Records from 1981 to 2001. Most recent: inspection, 2 October 2001.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 40
2 October 2001
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 700555
24 August 2001
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 293032
22 March 2001
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 766967
15 January 2001
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 203687
11 July 2000
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 279927
4 September 1999
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 432616
4 March 1999
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 426208
24 July 1998
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 422050
23 December 1993
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 646926
23 January 1993
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 828260
9 September 1992
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 948136
14 August 1992
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1270055
13 January 1992
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 960269
22 October 1991
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 933056
6 June 1991
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1247280
29 May 1991
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1249718
28 December 1990
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 919410
4 October 1990
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1242150
26 July 1990
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 924299
5 June 1990
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1234345
18 March 1990
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1241769
24 January 1990
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1218425
27 December 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 915621
29 November 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1238050
13 April 1989
Hull Examination · COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1032187
17 February 1989
Examination of Repairs
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1041629
30 September 1988
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1043794
15 March 1987
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1022709
21 February 1986
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1299920
17 June 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 984612
22 May 1985
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1289300
3 January 1985
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1285490
2 April 1984
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1280974
17 February 1984
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 990720
25 October 1983
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1276807
4 October 1983
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 965244
19 September 1983
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 970144
13 December 1982
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1271617
3 December 1981
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 967215
3 December 1981
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 973014
Navigation
Issued 24 August 2001
Resolved
PRIOR TO NEXT U.S. PORT INSTALL ARPA SPEED INPUTS ON ALL APPLICABLE RADARS TO COMPLY WITH IMO ARPA PERFORMANCE STANDARDS._x001C_ SOLAS 74 (AMD) CH.5 REG 12(J)(I)(2)
Condition: Unknown
Due 12 October 2001
Resolved 12 October 2001
Deck/Cargo
Issued 24 August 2001
Resolved
PRIOR TO TRANSFER OPERATIONS PROVE PROPER OPERATION OF CARGO CONTROL ROOM EMERGENCY SHUTDOWN FOR ALL CARGO PUMPS.
Condition: Unknown
Due 2 October 2001
Resolved 2 October 2001
Navigation
Issued 24 August 2001
Resolved
PRIOR TO NEXT U.S. PORT REPAIR ECHO DEPTH SOUNDER._x001C_ SOLAS 74 (AMD) CH.5 REG 12(K)
Condition: Unknown
Due 12 October 2001
Resolved 12 October 2001
Deck/Cargo
Issued 24 August 2001
Resolved
PRIOR TO TRANSFER OPERATIONS PROVIDE CERTIFICATE ATTESTING TO CALIBRATION GAS CONTENTS.
Condition: Unknown
Due 2 October 2001
Resolved 2 October 2001
Deck/Cargo
Issued 24 August 2001
Resolved
PRIOR TO TRANSFER OPERATIONS PRODUCE INERT GAS OXYGEN LEVELS BELOW 5%, CALIBRATE SYSTEM AND TEST ALARMS TO SATISFACTION OF CLASS.
Condition: Unknown
Due 2 October 2001
Resolved 2 October 2001
Deck/Cargo
Issued 24 August 2001
Resolved
PRIOR TO TRANSFER OPERATIONS REPAIR LEAK AT #3 CARGO PUMP PRESSURE GAUGE LINE IN PUMP ROOM
Condition: Unknown
Due 2 October 2001
Resolved 2 October 2001
Deck/Cargo
Issued 24 August 2001
Resolved
PRIOR TO TRANSFER OPERATIONS COMPLETE STATIC LIQUID PRESSURE TEST OF ALL TRANSFER LINES
Condition: Unknown
Due 12 October 2001
Resolved 12 October 2001
Deck/Cargo
Issued 4 September 1999
Resolved
REPAIR P/V VALVES AND ELMINATE MINOR VENT SEEPAGE ON #2 P&S, #3P AND P&S SLOP TANKS NO LATER THAN 04 OCT 99. CARGO TANKS TO REMAIN UNDER POSITIVE INERT GAS PRESSURE IN INTERIM PERIOD.
