
30 March 2007
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2898712
22 March 2007
Administrative Inspection · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2868475
27 July 2006
Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2732846
15 May 2006
Administrative Inspection · Re-Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2649804
16 March 2006
MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2602901
14 September 2005
Re-Inspection
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 2492513
24 July 2005
Type not recorded
No type recorded · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 2440411
10 June 2005
Deficiency Check
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 2386064
17 May 2005
Periodic Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2359916
30 March 2005
MTSA Verification · Deficiency Check · Periodic Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2322421
7 March 2005
MTSA Verification
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 2305377
22 February 2005
Type not recorded
No type recorded · USCG Heartland District (dwb) · USCG Heartland District (CGD-H) · Activity 2297394
9 February 2005
Deficiency Check
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2289359
22 January 2005
Examination of Repairs · Deficiency Check · Damage Survey
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2279109
21 January 2005
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 2290124
30 December 2004
MTSA Verification · COI Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2265554
6 November 2004
Administrative Inspection
Administrative · MSO Paducah · USCG Heartland District (CGD-H) · Activity 2243015
28 October 2004
Type not recorded
No type recorded · USCG Heartland District (dwb) · USCG Heartland District (CGD-H) · Activity 2275391
27 September 2004
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2207115
21 June 2004
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 2110540
30 March 2004
Quarterly Examination
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2033022
14 January 2004
Hull Examination · Internal Structural Exam
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1984752
29 December 2003
COI Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1970524
22 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1969253
17 September 2003
Quarterly Examination
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 1906799
10 July 2003
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1886748
26 June 2003
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1867165
10 June 2003
Type not recorded
No type recorded · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1814354
25 March 2003
Quarterly Examination
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1762558
27 December 2002
COI Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1719634
1 October 2002
Re-Inspection
Physical examination · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 1683174
3 September 2002
Administrative Inspection
Administrative · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1670236
14 August 2002
Drydock Extension
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1661265
29 July 2002
Drydock Extension
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1653496
25 June 2002
Type not recorded
No type recorded · Marine Safety Detachment Cincinnati · USCG Heartland District (CGD-H) · Activity 1636916
27 March 2002
Deficiency Check
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1597967
19 March 2002
Quarterly Examination
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1494865
27 December 2001
Deficiency Check · COI Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 1473875
21 November 2001
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 772570
21 September 2001
Damage Survey
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1444623
14 September 2001
Re-Inspection
Physical examination · MSO MEMPHIS · USCG Heartland District (CGD-H) · Activity 1073314
22 June 2001
Re-Inspection
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1444550
13 June 2001
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1070631
2 April 2001
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1060564
22 March 2001
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1466754
28 January 2001
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1058578
26 January 2001
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1056739
23 October 2000
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1054746
17 October 2000
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1406808
19 September 2000
Re-Inspection
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1424996
28 June 2000
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1050964
22 June 2000
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1381961
15 June 2000
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1469628
26 April 2000
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1418696
28 February 2000
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1047012
7 February 2000
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 815321
26 January 2000
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1395604
21 January 2000
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 814587
30 December 1999
COI Inspection · Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1472359
1 October 1999
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1352828
29 September 1999
Deficiency Check
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1038866
28 September 1999
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1347587
19 August 1999
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1460334
8 July 1999
Deficiency Check
Physical examination · MSO Paducah · USCG Heartland District (CGD-H) · Activity 1091764
17 June 1999
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 213641
10 June 1999
Re-Inspection
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1421680
6 April 1999
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1122116
29 March 1999
Type not recorded
No type recorded · Marine Safety Detachment Greenville · USCG Heartland District (CGD-H) · Activity 427134
11 March 1999
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1453564
1 February 1999
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1395097
11 January 1999
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1045744
7 January 1999
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 810660
11 December 1998
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1413457
30 October 1998
Deficiency Check
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 1424664
15 October 1998
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 802326
11 September 1998
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 798640
11 September 1998
Initial Certification
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 799799
Construction/Loadline › Hull › Bottom Plating
Issued 19 December 2008
Resolved
See Condition of Operation Ltr in documents dated 19 Dec 2008
Condition: Damaged By Earlier Event
Due 27 December 2008
Resolved 28 December 2008
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 28 December 2007
Resolved
Provide proof of annual servicing for all fixed CO2 systems
Condition: Unknown
Due 29 December 2007
Resolved 29 December 2007
Resolution: Servicing report provided.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 22 May 2007
Resolved
Install Exhaust lagging on both MDE's.
