Records from 2016 to 2026. Most recent: inspection, 14 July 2026.
Documentation record
Registered dimensions (L × B × D)41.5 ft × 14.2 ft × 6.3 ft
Registered tonnagegross 27 / net 18
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderDELTA MARINE INDUSTRIES · SEATTLE, WA, UNITED STATES · built 1976
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portSEWARD, AK
Trade endorsementsCoastwise, unrestricted, Fishery, Recreational, Registry
DocumentationValid · issued 2 July 2026 · expires 31 July 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it0 - Dead Weight, Ton
27 - Regulatory (Subpart C or D), Gross Ton
18 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 12
14 July 2026
DAPI Audit · Administrative Inspection · COI Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8434895
30 October 2023
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7816676
4 April 2023
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7662731
30 April 2021
COI Inspection · Administrative Inspection · DAPI Audit
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7186102
29 March 2021
Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7165229
5 July 2020
Administrative Inspection · Annual Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6999619
13 May 2019
DAPI Audit · Annual Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6683568
26 March 2019
Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6649766
12 May 2018
Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6412679
18 May 2017
DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6200405
15 March 2017
Internal Structural Exam · Drydock Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6106022
10 May 2016
DAPI Audit · COI Inspection · Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5868156
Fire Fighting › Fire Pumps › Arrangement
Issued 18 May 2017
Resolved
Prove proper operation of fire pump.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 May 2017
Resolved 18 May 2017
Resolution: Crew able to prove proper operation prior to my departure.
Fire Fighting › Fire Bucket › Stenciling
Issued 18 May 2017
Resolved
Mark 3 - 2 1/2 gallon buckets, "Fire Bucket" & attach suitable length lanyards.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 June 2017
Resolved 5 June 2017
Resolution: Buckets marked w/ proper lanyards.
Engineering › Bilge Water Management System › Valve
Issued 18 May 2017
Resolved
Install positive shutoff valve @ sideshell to electrical submersible bilge pump dischage hose in engine room.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 18 June 2017
Resolved 5 June 2017
Resolution: Proper valve installed.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 18 May 2017
Resolved
Install guard for starboard engine flywheel. 46 CFR 176.25-50(e)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 June 2017
Resolved 5 June 2017
Resolution: Observed guard.
Engineering › Fuel Oil Service System › Valve, Control
Issued 18 May 2017
Resolved
Replace starboard fuel shutoff shield. 46CFR182.20-40
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 June 2017
Resolved 5 June 2017
Resolution: New shield installed.
Engineering › Fuel Oil Service System › Valve, Control
Issued 18 May 2017
Resolved
Tighten port fuel shutoff reach rod guide. 46 CFR 182.20-40
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 June 2017
Resolved 5 June 2017
Resolution: Guide tightened.
Communications › Radio Communications › EPIRB
Issued 10 May 2016
Resolved
Replace hydrostatic release unit on epirb. 46CFR185.740
Action required: 705 - Other - as specified
Due 31 May 2016
Resolved 11 May 2016
Documentation › Safety Management System › Emergency Drill/Exercise Programs
Issued 10 May 2016
Resolved
Log emergency drills and monthly EPIRB test (none logged since 2014). 46CFR185.520
Action required: 705 - Other - as specified
Due 10 May 2016
Resolved 10 May 2016
Resolution: Corrected on the spot
Navigation › Piloting/Steering › Marine Charts
Issued 10 May 2016
Resolved
No coast pilot on board. Get coast pilot for operating areas. Paper charts not updated since 2006; update charts to satisfaction of attending CG inspector. 46CFR185.20-35
Action required: 705 - Other - as specified
Due 17 May 2016
Resolved 11 May 2016