Condition: Unknown
Due 24 July 2000
Resolved 24 July 2000
Navigation
Issued 24 July 1998
Resolved
PRIOR TO NEXT US PORT, INSTALL AUTOPILOT ALARM IN ACCORDANCE WITH 33CFR157.440. IN NO CASE LATER THEN 23 OCT 1998. WHILE OPERATING IN U.S WATERS, VESSEL MUST OPERATE STEERING GEAR IN HAND.
Condition: Unknown
Due 4 March 1999
Resolved 4 March 1999
Lifesaving
Issued 14 August 1992
Resolved
PROVIDE 6 USCG WATER LIGHTS FOR RING BOUYS, SEND COPY OF INVOICE STATING SPECIFIC MODEL RECIEVED TO [name withheld].
Condition: Unknown
Due 15 September 1992
Resolved 15 September 1992
Construction/Loadline
Issued 14 August 1992
Resolved
MAKE PERMANENT REPAIRS TO THE PUMP ROOM BILGE ALARM, SEND COPY OF PARTS INVOICE TO [name withheld] ITEM, ALSO SEND COPY OF LOG ENTIL SIGNED BY CHIEF ENGINEER.
Condition: Unknown
Due 14 August 1992
Resolved 14 August 1992
Documentation
Issued 14 August 1992
Resolved
VESSEL SHALL NOT OPERATE OR MOVE FROM THE PORT OF KORFUKHAN, VAE UNTIL MID-PERIOD INSPECTION IS COMPLETED INCLUDING ALL OUTSTANDING WORKLIST ITEMS ANDCG-835'S. INFORM MIO NEW YORK WHEN VESSEL IS READY TO COMPLETE MID PERIOD INSPECTION WHICH MUST BE COMPLETED NO LATER THAN 6 SEP 92.
Condition: Unknown
Due 4 September 1992
Resolved 4 September 1992
Engineering
Issued 14 August 1992
Resolved
MAKE PERMANENT REPAIRS TO PORT BOILER EXHAUST STACK EXCESS SMOKE ALARM. SEND COPY OF REPAIR PART INVOICE AND ENTRY FROM MACHINERY LOG SIGNED BY THECHIEF ENGINEER TO [name withheld] ITEM.
Condition: Unknown
Due 14 August 1992
Resolved 14 August 1992
Engineering
Issued 14 August 1992
Resolved
PRIOR TO OPERATING WITH REDUCED MANNING VESSEL TO PROVE OPERATION OF BOILERAUTOMATION IAW AUTOMATION CONTROL MANUAL TO THE SATISFACTION OF THE ATTENDING COAST GUARD MARINE INSPECTOR (AUTO COMBUSTION CONTROL OOC).
Condition: Unknown
Due 15 September 1992
Resolved 15 September 1992
Accommodation/Occupational Safety
Issued 14 August 1992
Resolved
PRIOR TO USING ELEVATOR MAKE REPAIRS (TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR) TO SAFETY DEVICES UNTIL SUCH TIME THAT REPAIRS HAVE BEEN MADE ACCESS DOORS ARE TO REMAIN BOLTED AND/ OR LOCKED SHUT.
Condition: Unknown
Due 14 August 1992
Resolved 14 August 1992
Electrical
Issued 13 January 1992
Resolved
PROVE PROPER OPERATION OF MAIN GENERATOR TO THE SATISFACTION OF ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 13 January 1992
Resolved 13 January 1992
Documentation
Issued 6 June 1991
Resolved
CHANGE VESSEL'S HOMEPORT EITHER AS PAINTED ON HULL, OR AS LISTED ON MARINE DOCUMENT. TO BE IN AGREEMENT WITH EACH OTHER
Condition: Unknown
Due 6 June 1991
Resolved 6 June 1991
Documentation
Issued 6 June 1991
Resolved
PROVIDE COMPLETE COPY OF IGS INSTRUCTION MANUAL.
Condition: Unknown
Due 6 June 1991
Resolved 6 June 1991
Documentation
Issued 6 June 1991
Resolved
PROVIDE [name withheld] WITH DOCUMENTATION PROVING REQUIRED CREW ARE ALL U.S.CITIZENS AND ONBOARD NO LATER THAN 12JUN91.
