MAURY USCG vessel records Sign in
← All vessels

ALUTIIQ SEA

ALUTIIQ SEA is a 1975 passenger vessel (inspected). The Coast Guard has recorded 42 inspections since 1985, most recently in August 2006, along with 72 deficiencies.

Records from 1985 to 2006. Most recent: inspection, 24 August 2006.

Built
1975
Last inspected
24 August 2006
Documentation
No Operation - PM · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WCZ7326
Flag
UNITED STATES
—
Maury page id
psix-48409

Inspections, by type

…with no type recorded9
Years with a record 22 calendar years (1985–2006)
The 42 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 20 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)48.5 ft × 15.7 ft × 6.7 ft
Registered tonnagegross 36 / net 29
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderDELTA MARINE INDUSTRIES · SEATTLE WA: TACOMA WA, UNITED STATES · built 1975
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portHOMER, AK
Trade endorsementsCoastwise, unrestricted, Fishery
DocumentationNo Operation - PM · issued 2 August 2006 · expires 31 August 2007
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it36 - Regulatory (Subpart C or D), Gross Ton
29 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WCZ7326MMSI not assigned · expired · voluntarily equipped · granted 29 March 2000, cancelled 29 May 2010
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 42

24 August 2006 Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 2758803
21 June 2005 COI Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 2398330
2 September 2004 Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 2184576
22 August 2004 Hull Examination · Periodic Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 2174363
27 August 2003 Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1888055
8 July 2003 Type not recorded
No type recorded · USCGC ANACAPA (WPB 1335) · USCG Northwest District (CGD-NW) · Activity 1868440
15 April 2002 Hull Examination · Periodic Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1603287
21 May 2001 Re-Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1405198
31 May 2000 COI Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 1361544
13 April 2000 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 817499
15 March 2000 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1420281
6 March 2000 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1376071
25 August 1999 Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 780553
22 April 1998 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 789928
22 May 1997 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 774011
13 May 1996 Re-Inspection · Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1085134
26 May 1995 COI Inspection · Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1182866
26 August 1994 Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1176045
17 May 1994 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1422373
4 April 1994 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1362963
30 June 1993 Type not recorded
No type recorded · Marine Safety Detachment Kenai · USCG Arctic District (CGD-A) · Activity 138756
26 April 1993 MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1358056
6 May 1992 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1269071
21 April 1992 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 948911
18 September 1991 Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1250762
10 June 1991 Administrative
Administrative · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 931875
16 May 1991 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 930438
30 April 1991 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 904201
14 May 1990 Deficiency Check
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 900183
25 October 1989 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1315784
11 October 1989 Re-Inspection · Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1345918
21 July 1989 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1032684
21 July 1989 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1033124
18 July 1989 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 897921
3 May 1989 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1213621
3 May 1989 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1343179
20 September 1988 Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1350883
7 September 1988 COI Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1348641
19 May 1988 Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 887829
18 May 1987 COI Inspection · Hull Examination
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1025356
14 May 1986 Credit Drydock · Re-Inspection
Physical examination · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 996634
23 May 1985 Type not recorded
No type recorded · MSO ANCHORAGE · USCG Arctic District (CGD-A) · Activity 1289609

