MAURY USCG vessel records
← All vessels

BAY MONARCH

Built
1976
Last inspected
17 April 2025
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 17 April 2025
…with no type recorded1
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WCZ9381
Flag
UNITED STATES
Maury page id
psix-48697

Documentation record

Registered dimensions (L × B × D)127.4 ft × 34.6 ft × 10.8 ft
Registered tonnagegross 97 / net 66
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCOLBERG INC · STOCKTON CA, UNITED STATES · built 1976
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portSAN FRANCISCO, CA
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 14 November 2025 · expires 31 December 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it97 - Regulatory (Subpart C or D), Gross Ton
66 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 27 inspections, each with its date, unit and type; 31 deficiencies with the resolution recorded against each, 2 without one; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 27

17 April 2025 Examination of Repairs · Administrative Inspection · Drydock Exam · Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8113647
19 February 2025 In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 8082537
13 March 2024 Annual Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7878012
28 November 2023 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7831483
3 April 2023 Deficiency Check · Internal Structural Exam · Hull Examination · Drydock Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7661657
15 February 2023 COI Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7633275
17 November 2022 Administrative Inspection · In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7595756
1 October 2022 Administrative Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7569816
14 April 2022 Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7430912
8 February 2022 Annual Inspection · Deficiency Check
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7393041
16 December 2021 In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7369433
6 August 2021 Deficiency Check · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7279149
14 April 2021 Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7174482
10 March 2021 Internal Structural Exam · Drydock Exam · Hull Examination
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7157451
23 July 2020 Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7033245
28 January 2020 Deficiency Check · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6895588
15 April 2019 Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6663120
10 January 2019 Internal Structural Exam · In-Service Inspection · Examination of Repairs · Drydock Exam · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6607718
10 October 2018 Administrative Inspection
Administrative · Navigation Center · Activity 6558344
21 February 2018 MTSA Verification · COI Inspection · Administrative Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6356527
24 March 2017 Administrative Inspection · In-Service Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6119321
15 March 2017 Annual Inspection · MTSA Verification
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6123904
27 December 2016 Examination of Repairs · Drydock Exam · Internal Structural Exam
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6063996
16 December 2016 Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6060177
16 December 2016 Damage Survey
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6061980
30 July 2016 Administrative Inspection · Damage Survey
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5962766
18 February 2016 Internal Structural Exam · Annual Inspection
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 5817432

