MAURY USCG vessel records Sign in
← All vessels

APOLLO

APOLLO is a 1976 passenger vessel (inspected). The Coast Guard has recorded 81 inspections since 1982, most recently in August 2025, along with 105 deficiencies.

Records from 1982 to 2025. Most recent: inspection, 8 August 2025.

Built
1976
Last inspected
8 August 2025
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDG5249
Flag
UNITED STATES
338345000
Maury page id
psix-48709

Inspections, by type

…with no type recorded12
Years with a record 32 calendar years (1982–2025)
The 81 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)100.0 ft × 22.8 ft × 4.7 ft
Registered tonnagegross 93 / net 63
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
Builderbuilder not recorded · CHALMETTE, LA, UNITED STATES · built 1976
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portGALVESTON, TX
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 25 August 2026 · expires 31 August 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it93 - Regulatory (Subpart C or D), Gross Ton
63 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDG5249MMSI 338345000 · active · compulsorily equipped · granted 30 August 2022, expires 7 September 2032
WCY2597MMSI 367341910 · expired · voluntarily equipped · granted 8 March 2008, cancelled 2 June 2018
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 81

8 August 2025 Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8205411
12 August 2024 Drydock Exam · Examination of Repairs
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7979607
27 June 2024 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7946281
25 June 2023 Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7722730
30 August 2022 Drydock Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7547009
8 June 2022 Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7472169
22 July 2021 Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7264356
13 April 2021 Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7174410
15 July 2020 Drydock Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7006967
15 July 2020 In-Service Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7026729
4 June 2020 Annual Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6967762
30 July 2019 Internal Structural Exam · Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6767551
25 June 2018 Internal Structural Exam · COI Inspection · Drydock Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6455119
26 February 2018 In-Service Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6361844
1 January 2018 Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6331049
31 July 2017 Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6226647
13 July 2017 Inclining Experiment
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6209241
14 December 2009 Administrative Inspection
Administrative · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3650054
30 September 2008 Deficiency Check · COI Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3309272
3 October 2007 Hull Examination · Annual Inspection
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3072323
5 December 2005 In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 2546455
28 September 2005 Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2502204
21 December 2004 Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 2260674
21 February 2003 COI Inspection · Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1747518
4 September 2001 Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1445876
2 September 2000 Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 187841
3 March 2000 Hull Examination · COI Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1446881
29 March 1999 Re-Inspection
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1472625
8 September 1998 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 798342
3 April 1998 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1123137
23 February 1998 Re-Inspection · Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1469162
4 June 1997 Examination of Repairs
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1407900
8 May 1997 Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1101153
7 May 1997 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 3956
4 March 1997 COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1455472
31 July 1996 Deficiency Check · COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1460890
10 January 1996 COI Inspection · Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1371265
5 December 1994 COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1367258
8 December 1993 COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1382675
17 November 1993 Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1391918
20 August 1993 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1155580
2 February 1993 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 831020
5 January 1993 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1138372
8 December 1992 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 831353
10 July 1992 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 948404
8 May 1992 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1261697
30 April 1992 Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1393854
26 March 1992 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 955020
10 February 1992 Plan Review "T" Boat
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1315507
2 January 1992 COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1265035
24 July 1991 Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1252016
18 April 1991 Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 911638
7 February 1991 Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 901666
1 February 1991 Hull Examination
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 932814
