Inspection history · 96
3 April 2019
Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6655184
27 March 2018
MTSA Verification · MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6378698
31 October 2017
Type not recorded
No type recorded · Marine Safety Unit Port Canaveral · USCG Southeast District (CGD-SE) · Activity 6299028
11 July 2017
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6219541
20 June 2017
MARPOL Annex I Examination · Annual Inspection · MTSA Verification · Deficiency Check · Administrative Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6181642
1 May 2017
Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6136481
24 March 2016
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5839478
23 March 2016
MARPOL Annex I Examination · MARPOL Annex VI Survey · Annual Inspection · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5839071
7 April 2015
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 5098067
23 March 2015
MARPOL Annex I Examination · COI Inspection · MTSA Verification
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5088648
22 May 2014
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4870301
15 May 2014
Examination of Repairs · Annual Inspection · Drydock Exam · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4825596
27 March 2014
Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4824108
9 March 2014
Damage Survey
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4815550
6 March 2014
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4812981
14 August 2013
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4686029
14 August 2013
Examination of Repairs · Damage Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4687013
18 June 2013
Annual Inspection · MARPOL Annex I Examination · MTSA Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4624255
11 May 2012
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4308492
4 April 2012
MARPOL Annex I Examination · Administrative Inspection · MTSA/ISPS Verification · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4277280
18 January 2010
Internal Structural Exam · Drydock Exam · MARPOL Annex I Examination · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3669689
11 March 2009
Annual Inspection · MARPOL Annex I Examination · MTSA Verification · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3431665
11 July 2008
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3268387
26 June 2008
MARPOL Annex I Examination · MTSA Verification · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3252559
16 April 2008
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3185446
7 March 2008
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3161353
13 February 2008
Internal Structural Exam · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 3150965
25 June 2007
Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2973876
29 May 2007
Annual Inspection · MARPOL Annex I Examination · MTSA/ISPS Verification
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2932725
22 May 2006
MTSA Verification · MARPOL Annex I Examination · Deficiency Check · COI Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 2655795
6 July 2005
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2417341
21 June 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2397476
18 May 2005
MTSA Verification · Annual Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2361614
20 January 2005
Examination of Repairs · Hull Examination · Internal Structural Exam
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2277855
10 June 2004
Annual Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 2094449
6 February 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2003605
30 December 2003
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1978252
12 March 2003
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1756333
14 February 2003
COI Inspection · In-Service Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1744616
9 November 2002
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1703040
10 October 2002
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1687734
13 September 2002
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1675360
30 August 2002
Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1668405
29 August 2002
Type not recorded
No type recorded · GROUP PHILADELPHIA · USCG East District (CGD-E) · Activity 1668288
23 May 2002
Special Interest Vessel
Type not classified · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1619993
14 July 2001
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 155984
28 June 2001
Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1073032
20 September 2000
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1053766
19 September 2000
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1053901
27 July 2000
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 444605
27 April 2000
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1049049
14 March 2000
Re-Inspection · Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1415326
14 January 1999
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 791351
9 April 1998
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 788663
13 March 1998
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 773249
8 February 1997
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1359347
8 April 1996
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1080995
10 February 1995
Deficiency Check · Hull Examination · COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1398203
25 January 1995
Examination of Repairs
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1134790
13 January 1995
Permit to Proceed
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1426989
26 November 1994
Deficiency Check · Damage Survey · Examination of Repairs
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1356911
23 November 1994
Damage Survey
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1172443
17 November 1994
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 45773
11 March 1994
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 854636
12 January 1993
Hull Examination · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 961685
4 June 1992
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 948010
27 May 1992
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 646327
21 May 1992
Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1261101
13 March 1992
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1264729
4 September 1991
Examination of Repairs
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1353276
29 June 1991
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 961208
14 March 1991
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 925690
16 May 1990
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 899342
11 March 1990
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1223551
23 February 1990
Administrative
Administrative · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 929105
12 January 1990
Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1226237
14 April 1989
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1344154
20 May 1988
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1042100
12 June 1987
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1003264
16 April 1987
Hull Examination · COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1003048
19 November 1986
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1019916
19 November 1986
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1314675
1 May 1986
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 494151
21 March 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1302057
4 February 1986
Re-Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 997493
24 April 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1290200
29 March 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1292006
15 March 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1285999
1 March 1985
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1287368
16 February 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1285183
15 February 1985
Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1283793
14 November 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 976924
14 November 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1283127
15 February 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 971508
26 January 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 971304
17 December 1982
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1275791
Engineering › Generator (propulsion/auxiliary-electric) › Overcurrent Devices Circuitry
Issued 23 March 2016
Resolved
Ship service generator overspeed shut down is not working. Make repairs and prove operation to OCMI Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 23 March 2016
Resolved 24 March 2016
Resolution: Proper operation of overspeed shutdown was proven to Marine Inspectors.
Construction/Loadline › Hull › Weld
Issued 23 March 2016
Resolved
2nd deck, 2nd lane from port side, discrepant inboard stanchions: frame 13, frame 21, fram 30 (broken welds). Main Deck, 2nd lane from port side discrepant stanchions: frame 20 diagonal cracked at toop, frame 22 stanchion weld cracked at base, frame 36 cracked diagonal at top.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 23 March 2016
Resolved 24 March 2016
Resolution: Stanchions were repaired to satisfaction of Marine Inspectors.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 23 March 2015
Resolved
Repair/replace wasted rail on 3rd deck port side aft.
Due 21 April 2015
Resolved 20 April 2015
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 23 March 2015
Resolved
Repair/replace multiple spots on fwd rail on 3rd deck.
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Structures › Superstructure
Issued 23 March 2015
Resolved
Repair/replace angle structural support for pilot station stbd side.