Deficiency record · 31

02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 July 2025 No resolution recorded
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull... Hull wastage was found during drydock in the sewage void IVO stbd main longitudinal, 2nd transverse frame. Worst wastage was 40% in single pit. Vessel was unable to complete repair at drydock. Temporary belzona coating authorized, affected area to be cropped and renewed at next haul out. Vessel crew shall monitor the affected area weekly and maintain a log to ensure condition does not worsen. 46 CFR 116.100(a)
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 July 2025 No resolution recorded
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull... Deck wastage was discovered in port fan space on 2nd deck. Temporary repair authorized to maintain watertight integrity. Crop and renew at next haul out. 46 CFR 116.100(a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 13 March 2024 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. The vessel’s shaft seals were leaking beyond limitations. Vessel to repair shaft seals to proper limitations to the satisfaction of the marine inspector. 46 CFR 182.05-1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 13 March 2024
Resolution: Vessel rectified deficiency during inspection.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 13 March 2024 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessels Port/Starboard rudder posts packing glads leaking. Vessel to repair rudder posts packing glands to the satisfaction of the marine inspector. 46 CFR 182.05-1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 27 March 2024
Resolved 13 March 2024
Resolution: Vessel rectified deficiency during inspection.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 13 March 2024 Resolved
Each vessel that operates on the high seas, or that operates beyond three miles from the coastline of the Great Lakes, must have on board an FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. Vessel had an expired registration sticker. Vessel route restricted to 3 NM from the coastline.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 April 2024
Resolved 28 March 2024
Resolution: Vessel sent satisfactory email showing new EPIRB sticker with registration to ensure the number was the same.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 13 March 2024 Resolved
At each initial and subsequent inspection for certification, the marine inspector shall view the vessel afloat and shall conduct the following tests and inspections of the hull structure and its appurtenances: Examine and test by operation all watertight closures in the hull, deck, and bulkheads. Vessels forward watertight door's bottom knife edge has wastage beyond limitations and has two inop dogs. Vessel to submit repair plan for knife edge wastage and replace dogs to the satisfaction of the marine inspector. 46 CFR 176.25-5(a)(2)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 March 2024
Resolved 15 May 2024
Resolution: All securing dogs were properly installed.
05 - Radio Communications › N/A - No Subsystem › Main installation
Issued 13 March 2024 Resolved
Vessels operated solely within 20 nautical miles of land must be equipped with a VHF–DSC radiotelephone installation meeting the requirements of § 80.1101(c)(2). Vessels VHF-DSC does not have an MMSI number programed and does not have the ability to transmit latitude and longitude. Vessel to repair radio to the satisfaction of the marine inspector. 47 CFR 80.805
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 April 2024
Resolved 24 April 2024
Resolution: Vessel rep sent satisfactory evidence of MMSI installed in the radios.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 13 March 2024 Resolved
At each initial and subsequent inspection for certification, the marine inspector shall view the vessel afloat and shall view the vessel afloat and shall conduct the following tests and inspections of the hull structure and its appurtenances: Examine and test by operation all watertight closures in the hull, decks, and bulkheads. The vessel’s port hole in starboard engine room entryway is cracked. Vessel to replace port hull to the satisfaction of the marine inspector. 46 CFR 176.25-5(a)(2)
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 April 2024
Resolved 25 April 2024
Resolution: Vessel rep sent satisfactory evidence showing repaired port hole.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 13 March 2024 Resolved
An internal structural examination conducted in compliance with § 115.600 of this part may be conducted while the vessel is afloat or out of the water and consists of a complete examination of the vessel's main strength members, including the major internal framing, the hull plating, voids, and ballast, cargo, and fuel oil tanks. Vessel has sharp insets on the port side of the sewage hold resulting in cracked welds between the 2nd, 3rd, and 5th frames. Vessel to submit repair plan to the satisfaction of the marine inspector prior to next credit dry dock.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 2 June 2025
Resolution: Witnessed repairs to cracked welds during drydock period.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 15 February 2023 Resolved
The minimum capacity of the power fire pump shall be 50 gallons per minute at a pressure of not less than 60 pounds per square inch at the pump outlet. The pump outlet shall be fitted with a pressure gage. Pressure gauge on fire pump was inadequate and did not read more than 30 psi. 46 CFR 181.10 (c) “OLD T”
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 15 February 2023
Resolution: Gauge was replaced with an appropriate type.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 October 2022 Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessel reported a mechanical failure of three muff coupling bolts on the STBD shaft. Make repairs to satisfaction of attending Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 October 2022
Resolution: New muff coupling installed. All reports uploaded.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 14 April 2022 Resolved
The construction and arrangement of a vessel must allow the safe operation of a vessel in accordance with the terms of its COI giving consideration for provisions for a seaworthy hull. Vessel struck piling and damaged rub rail on starboard quarter. Vessel is authorized a temporary welded repair utilizing a doubler.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 April 2022
Resolution: Rcvd photos for doubled rub rail.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 14 April 2022 Resolved
The construction and arrangement of a vessel must allow the safe operation of a vessel in accordance with the terms of its COI giving consideration for provisions for a seaworthy hull. Vessel to make permanent repairs for deficiency 01 prior to credit drydock. Plans shall be submitted as per 46 CFR 115.700(a) prior to starting work.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 13 April 2023
Resolution: Reveiwed repairs made to the stbd rub rail during dry dock inspection.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 16 February 2022 Resolved