20 August 1990 Administrative
Administrative · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1215476
25 April 1990 COI Inspection
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1232939
20 February 1990 Administrative
Administrative · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1233604
12 January 1990 Hull Examination
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1211216
7 June 1989 Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 889780
6 June 1989 COI Inspection
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 889598
17 May 1989 Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1197902
27 April 1989 Hull Examination
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1211974
9 August 1988 Hull Examination
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1343818
8 July 1988 Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 897044
21 June 1988 Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 891398
14 June 1988 COI Inspection
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 890905
5 February 1988 Hull Examination · Examination of Repairs
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1020594
10 July 1987 Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1021598
1 July 1987 Deficiency Check · COI Inspection
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1310306
23 April 1987 Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1319305
30 January 1987 Hull Examination · Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1010706
12 January 1987 Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1004811
26 November 1986 Administrative
Administrative · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1020144
3 July 1986 COI Inspection · Credit Drydock
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 993333
31 March 1986 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 988940
6 March 1986 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1303683
10 December 1985 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1297563
27 November 1985 Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 995411
1 November 1985 COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1298065
21 October 1985 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 995567
29 November 1982 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 963714

Deficiency record · 105

07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 27 June 2024 Resolved
Portable and semi-portable extinguishers must be inspected and maintained in accordance with NFPA 10 (incorporated by reference, see § 175.600 of this chapter) as amended here: Certification or licensing by a state or local jurisdiction as a fire extinguisher servicing agency will be accepted by the Coast Guard as meeting the personnel certification requirements of NFPA 10 for annual maintenance and recharging of extinguishers. MI observed all extinguishers out of date by several months. Vessel is required to have all extinguishers inspected/service prior to movement.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 July 2024
Resolution: MI attended vessel and obsereved the fire extinguishers to be inspected and tagged.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 25 June 2023 Resolved
(a) An interconnected detection and alarm system must: (1) Consist of multiple-station smoke detectors listed by an NRTL, or independent laboratory accepted by the Commandant according to 46 CFR subpart 159.010, as meeting UL 217 (incorporated by reference, see 46 CFR 175.600); (2) Be installed such that the actuation of alarm in one area results in both audible and visual alarms in all areas required by 46 CFR 181.405(c) or 118.400(d) to be protected by the interconnected detection and alarm system; (3) Contain an independent power source; and (4) Alarm on low power. The vessel's installed smoke detection system is not interconnected in all spaces, specifically, the machinery space/engine room. Make corrections to the satisfaction of a CG Marine Inspector. CITE: 46 CFR 181.450(a)(1)-(4)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 July 2023
Resolved 26 July 2023
Resolution: System installed and inspected; all sat.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 25 June 2023 Resolved
On a vessel of not more than 19.8 meters (65 feet) in length carrying more than 49 passengers, and on a vessel of more than 19.8 meters (65 feet) in length, the minimum capacity of the fire pump must be 189 liters (50 gallons) per minute at a pressure of not less than 414 kPa (60 psi) at the pump outlet. MI observed fire pump pressure of 48 psi at the local pressure gauge. Affect repairs to the firemain system and /or fire pump in order to achieve the required 60 psi. CITE: 46 CFR 181.300 (b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2023
Resolved 26 July 2023
Resolution: Tested the newly installed fire pump; all sat.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 June 2023 Resolved
Each portable fire extinguisher on a vessel must be of an approved type. The minimum number of portable fire extinguishers required on a vessel must be acceptable to the cognizant Officer in Charge, Marine Inspection, but must not be fewer than the minimum number required by Table 181.500(b) and other provisions of this section.The vessel has three 10-B:C CO2 portable fire extinguishers (PFEs) in the machinery space, however is required to have one 40-B:C in the vicinity of the exit as per 46 CFR Table 181.500(b). CITE: 46 CFR 181.500(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2023
Resolved 18 August 2023
Resolution: Corrected.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Railing, gangway, walkway and means for safe passage
Issued 25 June 2023 Resolved
