Records from 1998 to 2026. Most recent: inspection, 2 March 2026.
Inspection history · 32
2 March 2026
Vessel Attendance · Internal Structural Exam · Administrative Inspection · Annual Inspection · Drydock Exam
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 8318882
6 March 2025
Annual Inspection · Special Consideration · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 8089389
5 June 2024
Special Consideration · Administrative Inspection
Administrative · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7927739
7 March 2024
Annual Inspection · Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7871124
10 February 2023
COI Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7635136
8 August 2022
Annual Inspection · Administrative Inspection · DAPI Audit
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7522980
17 March 2022
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7413388
3 August 2021
COI Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7275893
6 May 2020
Drydock Exam · Administrative Inspection · Internal Structural Exam · DAPI Audit · Annual Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6938868
29 May 2019
Administrative Inspection · Annual Inspection · DAPI Audit
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6698220
23 July 2018
Type not recorded
No type recorded · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6488689
2 July 2018
Administrative Inspection · Annual Inspection · Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6459499
1 November 2017
Annual Inspection · DAPI Audit · Administrative Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6296087
23 May 2017
Deficiency Check · Administrative Inspection · Damage Survey
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6156004
25 October 2016
Construction Oversight
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6029352
1 August 2016
Administrative Inspection · Deficiency Check · Hull Examination · COI Inspection
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 5954904
29 June 2016
Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 5923917
17 June 2014
Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4890430
22 May 2012
Annual Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 4326042
23 July 2008
COI Inspection · Hull Examination
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 3240478
4 June 2007
Annual Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2944681
13 June 2006
Annual Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2678212
15 June 2005
Annual Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2383934
14 September 2004
Deficiency Check · Re-Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 2195256
16 September 2003
Administrative Inspection
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1906191
1 July 2003
Hull Examination
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 1832052
20 June 2003
COI Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 1822481
6 December 2002
Re-Inspection
Physical examination · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 1715252
11 October 2001
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1384899
23 October 2000
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 823995
28 October 1999
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 811331
30 October 1998
Hull Examination · Initial Certification
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 804912
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 2 July 2018
Resolved
A vessel must comply with the structural design standard of 46 subchapter T. There is a fracture on the STBD side aft. The vessel owner is required to crop and re-new the area of fractures on the STBD side aft.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 2 July 2018
Resolved 12 July 2018
Resolution: Corrected; all SAT.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 2 July 2018
Resolved
A vessel must comply with the structural design standard of 46 subchapter T. There are fractures on the stern near the port and STBD exhaust. The vessel owner is required to gouge and reweld the fractures.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Due 2 July 2018
Resolved 12 July 2018
Resolution: Corrected; all SAT.
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 2 July 2018
Resolved
A vessel must comply with the structural design standard of 46 subchapter T. There is a fracture on the port side of the hull aft. The vessel owner is required to gouge and reweld the fracture.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 2 July 2018
Resolved 12 July 2018
Resolution: Corrected; all SAT.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 2 July 2018
Resolved
A vessel must comply with the structural design standard of 46 subchapter T. There is a fracture on the STBD steps forward. The vessel owner is required to gouge and reweld the fracture.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Due 2 July 2018
Resolved 12 July 2018
Resolution: Corrected; all SAT.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 2 July 2018
Resolved
A vessel must comply with the structural design standard of 46 subchapter T. There is an area of fracutures on the STBD steps forward. The vessel owner is required to crop and re-new this area of fractures.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Due 2 July 2018
Resolved 12 July 2018
Resolution: Corrected; all SAT.
Construction/Loadline › Hull › Side Shell
Issued 23 May 2017
Resolved
Repair crack in aft stbd side side shell
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 June 2017
Resolved 9 June 2017
Resolution: Vessel repaired cracked side shell
Engineering › Fuel Oil Service System › Valve
Issued 1 August 2016
Resolved
Replace fuel shutoff valve
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 August 2016
Resolved 6 August 2016
Resolution: Vessel replaced fuel shutoff valve
Construction/Loadline › Hull › Bottom Plating
Issued 1 August 2016
Resolved
Install locking nuts on identified screws located in forward hull panel.