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Structures › Deck Plating
Issued 23 March 2015
Resolved
Repair/replace in kind wasted 3rd deck area lane B between frame 58&59
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Structures › Deck Plating
Issued 23 March 2015
Resolved
Repair/replace in kind wasted 3rd deck area lane B at frame 39.
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Structures › Deck Plating
Issued 23 March 2015
Resolved
Repair/replace in kind wasted 3rd deck area lane G between frame 54&55.
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Hull › Strut/Cross Tie
Issued 23 March 2015
Resolved
Repair/replace wasted angle support between lane D&E at frame 43, 45, 47, 62 on main deck
Due 21 April 2015
Resolved 7 April 2015
Resolution: Repalced support
Construction/Loadline › Hull › Strut/Cross Tie
Issued 23 March 2015
Resolved
Repair/replace wasted angle support between lane B&C at frame 19 on main deck
Due 21 April 2015
Resolved 7 April 2015
Resolution: Replaced support
Construction/Loadline › Hull › Strut/Cross Tie
Issued 23 March 2015
Resolved
Repair/replace wasted angle support between lane F at frame 41 on main deck
Due 21 April 2015
Resolved 7 April 2015
Resolution: Replaced Support
Construction/Loadline › Hull › Strut/Cross Tie
Issued 23 March 2015
Resolved
Repair/replace wasted angle support between lane I at frame 19 on main deck
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Hull › Strut/Cross Tie
Issued 23 March 2015
Resolved
Repair/replace wasted angle support between lane I&J at frame 41 on main deck.
Due 21 April 2015
Resolved 7 April 2015
Resolution: Replaced bracket
Construction/Loadline › Hull › Strut/Cross Tie
Issued 23 March 2015
Resolved
Repair/replace wasted angle support between lane B&C at frame 19.
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Hull › Strut/Cross Tie
Issued 23 March 2015
Resolved
Repair/replace wasted angle support between lane I&J at frame 16&17 on 2nd deck.
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Structures › Deck Plating
Issued 23 March 2015
Resolved
Repair/replace wasted deck at lane J at frame 14 on 2nd deck.
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Structures › Deck Plating
Issued 23 March 2015
Resolved
Between frames 42-44 on starboard side, repair holes in overhead and wasted longitudinal to original main deck.
Due 21 April 2015
Resolved 20 April 2015
Electrical › Electrical Distribution System (service) › Cable
Issued 23 March 2015
Resolved
Frame 55 stbd side, install 4 missing cable ties for electrical cable. Remove the line that was used to support the cable main deck.
Due 21 April 2015
Resolved 7 April 2015
Resolution: cable Ties replaced
Construction/Loadline › Hull › Side Shell
Issued 23 March 2015
Resolved
Between frames 17-18 stbd side, repair several holes in side shell at the top to original scantling.
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Structures › Deck Plating
Issued 23 March 2015
Resolved
Between frames 14-15, repair several holes in overhead to original scantling on main deck.
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Hull › Side Shell
Issued 23 March 2015
Resolved
Between frames 58-59 stbd side, repair two 3 in holes in top of side shell 2nd deck.
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Structures › Deck Plating
Issued 23 March 2015
Resolved
Between frames 44-45, stbd side, repair multiple holes and crack in deck (lane I), approximately 8 in square of holes in total 2nd deck.
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Hull › Stiffener
Issued 23 March 2015
Resolved
Between frames 38-40, stbd side shell, longitudinal showed significant wastage scaling, has two 2 in holes. Replace longitudinal to original scantling 2nd deck.
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Structures › Deck Plating
Issued 23 March 2015
Resolved
Between frames 16-17 Lane H has a 3 ft by 3 in crack in the deck. Repair to original scantling 2nd deck.
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Structures › Deck Plating
Issued 23 March 2015
Resolved
Between frames 54-55 Lane G overhead, 4 in by 1 in crack in weld of insert. Repair to original scantling. 2nd deck.
Due 7 April 2015
Resolved 20 April 2015
Construction/Loadline › Structures › Deck Plating
Issued 23 March 2015
Resolved
Between frames 62-63, Lane I, overhead patch has a 3" x 1" crack in weld of insert. Repair to original scantling on 2nd deck.
Condition: Improper/Lack of Maintenance
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Structures › Deck Plating
Issued 23 March 2015
Resolved
8 byas from bow, Lane I, Multiple holes in deck totaling 8 square in. Repair to original scantling on 3rd deck.
Condition: Improper/Lack of Maintenance
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Structures › Deck Plating
Issued 23 March 2015
Resolved
7 bays from bow, Lane J, crop and renew insert. The 2 ft x 2 ft insert has completely cracked welds on the fore and aft sides. Repair to original scantling on 3rd deck. Temp repair with doubler authorized until final repair.
Condition: Improper/Lack of Maintenance
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Structures › Deck Plating
Issued 23 March 2015
Resolved
3 bays from aft, Lane F (5 lanes from stbd), repair large hole in deck to original scantling on 3rd deck.
Condition: Improper/Lack of Maintenance
Due 21 April 2015
Resolved 20 April 2015
Construction/Loadline › Structures › Deck Plating
Issued 23 March 2015
Resolved
2 bays from aft, Lane H, repair large hole in deck to original scantling on 3rd deck.
Condition: Improper/Lack of Maintenance
Due 21 April 2015
Resolved 20 April 2015
Electrical › Electric Generation Source (service) › Generator
Issued 15 May 2014
Resolved
Repair and prove proper operation of service generator.
Action required: 705 - Other - as specified
Due 14 June 2014
Resolved 22 May 2014
Resolution: Tested Gen Set and Shut Downs all found sat
Deck/Cargo › Cargo Stowage › General
Issued 9 March 2014
Resolved
At next US port of San Juan, PR complete off loading of all cargo and make vessel available for inspection by attending Coast Guard Marine Inspector.