Rails shall consist of evenly spaced courses and the spacing between courses shall be not greater than 12". The chain rail across the aft deck is missing at least two chain courses, which must be installed. CITE: 46 CFR 177.35-1(a) Old-T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 July 2023
Resolved 26 July 2023
Resolution: Chain courses installed; all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 8 June 2022 Resolved
On board bench grinder missing machinery guard.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 8 June 2022
Resolved 8 June 2022
Resolution: Vessel crew removed bench grinder from vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 4 June 2020 Resolved
In addition to meeting §180.130, each life float and buoyant apparatus must be stowed as required under this section, The float-free link required by §180.130(a)(1) must be: Of proper strength for the size of the life float or buoyant apparatus as indicated on its identification tag. Vessel did not have tag on float-free link to determine if it was the proper size. Vessel must provide proof of the strength of the weak link to the satisfaction of the MI.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2020
Resolved 22 July 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 June 2020 Resolved
No. 10 or smaller conductors may be connected by means of clamps screw with terminal plates having up turned lugs. Vessel had connections on main engine and generators that did not have up turned lugs. Vessel is required to replace all connectors that do not meet the standard to the satisfaction of the MI.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2020
Resolved 22 July 2021
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 30 July 2019 Resolved
On a vessel of more than 19.8 meters (65 feet) in length, the public address system must be a fixed installation and be audible during normal operating conditions throughout the accommodation spaces. Vessel did not have an operable public address system.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 August 2019
Resolved 6 September 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 July 2019 Resolved
All electrical installations shall be to the satisfaction of the OCMI. 02 dead end wires were found in the port side void space aft of the frame 10 WT bulkhead, 01 dead end wire STBD side void space outboard of the crew quarters, and underneath the console on the bridge. All dead end wires need to be removed or properly terminated to the satisfaction of the attending Marine Inspectors.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 August 2019
Resolved 6 September 2019
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 30 July 2019 Resolved
A penetration in a watertight bulkhead must be made watertight. A cable penetration on the port side of the #10 frame watertight bulkhead was open between either side of the bulkhead, and not WT. Penetration need to be made WT to the satisfaction of the attending Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2019
Resolved 6 September 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 July 2019 Resolved
Replace all expired Alcohol test swab.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 August 2019
Resolved 6 September 2019
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 30 September 2008 Resolved
Repair fuel tank for generators.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 October 2008
Resolution: Repair complete.
Fire Fighting › Remote Fuel Shutoff › General
Issued 30 September 2008 Resolved
Replace PVC piping on emergency fuel shutoff.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 October 2008
Resolution: Repair complete.
Fire Fighting › Remote Fuel Shutoff › General
Issued 30 September 2008 Resolved
Provide proper clamps for fuel shot off.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 October 2008
Resolution: Repair complete.
Electrical › Electrical Distribution System (service) › Switch
Issued 30 September 2008 Resolved
Relace WTD switch on engine room forward door.
Due 4 October 2008
Resolved 1 October 2008
Resolution: Repair complete.
Stability › Watertight Integrity › General
Issued 30 September 2008 Resolved
Repair/replace dogs on emergency exit from engine room, adjust dogs to make watertight
Due 4 October 2008
Resolved 1 October 2008
Resolution: Repair complete.
Engineering › Bilge Water Management System › Strainer
Issued 30 September 2008 Resolved
Repair/replace foot on bilge suction piping in forepeak.
Due 4 October 2008
Resolved 1 October 2008
Resolution: Repair complete.
Accommodation/Occupational Safety › Potable Water System › General
Issued 30 September 2008 Resolved
Install insect screens on potable wtaer tank vent pipe.
Due 4 October 2008
Resolved 1 October 2008
Resolution: Repairs complete.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 3 October 2007 Resolved
Provide non conductive handle on switchboard.
Action required: 705 - Other - as specified
Due 1 January 2008
Resolved 26 December 2007
Resolution: Provided.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Block
Issued 3 October 2007 Resolved
Provide proper for port gen fuel oil return line.
Action required: 705 - Other - as specified
Due 25 December 2007
Resolved 24 December 2007
Resolution: provided.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 3 October 2007 Resolved
R/R clouded stern light lens.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 December 2007
Resolution: Replaced.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 3 October 2007 Resolved
Repair blkhd between e/r and g/r iwo of port side escape trunk.
Action required: 705 - Other - as specified
Resolved 24 December 2007
Resolution: Repaired.
Construction/Loadline › Structures › Machinery Space Opening
Issued 3 October 2007 Resolved
R/R gaskets for E/R escape scuttles.
Action required: 705 - Other - as specified
Due 1 January 2008
Resolved 24 December 2007
Resolution: Repaired.