Condition: Unknown
Due 6 June 1991
Resolved 6 June 1991
Engineering
Issued 6 June 1991
Resolved
RENEW/REPAIR STARBOARD BOILER DRUM SAFETY VALVE.
Condition: Unknown
Due 6 June 1991
Resolved 6 June 1991
Engineering
Issued 6 June 1991
Resolved
PROVIDE PROPER RELIEF VALVE FOR S/S AIR COMPRESSOR. PRESSURE VESSEL AND TEST IN PRESENCE OF A USCG MARINE INSPECTOR.
Condition: Unknown
Due 6 June 1991
Resolved 6 June 1991
Electrical
Issued 6 June 1991
Resolved
LOCATE AND REMOVE FULL GROUND FROM EMERGENCY BUS TIE (117V) ON MAIN/EMERGENCY SWITCHBOARD.
Condition: Unknown
Due 30 September 1991
Resolved 30 September 1991
Electrical
Issued 6 June 1991
Resolved
REMOVE FLEXIBLE TEMPORARY VENTILATION DUCTING FROM ALL MACHINERY/ENGINEERING SPACES.
Condition: Unknown
Due 30 September 1991
Resolved 30 September 1991
Engineering
Issued 6 June 1991
Resolved
MAKE PROPER REPAIRS TO SAFETY VALVE MAIN RECEIVING GEAR AND PROVE PROPER OPERATION TO THE ATTENDING USCG MARINE INSPECTOR.
Condition: Unknown
Due 30 September 1991
Resolved 30 September 1991
Electrical
Issued 5 June 1990
Resolved
REPAIR SHIP'S ELEVATOR.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990
Resolved
REPAIR AND PROVE OPERATION OF MACHINERY SPACE BILGE HOLDING TANK HIGH LEVELALARM IAW CCS PART III ITEM AA.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990
Resolved
REPAIR AND PROVE OPERATION OF THE ELECTRICALLY CONTROLLED REMOTELY OPERATEDVALVE FOR THE STBD BOILER FEED WATER INLET LINE.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990
Resolved
CORRECT AND RESUBMIT FOR APPROVAL THE CENTRALIZED CONTROL SYSTEM TEST PROCEDURE, ELIMINATING ALL REFERENCES TO "BRIDGE CONTROL", AS THIS PORTION OF THE SYSTEM IS NOW DISABLED.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990
Resolved
REPAIR AND REINSTALL #1 BILGE AND BALLAST PUMP.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990
Resolved
REPAIR ALL ELECTRICAL CIRCUITS WITH LOW MEGGER READINGS (BELOW 1 MEG) AS LISTED ON LETTER DATED 28 MAY 90 FROM CH ENG, M/V OCEAN RUNNER.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990
Resolved
COMPLETE MEGGER READING SURVEY OF ALL REMAINING ELECTRICAL CIRCUITS CORRECTING ANY CIRCUITS HAVING A MEGGER READING OF 1 MEG OF LOWER.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990
Resolved
MAKE PERMANENT REPAIRS TO BOTH CONTROL AIR SYSTEM AIR DRYERS.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Navigation
Issued 5 June 1990
Resolved
REPAIR AND PROVE OPERATION OF PILOT HOUSE PORT & STBD STEERING GEAR POWER FAILURE ALARMS, WHICH NOW BOTH ACTIVATE WHEN ANY ONE SYSTEM FAILURE IS EXPERIENCED.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Lifesaving
Issued 5 June 1990
Resolved
PROVIDE HI-RIDER INFLATION BOUYANCY CHAMBER FOR IMMERSION SUIT NOW MISSING SAME. UNTIL THIS ITEM IS CORRECTED, TOTAL PERSONS ON BOARD REDUCED TO 40.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Deck/Cargo
Issued 5 June 1990
Resolved
HYDROSTATICALLY TEST ALL CARGO LINES TO 225 PSI. PROVIDE COPY OF RESULTS TOOCMI HONOLULU. UNTIL THIS ITEM IS CORRECTED, CARGO LINE PRESSURE FOR LOAD- ING, DISCHARGING AND TANK WASHING LIMITED TO 135 PSI.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Construction/Loadline