Deficiency record · 72

Operations/Management › Drills/Instruction › Fire
Issued 23 August 2004 Resolved
Conduct underway drills (Man overboard and firefighting)
Condition: Unknown
Action required: 705 - Other - as specified
Due 10 September 2004
Resolved 15 September 2004
Resolution: Completed to the satisfaction of the attending Coast Guard Marine Inspector
Engineering › Steering Gear System › Motor
Issued 23 August 2004 Resolved
Propulsion and steering enable to be inspected at time of inspection.
Action required: 705 - Other - as specified
Due 10 September 2004
Resolved 15 September 2004
Resolution: Completed to the satisfaction of the attending Coast Guard Marine Inspector
Documentation › Certificates/Documents › Certificate of Inspection
Issued 23 August 2004 Resolved
Certificate of Inspection not posted or on board vessel.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 October 2004
Resolved 22 June 2005
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 23 August 2004 Resolved
Fixed engine room fire extinguisher shut off in operable.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 October 2004
Resolved 22 June 2005
Resolution: System removed.
Stability › Watertight Integrity › General
Issued 23 August 2004 Resolved
Engine room has 4 inch circular hole in bulkhead.
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 October 2004
Resolved 22 June 2005
Communications › Alarms/Indicators › Propeller Revolutions Rate Indicator
Issued 23 August 2004 Resolved
Engine tachometers in operable
Action required: 701 - Prior to carriage of passengers/cargo
Due 10 October 2004
Resolved 22 June 2005
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 27 August 2003 Resolved
Fixed fire fighting system not available for inspection.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 June 2005
Resolution: Removed
Lifesaving › Lifejacket/PFD (General)
Issued 27 August 2003 Resolved
Placards not posted for appropriate type of life jackets.
Due 30 September 2003
Resolved 4 December 2003
Engineering › Diesel Engine (propulsion-electric) › Crosshead Assembly
Issued 27 August 2003 Resolved
Main propulsion not operable and space not watertight.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 September 2004
Electrical
Issued 27 August 2003 Resolved
See Engineering.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 September 2003
Resolution: Ready for inspection.
Deck/Cargo › Holds/Tanks
Issued 27 August 2003 Resolved
Engine room entrance not water tight. Should be hose tested. LEGACY COMPONENT DESC: Hatch Cover
Action required: 705 - Other - as specified
Due 30 October 2003
Resolved 4 December 2003
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 27 August 2003 Resolved
Leak in exhaust poiping in aft steering space.
Action required: 705 - Other - as specified
Due 30 October 2003
Resolved 22 June 2005
Accommodation/Occupational Safety › Cooking Systems
Issued 27 August 2003 Resolved
Stove fuel line leaking. LEGACY COMPONENT DESC: Cooking Fuel
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 December 2003
Resolved 4 December 2003
Engineering › Fuel Oil Service System
Issued 27 August 2003 Resolved
Fuel tank space unavailable for inspection. LEGACY COMPONENT DESC: Tank
Action required: 705 - Other - as specified
Due 30 September 2003
Resolved 4 December 2003
Navigation › Piloting/Steering
Issued 15 April 2002 Resolved
Vsl did not have a current copy of the Tidal Current Tables onboard. LEGACY COMPONENT DESC: Tide/Tidal Current Tables
Action required: 705 - Other - as specified
Resolved 3 June 2002
Navigation › Piloting/Steering › Coast Guard Light List
Issued 15 April 2002 Resolved
Vsl did not have a current copy of the CG Light List onboard. LEGACY COMPONENT DESC: Coast Guard Light List