Construction/Loadline
Issued 29 March 1999 Resolved
REMOVE EXISTING SINGLE DAWG DOOR WITH ENG. ROOM AND INSTALL QUICK ACTING WATERTIGHT DOOR IAW 46 CFR 179.330.
Condition: Unknown
Due 29 March 1999
Resolved 29 March 1999
Construction/Loadline
Issued 29 March 1999 Resolved
OPERATION OF GEN. RM. AND ENG. RM. BILGE ALARMS ARE TO BE TESTED FOR PROPEROPERATION IN PRESENCE OF CG MARINE INSPECTOR IAW 46 CFR 182.530.
Condition: Unknown
Due 3 April 1999
Resolved 12 April 1999
Lifesaving
Issued 29 March 1999 Resolved
MAKE APPROVED REPAIRS OR REPLACE LIFEFLOATS, 2: 22-MAN AND 1: 12-MAN IAW 180.137.
Condition: Unknown
Due 3 April 1999
Resolved 12 April 1999
Electrical
Issued 29 March 1999 Resolved
PROVE PROPER OPERATION OF EMG. LIGHTING THROUGHOUT VSL 46 CFR 183.432.
Condition: Unknown
Due 3 April 1999
Resolved 12 April 1999
Construction/Loadline
Issued 29 March 1999 Resolved
MAKE REPAIRS AND ATEST TO THE CRACK ON GENERATOR ESCAPE HATCH.
Condition: Unknown
Due 29 March 1999
Resolved 29 March 1999
Lifesaving
Issued 29 March 1999 Resolved
PROPERLY LOG AND PERFORM CREW DRILLS PER 185.420.
Condition: Unknown
Due 29 March 1999
Resolved 29 March 1999
Electrical
Issued 29 March 1999 Resolved
PROVE PROPER OPERATION OF PORT/STBD GENERATOR OVERSPEED TRIPS IAW 183.320.
Condition: Unknown
Due 3 April 1999
Resolved 12 April 1999
Lifesaving
Issued 29 March 1999 Resolved
EPIRB- REPLACE BATTERY WITH NEW OR COMPLY WITH 46 CFR 180.64. LOG TESTING OF EPIRB.
Condition: Unknown
Due 3 April 1999
Resolved 12 April 1999
Electrical
Issued 29 March 1999 Resolved
MAKE REPAIRS AND ATEST TO THE PROPER OPERATION OF PORT GEN. EXHAUST PIPE IAW 46 CFR 182.430.
Condition: Unknown
Due 29 March 1999
Resolved 29 March 1999
Lifesaving
Issued 23 February 1998 Resolved
PROVE PROPER OPERATION OF WATERTIGHT DOOR AUDIBLE AND VISUAL ALARMS.
Condition: Unknown
Due 23 February 1998
Resolved 23 February 1998
Documentation
Issued 23 February 1998 Resolved
LABEL HOMEPORT AND VSL'S NAME ON STERN.
Condition: Unknown
Due 23 February 1998
Resolved 23 February 1998
Accommodation/Occupational Safety
Issued 23 February 1998 Resolved
PROVE PROPER OPERATION OF 3/4 FULL ALARM ON SEWAGE HOLDING TANK.
Condition: Unknown
Due 23 February 1998
Resolved 23 February 1998
Fire Fighting
Issued 23 February 1998 Resolved
REPLACE PORT FIRE HOSE AND HYDRO TEST BOTH HOSES ON MAIN DECK AND LABEL WITH VSL'S NAME.
Condition: Unknown
Due 23 February 1998
Resolved 23 February 1998
Engineering
Issued 23 February 1998 Resolved
RELOCATE CENTER F/O EMERGENCY REMOTE REACH ROD ON MAIN DECK TO A LOCATION AWAY (P/S) OF CARGO DECK (BLOCKAGE).
Condition: Unknown
Due 23 February 1998
Resolved 23 February 1998
Construction/Loadline
Issued 23 February 1998 Resolved
FREE UP AND PROVE WATERTIGHT INTEGRITY OF BOTH ESCAPE HATCHES (P/S) ON MAINDECK.