Issued 5 June 1990
Resolved
RENEW FLANGED SPOOL PIECE FOR #1 MAIN CIRCULATING PUMP LOW SUCTION LINE.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Accommodation/Occupational Safety
Issued 5 June 1990
Resolved
RENEW FLANGED DISCHARGE ELBOWS FOR BOTH SALT WATER SERVICE PUMPS.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Construction/Loadline
Issued 5 June 1990
Resolved
REPLACE CLOSURE DOGS ON WATER TIGHT DOOR TO MAIN DECK MIDSHIP BOS'N LOCKER.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990
Resolved
REPAIR/REPLACE MOTOR CONTROLLER FOR CONDENSATE PUMP #3.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990
Resolved
REPAIR/REPLACE EVAPORATOR #1 SALINITY INDICATOR.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990
Resolved
PROVIDE SEPARATE MOTOR CONTROLLERS FOR THE ROTARY COMPRESSOR LOCATED ENGINEROOM 43 FT LEVEL.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990
Resolved
AT NEXT SCHEDULED DRYDOCK, INSTALL ADDITIONAL LIGHTING FOR CARGO DECK AREA,IN ACCORDANCE WITH APPROVED PLANS.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Deck/Cargo
Issued 5 June 1990
Resolved
PERMANENTLY REPAIR INERT GAS SYSTEM VENT MAIN NOW WITH TEMPORARY PATCH JUSTFORWARD OF CARGO MANIFORD. PROVIDE TO [name withheld] SPECIFICATIONS AND CERTIFICATION OF WELDERS USED IN THIS REPAIR.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Deck/Cargo
Issued 5 June 1990
Resolved
PERMANENTLY REPAIR MAIN CARGO LINE #3 NOW WITH TEMPORARY PATCH JUST AFT OF CARGO MANIFOLD. PROVIDE TO [name withheld] SPECIFICATIONS AND CERTIFICATION OF WELDERS USED IN THIS REPAIR.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Deck/Cargo
Issued 5 June 1990
Resolved
PERMANENTLY REPAIR CARGO PUMP #1 & 2 SUCTION ELBOWS, NOW WITH TEMPORARY PATCHES. PROVIDE TO [name withheld] SPECIFICATIONS AND CERTIFICATION OF WELDERS USED IN THIS REPAIR.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Deck/Cargo
Issued 5 June 1990
Resolved
REPAIR/REPLACE ALL CARGO LINE CROSS OVER VALVES AND THE #1 DROP LINE VALVE,ALL IN WAY OF STBD MANIFOLD. EXCLUDING X-OVER VALUE #2.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Deck/Cargo
Issued 5 June 1990
Resolved
RENEW #6 CTR CRUDE OIL WASHING SYSTEM BRANCH LINE FROM ROOT VALVE TO TANK FITTINGS. ADDITIONALLY, REPLACE #6 C ROOT VALVE.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Deck/Cargo
Issued 5 June 1990
Resolved
PERMANENTLY REPAIR INERT GAS SYSTEM DECK WATER SEAL NOW WITH TEMPORARY PATCH ON LOWER FITTING OF GAUGE GLASS.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990
Resolved
PROVIDE ADEQUATE EMBARKATION LIGHTING FOR ACCOMMODATION AND PILOT LADDERS.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990
Resolved
REPAIR AND PROVE OPERATION OF MAIN CONDENSATE JPUMP DISCHARGE PRESSURE CONTROL SWITCH IAW CCS PRRT IV ITEM C.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Fire Fighting
Issued 5 June 1990
Resolved
PRIOR TO LOADING CARGO, INSTALL 3 CARGO DECK FIRE MAIN HYDRANTS NOW MISSING.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Fire Fighting
