Records from 1981 to 1998. Most recent: inspection, 11 April 1998.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 29
11 April 1998
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 414801
23 January 1993
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1138804
12 May 1992
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 656090
29 April 1992
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1256000
8 February 1992
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 962610
19 November 1991
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 939522
2 May 1991
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1226725
24 April 1991
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 939356
15 April 1991
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 939661
2 December 1990
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1226564
3 October 1989
Administrative
Administrative · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1317796
3 August 1989
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 932103
30 May 1989
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1032927
22 May 1989
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 900549
9 January 1989
Deficiency Check
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1351403
29 December 1988
Type not recorded
No type recorded · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1037698
18 December 1988
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1033890
7 December 1988
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 899087
1 December 1988
Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1207710
4 November 1988
COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1038678
21 March 1986
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1309187
21 February 1986
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 533058
21 February 1986
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 989097
13 February 1986
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1298979
18 January 1986
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 489945
16 January 1986
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 995973
13 January 1986
Credit Drydock · COI Inspection
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 992913
20 March 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1275613
12 November 1981
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 965821
Engineering
Issued 8 February 1992
Resolved
PERMANENTLY INSTALL, USING HARD PIPING, THE DIRTY WATER RETURN AND SENSOR SAMPLING LINES FOR THE OIL/WATER SEPARATOR TO BE COMPLETED AT NEXT DRYDOCK BUT IN NO CASE LATER THAN 31MAY92.
Condition: Unknown
Due 8 February 1992
Resolved 8 February 1992
Navigation
Issued 8 February 1992
Resolved
REPAIR OR REPLACE THE EMERGENCY RECEIVER/TRANSMITTER IN RADIO ROOM (RECEIVER INOP) REQUIREMENT IS TO BE COMPLETED AT NEXT PORT OF CALL, BUT INNO CASE LATER THAN 25MAR92.
Condition: Unknown
Due 9 April 1992
Resolved 9 April 1992
Lifesaving
Issued 8 February 1992
Resolved
PROVIDE TWO (2) USCG APPROVED SMOKE FLOATS, REQUIREMENT IS TO BE COMPLETED AT NEXT PORT OF CALL, BUT IN NO CASE LATER THAN 25MAR92.
Condition: Unknown
Due 8 February 1992
Resolved 8 February 1992
Engineering
Issued 8 February 1992
Resolved
MAKE DC HEATER AVAILABLE FOR INTERNAL INSPECTION OR HYDROSTATIC TEST.
Condition: Unknown
Due 8 February 1992
Resolved 8 February 1992
Lifesaving
Issued 8 February 1992
Resolved
REPACK POPPED 20-PERSON BF GOODRICH LIFERAFT ON PORT FANTAIL, PRIOR TO VESSEL GETTING UNDERWAY.
Condition: Unknown
Due 9 April 1992
Resolved 9 April 1992
Engineering
Issued 8 February 1992
Resolved
REPAIR OR REPLACE STBD SUPERHEATER SAFETY VALVE AT NEXT DRYDOCK BUT IN NO CASE LATER THAN 31MAY92.
Condition: Unknown
Due 8 February 1992
Resolved 8 February 1992
Fire Fighting
Issued 8 February 1992
Resolved
SERVICE ALL FIXED AND SEMI-PORTABLE FIRE EXTINGUISHING SYSTEMS. REQUIREMENTIS TO BE COMPLETED AT NEXT PORT OF CALL, BUT IN NO CASE LATER THAN 25MAR92.
Condition: Unknown
Due 9 April 1992
Resolved 9 April 1992
Accommodation/Occupational Safety
Issued 8 February 1992
Resolved
PROVE PROPER OPERATION OF THE STBD SIDE ENGINE ROOM SUPPLY FAN.
Condition: Unknown
Due 9 April 1992
Resolved 9 April 1992
Accommodation/Occupational Safety
Issued 8 February 1992
Resolved
PROVIDE COAST GUARD APPROVAL NUMBER AND MANUFACTURES DATA FOR THE MARINE SANITATION DEVICE.