Due 31 March 2014
Resolved 27 March 2014
Resolution: All cargo was discharged and walkthrough was satisfactorily conducted to ascertain barge''s return to Freeport, The Bahamas.
Deck/Cargo › Cargo Stowage › General
Issued 9 March 2014
Resolved
Prior to departure Bahamas remove all containers between rows 8 and 14 (9-13) with the exception containers located at B-11 and B-12 may remain on board.
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2014
Resolved 27 March 2014
Resolution: All containers and cargo were removed at San Juan, PR.
Construction/Loadline › Structures › Deck Plating
Issued 9 March 2014
Resolved
Submit repair proposal to cognizant Officer in Charge Marine Inspection to renew all damaged underdeck frames, underdeck longs, deck plating and stanchions uppermost deck forward.
Action required: 705 - Other - as specified
Due 31 March 2014
Resolved 15 May 2014
Electrical › Electric Generation Source (service) › Conductor
Issued 9 March 2014
Resolved
Barge generator must remained secured until extent of damaged cable on upper most deck can be determined and isolated by qualified electrician.
Action required: 705 - Other - as specified
Due 31 March 2014
Resolved 15 May 2014
Electrical › Electric Supply System (service) › Cable
Issued 9 March 2014
Resolved
Renew all damaged cable as original.
Action required: 705 - Other - as specified
Due 31 March 2014
Resolved 15 May 2014
Pollution Prevention/Response › Response Equipment › Containers
Issued 9 March 2014
Resolved
Prior to departure Bahamas remove all loose debris and trash from uppermost deck.
Action required: 17 - Rectify deficiencies prior to departure
Due 31 March 2014
Resolved 27 March 2014
Resolution: No loose debris or trash noticed at San Juan, PR.
Deck/Cargo › Cargo Stowage › General
Issued 9 March 2014
Resolved
Any changes noted to condition of containers remaining on board for transit from Bahamas to San Juan, P.R. must be immediately reported to US Coast Guard and prior to entry San Juan.
Action required: 15 - Rectify deficiencies by next port
Due 31 March 2014
Resolved 27 March 2014
Resolution: No notification was provided by the barge operator prior to entering or while at the Port of San Juan, PR.
Construction/Loadline › Hull › Hull Plating
Issued 14 August 2013
Resolved
Gas free fwd and aft rake for USCG inspection. Provide repair proposal to make permanent repairs to hull plate and associated internal structures. Vessel authorized to shift to local repair facility to conduct gas free and repairs.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 August 2013
Construction/Loadline › Hull › Longitudinal Frame
Issued 14 August 2013
Resolved
Crop and renew approximately 16' of #3 and #4 wasted bottom longitudinals and approximately 20' of #2 wasted bottom longitudinal IWO port aft stern rake.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 August 2013
Construction/Loadline › Hull › Bracket
Issued 14 August 2013
Resolved
Gouge out and reweld vertical gusset IWO port aft stern rake and install doubler of approximately 8" x 4".
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 August 2013
Construction/Loadline › Hull › Side Shell
Issued 4 April 2012
Resolved
REPAIR CRACK IN THE SIDE SHELL AT FRAME 16 ON DECK 2 ABOVE THE #1 LONG.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Fracture in fashion plate. Rewelded.
Construction/Loadline › Hull › Side Shell
Issued 4 April 2012
Resolved
C/R THE #1 SIDE LONG ON THE PORT SIDE, FRAME 40, DECK 2.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Insert side long 48" x 5" x 3" 3/8" angle.
Construction/Loadline › Hull › Hull Plating
Issued 4 April 2012
Resolved
C/R THE WASTED VERTICAL FRAME NEAR THE WATER TIGHT DOOR ON THE PORT SIDE, DECK 2.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Construction/Loadline › Hull › Longitudinal Frame
Issued 4 April 2012
Resolved
C/R THE UPPER LONG BTWN FRAMES 37-38 AND BAYS I-J ON DECK 2.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Insert is 5''10" x 6" x 4" x 3/8" angle.
Construction/Loadline › Structures › Deck Plating
Issued 4 April 2012
Resolved
INSERT DECK AT FRAME 21, LANE L, DECK 3.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Deck insert is 4'' x 6'' x 3/8".
Construction/Loadline › Structures › Superstructure
Issued 4 April 2012
Resolved
REPAIR STANCHIONS AT FRAME 72, DECK 2, BAY B-C AND FRAME 74, BAY D-E.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: repaired.
Electrical › Lighting (service) › Lighting Fixture
Issued 4 April 2012
Resolved
REPAIR LIGHT AT CAT WALK LANE A, TRAILER STANDS 5 AND 6 ON DECK 3.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Renewed.
Accommodation/Occupational Safety › Occupational Safety › Hand Grab
Issued 4 April 2012
Resolved
REPAIR LADDER PORT SIDE FWD, DECK 3.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Repaired.
Construction/Loadline › Hull › Side Shell
Issued 4 April 2012
Resolved
REAPIR BULWARK, FRAME 79, LANE J, DECK 3.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Fashion plate repair.
Construction/Loadline › Hull › Girder
Issued 4 April 2012
Resolved
C/R SIDE GIRDER, FRAME 59 MAIN DECK.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Fashion Plate panel stiffener repair.
Construction/Loadline › Structures › Superstructure
Issued 4 April 2012
Resolved
C/R STANCHION FRAME 35, LANES B AND C MAIN DECK.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Repaired.
Construction/Loadline › Structures › Deck Plating
Issued 4 April 2012
Resolved
C/R DECK TO GOOD METAL AT FRAME 68 BTWN BAYS H AND I ON DECK 3.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Deck insert is 6'' x 4'' x 3/8".
