Records from 1984 to 2024. Most recent: inspection, 5 February 2024.
Inspection history · 66
5 February 2024
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7868826
3 October 2023
Load Line/Change of Employment
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7798754
3 September 2019
Load Line/Change of Employment · Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6803071
11 January 2011
Annual Inspection · DAPI Audit · MARPOL Annex I Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3921031
10 February 2010
Internal Structural Exam · COI Inspection · Examination of Repairs · Drydock Exam · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3681642
6 October 2008
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3339537
7 September 2008
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3327655
28 February 2008
Annual Inspection · Deficiency Check · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3155548
5 July 2007
Internal Structural Exam · MARPOL Annex I Examination · Administrative Inspection · Annual Inspection · Hull Examination · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2973436
26 March 2006
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2612293
21 March 2006
Re-Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2598099
16 January 2006
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 2569089
24 March 2005
Plan Review (Other than "T") · COI Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 2305728
18 February 2005
Hull Examination · Permit to Proceed · Examination of Repairs · Plan Review (Other than "T") · Internal Structural Exam
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2295426
1 February 2005
Permit to Proceed
Administrative · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 2284228
26 September 2004
Annual Inspection
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 2205201
19 November 2003
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1950800
19 September 2003
Periodic Inspection · Internal Structural Exam · Examination of Repairs · MARPOL Annex I Examination · Administrative Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1874093
15 August 2003
Administrative Inspection
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1877180
12 August 2003
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1886992
19 June 2003
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1890728
28 April 2003
Drydock Extension
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1782539
29 March 2003
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1765636
19 March 2003
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1759491
5 February 2003
Deficiency Check · In-Service Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1759482
17 January 2003
Administrative Inspection
Administrative · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 1731846
7 January 2003
Deficiency Check · Examination of Repairs · Administrative Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1727361
8 November 2002
Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1704078
14 October 2002
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1697327
11 October 2002
Deficiency Check · Annual Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1691165
3 October 2001
Annual Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1401569
11 April 2001
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 135946
28 July 2000
COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1464093
7 January 2000
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1403017
3 January 2000
Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 780368
24 June 1998
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1130084
23 June 1997
COI Inspection · Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 778189
31 January 1997
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1101339
26 December 1996
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1100104
20 December 1996
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1094344
11 August 1996
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 191093
11 August 1996
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 754928
30 May 1996
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1412996
9 June 1995
COI Inspection · Examination of Repairs
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1435625
12 July 1994
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 537209
16 February 1994
Examination of Repairs · Damage Survey · Hull Examination · COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 851404
29 December 1993
Permit to Proceed
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1161200
20 November 1993
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 176519
2 November 1993
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1446030
4 May 1993
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 960381
11 December 1992
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1138019
17 November 1992
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1449566
1 May 1992
Examination of Repairs
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 960206
15 November 1991
COI Inspection · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1262727
1 December 1990
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 913455
8 November 1989
COI Inspection · Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1215136
1 December 1988
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1206694
21 April 1988
Damage Survey
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1033782
13 January 1988
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1024409
29 April 1987
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1012217
7 February 1987
Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1311838
18 December 1986
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1011302
19 August 1986
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1311363
2 January 1986
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1302980
19 December 1984
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1285390
4 September 1984
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1282206
Fire Fighting › Semiportable CO2 Fire Extinguishers › Location
Issued 10 February 2010
Resolved
Vessel did not have a B-V extinguiser located at each access route to the helo deck, IAW 46 CFR 108.495 (a)
Action required: 705 - Other - as specified
Due 30 April 2010
Resolved 13 April 2010
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 24 March 2005
Resolved
Properly label all breakers on all circuit breaker panels.
Due 24 April 2005
Resolved 25 March 2005
Resolution: Deficiency item cleared per letter sent by [name withheld], Senior Vice President, of Bisso Marine.
Engineering › Diesel Engine (auxiliary) › Overspeed Device
Issued 24 March 2005
Resolved
Show proper operation of lube oil, jacket water and overspeed shutdowns on the No. 1 and No. 2 Ship Service Diesel Generators.