Condition: Unknown
Due 8 February 1992
Resolved 8 February 1992
Engineering
Issued 8 February 1992
Resolved
INSTALL METAL DRIP PAN BELOW BOTH RAYCOR FUEL FILTERS IN THE EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 8 February 1992
Resolved 8 February 1992
Construction/Loadline
Issued 8 February 1992
Resolved
PROPERLY INSTALL A COVER ON THE BILGE SLOP TANK NEXT TO THE OIL/WATER SEPARATOR.
Condition: Unknown
Due 8 February 1992
Resolved 8 February 1992
Accommodation/Occupational Safety
Issued 8 February 1992
Resolved
INSTALL VENTILATION DUCT SCREENS THROUGHOUT MACHINERY SPACE.
Condition: Unknown
Due 8 February 1992
Resolved 8 February 1992
Documentation
Issued 8 February 1992
Resolved
PROVIDE WASTE MANAGEMENT PLAN TO INCLUDE MARPOL/STICKERS OR PLACARDS PROPERLY PLACED. REQUIREMENT IS TO BE COMPLETED AT NEXT PORT OF CALL, BUT IN NO CASE LATER THAN 25MAR92.
Condition: Unknown
Due 8 February 1992
Resolved 8 February 1992
Accommodation/Occupational Safety
Issued 8 February 1992
Resolved
PROVIDE SUITABLE HAND LIFTING DEVICE FOR THE AIR-SIDE RELIEF VALVE ON THE POTABLE WATER TANK LOCATED ON THE STBD SIDE OF THE ENGINE ROOM NEAR THE FORWARD BULKHEAD BY NEXT DRYDOCK BUT IN NO CASE LATER THAN 31MAY92.
Condition: Unknown
Due 8 February 1992
Resolved 8 February 1992
Engineering
Issued 2 December 1990
Resolved
REPAIR OR REPLACE 4 LOWER AND 4 UPPER OUTBOARD SUPERHEATER SUPPORTS ON STARBOARD BOILER.
Condition: Unknown
Due 2 December 1990
Resolved 2 December 1990
Engineering
Issued 2 December 1990
Resolved
MAKE AVAILABLE FOR INTERNAL INSPECTION OR HYDROSTATIC TEST DC HEATER.
Condition: Unknown
Due 2 December 1990
Resolved 2 December 1990
Engineering
Issued 2 December 1990
Resolved
INSTALL THE ORIFACE IAW. THE FOSTER WHEELER BOILER. TECH MANUAL FOR THE_x001C_ 5TH PASS MODIFICATION.
Condition: Unknown
Due 2 December 1990
Resolved 2 December 1990
Engineering
Issued 2 December 1990
Resolved
PROVIDE HAND LIFTING DEVICES FOR AIR RELIEF VALVE ON 40 DIFFERENTIAL/AIR RECEIVER.
Condition: Unknown
Due 2 December 1990
Resolved 2 December 1990
Deck/Cargo
Issued 2 December 1990
Resolved
MAKE PERMANENT REPAIRS TO THE FOLLOWING PIPING SYSTEMS; (A) NO. (1) S/W PUMP OUTLET, (B) NO. (2) S/W PUMP OUTLET, (C) EVAP FEED PUMP OUTLET, (D) MAKE UP FEED PIPE BY ADT, (E) PUMPROOM EDUCTOR LINE.
Condition: Unknown
Due 2 December 1990
Resolved 2 December 1990
Deck/Cargo
Issued 2 December 1990
Resolved
OBTAIN BENZINE DREGGER TEST TUBES, 2 PPM OR LOWER.
Condition: Unknown
Due 2 December 1990
Resolved 2 December 1990
Engineering
Issued 2 December 1990
Resolved
PROVE PROPER OPERATION OF OR RESUBMIT THE AUTOMATION PROCEDURES REFLECTING THE FOLLOWING: (A) BRIDGE TO ENGINEROOM RPM RECORDER AUTOMATION TEST PROCEDURES (A.T.P.) I.B. (B) 40 GRAVITY TANK LOW LEVEL ALARM (ATP)III X (C) WHITE SMOKE INDICATOR ( ATP) III FF(6).