Construction/Loadline › Hull › Longitudinal Frame
Issued 4 April 2012
Resolved
C/R UPPER LONG BTWN FRAMES 70-72 ON DECK 2.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Repaired
Construction/Loadline › Hull › Bracket
Issued 4 April 2012
Resolved
C/R THE GUSSETT AT FRAME 9, BAY B-C AND AT FRAME 19, BAY D-E ON THE MAIN DECK.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Renewed.
Accommodation/Occupational Safety › Occupational Safety › Receptacle Outlet
Issued 4 April 2012
Resolved
SECURE THE JUNCTION BOX ON THE MAIN DECK FRAME 21 PORT SIDE.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Secured.
Construction/Loadline › Structures › Superstructure
Issued 4 April 2012
Resolved
C/R THE LOWER PORTION OF THE DIAGONAL AT FRAME 39, BAY D-E ON THE MAIN DECK.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Repaired.
Accommodation/Occupational Safety › Occupational Safety › Receptacle Outlet
Issued 4 April 2012
Resolved
SECURE THE JUNCTION BOX ON THE MAIN DECK, FRAME 15, STBD SIDE OVER HEAD.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Secured
Construction/Loadline › Hull › Longitudinal Frame
Issued 4 April 2012
Resolved
C/R #7 SIDE LONG BTWN FRAMES 31 AND 32 ON THE MAIN DECK STBD SIDE.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Insert is 60" x 5" x 3" x 3/8" angle.
Construction/Loadline › Hull › Side Shell
Issued 4 April 2012
Resolved
REPAIR THE CRACK AT THE OPENING ON THE STBD SIDE MAIN DECK FRAME 32.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Fashion plate repair.
Construction/Loadline › Structures › Deck Plating
Issued 4 April 2012
Resolved
C/R THE DECK TO GOOD METAL, FRAME 59 BAY J ON DECK 2.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Deck insert is 51" x 30" x 3/8".
Construction/Loadline › Hull › Strut/Cross Tie
Issued 4 April 2012
Resolved
REAPIR FRACTURES IN THE UPPER BEAM AT FRAME 71, BAYS B-H ON DECK 2.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Repaired
Construction/Loadline › Hull › Side Shell
Issued 4 April 2012
Resolved
THE STABD SIDE SHELL NEEDS TO BE MADE AVAILABLE FOR INSPECTION.
Action required: 705 - Other - as specified
Due 4 June 2012
Resolved 11 May 2012
Resolution: Side shell shows normal wer and tear consistant with the vessel''s age and service.
Electrical › Electrical Distribution System (service) › Cable
Issued 12 March 2009
Resolved
Main deck: Secure the cables in the cable way on the port side from FR 39 to 41
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2009
Resolved 17 March 2009
Resolution: Cables are secured
Electrical › Electrical Distribution System (service) › Panelboard
Issued 12 March 2009
Resolved
Repair the latch for the cover on #1, #2 and #3 ballast pump panel
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2009
Resolved 17 March 2009
Resolution: The latches were repaired
Accommodation/Occupational Safety › Occupational Safety › Lifeline
Issued 12 March 2009
Resolved
Repair safety lines on the car deck on the main deck as needed
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 April 2009
Resolved 17 March 2009
Resolution: All safety line are repaired
Construction/Loadline › Hull › Stiffener
Issued 12 March 2009
Resolved
Repair the fractures at the top of the stanchions at FR 11, 12, 13, 14 lane f&g FR 29, 42 and 71 lane d&e on the main deck
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 April 2009
Resolved 17 March 2009
Resolution: All stanchions were re-welded
Fire Fighting › Means of Escape › Landings
Issued 12 March 2009
Resolved
Renew both boarding ladder openings deck grate on the stbd side. Clean out scale under both.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2009
Resolved 17 March 2009
Resolution: Grate was renewed.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 12 March 2009
Resolved
Repair broken hand rails on the car deck at FR 67 lame h&i on the main deck.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 March 2009
Resolution: Rail was renewed
Electrical › Electrical Distribution System (service) › Cable
Issued 12 March 2009
Resolved
Renew all wasted hangers IWO the window openings on the stbd side 2nd deck
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2009
Resolved 12 March 2009
Resolution: Hanger renewed.
Construction/Loadline › Structures › Deck Plating
Issued 12 March 2009
Resolved
Crop and renew deck plating on the 2nd deck stbd side outboard where holes are.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2009
Resolved 17 March 2009
Resolution: Plate was renewed.
Construction/Loadline › Hull › Stiffener
Issued 12 March 2009
Resolved
Repair the fractured stanchions at FR 74 lane d&e top and bottom, FR 71 d&e, 47 lane h&i at the top.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 12 April 2009
Resolved 17 March 2009
Resolution: FRs are repaired
Construction/Loadline › Hull › Girder
Issued 12 March 2009
Resolved
Crop and renew the I beam at FR 55 lane a&b prior to loading cargo on the 3rd deck in lanes b&c
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 March 2009
Resolution: The I beam was renewed.
Construction/Loadline › Hull › Girder
Issued 12 March 2009
Resolved
On the 2nd deck the 2 row of stanchions FR 73 there are 3 bent stanchion and a bent overhead I beam. Crop and renew
at next dry dock
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 March 2010
Resolved 23 March 2010
Resolution: Completed satisfactoy inspection of renewed stanchions and overhead "I" beam.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 12 March 2009
Resolved
Make repairs to the 3rd deck mid body bulwarks to make them safe for workers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 12 April 2009
Resolved 17 March 2009
Resolution: The sharp areas was cut off.