Condition: Improper/Lack of Maintenance
Due 24 April 2005
Resolved 25 March 2005
Resolution: Deficiency corrected via letter from [name withheld], Senior Vice President, of Bisso Marine on 25 March 2005.
Construction/Loadline › Structures
Issued 29 September 2003
Resolved
Crop and renew areas described in activity 1874093 narrative for No. 1 port ballast tank.
Action required: 705 - Other - as specified
Resolved 21 October 2003
Resolution: All areas identified were properly renewed.
Construction/Loadline › Hull
Issued 19 September 2003
Resolved
Crop and renew lower 5' of two inboard stiffeners in the port forepeak.
Action required: 705 - Other - as specified
Resolved 21 October 2003
Resolution: Both stiffeners were renewed.
Construction/Loadline › Hull
Issued 19 September 2003
Resolved
Crop and renew areas described in activity 1874093 narrative for center forepeak.
Action required: 705 - Other - as specified
Resolved 21 October 2003
Resolution: All areas identified were properly renewed.
Construction/Loadline › Hull
Issued 19 September 2003
Resolved
Crop and renew areas described in activity 1874093 narrative for starboard forepeak.
Action required: 705 - Other - as specified
Resolved 21 October 2003
Resolution: All areas identified were properly renewed.
Construction/Loadline › Hull
Issued 19 September 2003
Resolved
Crop and renew areas described in activity 1874093 narrative for starboard aft void.
Action required: 705 - Other - as specified
Resolved 21 October 2003
Resolution: All areas identified were properly renewed.
Construction/Loadline › Hull
Issued 19 September 2003
Resolved
Crop and renew areas described in activity 1874093 narrative for center aft void.
Action required: 705 - Other - as specified
Resolved 21 October 2003
Resolution: All areas identified were properly renewed.
Construction/Loadline › Hull
Issued 19 September 2003
Resolved
Crop and renew areas described in activity 1874093 narrative for forward pump room
Action required: 705 - Other - as specified
Resolved 21 October 2003
Resolution: all areas identified were properly renewed.
Construction/Loadline › Penetrations
Issued 19 September 2003
Resolved
Properly pack the watertight transit in way of the aft pump room.
Action required: 705 - Other - as specified
Resolved 21 October 2003
Resolution: The cable transit was properly packed.
Construction/Loadline › Structures
Issued 19 September 2003
Resolved
Crop and renew areas described in activity 1874093 narrative for No. 2 center ballast tank.
Action required: 705 - Other - as specified
Resolved 21 October 2003
Resolution: All areas identified were properly renewed.
Construction/Loadline › Structures
Issued 19 September 2003
Resolved
Crop and renew areas described in activity 1874093 narrative for No. 3 port ballast tank.
Action required: 705 - Other - as specified
Resolved 21 October 2003
Resolution: All areas identified were properly renewed.
Accommodation/Occupational Safety › Occupational Safety
Issued 5 February 2003
Resolved
Provide a sign for tail rotor for helo deck entrances.
Action required: 705 - Other - as specified
Due 13 February 2003
Resolved 13 February 2003
Accommodation/Occupational Safety › Occupational Safety
Issued 5 February 2003
Resolved
Adjust step height to control room and paint yellow.
Action required: 705 - Other - as specified
Due 13 February 2003
Resolved 13 February 2003
Electrical › Electrical Distribution System (service)
Issued 5 February 2003
Resolved
Mount drip shield over battery charger and distribution panel.
Action required: 705 - Other - as specified
Due 13 February 2003
Resolved 13 February 2003
Accommodation/Occupational Safety › Occupational Safety
Issued 5 February 2003
Resolved
Paint warning strips around stanchions for deck mooring cables.
Action required: 705 - Other - as specified
Due 13 February 2003
Resolved 13 February 2003
Electrical › Electric Supply System (service)
Issued 5 February 2003
Resolved
Cover electrical cable raceways on the main deck to prevent damage to the cables.
