Documentation record
Registered dimensions (L × B × D)28.0 ft × 10.0 ft × 8.0 ft
Registered tonnagegross 15 / net 12
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderPREMIUM PARASAIL BOATS · CAPE CORAL, FL, UNITED STATES · built 1998
Hull materialFRP (Fiberglass)
PropulsionDiesel Outdrive
Hull shapeShip
Hull configurationMonohull
Hailing portMAUI, HI
Endorsements, as the file codes themcw_un
DocumentationValid · issued 10 December 2025 · expires 31 December 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it15 - Simplified, Gross Ton
12 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 14 inspections, each with its date, unit and type; 16 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 14
13 January 2026
Administrative Inspection
Administrative · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8296110
16 October 2025
Annual Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 8253724
11 September 2024
Drydock Exam · Annual Inspection
Physical examination · OP location-Sector Honolulu Prevention Department- Wailuku · USCG Oceania District (CGD-O) · Activity 7997446
14 November 2023
Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7824330
22 September 2022
Drydock Exam · Deficiency Check · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7563979
29 March 2022
Plan Review "T" Boat · Administrative Inspection · Construction Oversight
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7420642
1 February 2022
Deficiency Check · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7388608
19 November 2020
Annual Inspection · Drydock Exam · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7095046
21 November 2019
Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6860079
11 December 2018
Administrative Inspection · Deficiency Check
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6595807
16 October 2018
Annual Inspection · Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6562718
11 May 2018
Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6411661
22 September 2017
Deficiency Check · COI Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6272643
13 May 2016
Annual Inspection · Deficiency Check · DAPI Audit · Hull Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5923092
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 11 September 2024
Resolved
Portable extinguishers must be inspected and maintained in accordance with NFPA 10. The owner or managing operator must provide satisfactory evidence of the required servicing to the marine inspector.
Action required: 10 - Deficiency Rectified
Due 11 September 2024
Resolved 11 September 2024
Resolution: Required fire extinguisher replaced with one having valid servicing records during inspection.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 22 September 2022
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International and Inland Navigation Rules. Navigation lights on vessel where not mounted properly. Stern light was facing forward and side light were opposite of what they should be. Make nav lights comply with nav rules.
46 CFR 183.420
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 September 2022
Resolution: Nav lights comply with nav rules.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 22 September 2022
Resolved
The fuel shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located. The fuel shutoff valve at the tank did not fully secure when closed from outside the compartment. Make fuel valve fully close from outside the compartment.
46 CFR 182.455(b)(4)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 September 2022
Resolution: Fuel shutoff fully closes.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 22 September 2022
Resolved
A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable and made watertight. Numerous bulkhead penetrations noted on forward watertight bulkhead and engine room bulkhead. In accordance with vessel Stability Letter watertight bulkheads are at the following longitudinal locations forward of the transom: 7'5", 15'5", 17'5". Make watertight bulkheads watertight.
46 CFR 179.320(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2022
Resolved 10 October 2022
Resolution: Bulkheads sealed.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 February 2022
Resolved
Each vessel must be provided with at least two operable portable battery flashlights. One at the helm and one at machinery space. Vessel did not have flashlights. Provide 02 flashlights.
46 CFR 183.430
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2022
Resolved 6 June 2022
Resolution: Lights provided.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 February 2022
Resolved
A hatch cover must be attached with a captive chain/keeper chain to prevent its loss. Forward hatch missing captive chain. Provide chain for hatch.
46 CFR 179.360
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2022
Resolved 6 June 2022
Resolution: Keeper chain provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 February 2022
Resolved
Fuel tank must be maintained in such a manner to afford adequate protection from emergent situations. Fuel tank showing signs of sever pitting at fill piping connection and tank top. Remove tank and make ready for full inspection or provide new CG Approved fuel tank including plans and approval letter.
46 CFR 182.440
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2022
Resolved 27 May 2022
Resolution: New fuel tank installed.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 1 February 2022
Resolved
Stability letter indicates 03 watertight bulkheads on vessel. Numerous penetrations throughout vessel noted. Make permanent repairs to penetrations on watertight bulkheads (see stability letter for location of bulkheads).
46 CFR 178.230
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2022
Resolved 6 June 2022
Resolution: Penetrations filled.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 February 2022
Resolved
A propulsion engine control system must be designed so that a loss of power to the control system does not result in an increase in shaft speed. New electronic propulsion controller installed on vessel. QFA and DVTP not provided and test not completed Provide QFA and DVTP in accordance with CVC-Policy Letter 17-07 and conduct testing IAW approved QFA and DVTP.
46 CFR 184.620
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 March 2022
Resolved 2 May 2022
Resolution: QFA/DVTP procedures approved and system tested.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 November 2020
Resolved
Shuttoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fule line to stop fuel flow when servicing accessories. the shutoff valve at the tank must be mmanually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. If the handle to the shutoff valve at the tank is located inside the machinery space, it must be located so that the operator does not have to reach more than 300 millimeters (12 inches) into the machinery space and the valve handle must be shielded from flames by the same material the hull is constructed of, or some noncombustible material. Electric solenoid valves must not be used, unless used in addition to the manual valve. The vesel's fuel shutoff valve was inoperable. Repair or replace the fuel shutoff valve.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 November 2020
Resolution: Marine Inspector verified repaired fuel shutoff valve.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 16 October 2018
Resolved
Epirb battery was expired. Hydrostatic release expiration date was expired. Renew battery and hydrostatic release in accordance with 46 CFR 180.64.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 December 2018
Resolution: New e-pirb provided.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 16 October 2018
Resolved
Console 10-B:C portable extinguisher was not mounted. Mount in accordance with 46 CFR 181.520.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 December 2018
Resolution: Extinguisher mounted.
Communications › Radio Communications › EPIRB
Issued 13 May 2016
Resolved
EPIRB battery is expired.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2016
Resolution: Vessel purchased and registered a new EPIRB.
Lifesaving › Lifebuoys › Size
Issued 13 May 2016
Resolved
Lifering was not proper size.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2016
Resolution: Vessel purchased a new 24" lifering and labled it.
Fire Fighting › Fixed Gas Fire Extinguishing System › Quantity of Gas
Issued 13 May 2016
Resolved
Fireboy is out of service inspection date.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2016
Resolution: Vessel had approved inspector check and certify system.
Fire Fighting › Fire Bucket › Quantity
Issued 13 May 2016
Resolved
Missing 2 fire buckets
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 May 2016
Resolution: Vessel purchased new fire buckets.