07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 15 January 2026
Resolved
Prove proper operation of the pre-engineered fixed gas fire extinguishing system's engine shutdown and override functions prior to carrying passengers.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 February 2026
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 15 January 2026
Resolved
Provide the operational navigation lights prior to operating during periods of reduced visibility.
Action required: 705 - Other - as specified
Resolved 4 February 2026
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 15 January 2026
Resolved
Apply new Type II retroreflective material to the life float.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 January 2026
Resolved 4 February 2026
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 15 January 2026
Resolved
Mark the life float paddles with the vessel's name.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 January 2026
Resolved 4 February 2026
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 21 January 2025
Resolved
Provide valid EPIRB registration prior to operating beyond 3 miles from shore.
Action required: 705 - Other - as specified
Resolved 21 January 2025
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 21 January 2025
Resolved
Provide GPS location on the DSC VHF radio.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 February 2025
Resolved 6 February 2025
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 January 2025
Resolved
Install metal wire supports with chaffing protection on all electrical wire runs at intervals no greater than 24" apart.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 February 2025
Resolved 6 February 2025
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 21 January 2025
Resolved
Mark the remote fuel shutoff valves that are located at the fuel tanks and obscure the marking located at the fuel filter.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 February 2025
Resolved 6 February 2025
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 21 February 2024
Resolved
Wire runs in the middle compartment must have metal supports with anti chaffing material installed at intervals no greater than 24" apart.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 February 2024
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 21 February 2024
Resolved
Secure the aft hatch to the frame or deck with a captive chain or other means.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 22 February 2024
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 6 March 2023
Resolved
Provide one additional 2.5 gallon fire bucket with attached lanyard so the vessel has at least three total fire buckets.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 March 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 March 2023
Resolved
Provide a visual indicator at the operating station to light when any automatic bilge pump is operating.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 March 2023
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 6 March 2023
Resolved
Suitably line the engine room boundaries to the deck accommodation space with noncombustible panels or insulation.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 21 March 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 October 2022
Resolved
Vessel had a loss of propulsion (single screw) while approaching a mooring ball at Looe Key. Must complete sea trials with a CG Marine Inspector prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 October 2022
Resolution: Changed fuel filter and completed satisfactory sea trials.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 22 February 2021
Resolved
No paper NAV Chart on board vessel and GPS no updated with latest update. Must have CG approved NAV Chart on board or update GPS to latest version.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 March 2021
Resolved 8 March 2021
Resolution: Received screen shot of GPS updated
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 22 February 2021
Resolved
First Aid kit had expired items. Must update first aid kit to meet requirements
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 March 2021
Resolved 8 March 2021
Resolution: Received pictures of all expired meds replaced with new experation dates
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 22 February 2021
Resolved
Vessel does not have proof of "Crew Training" for new hires and Fire drills are not being logged properly. Must make log for crew training and log drills as required.
46 CFR 185.420
46 CFR 185.520
46 CFR 185.524
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 March 2021
Resolved 8 March 2021
Resolution: Received pictures of new logs with proper entry
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 19 March 2020
Resolved
Replace retro-reflective tape on ring buoy (4 strips on each side).
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 April 2020
Resolution: completed
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 19 March 2020
Resolved
Renew FCC station license and program VHF radio with MMSI# once obtained from the FCC.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 April 2020
Resolution: completed
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 March 2020
Resolved
Repair/replace main diesel propulsion engine, engine is leaking oil from rear head gasket. Provide report from certified diesel technician attesting to repair.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 March 2020
Resolution: Engine repaired with cert tech
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 19 March 2020
Resolved
Remove all oil from bilge, oil presents environmental hazard if discharged overboard.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 March 2020
Resolution: Oil removed from bilge
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 April 2019
Resolved
Damage to stainless steel shaft was identified just aft of cutlass bearing, two 1/32in deep cuts an estimated 1/2in long with sharp edges. Draw shaft and conduct Non-Destructive Testing (NDT) utilizing dye-pen in presence of Marine Inspector, have servicing facility attest to structural integrity, or replace shaft. Further testing or repair may be required after conducting NDT.