Action required: 705 - Other - as specified
Due 13 February 2003
Resolved 13 February 2003
Accommodation/Occupational Safety › Occupational Safety
Issued 5 February 2003
Resolved
Secure step from plow support area.
Action required: 705 - Other - as specified
Due 13 February 2003
Resolved 13 February 2003
Electrical › Electric Supply System (service)
Issued 5 February 2003
Resolved
Provide rubber mats in front of all newly installed electrical panels.
Action required: 705 - Other - as specified
Due 13 February 2003
Resolved 13 February 2003
Construction/Loadline › Structures
Issued 7 January 2003
Resolved
Renew tripped side longitudinals and frames in port aft void. LEGACY COMPONENT DESC: Frames and longitutinals
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 7 January 2003
Resolved 7 January 2003
Resolution: Examined four frames and three side longitudinals after they were renewed in the port aft void.
Construction/Loadline › Structures
Issued 7 January 2003
Resolved
Add additional structure to support weight of winches on deck.
Action required: 705 - Other - as specified
Due 7 January 2003
Resolved 7 January 2003
Resolution: Examined structure added to #2 and #3 port, starboard and center ballast tanks in acordance with plans submitted to ABS.
Construction/Loadline › Hull › Longitudinal Frame
Issued 8 November 2002
Resolved
Crop and renew approximately 220 feet of 6" x 3.5" x 3/8" bottom longitudinal angle in No. 2 starboard ballast tank due to wastage.
Condition: Improper/Lack of Maintenance
Due 8 November 2002
Resolved 8 November 2002
Resolution: Repairs were examined, tested as considered necessary and found satisfactory.
Construction/Loadline › Hull › Longitudinal Frame
Issued 8 November 2002
Resolved
Crop and renew approximately 110 feet of 6" x 3.5" x 3/8" bottom longitudinal angle in No.2 port ballast tank due to wastage.
Condition: Improper/Lack of Maintenance
Due 8 November 2002
Resolved 8 November 2002
Resolution: Repairs were examined, tested as considered necessary and found satisfactory.
Construction/Loadline › Hull › Transverse Frame
Issued 8 November 2002
Resolved
Crop and renew approximately 10 feet of bottom transverse framing in No. 2 port ballast tank due to wastage.
Condition: Improper/Lack of Maintenance
Due 8 November 2002
Resolved 8 November 2002
Resolution: Repairs and renewals were examined, tested as considered necessary and found satisfactory.
Construction/Loadline › Hull › Stiffener
Issued 8 November 2002
Resolved
Crop and renew approximately 24 feet of 6" x 3.5"x 3/8" inboard longitudinal bulkhead stiffner angle in No. 1 starboard ballast tank due to wastage.
Condition: Improper/Lack of Maintenance
Due 8 November 2002
Resolved 8 November 2002
Resolution: Repairs and renewals were examined, tested as considered necessary andfound satisfactory.
Construction/Loadline › Hull › Longitudinal Frame
Issued 8 November 2002
Resolved
Crop and renew all bottom longitudinal angles in forward No. 1 center pump room due to wastage.
Condition: Improper/Lack of Maintenance
Due 8 November 2002
Resolved 8 November 2002
Resolution: All repairs and renewals were examined , tested as considered necessary and found satisfactory.
Construction/Loadline › Hull › Transverse Frame
Issued 8 November 2002
Resolved
Crop and renew all bottom transverse floor frames12" x 3/8" for full length in No. 1 center forward pump room due to wastage.
Condition: Improper/Lack of Maintenance
Due 8 November 2002
Resolved 8 November 2002
Resolution: All repairs and renewals were examined, tested as considered necessary and found satisfactory.
Construction/Loadline › Hull › Longitudinal Frame
Issued 8 November 2002
Resolved
Crop and renew center longitudinal floor frame approximately 14" x 3/8" for full length in No. 1 center forward pump room due to wastage.