Fire Fighting › Means of Escape › Stairways
Issued 26 June 2008
Resolved
Repair the port and stbd aft ladders as needed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 July 2008
Resolved 11 July 2008
Resolution: Both ladders are repaired.
Construction/Loadline › Structures › Superstructure
Issued 26 June 2008
Resolved
Main deck. Repair or replace the stanchions at frame 51 in lain H & I, frame 45 in lain B & C, frame 74 in lain H & I.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 July 2008
Resolved 11 July 2008
Resolution: All stanchion listed are repaired.
Construction/Loadline › Structures › Superstructure
Issued 26 June 2008
Resolved
2nd deck. Repair or replace the stanchions at frame 74 in lain D & E, H & I.
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 26 June 2008
Resolution: Stanchions are repaired.
Construction/Loadline › Structures › Superstructure
Issued 26 June 2008
Resolved
2nd deck. Repair or replace the stanchion at frame 70 in lain H & I.
Condition: Unknown
Action required: 705 - Other - as specified
Due 26 July 2008
Resolved 11 July 2008
Resolution: The stanchion is repaired.
Construction/Loadline › Structures › Deck Plating
Issued 13 February 2008
Resolved
Properly repair tear in 3rd deck between frames 65-66 stbd side of centerline.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Construction/Loadline › Hull › Transverse Frame
Issued 13 February 2008
Resolved
Void #7 descale frame #33 stbd side web and frame #36 port side web and reinspect.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Resolution: Area descaled and frame found wasted. Insert (4'' X 6'') made.
Construction/Loadline › Hull › Transverse Frame
Issued 13 February 2008
Resolved
Void #7 frame 34 and 36 center section gouge and weld all cracks as marked, weld missed welds as marked.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Construction/Loadline › Hull › Side Shell
Issued 13 February 2008
Resolved
Void #7 frame 35 stbd side, insert side web approx 18" X 5', and renew all affected side longs as needed.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Construction/Loadline › Hull › Stiffener
Issued 13 February 2008
Resolved
Void #7 frames 34 and 36 repair side longs as marked on aft side of both frames.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 13 February 2008
Resolved
Void #7 stbd ladder crop and renew top mounting brackets and top 2nd and 3rd rungs. Renew hatch seal.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 13 February 2008
Resolved
Void #3 renew stbd hatch seal.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Construction/Loadline › Hull › Stiffener
Issued 13 February 2008
Resolved
Void #14 port side, crop and renew lower poriton of vertical stiffner on fwd bulkhead.
Action required: 705 - Other - as specified
Due 14 April 2008
Resolved 4 April 2008
Resolution: Repairs made to stiffner.
Construction/Loadline › Hull › Stiffener
Issued 13 February 2008
Resolved
Void #14 center: 2nd vertical stiffner from stbd bulkhead IWO forward bulkhead, crop and renew approx. 8' from bottom.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Construction/Loadline › Hull › Stiffener
Issued 13 February 2008
Resolved
Void #14 center: 1st vertical stiffner port of CVK IWO fwd bulkhead, crop and renew lower portion. 2nd vertical stiffner port of CVK IWO fwd bulkhead, crop and renew lower portion.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Construction/Loadline › Hull › Bracket
Issued 13 February 2008
Resolved
Void #14 center: crop and renew #5 and #6 stbd of CVK brackets on stern at deck. Also crop and renew under deck stiffner at #6 bracket (approx 2 ft.)
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Construction/Loadline › Hull › Stiffener
Issued 13 February 2008
Resolved
#13 tank, port, at from 68 crop and renew #1 and #2 side longs aft, crop and renew the #2 side long at from 65, crop and renew the #4 side long at frame 67.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Construction/Loadline › Hull › Transverse Frame
Issued 13 February 2008
Resolved
Tank #13, center port, gouge and weld fracture on the transverse frame as marked.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Construction/Loadline › Hull › Transverse Frame
Issued 13 February 2008
Resolved
Tank #13, center stbd, gouge and weld fractures on teh transverse frames as marked.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Construction/Loadline › Hull › Stiffener
Issued 13 February 2008
Resolved
Tank #13 stbd, crop and renew 1 side long between frames 67 and 68. Crop and renew #1 and #2 side longs and the #1 gusset aft.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Construction/Loadline › Hull › Transverse Frame
Issued 13 February 2008
Resolved
Tank #4, port, frame # 19 crop and renew 8 ft. to good steel of teh deep web frame. Crop and renew 4 ft of the overhead long at frame 19.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Construction/Loadline › Hull › Transverse Frame
Issued 13 February 2008
Resolved
Tank #4, stbd, frame #20 crop and renew to good steel in the transverse frame IWO the deep web frame.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 13 February 2008
Resolved
Void #11: Stbd side of center section, stbd longitudinal bulkhead, IWO transverse frame #3 and #4 weld connection is fractured.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Construction/Loadline › Hull › Transverse Frame
Issued 13 February 2008
Resolved
Void #5: Center section, frame #24 port, outboard under main deck transverse web fractured IWO 6" X 6" X 1/2" diagonal.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Construction/Loadline › Hull › Stiffener
Issued 13 February 2008
Resolved
Void #2: Port side, IWO frame 8 and 9, the 3rd and 4th deck sideshell longs upset. Reweld fractured welds.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 13 February 2008
Construction/Loadline › Hull › Stiffener
Issued 13 February 2008
Resolved
Void #14 stbd side fracture in 3rd vertical stiffner from stbd aft on stern at deck.
Action required: 705 - Other - as specified
Due 14 March 2008
Resolved 7 March 2008
Construction/Loadline › Hull › Stiffener
Issued 29 May 2007
Resolved
Crop and renew the web of frame 50, on the stbd side of the main deck. Crop to good metal.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 June 2007
Resolved 26 June 2007
Resolution: Frame renewed back to good metal. All Sat.