Condition: Unknown
Due 22 May 2007
Resolved 22 May 2007
Resolution: Lagging installed.
Engineering › Diesel Engine (propulsion-reduction gear) › Crankcase
Issued 22 May 2007
Resolved
Make permanent repairs to holed oil cooler expanison tank on port MDE.
Condition: Unknown
Due 24 May 2007
Resolved 24 May 2007
Resolution: Pemanent reapirs completed.
Construction/Loadline › Hull › Hull Plating
Issued 30 March 2007
Resolved
Vessel allowed to transit from mm 114 to mm95 LMR LDB in reverse with all passenger moved form the barge De Soto to the Barge La Salle. Tug assist required by the M/V [name withheld]. Vessel to transit in daylight only and to remain at the Thalia Street Wharf mm 95 until plans for drydock confirmed. DMI to be contacted upon arrival and when repair facility dtermined.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 March 2007
Resolved 19 April 2007
Resolution: Repairs made to the satisfaction of the Marine Inspector
Engineering › Steering Gear System › Linkage
Issued 22 March 2007
Resolved
Repair coupling between motor and starboard steering pump and replace missing machinery guard.
Action required: 705 - Other - as specified
Due 1 May 2007
Resolved 23 April 2007
Resolution: Guard installed and coupling repaired
Accommodation/Occupational Safety › Occupational Safety › Welding/Hot Work
Issued 22 March 2007
Resolved
Properly secure oxygen bottle in tug engine room.
Action required: 705 - Other - as specified
Due 1 May 2007
Resolved 23 April 2007
Resolution: Bottle properly secured in E/R
Engineering › Lubricating Oil Storage/Transfer System › Tank
Issued 22 March 2007
Resolved
Remove buckets of oil from ltugs lower engineroom.
Action required: 705 - Other - as specified
Due 1 May 2007
Resolved 23 April 2007
Resolution: Oil poured into slop tank and buckets removed.
Accommodation/Occupational Safety › Occupational Safety › Rubbish/Waste Materials
Issued 22 March 2007
Resolved
Secure loose gear in bow thruster space including battery boxes, battery chargers, etc...
Action required: 705 - Other - as specified
Due 1 May 2007
Resolved 23 April 2007
Resolution: All gear properly stowed and lashed down.
Engineering › Thrusters › Gland
Issued 22 March 2007
Resolved
Repair thruster shaft packing to prevent excessice leaking.
Action required: 705 - Other - as specified
Due 1 May 2007
Resolved 23 April 2007
Resolution: Shaft re-packed
Electrical › Electric Supply System (service) › Cable
Issued 22 March 2007
Resolved
Properly route bow thruster compt. bilge pump wiring.
Action required: 705 - Other - as specified
Due 1 May 2007
Resolved 23 April 2007
Resolution: Wiring properly run and j-box installed.
Fire Fighting › Structural - A Class Divisions › Doors
Issued 22 March 2007
Resolved
Prove operation of remote operation of all fire screen doors.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 March 2007
Lifesaving › Launching Appliances › Winch
Issued 14 September 2005
Resolved
Renew cable wire on winch for rescue boat launching.
Condition: Unknown
Due 14 September 2005
Resolved 14 September 2005
Resolution: Replaced cable wire with new.
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 17 May 2005
Resolved
Prove proper operation of the overspeed shutdown on the Number 1 ship service diesel generator on the DE SOTO Barge.