Action required: 705 - Other - as specified
Due 14 August 2016
Resolved 6 August 2016
Resolution: Vessel installed locking nuts
Lifesaving › Lifebuoys › Stowage
Issued 1 August 2016
Resolved
Relocate ring buoy to allow deployment in an emergency from operation station.
Action required: 705 - Other - as specified
Due 14 August 2016
Resolved 6 August 2016
Resolution: Vessel relocated ring buoy
Construction/Loadline › Structures › Superstructure
Issued 1 August 2016
Resolved
Tighten cage brace bolts
Action required: 705 - Other - as specified
Due 14 August 2016
Resolved 6 August 2016
Resolution: Vessel tighten bolts
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 15 June 2005
Resolved
Fuel tank is to be properly grounded IAW 46 CFR 182.445(g).
Action required: 705 - Other - as specified
Due 15 July 2005
Resolved 16 June 2005
Resolution: Tank was grounded.
Lifesaving › Lifebuoys › Serviceable
Issued 15 June 2005
Resolved
Buoyant line for lifebuoy was wasted and not serviceable. Line is to be renewed IAW 46 CFR 180.70(c).
Action required: 705 - Other - as specified
Due 15 July 2005
Resolved 16 June 2005
Resolution: Faxed receipt was provided for new line.
Engineering › Fuel Oil Service System › Hose
Issued 14 September 2004
Resolved
Issued CG-835 to install double clamps on fuel supply hoses.
Condition: Placed in Improper Service
Due 24 September 2004
Resolved 24 September 2004
Resolution: Corrected.
Engineering › Fuel Oil Service System › Vent Pipe
Issued 14 September 2004
Resolved
Issued CG-835 to replace fuel vent hose.
Condition: Improper/Lack of Maintenance
Due 24 September 2004
Resolved 24 September 2004
Resolution: Corrected.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 14 September 2004
Resolved
Issued CG-835 to post lifejacket donning procedures in 2nd row.
Condition: Unknown
Due 24 September 2004
Resolved 24 September 2004
Resolution: Corrected.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Pressure
Issued 20 June 2003
Resolved
Issued CG-835 to have fire extinguisher inspected. Aft fire extinguisher's charge was low.
Condition: Unknown
Due 28 June 2003
Resolved 20 June 2003
Resolution: Fire extinguisher was tested and recharged.
Documentation › Certificates/Documents
Issued 20 June 2003
Resolved
Issued CG-835 to provide an original copy of the Stability letter. LEGACY COMPONENT DESC: Stability Letter
Condition: Unknown
Due 18 July 2003
Resolved 24 June 2003
Resolution: Received a copy of the Stability letter from the representative.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 6 December 2002
Resolved
1. Issued CG-835 to label location of lifejackets and seperate child from the adult lifejackets.
LEGACY COMPONENT DESC: Storage
Condition: Unknown
Due 6 January 2003
Resolved 11 October 2004
Resolution: Corrected.
Engineering › Fuel Oil Service System › Valve
Issued 6 December 2002
Resolved
2. Issued CG-835 to install a remote means of securing the fuel shutoff valve. (Found that in the case of a fire it would be extremely difficult to reach around the guard and secure the valve.)
LEGACY COMPONENT DESC: Valve
Condition: Unknown
Due 6 January 2003
Resolved 11 October 2004
Resolution: Corrected.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 6 December 2002
Resolved
3. Issued CG-835 to provide a better means of access to the lifejackets. (Lifejackets were being stored in bags under the seats. A bar extending across the bottom of the seats base made it difficult to get the bags out from under the seats.)
LEGACY COMPONENT DESC: Storage
Condition: Improper Installation
Due 6 January 2003
Resolved 11 October 2004
Resolution: Corrected.