Construction/Loadline › Structures › Deck Plating
Issued 29 May 2007
Resolved
Repair the cracks in the deck by the side shell, at frame 50 and frame 40. On the stbd side of the main deck.
Condition: Unknown
Action required: 705 - Other - as specified
Due 29 June 2007
Resolved 26 June 2007
Resolution: Cracked welds were ground out and rewelded. All Sat.
Fire Fighting › Means of Escape › Enclosed Stairway
Issued 29 May 2007
Resolved
Replace ladder rugs as needed to the ladder at frame 8 on the stbd side main deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 July 2007
Resolved 13 February 2008
Resolution: Rungs replaced.
Construction/Loadline › Hull › Longitudinal Frame
Issued 29 May 2007
Resolved
Crop and renew the plate by the towing bit on the bow, center line.
Condition: Unknown
Action required: 705 - Other - as specified
Due 29 July 2007
Resolved 13 February 2008
Resolution: Plate cropped and renewed.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 29 May 2007
Resolved
Replace glass cover over the light at frames 16 and 65, on the 2 deck, stbd side.
Condition: Unknown
Action required: 705 - Other - as specified
Due 29 July 2007
Resolved 13 February 2008
Resolution: Glass cover replaced.
Electrical › Electrical Distribution System (service) › Cable
Issued 29 May 2007
Resolved
Remove dead end wires. On the 2 deck, stbd side at frame 53.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 June 2007
Resolved 26 June 2007
Resolution: All dead end wires were removed. All Sat.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 29 May 2007
Resolved
Resecure the J-box at frame 45, on the stbd side top deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 June 2007
Resolved 26 June 2007
Resolution: J-Box properly secured. All Sat.
Construction/Loadline › Hull › Longitudinal Frame
Issued 29 May 2007
Resolved
Repair cracked welds on the overhead longitudinals throughout the vessel. Main deck frames, on the stbd side, first bay: 74 to 65,63,61,59,45,43,35,27,14. The 2 deck frames on the stbd side, first bay: 4,11,36,42,44,63,64.
Condition: Unknown
Action required: 705 - Other - as specified
Due 29 July 2007
Resolved 13 February 2008
Resolution: Welds repaired.
Electrical › Electrical Distribution System (service) › Cable
Issued 29 May 2007
Resolved
Remove dead end cables on port side main deck between frames 65-66 and the 2nd deck at frame 67.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 June 2007
Resolved 26 June 2007
Resolution: All dead end cables were removed. All Sat.
Electrical › Electrical Distribution System (service) › Wiring
Issued 29 May 2007
Resolved
Replace plastic wire ties with steel wire ties on the port side 1st and 2nd decks at frame 61.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 June 2007
Resolved 26 June 2007
Resolution: Plastic wire ties were removed and new stainless steel wire hanger were installed. All Sat.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 29 May 2007
Resolved
Properly install distribution box cover, port side forward, behind generator.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 June 2007
Resolved 26 June 2007
Resolution: Properly installed cover on distrabution panel. All Sat.
Construction/Loadline › Hull › Stiffener
Issued 29 May 2007
Resolved
Crop and renew 6 vertical stanchions on the 2nd deck, all are bent excessively. Start with the three on the stern opening. Complete in accordance with work schedule provided by [name withheld].
Condition: Unknown
Action required: 705 - Other - as specified
Due 29 August 2007
Resolved 13 February 2008
Resolution: Stanchions replaced/repaired.
Construction/Loadline › Hull › Stiffener
Issued 29 May 2007
Resolved
Crop and renew all side shall longitudinals stiffeners and transverse I beams as needed in accord to attached work schedule provided by [name withheld] frames 55 aft on the port side. To be completed no later then 06 Mar 2008.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 March 2008
Resolved 13 February 2008
Resolution: Stiffners and transverse I beams replaced.
Electrical › Electric Generation Source (service) › Generator Cable
Issued 17 May 2007
Resolved
Properly ground all electrical motors and equipment throughout the vessel.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 June 2007
Resolved 26 June 2007
Resolution: All pumps had new grounding strap installed. All Sat.
Construction/Loadline › Structures › Deck Plating
Issued 22 May 2006
Resolved
Repair 2' fracture in deck on 3rd deck starboard side near midship.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 May 2006
Resolved 13 June 2006
Construction/Loadline › Structures › Deck Plating
Issued 22 May 2006
Resolved
Repair 2' fracture in deck on second deck starboard side at frame 40
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 May 2006
Resolved 13 June 2006
Construction/Loadline › Hull › Girder
Issued 22 May 2006
Resolved
Crop and renew 14'x36" section of frame 46, on main deck starboard side.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 May 2006
Resolved 13 June 2006
Engineering › Diesel Engine (auxiliary)
Issued 14 February 2003
Resolved
RENEW EXHAUST RETAINING BRACKET, RENEW LAGGING AND REPAIR EXHAUST LEAK ON RIGHT BANK OF GENERATOR. LEGACY COMPONENT DESC: Piping (exhaust)
Condition: Unknown
Due 6 April 2003
Resolved 12 March 2003
Electrical › Lighting (service)
Issued 14 February 2003
Resolved
RENEW / REPAIR DECK LIGHTING AND WIRING ON 3RD DECK AFT - BOTH SIDES. LEGACY COMPONENT DESC: Lighting Fixture
Condition: Damaged By Earlier Event
Due 6 April 2003
Resolved 12 March 2003
Deck/Cargo › Holds/Tanks
Issued 14 February 2003
Resolved
REMOVE RUBRAILS FROM LANE 8-9 FRAMES 66 AND 64 FOR INSPECTION OF STANCHIONS AT MAIN DECK. LEGACY COMPONENT DESC: Bulkhead
Condition: Improper/Lack of Maintenance
Due 6 April 2003
Resolved 12 March 2003
Resolution: Stanchions found sat.