Condition: Unknown
Due 23 February 1998
Resolved 23 February 1998
Construction/Loadline
Issued 23 February 1998 Resolved
INSTALL BILGE SUCTION BELL MOUTH AND STRAINER IN THE LOWER PASSENGER COMPARTMENT AFT BULKHEAD.
Condition: Unknown
Due 23 February 1998
Resolved 23 February 1998
Construction/Loadline
Issued 23 February 1998 Resolved
INSTALL WARNING PLACARD AT BILGE DISCHARGE LOCATION IN ENGINEROOM.
Condition: Unknown
Due 23 February 1998
Resolved 23 February 1998
Lifesaving
Issued 23 February 1998 Resolved
CONDUCT A MAN OVERBOARD DRILL AND PROVE VSL IS MANUEVERABLE, ARRANGE AND EQUIPPED TO DO SO WITHOUT THE USE OF A RESCUE BOAT.
Condition: Unknown
Due 23 February 1998
Resolved 23 February 1998
Navigation
Issued 23 February 1998 Resolved
LABEL ENGINE CONTROLS AT AFT STEERING STATION (PORT/STBD/ FORE/AFT).
Condition: Unknown
Due 23 February 1998
Resolved 23 February 1998
Electrical
Issued 23 February 1998 Resolved
STUFF MAIN LEAD FROM STBD GENERATOR INTO CASING.
Condition: Unknown
Due 23 February 1998
Resolved 23 February 1998
Lifesaving
Issued 4 June 1997 Resolved
PROVIDE TWO PADDLES FOR LIFE FLOAT.
Condition: Unknown
Due 4 June 1997
Resolved 17 June 1997
Lifesaving
Issued 4 June 1997 Resolved
PROVIDE WATERLIGHT FOR LIFE FLOAT.
Condition: Unknown
Due 4 June 1997
Resolved 17 June 1997
Lifesaving
Issued 10 January 1996 Resolved
The crew to re-check primary lifesaving and insure everything is up to dateprior to carring passengers.
Condition: Unknown
Due 10 January 1996
Resolved 10 January 1996
Lifesaving
Issued 10 January 1996 Resolved
Prior to carring passengers conduct drills as per 46CFR185.25-10.
Condition: Unknown
Due 10 January 1996
Resolved 10 January 1996
Navigation
Issued 10 January 1996 Resolved
Ensure navigation gear is all in proper working order.
Condition: Unknown
Due 10 January 1996
Resolved 10 January 1996
Lifesaving
Issued 10 January 1996 Resolved
Provide 6 hand red flare and 6 orange smoke distress signals.
Condition: Unknown
Due 10 January 1996
Resolved 10 January 1996
Accommodation/Occupational Safety
Issued 8 December 1993 Resolved
Clean machinery space bilges.
Condition: Unknown
Due 21 December 1993
Resolved 21 December 1993
Electrical
Issued 8 December 1993 Resolved
Properly support electrical wiring throughout the vessel in accordance withIEEE-45.
Condition: Unknown
Due 21 December 1993
Resolved 21 December 1993
Fire Fighting
Issued 8 December 1993 Resolved
Repair/renew vessel's primary fire pump. Demonstrate 60 psig at pump discharge.
Condition: Unknown
Due 21 December 1993
Resolved 21 December 1993
Engineering
Issued 8 December 1993 Resolved
Replace coolong water piping for main engines.
Condition: Unknown
Due 21 December 1993
Resolved 21 December 1993
Electrical
Issued 8 December 1993 Resolved
Properly block unused openings at top of quarters power and lighting panel.
Condition: Unknown
Due 21 December 1993
Resolved 21 December 1993
Construction/Loadline
Issued 8 December 1992 Resolved
REMOVE WOOD PLUG AND PROPERLY PLUG BULKHEAD PENETRATION PORT SIDE AFT ENGINE ROOM.