Condition: Unknown
Due 2 December 1990
Resolved 2 December 1990
Engineering
Issued 2 December 1990
Resolved
PROVE PROPER OPERATION OF STARBOARD SUPERHEATER SAFETY RELIEF VALVE.
Condition: Unknown
Due 2 December 1990
Resolved 2 December 1990
Electrical
Issued 2 December 1990
Resolved
PROVE PROPER OPERATION OF REVERSE POWER RELAY ON #2 SHIPS SERVICE GENERATOR.
Condition: Unknown
Due 2 December 1990
Resolved 2 December 1990
Lifesaving
Issued 2 December 1990
Resolved
PROVIDE 2 CG APPROVED LIFE PRESERVERS TO ACCOUNT TOTAL REQUIRED BY CERTIFICATE OF INSPECTION.
Condition: Unknown
Due 2 December 1990
Resolved 2 December 1990
Deck/Cargo
Issued 2 December 1990
Resolved
REPAIR NUMBER #1 CARGO PUMP.
Condition: Unknown
Due 2 December 1990
Resolved 2 December 1990
Engineering
Issued 2 December 1990
Resolved
PROVE PROPER OPERATION OF HI-WATER AND HI-HI WATER ALARMS ON PORT BOILER.
Condition: Unknown
Due 2 December 1990
Resolved 2 December 1990
Construction/Loadline
Issued 22 May 1989
Resolved
PROVIDE USCG APPROVED PLANS FOR THE MODIFICATION OF FOREPEAK BALLAST/ DEBALLAST PIPING.
Condition: Unknown
Due 22 May 1989
Resolved 22 May 1989
Deck/Cargo
Issued 22 May 1989
Resolved
HYDROSTATICALLY TEST TO 225 PSI THE CARGO PIPELINES THAT WERE REPAIRED ABOVE THE MAIN DECK DURING YARD PERIOD, MAY89.
Condition: Unknown
Due 22 May 1989
Resolved 22 May 1989
Engineering
Issued 22 May 1989
Resolved
REPLACE SEA LINE RUBBER EXPANSION JOINT FOR CONDENSER, AFT INLET.
Condition: Unknown
Due 22 May 1989
Resolved 22 May 1989
Navigation
Issued 9 January 1989
Resolved
DURING INSTALLATION OF THE NEW AUX. STEERING SYS., THE CONTRACTORS, ATCO TECH. SRVC. AND CLARK-CIM INC.,DID NOT PROVIDE CERTIFICATION THAT THE FOREIGN MANUF. VALVES INSTALLED COMPLIED WITH ASTM STANDARD A-105. PROVIDE THIS OFFICE WITH CERTIFICATION THAT THESE VALVES COMPLY WITH THIS STANDARD.
Condition: Unknown
Due 9 January 1989
Resolved 9 January 1989
Construction/Loadline
Issued 4 November 1988
Resolved
PRIOR TO CARRIAGE OF BALLAST WATER IN THE AFTER PEAK TANK, CLEAN AND REMOVE ALL OILY RESIDUE. THE COOLING WATER STORED IN THE AFTER PEAK FOR THESHAFT SEAL IS TO REMAIN BELOW THE 6 FT. LEVEL ABOVE THE STERN TUBE UNTIL THIS ITEM IS CORRECTED.
Condition: Unknown
Due 4 November 1988
Resolved 4 November 1988
Construction/Loadline
Issued 4 November 1988
Resolved
PROVIDE USCG APPROVED PLANS FOR THE NEWLY INSTALLED PART FLOW SYSTEM.
Condition: Unknown
Due 4 November 1988
Resolved 4 November 1988
Navigation
Issued 21 February 1986
Resolved
MAKE PERMANENT REPAIRS TO THE COLLISION ADVOIDANCE SYSTEM RADAR PRIOR TO DEPARTURE OF NEXT U.S. PORT.
Condition: Unknown
Due 21 February 1986
Resolved 21 February 1986
Engineering
Issued 13 January 1986
Resolved
TEST THE STARBOARD BOILER SMOKE DETECTOR AND ALARM IN ACCORDANCE WITH THE TEST PROCEDURES.
Condition: Unknown
Due 13 January 1986
Resolved 13 January 1986
Deck/Cargo
Issued 13 January 1986
Resolved
TEST THE IGS POWER FAILURE ALARM.