Construction/Loadline
Issued 14 March 2000
Resolved
SUBMIT REPAIR PROPOSAL FOR 01 DECK (MIDDLE DECK) IWO HEAVILY PITTED AREAS &UNDER DECK LONG REPLACEMENT ON PORT & STBD OUTER MOST LANES IWO BREEZE WAY.
Condition: Unknown
Due 20 September 2000
Resolved 21 September 2000
Construction/Loadline
Issued 14 March 2000
Resolved
PROVIDE GAUGING REPORT & STRENGTH CALCULATIONS FOR PORT & STBD OUTER MOST LANES IWO BREEZE WAY. 01 DECK (MIDDLE DECK).
Condition: Unknown
Due 27 April 2000
Resolved 5 May 2000
Construction/Loadline
Issued 13 March 1998
Resolved
The #3 stiffener, inboard from frame 2, stbd side forecastle, is twisted. Required to repair/renew by 13MAY98.
Condition: Unknown
Due 13 March 1998
Resolved 13 March 1998
Construction/Loadline
Issued 10 February 1995
Resolved
MAKE PERMANENT REPAIRS TO THE TEMPORARY MANHOLES IN BALLAST TANKS 11 AND 12AT CENTERLINE BETWEEN FRAMES 59 AND 64. RESTORE AND PROVE WATERTIGHT INTEGRITY TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR NOT LATER THAN 21 FEB 95.
Condition: Unknown
Due 21 February 1995
Resolved 27 February 1995
Construction/Loadline
Issued 10 February 1995
Resolved
PROVIDE A COPY OF GAUGINGS TAKEN DURING THE ABS SPECIAL SURVEY #4 TO COGNIZANT OCMI.
Condition: Unknown
Due 9 March 1995
Resolved 27 February 1995
Construction/Loadline
Issued 25 January 1995
Resolved
Make vessel available for CG examination and repair all cracked structual welds and repair all cracks in superstructure, make all other called out repairs to the satisfaction of the attending inspector in Norfolk Va.
Condition: Unknown
Due 25 January 1995
Resolved 25 January 1995
Construction/Loadline
Issued 26 November 1994
Resolved
MAKE PERMANENT REPAIRS IN WAY OF DAMAGES TO THE STBD AFT CORNER OF THE STBDSTERN VOID (COMPARTMENT #14) AND THE STBD SKEG ATTACHMENT, TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 26 November 1994
Resolved 26 November 1994
Construction/Loadline
Issued 26 November 1994
Resolved
MAINTAIN TEMPORARY REPAIRS (CEMENT BOX) TO THE 18" HORIZONTAL TEAR AT THE STBD AFT CORNER OF THE STBD STERN VOID AND MAKE PERIODIC CHECKS OF THAT REPAIR UNTIL PERMANENT REPAIRS ARE COMPLETED. REPORT ANY FAILURE OF THE TEMPORARY REPAIR TO THE COGNIZANT OCMI.
Condition: Unknown
Due 26 November 1994
Resolved 26 November 1994
Construction/Loadline
Issued 23 November 1994
Resolved
MAKE PERMANENT RERPAIRS TO AREA IN WAY OF STARBOARD SKEG.
Condition: Unknown
Due 23 November 1994
Resolved 23 November 1994
Construction/Loadline
Issued 23 November 1994
Resolved
PROCEED DIRECTLY TO PORT OF PHILADELPHIA TO OFFLOAD CARGO; MAKE BARGE AVAILABLE TO FOR CG INSPECTION.
Condition: Unknown
Due 23 November 1994
Resolved 23 November 1994
Construction/Loadline
Issued 21 May 1992
Resolved
REMOVE BACKING STRIPS, VEE-OUT, AND WELD INSIDE SEAMS ON THE TWO INSERTS LOCATED AT THE INBOARD TOP CORNER OF NO. 14 STBD. VOID.
Condition: Unknown
Due 4 June 1992
Resolved 4 June 1992
Construction/Loadline
Issued 21 May 1992
Resolved
REPAIR FRACTURE ON VOID TOP PLATING LOCATED BY THE FWD. VERTICAL DEEP WEB IN NO. 7 STBD. VOID.
Condition: Unknown
Due 4 June 1992
Resolved 4 June 1992
Construction/Loadline
Issued 21 May 1992
Resolved
REPAIR FRACTURE ON VOID TOP PLATING LOCATED BY THE 3RD. VERTICAL DEEP WEB IN NO. 8 STBD. VOID.
Condition: Unknown
Due 4 June 1992
Resolved 4 June 1992
Construction/Loadline
Issued 21 May 1992
Resolved
VEE & WELD FRACTURES ON NO. 1 AND 5 SIDE LONGITUDINALS, NUMBERED FROM THE BOTTOM, IN BAY 5 OF NO. 10 STBD. VOID.
Condition: Unknown
Due 4 June 1992
Resolved 4 June 1992
Construction/Loadline
Issued 21 May 1992
Resolved
VEE & WELD FRACTURE ON NO. 4 SIDE LONGITUDINAL, NUMBERED FROM THE BOTTOM, IN BAY 5 OF NO. 13 PORT VOID.
Condition: Unknown
Due 4 June 1992
Resolved 4 June 1992
Construction/Loadline
Issued 21 May 1992
Resolved
VEE & WELD FRACTURES ON NO. 1,2, AND 3 SIDE LONGITUDINALS, NUMBERED FROM THE BOTTOM, IN BAY 1 OF NO. 2 PORT VOID.