Condition: Unknown
Due 8 December 1992
Resolved 8 December 1992
Fire Fighting
Issued 8 December 1992 Resolved
PROVIDE AND INSTALL APPROVED FIRE EXTINGUISHER BRACKETS FOR ALL FIRE EXTINGUISHERS.
Condition: Unknown
Due 8 December 1992
Resolved 8 December 1992
Unknown
Issued 8 December 1992 Resolved
MASTER OF VESSEL MUST DESIGNATE SR DECKHAND INWRITING.
Condition: Unknown
Due 8 December 1992
Resolved 8 December 1992
Construction/Loadline
Issued 8 December 1992 Resolved
INSTALL CHECK VALVES IN AN ACCESSIBLE POINT OF EACH BILGE LINE AND PROVE SUCTION OF EACH LINE.
Condition: Unknown
Due 8 December 1992
Resolved 8 December 1992
Construction/Loadline
Issued 8 December 1992 Resolved
REPLACE FORWARD FLUSH MOUNT HATCH. HATCH PRESENTLY HAS CRACKS OUTBOARD OF GASKET TROUGH.
Condition: Unknown
Due 8 December 1992
Resolved 8 December 1992
Lifesaving
Issued 2 January 1992 Resolved
PROVIDE AND INSTALL WATER LIGHTS ON NEW LIFEFLOATS. CONNECT LIFEFLOATS _x001C_TOGETHER TO SEA PAINTER. THIS ITEM TO BE COMPLETED PRIOR TO CARRYING _x001C_ PASSENGERS.
Condition: Unknown
Due 27 January 1992
Resolved 27 January 1992
Electrical
Issued 2 January 1992 Resolved
INSTALL LEAD LINER IN BRIDGE BATTERY BOX
Condition: Unknown
Due 27 January 1992
Resolved 27 January 1992
Lifesaving
Issued 2 January 1992 Resolved
PROVIDE VESSEL WITH AN APPROVED RESCUE PLATFORM
Condition: Unknown
Due 30 March 1992
Resolved 30 March 1992
Electrical
Issued 2 January 1992 Resolved
INSTALL STOVE DISCONECT SWITCH IN GALLEY.
Condition: Unknown
Due 27 January 1992
Resolved 27 January 1992
Electrical
Issued 2 January 1992 Resolved
INSTALL LIGHT COVER ON EMERGENCY LIGHT IN CREW/OFFICE COMPARTMENT.
Condition: Unknown
Due 30 March 1992
Resolved 30 March 1992
Unknown
Issued 1 February 1991 Resolved
CLEAN ENGINEROOM BILGES FREE OF OILY-WATER MIXTURES PRIOR TO CARRYING _x001C_ PASSENGERS ON BOARD. _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 1 February 1991
Resolved 1 February 1991
Unknown
Issued 6 June 1989 Resolved
PROVIDE FCC CERTIFICATION OF COMPLIANCE WITH THE RADIO PROVISIONS OF SAFETY OF LIFE AT SEA.
Condition: Unknown
Due 6 June 1989
Resolved 6 June 1989
Fire Fighting
Issued 6 June 1989 Resolved
INSTALL DISCHARGE PRESSURE GAUGE FOR PORT AND STARBOARD ELECTRIC FIRE PUMPS.
Condition: Unknown
Due 6 June 1989
Resolved 6 June 1989
Fire Fighting
Issued 6 June 1989 Resolved
HYDROTEST FIRE HOSES AND FIRE MAIN SYSTEMS AFTER REPAIR IS COMPLETED ON THEELECTRIC FIRE PUMPS.
Condition: Unknown
Due 6 June 1989
Resolved 6 June 1989
Construction/Loadline
Issued 6 June 1989 Resolved
REPLACE WORN OUT GASKET FOR THE WATERTIGHT DOOR FROM THE ENGINEROOM TO THE LAZARETTE.
Condition: Unknown
Due 6 June 1989
Resolved 6 June 1989
Navigation
Issued 6 June 1989 Resolved
REPLACE COTTER PIN FOR THE PORT STEERING HYDRAULIC ROD BALL JOINT.