Condition: Unknown
Due 17 June 2005
Resolved 10 June 2005
Resolution: Witnessed testing of the electronic overspeed shut down as sat.
Engineering › Fuel Oil Service System › Valve
Issued 9 February 2005
Resolved
Required to install a remote valve shut off on the deck of the [name withheld] to secure discharge from the fuel service tank.
Condition: Improper Installation
Due 31 March 2005
Resolved 30 March 2005
Resolution: Remote valve shut off installed on stbd side of [name withheld].
Communications › Alarms/Indicators › Fire Alarm
Issued 9 February 2005
Resolved
Provide audible and visual alarm at the operators station for the bow thruster engine space.
Condition: Improper Installation
Due 31 March 2005
Resolved 30 March 2005
Resolution: Audible and visible alarm operational in pilothouse.
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 9 February 2005
Resolved
Demonstrate procedures for dropping the emergency anchor.
Condition: Improper Installation
Due 31 March 2005
Resolved 30 March 2005
Resolution: The [name withheld] was moved to the port side of the vessel and the anchor made ready for dropping in 2 min 13 sec. The crew was well versed in what needed to be done to accomplish setting the anchor in case of emergency.
Engineering › Generator (propulsion-electric) › Winding
Issued 29 December 2004
Resolved
Repair/ replace #2 ship service diesel Generator starter.
Condition: Improper/Lack of Maintenance
Due 30 December 2004
Resolved 30 December 2004
Resolution: Diesel Generator operating properly.
Engineering › Generator (propulsion-electric) › Wiring
Issued 29 December 2004
Resolved
12/29/2004: Repair #2 ship service generator overspeed alarm system on the La Salle barge.
Condition: Improper/Lack of Maintenance
Due 30 December 2004
Resolved 30 December 2004
Resolution: Generator working properly.
Fire Fighting › Firemans Outfit › Self-Contained Breathing Apparatus
Issued 29 December 2004
Resolved
Prove proper operation of all SCBA's
Condition: Improper/Lack of Maintenance
Due 30 December 2004
Resolved 30 December 2004
Resolution: All SCBA''s in proper working order.
Construction/Loadline › Hull › Hull Plating
Issued 29 December 2004
Resolved
the Bow thruster barge [name withheld] must comply with all regulations of Sub chapter C.
Condition: Improper/Lack of Maintenance
Due 10 February 2005
Resolved 10 February 2005
Resolution: Other requirements have been issued to clarify deficiencies.
Engineering › Non-conventional Propulsion/Steering › Bearing, Main (cycloidal)
Issued 6 November 2004
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Action required: 705 - Other - as specified
Due 6 December 2004
Resolved 22 January 2005
Engineering › Pressure Vessel
Issued 29 December 2003
Resolved
Conduct internal examinations of pressure vessels in conjunction with the drydock and internal structural exam.
Due 29 January 2004
Resolved 5 January 2004
Resolution: Pressure vessels inspected, all sat.
Electrical
Issued 27 December 2002
Resolved
Locate / Remove ground faults on Lasalle and Desoto barge generators.
Action required: 705 - Other - as specified
Due 27 January 2003
Resolved 29 December 2003
Deck/Cargo › Cargo Stowage
Issued 27 December 2002
Resolved
Removes from stores from air handler in barge master's office
Action required: 705 - Other - as specified
Due 27 January 2003
Resolved 2 January 2003
Fire Fighting › Structural Fire Protection - General
Issued 27 December 2002
Resolved
Repair fire screen doors to galley.
Action required: 705 - Other - as specified
Due 27 January 2003
Resolved 2 January 2003
Engineering
Issued 27 December 2002
Resolved
Secure water comequipment second deck aft Lasalle barge and barge master's office.