At each initial and subsequent inspection for certification, the marine inspector shall view the vessel afloat and shall conduct the following tests and inspections of the hull structure and its appurtenances: Examine all accessible parts of the interior of the hull, and watertight bulkheads. Vessel has cable runs through bulkhead in between sewage void and engine room that are not secured with an approved sealant in addition to too many cables running through the bulkhead penetration. 46 CFR 176.25-5(a)(1) Old T(L)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 March 2022
Resolved 4 March 2022
Resolution: Operator sent photos of adequate cable runs.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 14 April 2021 Resolved
Adequate means of ground detection shall be provided on ships service generator and distribution switchboard. The bulb on panel for number two generator was inoperable. 46 CFR 111.30-15(b)(7) (old J)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 May 2021
Resolved 25 April 2021
Resolution: Received photos from operator for repair.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 14 April 2021 Resolved
Vessel operating in cold water that maintains radio communications every 15 minutes may provide life floats that will accommodate at least 100 % of total number of persons on board that is operating on limited coastwise route. Vessel has 12 life floats on board not concurrent with COI, passenger count restricted for limited coastwise to total persons on board 240. 46 CFR 117.205(b)
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 15 February 2023
Resolution: Vessel has correct number of life floats as indicated on COI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 April 2021 Resolved
Distribution panels of switchboard type shall be completely enclosed or otherwise protected against accidental contact and unauthorized operation. MI observed no enclosure on general switchboard for starboard generator, leaving exposed wires. 46 CFR 111.40-1(b)(1)
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 4 June 2021
Resolved 31 August 2021
Resolution: Operator provided photos for new enclosure around switchboard.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 14 April 2021 Resolved
Lighting fixtures in locations exposed to the weather or any other locations exposed to splashing water shall be made of watertight construction. The main deck overhead light was missing cover and bulb was inoperable. 46 CFR 111.75-20(b) (old J)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 June 2021
Resolved 25 April 2021
Resolution: Received verification from operator that cover was replaced.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 January 2020 Resolved
The VSO must ensure that at least one security drill is conducted at least every three months. Security drill records not present. 33 CFR 104.230(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 April 2020
Resolution: Received records from previous 12 months ascertaining required security drills were completed every three months.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 January 2020 Resolved
The vessel owner or operator must ensure that a written VSA report is prepared and included as part of the VSP. Vessel security assessment was not present. 33 CFR 104.305(d)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 February 2020
Resolved 8 April 2020
Resolution: Received Vessel Security Assessment from vessel rep; all sat.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 28 January 2020 Resolved
The CSO or VSO must ensure a audit of the VSP is performed annually. Security audit not present. 33 CFR 104.415(b)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 7 April 2020
Resolution: Received electronic record of completed annual security audit from CSO and FSO in 12/2019.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 28 January 2020 Resolved
The required monthly EPIRB test shall be logged or otherwise documented. No EPIRB logs found. 46 CFR 185.728(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 February 2020
Resolved 12 July 2021
Resolution: Received log book for EPIRM from Vessel Rep.
05 - Radio Communications › N/A - No Subsystem › Main installation
Issued 28 January 2020 Resolved
Every vessel must have a detailed inspection of the radio installation by an FCC-licensed technician every five years. FCC-licensed technician did not verify inspection of EPIRB installation on Communications Act Safety Radiotelephony Certificate. 46 CFR 184.502 [Parent cite] & 47 CFR 80.903
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 10 March 2020
Resolution: Received documentation attesting to proper EPIRB installation check by licensed technician for FCC Radiotelephony Certificate.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 28 January 2020 Resolved
When buoyant apparatuses are stowed in tiers, the separate units must be kept apart by spaces. Wooden spaces not evident in BA tiers. 46 CFR 180.137(f)
Action required: 10 - Deficiency Rectified
Resolved 28 January 2020
Resolution: Corrected on the spot.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 January 2020 Resolved
Electrical installations and equipment shall not cause fire and reasonably safe from electrical shock of personnel. Dead end wires in lazarette space found hanging in bilge and not capped. 46 CFR 183.01-5 [Old T]
Action required: 10 - Deficiency Rectified
Resolved 28 January 2020
Resolution: Corrected on the spot.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 10 October 2018 Resolved
ZERO DRAFT: no static draft information
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 16 April 2019
Resolution: Master entered draft data into AIS.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 24 March 2017 Resolved
Fixed CO2 systems on inspected vessels need to be type approved and installed in accordance with applicable regulations. Relocate the CO2 pressure switch outside of the protected space. Cite: 46CFR118.410(b)(1)(i), See MSIB 1512 for reference.
Action required: 705 - Other - as specified
Due 31 January 2019
Resolved 16 April 2019
Resolution: CO2 pressure switch relocated to CO2 storage space in the lazarette.
Construction/Loadline › Structures › Door
Issued 16 December 2016 Resolved
Repair damage to stern port side tonnage door to original condition to the satisfaction of the attending marine inspector.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 10 February 2017
Resolved 10 February 2017
Fire Fighting › Fixed CO2 Fire Extinguishing System › Remote Pulls
Issued 16 December 2016 Resolved
Repair or replace remote pull cable for CO2 system and have the system retested to the satisfaction of attending marine inspector.
Action required: 705 - Other - as specified
Due 10 February 2017
Resolved 10 February 2017
Lifesaving › Buoyant Apparatus › Float-free Link
Issued 18 February 2016 Resolved
The bouyant apparatus float free link must be the proper size for the bouyant apparatus. The current link is too large; change link size or re-arrange BAs on the STBD bridge wing.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 25 February 2016
Resolution: Vsl re-arranged the BA storage locations so that the float free links are appropriatly sized for the number of floats.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 18 February 2016 Resolved
Provide complete, accurate, and simple CO2 system instructions locally and at the remote pull station.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 February 2016
Resolved 16 March 2016
Resolution: Recieved pictures from the operator of the updated and posted instructions for the installed CO2 system at both the lcoal and remote station.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.