Condition: Improper/Lack of Maintenance
Due 8 November 2002
Resolved 8 November 2002
Resolution: repairs and renewals were examined, tested as considered necessary and found satisfactory.
Construction/Loadline › Hull › Hull Plating
Issued 8 November 2002
Resolved
Crop and renew approximately 7' x 3' x 7/16" bottom shell plating in No. 1 center forward pump room due to wastage.
Condition: Improper/Lack of Maintenance
Due 8 November 2002
Resolved 8 November 2002
Resolution: All repairs and renewals were examined , tested as considered necessary and found satisfactory.
Fire Fighting › Fire Pumps
Issued 22 October 2002
Resolved
Replace and prove proper operation of pressure gauge on the forward fire pump. 46CFR95.10-5(e) LEGACY COMPONENT DESC: Gauge
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 22 November 2002
Resolved 22 October 2002
Resolution: Operational test of gauge satisfactory.
Fire Fighting › Nozzles
Issued 22 October 2002
Resolved
Repair or replace fire nozzle at fire station No. 11. LEGACY COMPONENT DESC: Condition
Action required: 17 - Rectify deficiencies prior to departure
Due 22 November 2002
Resolved 22 October 2002
Resolution: Fire nozzle replaced, operational test satisfactory.
Fire Fighting › Nozzles
Issued 22 October 2002
Resolved
Repair leaking valve and fire nozzle at fire station No. 6. 46 CFR 95.10-10
Action required: 17 - Rectify deficiencies prior to departure
Due 22 November 2002
Resolved 22 October 2002
Resolution: Nozzle repaired, operational test satisfactory.
Fire Fighting › Fire Hydrants
Issued 22 October 2002
Resolved
Mark station identification at fire station No. 4. 46CFR97.37-15. LEGACY COMPONENT DESC: Location/Position
Due 17 November 2002
Resolved 22 October 2002
Resolution: Fire station No. 4 properly marked.
Communications › Alarms/Indicators
Issued 22 October 2002
Resolved
Prove proper operation of general alarms. 46CFR113.25-25 LEGACY COMPONENT DESC: General Alarm
Action required: 17 - Rectify deficiencies prior to departure
Due 22 November 2002
Resolved 22 October 2002
Resolution: Operationally tested general alarm. Alarm activated from stations in accomodations and remote location. Checked audio and visual indicators in accommodations, lower and aft machinery spaces, and main deck. Test satisfactory.
Operations/Management › Lifesaving
Issued 22 October 2002
Resolved
Provide emergency lighting for Muster Area 1. 46CFR199.110(c) LEGACY COMPONENT DESC: Op Readiness/Maintenance/Inspection
Due 17 November 2002
Resolved 29 October 2002
Resolution: Permanently mounted lights tested on emergency power, test and illumination coverage satisfactory.
Fire Fighting › Miscellaneous Items
Issued 22 October 2002
Resolved
Provide proper cable penetration fire stop in aft pump room in way of fore and aft bulkheads. 46CFR92.07-10 LEGACY COMPONENT DESC: A Class Division Penetrations
Due 17 November 2002
Resolved 22 October 2002
Resolution: Cable penetrations packed with approved fire stop material.
Deck/Cargo › Holds/Tanks
Issued 22 October 2002
Resolved
Provide mechanical plug for drain line/stripping line on fuel tank in aft pump room.
Due 17 November 2002
Resolved 22 October 2002
Resolution: Mechanical plugs installed on drain line.
Fire Fighting › Structural - A Class Divisions
Issued 22 October 2002
Resolved
Repair holes in overhead stairwell going down to aft pump room. LEGACY COMPONENT DESC: Decks - External Escape Routes
Due 17 November 2002
Resolved 22 October 2002
Resolution: The holes where old wire way penetrations with only the treaded sleeve remaining. The sleeves where capped and filled with approved fire stop material.