Issued 5 June 1990
Resolved
UPDATE AND SUBMIT FOR REVIEW AND APPROVAL A VESSEL FIRE CONTROL SAFETY PLAN.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990
Resolved
REPAIR AND PROVE OPERATION OF THE PORT BOILER BURNER #3 FLAME SENSOR. UNTILTHIS ITEM IS CORRECTED THIS BURNER SHALL REMAIN OUT OF SERVICE.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990
Resolved
REPAIR BOILER CROSSOVER DAMPER AND PROVE OPERATION OF VENTILATION INTERLOCKS IAW COMBUSTION CONTROL TEST PROCEDURE ITEM B (D & E). UNTIL THISITEM IS CORRECTED, BOTH BOILERS SHALL NOT BE FIRED USING ONLY ONE FORCED DRAFT FAN.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990
Resolved
REPAIR PORT AND STBD BOILER REMOTE WATER LEVEL INDICATORS.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Electrical
Issued 5 June 1990
Resolved
SUBMIT PLANS FOR REVIEW AND APPROVAL TO INSTALL ADDITIONAL LIGHTING IN CARGO DECK AREA. PLANS TO BE SUBMITTED TO USCG MARINE SAFETY CENTER, WASH, D.C.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990
Resolved
REPAIR AND PROVE OPERATION OF EXCESSIVE UPTAKE SMOKE ALARM IAW CCS PART IIIITEM FF.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990
Resolved
REPAIR AND PROVE OPERATION OF FEED SYSTEM LOW PRESSURE ALARM IN IAW CENTRALIZED CONTROL SYSTEM PART III ITEM B.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990
Resolved
REPAIR AND PROVE OPERATION OF MAIN CONDENSER LOW VACUUM ALARM IAW CCS PART III ITEM E.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990
Resolved
REPAIR AND PROVE OPERATION OF EXTERNAL DESUPERHEATER HIGH TEMPERATURE ALARMS IAW CCS PART III ITEM F (A, B, & D).
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Accommodation/Occupational Safety
Issued 5 June 1990
Resolved
REPAIR AND PROVE OPERATION OF FRESH WATER DRAIN COLLECTING TANK HIGH LEVEL ALARM IAW CCS PART III ITEM Q.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990
Resolved
REPAIR AND PROVE OPERATION OF STERN TUBE LUBE OIL TANK LEVEL AND PRESSURE ALARMS IAW CCS PART III ITEM Q.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Engineering
Issued 5 June 1990
Resolved
REPAIR AND PROVE OPERATION OF FUEL OIL STORAGE AND SETILING TANKS (3 TKS) HIGH/LOW LEVEL ALARMS IAW CCS PART III ITEM R.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Navigation
Issued 5 June 1990
Resolved
REPAIR AND PROVE OPERATION OF STEERING GEAR MOTOR OVERLOAD ALARMS IAW CCS PART III ITEM T.
Condition: Unknown
Due 5 June 1990
Resolved 5 June 1990
Documentation
Issued 15 March 1987
Resolved
PROVIDE A CURRENT CERTIFICATE OF DOCUMENTATION ONBOARD THE VESSEL.
Condition: Unknown
Due 15 March 1987
Resolved 15 March 1987
Lifesaving
Issued 15 March 1987
Resolved
PROVIDE TWO CURRENTLY SERVICED LIFERAFTS ONBOARD.
Condition: Unknown
Due 15 March 1987
Resolved 15 March 1987
Lifesaving
Issued 15 March 1987
Resolved
MAKE PERMANENT REPAIR TO LIFEBOAT NO.1, SER.NO.2430 IN WAY OF TEMPORARY HULL REPAIR AT THE KEEL, AND THE WOODEN THWARTS WHERE DRY ROTTED.
Condition: Unknown
Due 15 March 1987
Resolved 15 March 1987
Lifesaving
Issued 15 March 1987
Resolved
PROVIDE ONE SEA ANCHOR FOR EACH LIFEBOAT.