Action required: 705 - Other - as specified
Due 27 January 2003
Resolved 2 January 2003
Engineering
Issued 21 November 2001
Resolved
MAKE PROPER REPAIRS TO, OR REPLACE PORT Z-PELLER UNIT.
Condition: Unknown
Due 13 February 2002
Resolved 1 March 2002
Resolution: REPAIRS COMPLETED AND Z-PELLER UNIT INSTALLED AND OPERATING.
Engineering
Issued 21 September 2001
Resolved
PORT Z-PELLER UNIT SUSTAINED CATASTROPHIC FAILURE. REQUIRES COMPLETE REPLACEMENT. SEE MINS FOR FURTHER DETAILS.
Condition: Unknown
Due 21 September 2001
Resolved 21 September 2001
Fire Fighting
Issued 26 January 2001
Resolved
ENSURE ALL FIRE SAFETY DOOR BOTTOMS HAVE A GAP LESS THAN 1/2".
Condition: Unknown
Due 31 March 2001
Resolved 29 December 2003
Fire Fighting
Issued 19 September 2000
Resolved
ENSURE ALL FIRST DECK EXTERIOR VENTS CLOSE PROPERLY.
Condition: Unknown
Due 19 September 2000
Resolved 19 September 2000
Electrical
Issued 19 September 2000
Resolved
Repair lube oil sending unit on LaSalle #1 main generator.
Condition: Unknown
Due 19 September 2000
Resolved 19 September 2000
Lifesaving
Issued 19 September 2000
Resolved
POST LIFEJACKET DONNING INSTRUCTIONS.
Condition: Unknown
Due 19 September 2000
Resolved 19 September 2000
Lifesaving
Issued 19 September 2000
Resolved
FIND REASON FOR BOTH SHORTED OUTLETS IN SKY DECK BAR AND REPAIR AS NEEDED.
Condition: Unknown
Due 19 September 2000
Resolved 19 September 2000
Electrical
Issued 19 September 2000
Resolved
REPAIR LUBE OIL AND FUEL OIL LEAKS ON DESOTO NO. 2 GENERATOR.
Condition: Unknown
Due 19 September 2000
Resolved 19 September 2000
Electrical
Issued 19 September 2000
Resolved
ENSURE ALL GAUGES ON EMERGENCY GENERATOR FUNCTION PROPERLY ON BOTH BARGES.
Condition: Unknown
Due 19 September 2000
Resolved 19 September 2000
Lifesaving
Issued 19 September 2000
Resolved
REPAIR SOUND POWERED PHONE IN [name withheld].
Condition: Unknown
Due 19 September 2000
Resolved 19 September 2000
Lifesaving
Issued 19 September 2000
Resolved
ENSURE ALL INTERIOR GARBAGE CANS ARE NON-COMBUSTIBLE.
Condition: Unknown
Due 19 September 2000
Resolved 19 September 2000
Fire Fighting
Issued 19 September 2000
Resolved
PROVE PROPER OPERATION OF FIRE SCREEN DOORS 2,3,4,6,11,12 AND 19.
Condition: Unknown
Due 19 September 2000
Resolved 19 September 2000
Electrical
Issued 19 September 2000
Resolved
LABEL ON EMERGENCY LIGHTS WITH "E" LABEL ON BOTH BARGES.
Condition: Unknown
Due 19 September 2000
Resolved 19 September 2000
Fire Fighting
Issued 19 September 2000
Resolved
ENSURE ALL FIRE SAFETY DOOR BOTTOMS HAVE A GAP LESS THAN 1/2".
Condition: Unknown
Due 19 September 2000
Resolved 19 September 2000
Accommodation/Occupational Safety
Issued 19 September 2000
Resolved
INSTALL ILLUMINATED "EXIT" SIGNS ABOVE DOORS IN SPRAGUE THEATER.
Condition: Unknown
Due 19 September 2000
Resolved 19 September 2000
Construction/Loadline
Issued 19 September 2000
Resolved
MOUNT SCHEMATIC OF BILGE PIPING SYSTEM, ABOVE THE BILGE MANIFOLD, ON BOTH BARGES.