Condition: Unknown
Due 6 June 1989
Resolved 6 June 1989
Lifesaving
Issued 6 June 1989 Resolved
POST LAUNCHING INSTRUCTION PLACARDS NEXT TO EACH INFLABLE LIFERAFTS.
Condition: Unknown
Due 6 June 1989
Resolved 6 June 1989
Lifesaving
Issued 6 June 1989 Resolved
PROVIDE NINE(9) ADDITIONAL ADULT, TYPE 1 PFD'S WITH LIGHTS. VESSEL IS LIMITED TO CARRY 154 TOTAL PERSONS ON BOARD.
Condition: Unknown
Due 6 June 1989
Resolved 6 June 1989
Navigation
Issued 6 June 1989 Resolved
PROVIDE THREE(3) BLACK BALL DAY SHAPES.
Condition: Unknown
Due 6 June 1989
Resolved 6 June 1989
Navigation
Issued 6 June 1989 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 6 June 1989
Resolved 6 June 1989
Fire Fighting
Issued 6 June 1989 Resolved
REPAIR INOPERABLE ELECTRIC FIRE PUMPS PRIOR TO PLACING VESSEL IN OPERATION.
Condition: Unknown
Due 6 June 1989
Resolved 6 June 1989
Unknown
Issued 27 April 1989 Resolved
SUBMIT RECALCULATION OF STABILITY TO DETERMINE THE EFFECTS OF THE REMOVAL OF THE BOW THRUSTER WHICH WEIGHS APPROXIMATELY 2200 POUNDS.
Condition: Unknown
Due 27 April 1989
Resolved 27 April 1989
Unknown
Issued 14 June 1988 Resolved
REPLACE RUSTED SAFETY CHAIN ON PORT SIDE MAIN DECK.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Unknown
Issued 14 June 1988 Resolved
PERMANENTLY SECURE PA SYSTEM IN THE WHEELHOUSE.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Navigation
Issued 14 June 1988 Resolved
RECALIBRATE AND SWING MAGNETIC COMPASS. PROVIDE A CURRENT DEVIATION CARD AND HAVE IT POSTED NEXT TO MAGNETIC COMPASS IN THE WHEEL HOUSE.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Navigation
Issued 14 June 1988 Resolved
PROVIDE A CURRENT (1988) LIGHT LISTS AND TIDE TABLES.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Unknown
Issued 14 June 1988 Resolved
CLEAN ACCUMULATED MOLDS ON DECK IN THE GALLEY.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Electrical
Issued 14 June 1988 Resolved
REPAIR ELECTRICAL WIRING SPLICES IN PORT A/C ROOM, BRIDGE ROOF, UNDERNEATH WHEEL HOUSE CONTROL CONSOLE, AND GENERATOR ROOM.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Unknown
Issued 14 June 1988 Resolved
REPAIR HYDRAULIC LEAK ON ANCHOR WINDLASS HYDRAULIC SYSTEM.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Unknown
Issued 14 June 1988 Resolved
CLEAN FORWARD VOID FREE OF HYDRAULIC OIL RESIDUE.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Unknown
Issued 14 June 1988 Resolved
INSTALL MISSING POP HANDLE TO RELIEF VALVE ON PORT AIR COMPRESSOR SYSTEM.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Engineering
Issued 14 June 1988 Resolved
INSTALL PROTECTIVE GUARD TO ROTATING PULLEY FORWARD OF PORT MAIN PROPULSIONENGINE.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Fire Fighting
Issued 14 June 1988 Resolved
REPLACE FIREHOSE FITTED WITH BRASS OR SUITABLE MATERIAL COMPATIBLE TO THE FITTINGS ON FIREMAIN STATION.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Lifesaving
Issued 14 June 1988 Resolved