Engineering › Diesel Engine (auxiliary)
Issued 22 October 2002
Resolved
Prove overspeed trip on No 1 generator. 46CFR111.12-1 (b) LEGACY COMPONENT DESC: Overspeed Device
Due 17 November 2002
Resolved 22 October 2002
Resolution: Overspeed properly demonstrated and tested satisfactory.
Engineering › Electric Propulsion System
Issued 22 October 2002
Resolved
Prove reverse power relay on No. 1/ No. 2 generators. 46 CFR 111.12-11(f) LEGACY COMPONENT DESC: Reverse Power Protection Relay Circuitry
Due 17 November 2002
Resolved 22 October 2002
Resolution: Reverse power function demonstrated on both generators. Test satisfactory.
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 22 October 2002
Resolved
Replace brackets for portable fire extinguishers No. 6 & No. 15. 46 CFR 95.05-15. LEGACY COMPONENT DESC: Mounting Bracket
Due 17 November 2002
Resolved 22 October 2002
Resolution: Mounting brackets for both fire extinguishers replaced.
Construction/Loadline › Structures
Issued 22 October 2002
Resolved
Replace fuel oil tank vent in crane house. 46 CFR 58.5d-10(a)(4) LEGACY COMPONENT DESC: Ventilators
Due 17 November 2002
Resolved 22 October 2002
Resolution: Tank vent replace and deemed satisfactory.
Electrical › Electrical Distribution System (service)
Issued 22 October 2002
Resolved
Make proper splices to electrical cables in way of starboard crane house. 46 CFR 111.60-5 LEGACY COMPONENT DESC: Cable
Due 17 November 2002
Resolved 22 October 2002
Resolution: Cable connections replaced with junction boxes properly mounted to the bulkhead.
Electrical › Electrical Distribution System (service)
Issued 22 October 2002
Resolved
Properly secure all electrical wiring internal/external to crane house. 46 CFR 111.60-5 LEGACY COMPONENT DESC: Busway
Due 17 November 2002
Resolved 22 October 2002
Resolution: All wires properly secured using metallic bands and rubber chaffinge pieces.
Lifesaving › Lifebuoys
Issued 22 October 2002
Resolved
Properly mount waterlights for ring bouys. 46 CFR 199.70(a)(3) LEGACY COMPONENT DESC: Self-igniting Lights
Due 17 November 2002
Resolved 22 October 2002
Resolution: Waterlight where mounted in an authorized holder.
Engineering › Diesel Engine (auxiliary)
Issued 22 October 2002
Resolved
Prove emergency shut-downs for service generators. 46 CFR 58.01-25 LEGACY COMPONENT DESC: Emergency Shutdown
Due 17 November 2002
Resolved 22 October 2002
Resolution: Emergency shutdowns for both generators tested satisfactory.
Documentation › Safety/Response Plans/Programs
Issued 22 October 2002
Resolved
Update Fire Control & Safety Plan to reflect proper number of fire extinguishers and Class "A" and Class "B" boundaries. 46 CFR 97.36-1(a). LEGACY COMPONENT DESC: Fire Control Plans
Action required: 705 - Other - as specified
Due 8 December 2002
Resolved 7 January 2003
Resolution: Reviewed and approved Fire Control and Safety Plan this date.
Operations/Management › Drills/Instruction
Issued 22 October 2002
Resolved
Conduct Fire and Boat Drills LEGACY COMPONENT DESC: Fire & Boat
Due 17 November 2002
Resolved 22 October 2002
Resolution: Fire and boat drill satifactory. See narrative for details.
Lifesaving › Line-Throwing Appliances
Issued 22 October 2002
Resolved
Provide 1500 ft of auxiliary line for line throwing appliance. LEGACY COMPONENT DESC: Lines
Due 17 November 2002
Resolved 22 October 2002
Resolution: Line provided and adequately stored.
Construction/Loadline
Issued 3 October 2001
Resolved
The through bulkhead penetration for electrical wires that passes through the forward bulkhead of the aft machinery space was not properly packed with a fire retardant product. The penetration must be repacked with an approved method of packing for the product used.