Condition: Unknown
Due 19 September 2000
Resolved 19 September 2000
Fire Fighting
Issued 19 September 2000
Resolved
ENSURE BRIDGE FIRE ALARM SYSTEM SOUNDS LOUD ENOUGH FOR THE OPERATORS TO HEAR.
Condition: Unknown
Due 19 September 2000
Resolved 19 September 2000
Electrical
Issued 19 September 2000
Resolved
INSTALL ELECTRICAL BOX COVER ON FORWARD SIDE OF PORT SEWAGE TANK, ON DESOTOBARGE.
Condition: Unknown
Due 19 September 2000
Resolved 19 September 2000
Fire Fighting
Issued 26 April 2000
Resolved
INSULATE HVAC SPACE ON DESOTO BARGE 2ND DECK TO A-60. INSTALL SMOKE DETEDTOR IN HVAC SPACE AND HEAD (STORE ROOM) NEXT TO OFFICE SPACE. UPDATE FIRE SAFETY PLAN TO REFLECT ACTUAL USE OF SPACE.
Condition: Unknown
Due 26 April 2000
Resolved 26 April 2000
Unknown
Issued 21 January 2000
Resolved
Install <100 PSI/<212 F pressure/temperature relief valves on all hot waterheaters.
Condition: Unknown
Due 21 January 2000
Resolved 21 January 2000
Engineering
Issued 30 December 1999
Resolved
Repair stbd z-drive propulsion/steering unit to eliminate creep in the manual mode.
Condition: Unknown
Due 30 December 1999
Resolved 30 December 1999
Electrical
Issued 30 December 1999
Resolved
Remove plastic wire tie wraps and install corrosion resistant metal bandingon wire ways thoughout vessel iaw IEEE std 45.
Condition: Unknown
Due 30 December 1999
Resolved 30 December 1999
Engineering
Issued 30 December 1999
Resolved
Install <100psi/<212degree F pressure/temp relief valves on all hot water heaters.
Condition: Unknown
Due 30 December 1999
Resolved 30 December 1999
Fire Fighting
Issued 30 December 1999
Resolved
Provide proof of testing and annual servicing of fire detection system as per manufacturers specification and NFPA 72.
Condition: Unknown
Due 30 December 1999
Resolved 30 December 1999
Documentation
Issued 30 December 1999
Resolved
Provide muster list per 46CFR199.80
Condition: Unknown
Due 30 December 1999
Resolved 30 December 1999
Documentation
Issued 30 December 1999
Resolved
Provide onboard approved fire safety plan.
Condition: Unknown
Due 30 December 1999
Resolved 30 December 1999
Documentation
Issued 30 December 1999
Resolved
Provide proof of training and training aids per 46CFR199.180.
Condition: Unknown
Due 30 December 1999
Resolved 30 December 1999
Electrical
Issued 30 December 1999
Resolved
Prove proper operation of each generator starting system (6 starts without starting aids)
Condition: Unknown
Due 30 December 1999
Resolved 30 December 1999
Electrical
Issued 30 December 1999
Resolved
Lable electrical panels inside and out.
Condition: Unknown
Due 30 December 1999
Resolved 30 December 1999
Engineering
Issued 19 August 1999
Resolved
MAKE REPAIRS TO AND DEMONSTRATE PROPER OPERATION OF ALL LOW LUBE OIL AND HIGH JACKETWATER TEMP SHUTDOWNS AND ALARMS ON ALL 6 DIESEL GENS.
Condition: Unknown
Due 19 August 1999
Resolved 19 August 1999
Fire Fighting
Issued 19 August 1999
Resolved
SERVICE FIXED CO2 SYSTEMS TO INCLUDE TEST OF PNUEMATIC SWITCHES, TIME DELAYS, SIRENS AND NOZZLES.