Action required: 705 - Other - as specified
Due 22 June 2005
Resolved 22 June 2005
Navigation › Piloting/Steering
Issued 15 April 2002 Resolved
Vsl did not have a current copy of the US Coast Pilot onboard. LEGACY COMPONENT DESC: US Coast Pilot
Action required: 705 - Other - as specified
Resolved 3 June 2002
Pollution Prevention/Response › Prevention Equipment
Issued 15 April 2002 Resolved
Vsl did not have a forward visual bilge alarm. LEGACY COMPONENT DESC: Bilge Monitor
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 5 June 2002
Resolution: Corrected.
Pollution Prevention/Response › Prevention Equipment
Issued 15 April 2002 Resolved
Vsl missing two visual indicators to indicate when the bilge pumps are operating automatically. LEGACY COMPONENT DESC: Bilge Monitor
Action required: 705 - Other - as specified
Resolved 5 June 2002
Resolution: Corrected.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (air intake)
Issued 15 April 2002 Resolved
Vsl did not have a means for securing both main engines from the operating station.
Action required: 705 - Other - as specified
Due 22 June 2005
Resolved 22 June 2005
Engineering › Diesel Engine (propulsion-direct drive) › Valve
Issued 15 April 2002 Resolved
Vsl did not have operating tachometers for each main engine.
Action required: 705 - Other - as specified
Resolved 22 June 2005
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 15 April 2002 Resolved
Vsl did not have a means to secure both overboard sewage valves and neither valve was labeled with "Do not open within 3 nautical miles of land".
Action required: 705 - Other - as specified
Resolved 5 June 2002
Resolution: Corrected.
Deck/Cargo › Holds/Tanks
Issued 15 April 2002 Resolved
Vsl's hatch cover is not sealing properly. LEGACY COMPONENT DESC: Hatch Cover
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 3 June 2002
Lifesaving
Issued 22 May 1997 Resolved
ATTACH WATERLIGHT TO LIFEFLOAT.
Condition: Unknown
Due 22 May 1997
Resolved 3 June 1997
Lifesaving
Issued 22 May 1997 Resolved
ATTACH WATERLIGHT TO RING BUOY.
Condition: Unknown
Due 22 May 1997
Resolved 3 June 1997
Lifesaving
Issued 22 May 1997 Resolved
PROVIDE COVERED METAL TRASH CONTAINER IN LOUNGE.
Condition: Unknown
Due 22 May 1997
Resolved 3 June 1997
Navigation
Issued 22 May 1997 Resolved
PROVIDE EMERGENCY BROADCAST PLACARD.
Condition: Unknown
Due 3 June 1997
Resolved 3 June 1997
Lifesaving
Issued 22 May 1997 Resolved
MOUNT EPIRB IN FLOAT FREE ARRANGEMENT.
Condition: Unknown
Due 3 June 1997
Resolved 3 June 1997
Documentation
Issued 22 May 1997 Resolved
PROVIDE MOST RECENT STABILITY LETTER ON VESSEL FROM 1994.
Condition: Unknown
Due 22 May 1997
Resolved 3 June 1997
Lifesaving
Issued 22 May 1997 Resolved
PROVIDE RECORD OF DRILLS AND TRAINING.
Condition: Unknown
Due 22 May 1997
Resolved 3 June 1997
Lifesaving
Issued 22 May 1997 Resolved
PROVIDE RECORD OF MONTHLY EPIRB TESTING.
Condition: Unknown
Due 22 May 1997
Resolved 3 June 1997
Documentation
Issued 22 May 1997 Resolved
PROVIDE PROOF OF CURRENT ENROLLMENT IN RANDOM DRUG TESTING PROGRAM FOR CREW.
Condition: Unknown
Due 22 May 1997
Resolved 3 June 1997
Lifesaving
Issued 22 May 1997 Resolved
PROVIDE 4 ADDITIONAL ADULT LIFE PRESERVERS. PASSENGERS REDUCED TO 20 AND TOTAL PERSONS REDUCED TO 24.
Condition: Unknown
Due 22 May 1997
Resolved 3 June 1997
Navigation
Issued 13 May 1996 Resolved
PROVE PROPER OPERATION OF VHF RADIO.
Condition: Unknown
Due 23 May 1996
Resolved 28 May 1996
Navigation
Issued 13 May 1996 Resolved
PROVE PROPER OPERATION OF STERN LIGHT.
Condition: Unknown
Due 16 May 1996
Resolved 28 May 1996
Lifesaving
Issued 13 May 1996 Resolved
MARK EPIRB WITH VESSEL NAME.
Condition: Unknown