Action required: 705 - Other - as specified
Resolved 8 July 2019
Resolution: Shaft replaced inkind, new cutlass installed.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 11 April 2019
Resolved
Aft deck cut out for fill pipe section, cut back further to good core material, follow layup schedule for deck replacement.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2019
Resolution: Deck cut back to good core.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 11 April 2019
Resolved
Repair/re-secure aft platform
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2019
Resolution: Platform secured, new hardware utilized.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 11 April 2019
Resolved
Remove angel hair from starboard side deck beam running parallel with engine hatch cover.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 August 2019
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 11 April 2019
Resolved
Stringer on starboard side engine room shows cracking through fiberglass-grind back to verify condition of stringer.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 August 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 April 2019
Resolved
Fishing line found wrapped around shaft near cutlass bearing-remove line.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 24 April 2019
Resolution: Line removed, additional 835 issued for damage in shaft
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 April 2019
Resolved
Cotter pin in prop nut is broke off-replace
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 August 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 April 2019
Resolved
Pitting in prop on blades and near hub- replace or get certified proving to be within specs
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 August 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 April 2019
Resolved
Make vessel available for inspection. Engine room compartment bilge full of oil, lazarette compartment full of water.
Action required: 705 - Other - as specified
Resolved 11 April 2019
Resolution: Vessel ready for inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 April 2019
Resolved
Replace Port and STBD fuel tanks with tanks that meet listed requirements in 46 CFR 182.440-450. Submit plans to local OCMI for approval.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 April 2019
Resolution: New tanks ordered from company that builds tanks for inspected vessels. (BEST FAB)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 April 2019
Resolved
Repair/replace muffler, FRP muffler is damaged and cracked open.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2019
Resolution: Muffler repaired with Epoxy resin.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 March 2019
Resolved
Tanks shall be made available for inspection at next credit drydock to include verifying baffles are installed in tanks or replace tanks.
*Prior to credit drydock*
Action required: 705 - Other - as specified
Resolved 8 April 2019
Resolution: Tanks had several areas of heavy pitting over 50% wastage.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 March 2019
Resolved
Flexible fuel lines over 30 inches must meet SAE J-1942 and installed with fittings meeting SAE J-1475. Hoses from tank to fuel filter were previously copper but their use was discontinued at some point and non-approved lines were installed. Hoses under 30 shall be USCG Type A1, A2, B1, B2.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2019
Resolution: New hoses installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 March 2019
Resolved
Fuel shutoff valves shall be installed at the top of the tank, no shutoff valve installed at or near tank connection. Fuel selector switch installed 1ft after fuel tank connection Port side and 3ft on STBD side.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2019
Resolution: New closure devices installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 March 2019
Resolved
Fuel lines shall be adequately supported, no hose supports on any section of fuel piping.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 July 2019
Resolution: Lines properly supported.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 18 March 2019
Resolved
Engine room vents under gunwale on Port and STBD sides must be arranged to secure ventilation to space protected by Fireboy.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 18 March 2019
Resolution: Vents closed and will not be utilized, 2 sets of vents open for each side of Engine Room.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 18 March 2019
Resolved
Repair replace gaskets on Fore and Aft deck hatches, gaskets were missing or loose.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 March 2019
Resolution: Gaskets replaced, hatch is watertight.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 March 2019
Resolved
Auxiliary steering shall be of adequate strength to move rudder Port to Starboard, securing bolt for tiller arm was undersized and bending under light pressure. Demonstrate adequate arrangement to turn rudder.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 July 2019
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 18 March 2019
Resolved
Provide valid registration for EPIRB, registration expired on November 2018. Vessel restricted 3nm to land.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 23 July 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 18 March 2019
Resolved
Each installed submersible bilge pump shall be provided with a metallic positive shut off valve at the hull penetration. Means must be provided for each valve to be operated by vessel crew. No shutoff valve currently installed on 03 installed pumps.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 23 July 2019
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 March 2019
Resolved
Provide over current protection (fuse) for battery power supply to house panel, fuse shall be within 72 inches from battery terminal and sizes approximately.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 2 August 2019
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 18 March 2019
Resolved
VHF shall be provided with GPS connection to broadcast position if in distress.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 August 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 18 March 2019
Resolved
Provide (10) ammonia inhalants for first aid kit.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 2 August 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 March 2019
Resolved
Installed fuel tanks do not meet requirements for carriage of passengers under 46 CFR 176. Installed tanks are built to 33 CFR 183 requirements which are recreational vessel standards. Additionally tanks are not available for inspection because they are coated in Fiberglass. Submit plans to local OCMI to replace with fuel tanks that meet requirements listed in 46 CFR 182.440 for independent tanks.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 April 2019
Resolution: Tanks removed and taken out of service.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 March 2019
Resolved
Remove fiberglass that is covering fuel tanks, fuel tanks shall be made available for external inspections. Remove enough fiber glass so an reasonable area of tank can be inspected for structural integrity.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 April 2019
Resolution: Fiberglass removed from tanks, heavy pitting on both tanks.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 March 2019
Resolved
Conduct pressure test of both Port and STBD fuel tanks in the presence of a Marine Inspector. Test shall use one of the following methods: (1)Attach a 11.5ft standpipe of atleast 1-inch diameter to the tank and close all other fittings but the vent, tank shall be level during testing. Tank shall be filled until median pours out of tank vent to ensure no air is in tank and then cap vent. Hold pressure on tank for 10 minutes to check for signs of leakage. (2) Pressure tank with water using pressure regulator to 5 psi for 10 minutes.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 April 2019
Resolution: Tanks will be replaced, issued additional deficiency.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 18 March 2019
Resolved
Replace missing machinery space noncombustible insulation.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 August 2019
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 29 March 2018
Resolved
FIRE BOY OVERRIDE DOES NOT OPERATE. REPAIR/RENEW
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 April 2018
Resolved 23 April 2018
Resolution: Found loose and corroded connections. Renewed and demostrated proper of operation of the shutdown, alarms, and override functions.