Condition: Unknown
Due 19 August 1999
Resolved 19 August 1999
Fire Fighting
Issued 19 August 1999
Resolved
CONNECT PNUEMATIC SWITCHES IN EMERGENCY GEN ROOMS TO SHUT DOWN GENS AND VENTILATION.
Condition: Unknown
Due 19 August 1999
Resolved 19 August 1999
Engineering
Issued 19 August 1999
Resolved
MAKE REPAIRS TO AND PROVE PROPER OPERATION OF OVERSPEED TRIPS ON BOTH NR 1 DIESEL GENS.
Condition: Unknown
Due 19 August 1999
Resolved 19 August 1999
Engineering
Issued 10 June 1999
Resolved
REPAIR THE OVERSPEED ALARM INDICATION FOR THE NUMBER 1 GENERATOR ABOARD DESOTO.
Condition: Unknown
Due 10 June 1999
Resolved 10 June 1999
Engineering
Issued 10 June 1999
Resolved
MAKE OPERABLE THE LOW LUBE OIL PRESSURE ALARM ON THE NUMBER 1 GENERATOR ON THE LASALLE.
Condition: Unknown
Due 10 June 1999
Resolved 10 June 1999
Engineering
Issued 10 June 1999
Resolved
PROVIDE AND INSTALL THE FLAME IMPINGEMENT BOWLS FOR THE RACOR FUEL FILTERS FOR THE EMERGENCY GENERATORS ABOARD LASALLE AND DESOTO.
Condition: Unknown
Due 10 June 1999
Resolved 10 June 1999
Electrical
Issued 11 March 1999
Resolved
REPAIR OVERHEAD INSULATION IN GENERATOR ROOM. INSULATION ON EXHAUST TRUNK NEEDS TO COME DOWN 12 INCHES.
Condition: Unknown
Due 11 March 1999
Resolved 11 March 1999
Electrical
Issued 11 March 1999
Resolved
PROPERLY BAND CABLES IAW AEEE-45.
Condition: Unknown
Due 11 March 1999
Resolved 11 March 1999
Engineering
Issued 11 March 1999
Resolved
INSTALL PROPER SIGHT GLASS GUARDS ON BOTH EM GEN DAY TANKS.
Condition: Unknown
Due 11 March 1999
Resolved 11 March 1999
Accommodation/Occupational Safety
Issued 11 March 1999
Resolved
COMPLETE ATTACHED WORKLIST.
Condition: Unknown
Due 11 March 1999
Resolved 11 March 1999
Construction/Loadline
Issued 11 March 1999
Resolved
CLEAN OIL OUT OF BILGES_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 11 March 1999
Resolved 11 March 1999
Documentation
Issued 11 December 1998
Resolved
PROVIDE FIRE SAFETY PLAN IN ACCORDANCE WITH 46CFR78.45-1.
Condition: Unknown
Due 11 January 1999
Resolved 4 January 1999
Engineering
Issued 11 December 1998
Resolved
EXTEND EXHAUST BLANKETS OF GENERATORS TO COVER ALL AREAS GREATER THAN 150 DEGREES.
Condition: Unknown
Due 11 January 1999
Resolved 4 January 1999
Documentation
Issued 11 December 1998
Resolved
PROVIDE AND POST FUEL OIL TRANSFER PROCEDURES.
Condition: Unknown
Due 11 December 1998
Resolved 11 December 1998
Fire Fighting
Issued 11 December 1998
Resolved
SUBMIT PROPOSAL TO [name withheld] TO PROVIDE LATCHES ON ALL FIRE SCREEN DOORS.
Condition: Unknown
Due 11 December 1998
Resolved 11 December 1998
Engineering
Issued 11 December 1998
Resolved
PROVE PROPER OPERATION OF SHIPS SERVICE GENERATOR OVERSPEED TRIPS.
Condition: Unknown
Due 11 December 1998
Resolved 11 December 1998
Accommodation/Occupational Safety
Issued 11 December 1998
Resolved
REPLACE PLASTIC DRYER VENT LINES WITH METAL.