Due 16 May 1996
Resolved 28 May 1996
Lifesaving
Issued 13 May 1996 Resolved
TIGHTEN BATTERY COVER ON EPIRB SO WATER WILL NOT GET INSIDE.
Condition: Unknown
Due 16 May 1996
Resolved 28 May 1996
Documentation
Issued 13 May 1996 Resolved
PROVIDE PROOF OF RANDOM DRUG TESTING FOR ALL CREW.
Condition: Unknown
Due 23 May 1996
Resolved 28 May 1996
Construction/Loadline
Issued 13 May 1996 Resolved
ATTACH LAZARETTE HATCH TO VESSEL.
Condition: Unknown
Due 23 May 1996
Resolved 28 May 1996
Lifesaving
Issued 13 May 1996 Resolved
REPLACE ROTTEN LINE FROM WATERLIGHT TO LIFEFLOAT.
Condition: Unknown
Due 23 May 1996
Resolved 28 May 1996
Lifesaving
Issued 13 May 1996 Resolved
REPLACE ROTTEN LINE ON BOTH RING BUOYS WHICH ARE BEING USED AS PRIMARY LIFESAVING.
Condition: Unknown
Due 23 May 1996
Resolved 28 May 1996
Electrical
Issued 13 May 1996 Resolved
REMOVE EXPOSED DEAD END WIRING IN LAZARETTE.
Condition: Unknown
Due 23 May 1996
Resolved 28 May 1996
Lifesaving
Issued 13 May 1996 Resolved
MARK PERSON CAPACITY ON LIFEFLOAT.
Condition: Unknown
Due 16 May 1996
Resolved 28 May 1996
Lifesaving
Issued 13 May 1996 Resolved
ATTACH WATERLIGHT TO LIFEFLOAT.
Condition: Unknown
Due 16 May 1996
Resolved 28 May 1996
Construction/Loadline
Issued 13 May 1996 Resolved
REMOVE AND CAP OR OPEN FOR INSPECTION 1 INCH SEA VALVE WHICH IS NO LONGER USED.
Condition: Unknown
Due 16 May 1996
Resolved 28 May 1996
Lifesaving
Issued 13 May 1996 Resolved
PROVIDE TWO PADDLES AND ATTACH INSIDE OF LIFEFLOAT.
Condition: Unknown
Due 16 May 1996
Resolved 28 May 1996
Lifesaving
Issued 13 May 1996 Resolved
ATTACH 2 RING BUOYS TO LIFEFLOAT TO TOTAL 50% PRIMARY LIFESAVING.
Condition: Unknown
Due 16 May 1996
Resolved 28 May 1996
Lifesaving
Issued 13 May 1996 Resolved
ADJUST LIFEFLOAT BRACKET SO LIFEFLOAT WILL BE ABLE TO FLOAT FREE. NOW LIFEFLOAT IS TOO TIGHT.
Condition: Unknown
Due 16 May 1996
Resolved 28 May 1996
Electrical
Issued 13 May 1996 Resolved
REMOVE EXPOSED DEAD END WIRING IN CABIN OVERHEAD ON PORTSIDE AFT.
Condition: Unknown
Due 16 May 1996
Resolved 28 May 1996
Documentation
Issued 16 May 1991 Resolved
Provide evidence to prove the vessel's stability test performed to meet exposed route criteria or complete new stability test.
Condition: Unknown
Due 16 May 1991
Resolved 16 May 1991
Engineering
Issued 30 April 1991 Resolved
Prove vessel systems with vessel underway following completion of engine replacement.
Condition: Unknown
Due 30 April 1991
Resolved 30 April 1991
Accommodation/Occupational Safety
Issued 30 April 1991 Resolved
Repair to make operable the marine sanitation system.
Condition: Unknown
Due 30 April 1991
Resolved 30 April 1991
Construction/Loadline
Issued 11 October 1989 Resolved
GRIND OUT AND REPAIR NUMEROUS FRACTURES LOCATED ON THE MAIN DECK, THIS ITEMIS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN DATE OFCOMPLIANCE.
Condition: Unknown
Due 11 October 1989
Resolved 11 October 1989
Engineering
Issued 11 October 1989 Resolved
REPLACE THE PORT FORWARD AND STARBOARD AFT CUTLASS BEARINGS. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 11 October 1989
Resolved 11 October 1989
Construction/Loadline
Issued 11 October 1989 Resolved
MARK BILGE MANIFOLD VALVES AT THE VALVES, TO ACCOMODATE IDENTIFYING VALVES IN THE ENGINE SPACE. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN DATE OF COMPLIANCE.
Condition: Unknown
Due 11 October 1989
Resolved 11 October 1989
Fire Fighting
Issued 11 October 1989 Resolved
PROVIDE A PROPER BRACKET FOR THE PORTABLE FIRE EXTINGUISHER IN THE PILOT HOUSE. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 11 October 1989
Resolved 11 October 1989
Fire Fighting
Issued 11 October 1989 Resolved