PROVIDE ADDITIONAL (21) ADULT TYPE 1 PFD'S WITH COAST GUARD APPROVED LIGHTS. EXISTING JIM BUOY LIGHTS HAS BEEN DISCONTINUED AND NOT APPROVED BY THE COAST GUARD. PASSENGERS LIMITED TO (127) UNTIL REQUIREMENT IS COMPLETED.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Unknown
Issued 14 June 1988 Resolved
REPAIR INOPERABLE LOUD HAILER.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Electrical
Issued 14 June 1988 Resolved
LABEL 120 VOLT ELECTRICAL PANEL PORT SIDE OF WHEELHOUSE.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Unknown
Issued 14 June 1988 Resolved
PERMANENTLY SECURE RHEOSTAT IN PORT AIR CONDITIONING SYSTEM.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Accommodation/Occupational Safety
Issued 14 June 1988 Resolved
HYDROTEST AIR RECEIVERS TO 1-1/2 TIMES ITS MAXIMUM ALLOWABLE WORKING PRESSURE.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Unknown
Issued 14 June 1988 Resolved
LABEL SEWAGE ISOLATION VALVE ON PORT SIDE MAIN DECK.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Electrical
Issued 14 June 1988 Resolved
INSTALL COVER TO ELECTRICAL JUNCTION BOX FOR BOW THRUSTER CONTROL.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Unknown
Issued 14 June 1988 Resolved
MINIMIZE/SECURE LOOSE GEAR IN CREWS QUARTERS.
Condition: Unknown
Due 14 June 1988
Resolved 14 June 1988
Electrical
Issued 1 July 1987 Resolved
REPAIR LEAK ON STARBOARD GENERATOR DRIVE S.W.COOLER OUTLET.
Condition: Unknown
Due 1 July 1987
Resolved 1 July 1987
Electrical
Issued 1 July 1987 Resolved
REPLACE TWIST ON CONNECTORS ON ELECTRICAL WIRING WITH SOLID CONNECTORS.
Condition: Unknown
Due 1 July 1987
Resolved 1 July 1987
Engineering
Issued 1 July 1987 Resolved
REPAIR PORT MAIN ENGINE.
Condition: Unknown
Due 1 July 1987
Resolved 1 July 1987
Construction/Loadline
Issued 1 July 1987 Resolved
REPLACE BROKEN WINDOW IN WHEELHOUSE.
Condition: Unknown
Due 1 July 1987
Resolved 1 July 1987
Lifesaving
Issued 1 July 1987 Resolved
REPAIR OR REPLACE LIGHTS ON 12 ADULT AND 1 CHILD PFD.
Condition: Unknown
Due 1 July 1987
Resolved 1 July 1987
Construction/Loadline
Issued 3 July 1986 Resolved
VERIFY BY PLAN SUBMITTAL ACTUAL LOCATION OF FORE AND AFT DRAFT MARKS.INDICATE ON PLAN WHERE MARKS ARE ACTUALLY LOCATED IF IT IS DETERMINED THEY ARE NOT CORRECTLY POSITIONED.
Condition: Unknown
Due 3 July 1986
Resolved 3 July 1986
Construction/Loadline
Issued 3 July 1986 Resolved
SUBMIT FOR ANALYSIS TO MARINE SAFETY CENTER CALCULATIONS TO SUPPORT DAMAGE STABILITY,WATERTIGHT BULKHEAD SUBDIVISION AND SPACING OF BULKHEADS.
Condition: Unknown
Due 3 July 1986
Resolved 3 July 1986
Construction/Loadline
Issued 3 July 1986 Resolved
PROVE TO LOCAL OCMI THE DRAFT MARKS ARE CORRECTLY LOCATED ON FORE AND AFT OF VESSEL.
Condition: Unknown
Due 3 July 1986
Resolved 3 July 1986
Accommodation/Occupational Safety
Issued 1 November 1985 Resolved
MAKE AVAILABLE FOR INTERNAL EXAM AND LIFT RELIEF VALVES IN THE PRESENCE OF COAST GUARD ON 3 PRESSURE VESSELS
Condition: Unknown
Due 1 November 1985
Resolved 1 November 1985

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.