Condition: Unknown
Due 11 January 1999
Resolved 4 January 1999
Electrical
Issued 11 December 1998
Resolved
PROVIDE ACCURATE INDEX CARDS FOR ALL ELECTRICAL PANELS.
Condition: Unknown
Due 11 December 1998
Resolved 11 December 1998
Fire Fighting
Issued 11 September 1998
Resolved
MAKE REPAIRS TO FIRE SAFETY DOOR #9 ON THE AFT MAIN DECK OF THE DESOTO BARGE TO PROVIDE MAXIMUM 1/2" CLEARANCE OR LESS ALONG THE DOOR BOTTOM.
Condition: Unknown
Due 11 September 1998
Resolved 11 September 1998
Electrical
Issued 11 September 1998
Resolved
PROVIDE EACH PANELBOARD WITH A CIRCUIT DIRECTORY.
Condition: Unknown
Due 2 November 1998
Resolved 2 November 1998
Fire Fighting
Issued 11 September 1998
Resolved
PROVIDE ROCK BLOCKS OR OTHER ACCEPTABLE A-0 BOUNDRY AT THE WIRE PENETRATIONOVER DOOR TO GENERATOR SPACE ON THE LASALLE BARGE.
Condition: Unknown
Due 11 September 1998
Resolved 11 September 1998
Electrical
Issued 11 September 1998
Resolved
PROVIDE A NEMA TYPE 4 ENCLOSURE OR EQUIVALENT THAT MEETS 46 CFR 111.01-9(b)ON ELECTRICAL PANELBOARDS IN THE GALLEY AND LAUNDRY SPACES.
Condition: Unknown
Due 11 September 1998
Resolved 11 September 1998
Fire Fighting
Issued 11 September 1998
Resolved
PROVIDE ROCK BLOCKS OR OTHER ACCEPTABLE A-0 BOUNDRY AT OVERHEAD WIRE PENETRATION IN MAIN DECK HVAC SPACE BY ELEVATOR ON THE DESOTO BARGE.
Condition: Unknown
Due 11 September 1998
Resolved 11 September 1998
Fire Fighting
Issued 11 September 1998
Resolved
REPAIR BROKEN VENTILATION CLOSURE TO THE PORT MAIN DECK BLACK WATER VOID ONTHE DESOTO BARGE.
Condition: Unknown
Due 11 September 1998
Resolved 11 September 1998
Fire Fighting
Issued 11 September 1998
Resolved
PROVIDE AN ACCESS INSPECTION PANEL TO THE VENTILATION DAMPER IN ROOM #111, ROOM #112, ROOM #101, ROOM #239 AND THE BARGE MASTER'S STATEROOM ON THE LASALLE BARGE.
Condition: Unknown
Due 2 November 1998
Resolved 2 November 1998
Navigation
Issued 11 September 1998
Resolved
PROVIDE STATION IDENTIFICATION LABELS FOR THE SOUND POWERED TELEPHONE SYSTEM.
Condition: Unknown
Due 2 November 1998
Resolved 2 November 1998
Fire Fighting
Issued 11 September 1998
Resolved
PROVIDE ROCK BLOCKS OR OTHER ACCEPTABLE A-0 BOUNDRY AT THE WIRE PENETRATIONOF THE AFT GALLEY BULKHEAD BY STAIRWAY TO THE GALLEY PREP SPACE.
Condition: Unknown
Due 2 November 1998
Resolved 2 November 1998
Fire Fighting
Issued 11 September 1998
Resolved
PROVIDE ROCK BLOCKS OR OTHER ACCEPTABLE A-60 BOUNDRY AT WIRE PENETRATION OVERHEAD PANELBOARDS IN GENERATOR SPACE ON THE LASALLE BARGE.
Condition: Unknown
Due 11 September 1998
Resolved 11 September 1998