SERVICE AND HYDROTEST BOTH PORTABLE CARBON DIOXIDE FIRE EXTINGUISHERS. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 11 October 1989
Resolved 11 October 1989
Lifesaving
Issued 11 October 1989 Resolved
PROPERLY RIG ALL LIFE FLOATS WITH LIGHTS, OARS AND REQUIRED EQUIPMENT. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 11 October 1989
Resolved 11 October 1989
Construction/Loadline
Issued 11 October 1989 Resolved
PROVE THE PROPER OPERATION OF THE FIRE AND BILGE PUMPS. THIS ITEM IS TO BECOMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COM-PLIANCE.
Condition: Unknown
Due 11 October 1989
Resolved 11 October 1989
Unknown
Issued 11 October 1989 Resolved
PROVE ALL VESSEL SYSTEMS UNDERWAY. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN DATE OF COMPLIANCE.
Condition: Unknown
Due 11 October 1989
Resolved 11 October 1989
Engineering
Issued 11 October 1989 Resolved
PROVIDE FOR INSPECTION OF BOTH SHAFTS WHEN THEY ARE DRAWN TO FACILITATE CHANGING OF THE CUTLASS BEARINGS.
Condition: Unknown
Due 11 October 1989
Resolved 11 October 1989
Lifesaving
Issued 11 October 1989 Resolved
PROVIDE SUFFICIENT LIFE FLOATS TO ACCOMODATE A TOTAL OF 14 PERSONS. THIS ITEM IS TO BE COMPLETED PRIOR TO OPERATING THE VESSEL AND NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 11 October 1989
Resolved 11 October 1989
Documentation
Issued 3 May 1989 Resolved
ROUTE LIMITED TO LAKES, BAYS, AND SOUNDS PENDING SATISFACTORY COMPLETION OFITEM 2.
Condition: Unknown
Due 3 May 1989
Resolved 3 May 1989
Lifesaving
Issued 3 May 1989 Resolved
PROVIDE AN INDATE BATTEY FOR THE CLASS A EPIRB AND PROVE SATISFACTORY OPERATION.
Condition: Unknown
Due 3 May 1989
Resolved 3 May 1989
Lifesaving
Issued 7 September 1988 Resolved
LASH THE PADDLES FOR THE LIFE FLOAT TO THE LIFE FLOAT, THIS ITEM IS TO BE COMPLETED PRIOR TO PLACING THE VESSEL IN SERVICE BUT NOT LATER THAN DATE OF COMPLIANCE.
Condition: Unknown
Due 7 September 1988
Resolved 7 September 1988
Fire Fighting
Issued 7 September 1988 Resolved
PROVIDE AN ADEQUATE HAND FIRE/BILGE PUMP WITH SUCTION AND DISCHARGE HOSES. THIS ITEM IS TO BE COMPLETED PRIOR TO PLACING THE VESSEL IN SERVICE BUT NOTLATER THAN DATE OF COMPLIANCE.
Condition: Unknown
Due 7 September 1988
Resolved 7 September 1988
Lifesaving
Issued 7 September 1988 Resolved
ATTACH THE WATERLIGHT AND LINE TO THE LIFE RING. THIS ITEM IS TO BE COMPLETED PRIOR TO PLACING THE VESSEL IN SERVICE BUT NOT LATER THAN DATE OF COMPLIANCE.
Condition: Unknown
Due 7 September 1988
Resolved 7 September 1988
Lifesaving
Issued 7 September 1988 Resolved
PERMANENTLY MOUNT THE EPIRB, THIS ITEM IS TO BE COMPLETED PRIOR TO PLACING THE VESSEL IN SERVICE BUT NOT LATER THAN DATE OF COMPLIANCE.
Condition: Unknown
Due 7 September 1988
Resolved 7 September 1988
Construction/Loadline
Issued 7 September 1988 Resolved
PROVIDE PROPER FLAME SCREENS FOR BOTH FUEL OIL TANK VENTS IN ACCORDANCE WITH 46 CFR 182.20-35(D).
Condition: Unknown
Due 7 September 1988
Resolved 7 September 1988
Construction/Loadline
Issued 7 September 1988 Resolved
MARK THE REMOTE FUEL CUT OFF VALVES IN ACCORDANCE WITH 46 CFR 185.30-20(A).
Condition: Unknown
Due 7 September 1988
Resolved 7 September 1988
Lifesaving
Issued 7 September 1988 Resolved
PROVIDE ONE ADDITIONAL ADULT LIFE JACKET, THIS ITEM IS TO BE COMPLETED PRIOR TO CARRYING MORE THAN 23 ADULTS ON BOARD THE VESSEL BUT NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 7 September 1988
Resolved 7 September 1988
Deck/Cargo
Issued 7 September 1988 Resolved
PLACE THE ANCHOR ON BOARD THE VESSEL AND RIG FOR SEA. THIS ITEM IS TO BE COMPLETED PRIOR TO PLACING THE VESSEL IN SERVICE BUT NOT LATER THAN THE DATE OF COMPLIANCE.
Condition: Unknown
Due 7 September 1988
Resolved 7 September 1988

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.