Condition: Unknown
Due 4 June 1992
Resolved 4 June 1992
Construction/Loadline
Issued 21 May 1992
Resolved
VEE & WELD FRACTURE ON NO. 2 SIDE LONGITUDINAL, NUMBERED FROM THE BOTTOM, IN BAY 3 OF NO. 5 PORT VOID.
Condition: Unknown
Due 4 June 1992
Resolved 4 June 1992
Construction/Loadline
Issued 21 May 1992
Resolved
REPAIR FRACTURE ON VOID TOP PLATING LOCATED BY THE AFT VERTICAL DEEP WEB INNO. 6 STBD. VOID.
Condition: Unknown
Due 4 June 1992
Resolved 4 June 1992
Construction/Loadline
Issued 21 May 1992
Resolved
VEE & WELD FRACTURES ON NO. 2 AND 3 SIDE LONGITUDINALS, NUMBERED FROM THE BOTTOM, IN BAY 3 OF NO. 7 PORT VOID.
Condition: Unknown
Due 4 June 1992
Resolved 4 June 1992
Construction/Loadline
Issued 12 January 1990
Resolved
MAKE PERMANENT REPAIRS TO WEB FRAME 41 STBD., AT DECK CONNECTION IN NO. 8 VOID.
Condition: Unknown
Due 12 January 1990
Resolved 12 January 1990
Construction/Loadline
Issued 12 January 1990
Resolved
MAKE PERMANENT REPAIRS TO BULKHEAD 64 STBD. AT DECK CONNECTION JUST IN- BOARD OF SIDESHELL IN NO. 12 BALLAST TANK.
Condition: Unknown
Due 12 January 1990
Resolved 12 January 1990
Construction/Loadline
Issued 12 January 1990
Resolved
MAKE PERMANENT REPAIRS TO FRAMES 69, 73, AND 73 1/2 STBD. AT DECK CONNEC- TIONS IN NO. 14 VOID.
Condition: Unknown
Due 12 January 1990
Resolved 12 January 1990
Construction/Loadline
Issued 12 January 1990
Resolved
CROP AND INSERT BULKHEAD 69 PORT SIDE IN WAY OF SIDESHELL TO DECK CONNEC- TION IN NO. 14 VOID.
Condition: Unknown
Due 12 January 1990
Resolved 12 January 1990
Construction/Loadline
Issued 12 January 1990
Resolved
MAKE PERMANENT REPAIRS TO WEB FRAME 13 PORT, BETWEEN 2ND AND 4TH SIDE LONG-ITUDINALS IN NO. 2 VOID
Condition: Unknown
Due 12 January 1990
Resolved 12 January 1990
Construction/Loadline
Issued 12 January 1990
Resolved
MAKE PERMANENT REPAIRS TO WEB FRAME 33 STBD., AT DECK CONNECTION IN NO. 7 VOID.
Condition: Unknown
Due 12 January 1990
Resolved 12 January 1990
Construction/Loadline
Issued 15 March 1985
Resolved
GOUGE OUT AND WELD ALL FRACTURES IN WAY OF FRAMES 10-15 PORT AND STARBOARD ON 1ST AND 2ND DECKS. NOTIFY [name withheld] COMPLETED.
Condition: Unknown
Due 15 March 1985
Resolved 15 March 1985
Construction/Loadline
Issued 16 February 1985
Resolved
GOUGE OUT AND WELD TWO FRACTURES LOCATED IN STARBOARD SIDE SHELL FORWARD OFFRAMES 62 AND 63 AT APPROX. 12-13 FEET OFF LOWER DECK. REPAIRS ARE TO BE COMPLETED TO THE SATISFACTION OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 16 February 1985
Resolved 16 February 1985
Construction/Loadline
Issued 16 February 1985
Resolved
PROVIDE ABS WELDER CERTIFICATION FOR ALL WELDERS USED ON REPAIR OF HULL IN WAY OF FRAMES 10-15 PORT AND STARBOARD ON 15-16 FEB 85 TO [name withheld], PA.
Condition: Unknown
Due 16 February 1985
Resolved 16 February 1985
Construction/Loadline
Issued 15 February 1985
Resolved
GOUGE OUT AND WELD FRACTURES IN WAY OF FORWARD AIRPORTS (FRAMES 10-15) ON THE MAIN AND SECOND DECKS.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Unknown
Issued 26 January 1984
Resolved
REPLACE THE TORN FLAME SCREEN IN THE DIESEL TANK VENT.
Condition: Unknown
Due 26 January 1984
Resolved 26 January 1984
Unknown
Issued 26 January 1984
Resolved
REPLACE THE PORT AND STARBOARD BATTERY BOXES ON THE THIRD DECK.
Condition: Unknown
Due 26 January 1984
Resolved 26 January 1984
Unknown
Issued 26 January 1984
Resolved
RENEW THE GASKETS ON THE WATERTIGHT DOORS ON THE SECOND DECK.
Condition: Unknown
Due 26 January 1984
Resolved 26 January 1984
Unknown
Issued 26 January 1984
Resolved
EFFECT REPAIRS TO THE EXHAUST LEAK ON THE DIESEL GENERATOR ENGINE.
Condition: Unknown
Due 26 January 1984
Resolved 26 January 1984
Unknown
Issued 26 January 1984
Resolved
REPAINT THE DRAFT MARKS AND LOADLINE SO IT IS CLEARLY VISIBLE.
Condition: Unknown
Due 26 January 1984
Resolved 26 January 1984
Unknown
Issued 26 January 1984
Resolved
THE FOLLOWING DEFICIENCIES ARE FOR THE MIAMI, DN574568.
Condition: Unknown
Due 26 January 1984
Resolved 26 January 1984