Condition: Unknown
Due 13 January 1986
Resolved 13 January 1986
Engineering
Issued 13 January 1986
Resolved
TEST BOTH PORT AND STARBOARD STEAM DRUM LOW LEVEL ALARMS IN ACCORDANCE WITHTEST PROCEDURES.
Condition: Unknown
Due 13 January 1986
Resolved 13 January 1986
Deck/Cargo
Issued 13 January 1986
Resolved
CONDUCT OPERATIONAL HYDRO OF CARGO PIPING.
Condition: Unknown
Due 13 January 1986
Resolved 13 January 1986
Deck/Cargo
Issued 13 January 1986
Resolved
PROVIDE TWO YEARS SUPPLY OF IG SYSTEM'S CIRCULAR RECORDING PAPER AND MAINTAIN USED ONES ON BOARD.
Condition: Unknown
Due 13 January 1986
Resolved 13 January 1986
Navigation
Issued 13 January 1986
Resolved
PROVIDE UP-TO-DATE DEVIATION CARD FOR MAGNETIC COMPASS.
Condition: Unknown
Due 13 January 1986
Resolved 13 January 1986
Unknown
Issued 13 January 1986
Resolved
MAKE PERMANENT REPAIRS TO THE MSD TREATMENT SYSTEM IN ACCORDANCE WITH THE DAILY AND WEEKLY OPERATIONAL CHECKS LISTED IN THE INSTRUCTION MANUAL. PROVIDE AMPLE SPARE CHEMICAL FOR TREATMENT.
Condition: Unknown
Due 13 January 1986
Resolved 13 January 1986
Deck/Cargo
Issued 13 January 1986
Resolved
CALIBRATE CARGO PUMP GAUGES.
Condition: Unknown
Due 13 January 1986
Resolved 13 January 1986
Construction/Loadline
Issued 13 January 1986
Resolved
PROVE PROPER OPERATION OF THE OIL CONTENT MONITOR.
Condition: Unknown
Due 13 January 1986
Resolved 13 January 1986
Unknown
Issued 13 January 1986
Resolved
CONDUCT FIRE AND BOAT DRILLS.
Condition: Unknown
Due 13 January 1986
Resolved 13 January 1986
Accommodation/Occupational Safety
Issued 13 January 1986
Resolved
RENEW VENT SCREENS ON GOOSE NECK VENTS ON FANTAIL AND FORECASTLE AND THE SCREEN ON THE PORT OUTBOARD PLENUM INTAKE.
Condition: Unknown
Due 13 January 1986
Resolved 13 January 1986
Construction/Loadline
Issued 13 January 1986
Resolved
RENEW HAND RAILS ON THE STARBOARD SIDE OF #1 FOAM MONITOR WALKWAY.
Condition: Unknown
Due 13 January 1986
Resolved 13 January 1986
Engineering
Issued 13 January 1986
Resolved
TEST ALL SIX FLAME DETECTORS TO READ BETWEEN 20-28 VOLTS RUNNING AND 0-5 VOLTS NOT RUNNING AS PER TEST PROCEDURES.
Condition: Unknown
Due 13 January 1986
Resolved 13 January 1986
Engineering
Issued 13 January 1986
Resolved
MAKE PERMANENT REPAIRS TO THE LIGHT ON THE PORT BOILER WATER LEVEL INDICATOR ON THE CONTROL CONSOLE.
Condition: Unknown
Due 13 January 1986
Resolved 13 January 1986
Unknown
Issued 13 January 1986
Resolved
CLEAN, REMOVE, TIE DOWN, OR MAKE SAFE, ALL LOOSE GEAR IN THE FOAM ROOM AND STEERING GEAR ROOM.
Condition: Unknown
Due 13 January 1986
Resolved 13 January 1986
Engineering
Issued 13 January 1986
Resolved
MAKE PERMANENT REPAIRS AND TEST THE AUTO-ROTATION SYSTEM IN ACCORDANCE WITHTHE TEST PROCEDURES.
Condition: Unknown
Due 13 January 1986
Resolved 13 January 1986