Condition: Unknown
Due 15 March 1987
Resolved 15 March 1987
Documentation
Issued 21 February 1986
Resolved
PROVIDE CURRENT PUBLICATIONS OF THE COAST PILOT, LIGHT LIST AND TIDAL & CURRENT TABLES.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Fire Fighting
Issued 21 February 1986
Resolved
SERVICE THE FIXED CO2 SYSTEM AND PROVIDE SERVICING CERTIFICATES.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Fire Fighting
Issued 21 February 1986
Resolved
PROVE SATISFACTORY OPERATION OF THE DECK FOAM SYSTEM.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Navigation
Issued 21 February 1986
Resolved
PROVE SATISFACTORY OPERATION OF ELECTRONIC NAVIGATION EQUIPMENT.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Accommodation/Occupational Safety
Issued 21 February 1986
Resolved
TEST REMOTE VENTILATION SHUTDOWNS.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Navigation
Issued 21 February 1986
Resolved
REPLACE BURNED OUT NAVIGATION LIGHTS AS NECESSARY.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Documentation
Issued 21 February 1986
Resolved
PROVIDE EVIDENCE OF ANNUAL CARGO GEAR SURVEY.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Accommodation/Occupational Safety
Issued 21 February 1986
Resolved
REPLACE WINDOWS IN CREWS LOUNGE AND [name withheld].
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Lifesaving
Issued 21 February 1986
Resolved
CONDUCT A COMPLETE FIRE AND BOAT DRILL WITH ENTIRE CREW AND LOG AS REQUIRED
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Deck/Cargo
Issued 21 February 1986
Resolved
PROVE SATISFACTORY OPERATION OF THE #2 CARGO PUMP AND MAIN CARGO VALVE.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Deck/Cargo
Issued 21 February 1986
Resolved
REPLACE FLAME SCREENS ON #1C, #1P, #2S, #2C, #3P, #3C AND #4C CARGO TANK P/V VALVES.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Deck/Cargo
Issued 21 February 1986
Resolved
PROVE SATISFACTORY OPERATION OF THE EMERGENCY SHUTDOWNS FOR THE CARGO SYSTEM.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Lifesaving
Issued 21 February 1986
Resolved
PROVIDE 17 ADDITIONAL TYPE I COAST GUARD APPROVED LIFEJACKETS.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Deck/Cargo
Issued 21 February 1986
Resolved
MAKE PERMANENT REPAIRS TO IGS LINE IMMEDIATELY FORWARD OF THE DECK HOUSE IN LIEU OF THE PRESENT TEMPORARY PATCH.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Engineering
Issued 21 February 1986
Resolved
CONDUCT HYDRO OF PORT AND STBD MAIN PROPULSION BOILERS AND MAIN STEAM PIPING DOWN TO THE THROTTLE VALVE
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Electrical
Issued 21 February 1986
Resolved
PROVE PROPER OPERATION OF THE STEAM DRIVEN GENERATORS AND STEAM DRIVEN FIRE PUMP.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Engineering
Issued 21 February 1986
Resolved
CONDUCT COMPLETE BOILER AUTOMATION TEST.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Engineering
Issued 21 February 1986
Resolved
CONDUCT WATERSIDE EXAM OF PORT AND STBD BOILERS.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Electrical
Issued 21 February 1986
Resolved
REMOVE ALL JURY RIGGED WIRING OF HEAR LAMPS IN ENGINE ROOM PRIOR TO PLACINGVESSEL IN SERVICE.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Lifesaving
Issued 21 February 1986
Resolved
PROVIDE TWO (2) COAST GUARD APPROVED INFLATABLE LIFERAFTS WITH CURRENT SERVICING CERTIFICATES.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Lifesaving
Issued 21 February 1986
Resolved
PROVIDE PROVISIONS FOR LIFEBOATS: 40 GALLONS OF WATER,48 CANS OF PROVISIONS1 QUART OF ILLUMINATION OIL, 1 FIRE EXTINGUISHER.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Unknown
Issued 4 October 1983
Resolved
(CONTD FROM # 2) REPLACED WITH A VALVE OF AN ACCEPTABLE TYPE (46 CFR 56.20)
Condition: Unknown
Due 4 October 1983
Resolved 4 October 1983
Unknown
Issued 4 October 1983
Resolved
SURFACE AND BOTTOM BLOW VALVES FOR PORT & STBD BOILERS SHALL BE RENEWED WITH VALVES OF AN ACCEPTABLE TYPE (46 CFR 56.20).