Lifesaving › Hand Flares › Not on Board
Issued 29 March 2018
Resolved
VESSEL IS MISSING 2 RED HAND FLARES. PROVIDE NEW FLARES
Action required: 705 - Other - as specified
Due 30 March 2018
Resolved 11 April 2018
Resolution: Provided the required number of flares.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 29 March 2018
Resolved
RING BUOY LINE IS WASTED. RENEW (60')
Action required: 705 - Other - as specified
Due 5 April 2018
Resolved 25 April 2018
Resolution: Renewed lifering line.
Fire Fighting › Fire Bucket › Availability
Issued 29 March 2018
Resolved
MISSING FIRE BUCKETS. PROVIDE 3, 2.5 GALLON BUCKETS MARKED WITH LINE.
Action required: 705 - Other - as specified
Due 5 April 2018
Resolved 25 April 2018
Resolution: Provided three 2.5 gallon buckets with lanyards and proper markings.
Documentation › Manuals/Policy Documentation › Bridge Resource Management Policy/Procedures
Issued 29 March 2018
Resolved
PROVIDE UP TO DATE COAST PILOT, LIGHT LIST & TIDE TABLE.
Action required: 705 - Other - as specified
Due 5 April 2018
Resolved 25 April 2018
Resolution: Provided updated nautical publications.
Electrical › Electric Supply System (service) › Battery Installation
Issued 29 March 2018
Resolved
PROVIDE BATTERY BOX TOP & REPLACE WING NUTS
Action required: 705 - Other - as specified
Due 5 April 2018
Resolved 25 April 2018
Resolution: Wing nuts were removed and replaced.
Operations/Management › Drug and Alcohol Testing › Recordkeeping
Issued 29 March 2018
Resolved
PROVIDE UP TO DATE ENROLLMENT IN CONSORTIUM.
Action required: 705 - Other - as specified
Due 5 April 2018
Resolved 25 April 2018
Resolution: Provided updated documentation of all crewmembers enrolled in consortium.
Lifesaving › Lifefloat › Lifeline
Issued 7 December 2016
Resolved
Grablines are wasted, and must be renewed.
Action required: 705 - Other - as specified
Due 14 December 2016
Resolved 14 December 2016
Resolution: New grab lines were installed.
Lifesaving › Hand Flares › Quantity
Issued 7 December 2016
Resolved
vessel is missing 3 orange hand smoke flares.
Action required: 705 - Other - as specified
Due 14 December 2016
Resolved 14 December 2016
Resolution: New flares were placed onboard.
Documentation › Certificates/Documents › FCC Safety Radiotelephony Certificate
Issued 7 December 2016
Resolved
FCC safety Radio cert is expired.
Action required: 705 - Other - as specified
Due 14 December 2016
Resolved 14 December 2016
Resolution: New valid FCC cert was provided.
Navigation › Piloting/Steering › Marine Charts
Issued 7 December 2016
Resolved
All charts and publications were expired.
Action required: 705 - Other - as specified
Due 14 December 2016
Resolved 14 December 2016
Resolution: New charts and publications were purchased and placed into service.