Condition: Unknown
Due 6 November 2001
Resolved 22 October 2002
Resolution: Examined and found satisfactory installion of accepted fire stop material for wire penetrations.
Engineering
Issued 3 October 2001
Resolved
Hoses used for fueling were not tested annually and did not have the MAWP or the words "OIL SERVICE" stenciled on the hose.
Condition: Unknown
Due 5 October 2001
Resolved 5 October 2001
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 3 October 2001
Resolved
Provide appropriate crew to show that manning requirements could be met. Crew of vessel was not present during initial inspection.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 October 2001
Resolution: Adequate crew was provided prior to departure.
Deck/Cargo › Cargo Transfer (solid)
Issued 3 October 2001
Resolved
Obtain current crane certification from servicing company. LEGACY COMPONENT DESC: Crane
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 October 2001
Resolution: Servicing rep. was present on last day of inspection and presented current crane certification.
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 3 October 2001
Resolved
Provide attending marine inspector with adequate transfer procedures. LEGACY COMPONENT DESC: Transfer procedures
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 October 2001
Resolution: Vessel rep. presented attending marine inspector with adequate transfer procedures prior to the vessel leaving port.
Fire Fighting › Fixed Fire Detection System › Smoke Detectors
Issued 3 October 2001
Resolved
Replace missing smoke detector in the laundry as shown in the fire control plan.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 October 2001
Resolution: Missing smoke detector was replace with an approved smoke detector prior to leaving port.
Deck/Cargo
Issued 30 May 1996
Resolved
Prove suitability for service or renew emergency towing pendant prior to departure from Bahia de San Juan, Puerto Rico._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 30 May 1996
Resolved 4 June 1996
Construction/Loadline
Issued 16 February 1994
Resolved
Properly secure or remove rubber bumper where hanging loosely at stern.
Condition: Unknown
Due 28 February 1994
Resolved 28 February 1994
Electrical
Issued 16 February 1994
Resolved
Properly dead-end or remove exposed eletrical wiring from conduits on deck,both port and starboard side.
Condition: Unknown
Due 28 February 1994
Resolved 28 February 1994
Navigation
Issued 16 February 1994
Resolved
Make installed nav lights operable._x001C_
Condition: Unknown
Due 28 February 1994
Resolved 28 February 1994
Construction/Loadline
Issued 2 November 1993
Resolved
Repack reach rods for both sea valves in way of the ballast pump.
Condition: Unknown
Due 2 November 1993
Resolved 2 November 1993
Electrical
Issued 2 November 1993
Resolved
Renew electrical conduit in way of starboard forward bitts.
Condition: Unknown
Due 2 November 1993
Resolved 2 November 1993
Electrical
Issued 2 November 1993
Resolved
Renew stuffing tube on the fourth deck light fixture from bow starboard side.
Condition: Unknown
Due 2 November 1993
Resolved 2 November 1993
Electrical
Issued 2 November 1993
Resolved
Renew stuffing tube located between the fourth and fifth deck light fixturefrom the bow on the starboard side.
Condition: Unknown
Due 2 November 1993
Resolved 2 November 1993
Fire Fighting
Issued 2 November 1993
Resolved
Renew fire extinguisher bracket in way of the generator.
Condition: Unknown
Due 2 November 1993
Resolved 2 November 1993
Construction/Loadline
Issued 1 December 1990
Resolved
CROP AND RENEW AS REQUIRED APPROX 6' X 8' SECTION OF MAIN DECK-LOCATION PORT STERN QUARTER-CARGO LANE "A" AFT.
Condition: Unknown
Due 1 December 1990
Resolved 1 December 1990
Construction/Loadline
Issued 1 December 1990
Resolved
CROP AND RENEW #3 TRANSVERSE FRAM IN FWD CTR RAKE FROM CVK TO PORT SIDE BULKHEAD._x001C_
Condition: Unknown
Due 1 December 1990
Resolved 1 December 1990