Condition: Unknown
Due 4 October 1983
Resolved 4 October 1983
Unknown
Issued 4 October 1983
Resolved
THE PORT GENERATOR STEAM STOP VALVE SHALL BE REPAIRED BY THE MANUFACTURER OR REPAIR FACILITY CERTIFIED BY THE VALVE MANUFACTURER, OR SHALL BE (CONTD)
Condition: Unknown
Due 4 October 1983
Resolved 4 October 1983
Unknown
Issued 19 September 1983
Resolved
MAKE PERMANENT REPAIRS TO AND TEST OPERATION OF MARINE SANITATION DEVICE TOMANUFACTURERS INSTRUCTIONS AND SPECIFICATIONS.
Condition: Unknown
Due 19 September 1983
Resolved 19 September 1983
Unknown
Issued 19 September 1983
Resolved
UNTIL THE ABOVE REPAIRS HAVE BEEN EFFECTED SEWAGE OVERBOARD DISCHARGE MUST BE CLOSED AND LOCKED. RAW SEWAGE IS TO BE PUMPED TO HOLDING TANK.
Condition: Unknown
Due 19 September 1983
Resolved 19 September 1983
Unknown
Issued 13 December 1982
Resolved
REPLACE THE FLAME SCREENS IN P/V VALVES AT CARGO TANKS NO. 1S, 2C, 2S, 3S, AND 7S WITH CORROSION-RESISTANT 30X30 WIRE MESH SCREENS.
Condition: Unknown
Due 13 December 1982
Resolved 13 December 1982
Unknown
Issued 13 December 1982
Resolved
REPLACE MISSING HANDRAILS FOR PORTSIDE INCLINED LADDER AT NUMBER 4 FOAM MONITOR STATION.
Condition: Unknown
Due 13 December 1982
Resolved 13 December 1982
Engineering
Issued 3 December 1981
Resolved
MAKE PERMANENT REPAIRS TO PORT TUBE BOILER'S INSULATION AND REFRACTORY MATERIALS.
Condition: Unknown
Due 3 December 1981
Resolved 3 December 1981
Engineering
Issued 3 December 1981
Resolved
MAKE PERMANENT REPAIRS TO LEAK IN WAY OF STERN TUBE.
Condition: Unknown
Due 3 December 1981
Resolved 3 December 1981
Engineering
Issued 3 December 1981
Resolved
MAKE PERMANENT REPAIRS TO FORWARD MAIN TURBINE BEARING SEAL.
Condition: Unknown
Due 3 December 1981
Resolved 3 December 1981
Engineering
Issued 3 December 1981
Resolved
PREFORM INTERNAL EXAM ON UNFIRED PRESSURE VESSELS AT NEXT DRYDOCKING.
Condition: Unknown
Due 3 December 1981
Resolved 3 December 1981
Engineering
Issued 3 December 1981
Resolved
REPAIR LEAK IN WAY OF MANHOLE IN DC HEATER DURING NEXT DRYDOCKING.
Condition: Unknown
Due 3 December 1981
Resolved 3 December 1981
Deck/Cargo
Issued 3 December 1981
Resolved
CROP AND RENEW WAISTED SECTIONS OF SHIPS SERVICE AIR LINE ON MAIN DECK.
Condition: Unknown
Due 3 December 1981
Resolved 3 December 1981
Deck/Cargo
Issued 3 December 1981
Resolved
RENEW FLAME SCREENS IN #1-6, P, 1,4,5,7, C, AND 5S, PV VENTS PRIOR TO LOADING OF NEXT CARGO.
Condition: Unknown
Due 3 December 1981
Resolved 3 December 1981
Deck/Cargo
Issued 3 December 1981
Resolved
MAKE PERMANENT REPAIRS TO AFTER OUTBOARD CORNER OF SCRUBBER CASING TO INERTGAS SYSTEM. TEMP. REPAIRS FOUND SATISFACTORY.
Condition: Unknown
Due 3 December 1981
Resolved 3 December 1981