RICHARD W. is a 1976 passenger vessel (inspected). The Coast Guard has recorded 34 inspections since 1981, most recently in May 1997, along with 87 deficiencies.
Records from 1981 to 1997. Most recent: inspection, 21 May 1997.
- Built
- 1976
- Last inspected
- 21 May 1997
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 87 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
574635
48803
Flag
UNITED STATES
—
Maury page id
psix-48803
Inspections, by type
…with no type recorded9
Years with a record
14 calendar years (1981–1997)
The 34 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 29 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Tonnage as PSIX records it56 - Regulatory (Subpart C or D), Gross Ton
38 - Regulatory (Subpart C or D), Net Ton
38 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 34
21 May 1997
Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1100325
14 June 1996
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1089851
14 June 1996
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1090131
13 July 1995
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1183974
26 June 1995
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 873244
19 July 1994
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 867215
1 June 1994
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1019716
1 June 1994
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1169499
21 March 1994
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1164613
27 July 1993
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1155286
25 May 1993
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 832629
13 May 1993
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1151752
25 November 1992
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1139363
30 July 1992
Excursion Permit
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 962928
12 July 1992
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 9764
30 June 1992
Excursion Permit
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 947427
16 June 1992
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 953553
18 November 1991
Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 932287
6 May 1991
COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1235226
5 April 1991
Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1238198
28 November 1990
Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 918167
23 July 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1237537
6 June 1990
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1218358
22 March 1990
Re-Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 932802
14 August 1989
Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1039149
21 July 1989
Deficiency Check · Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1207691
3 April 1989
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 896322
29 March 1988
Initial Certification
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1033020
19 January 1988
Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1016681
17 October 1984
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1282268
27 October 1983
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 971226
9 July 1982
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1276042
19 June 1981
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 966298
17 June 1981
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 963431
Deficiency record · 87
Construction/Loadline
Issued 14 June 1996
Resolved
WELD BOTH SIDES OF THE STARBOARD BOW INSERT AND PROVE WATERTIGHTNESS.
Construction/Loadline
Issued 14 June 1996
Resolved
REMOVE ALL BONDO ON THE PORT QUARTER, INSIDE AND OUT, AND MAKE AVAILABLE FOR FURTHER INSPECTION.
Documentation
Issued 14 June 1996
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Construction/Loadline
Issued 14 June 1996
Resolved
PLUG THE 1 1/4" THROUGH HULL FITTING THAT WAS THE SHOWER DRAIN OVERBOARD.
Electrical
Issued 14 June 1996
Resolved
PROPERLY DEAD END THE ARMORED CABLE NEAR THE SSG AND PORT FORWARD MDE.
Engineering
Issued 14 June 1996
Resolved
LABEL THE EMERGENCY FUEL SHUTOFF VALVE.
Lifesaving
Issued 14 June 1996
Resolved
PROVIDE CORRECT AMOUNT OF RETROREFLECTIVE TAPE ON LIFEFLOATS AND LASH PADDLES TO THE LIFEFLOAT.
Documentation
Issued 14 June 1996
Resolved
PROVE COMPLIANCE WITH THE DRUG TESTING REQUIREMENTS CONTAINED IN 46 CFR PART 16.
Lifesaving
Issued 14 June 1996
Resolved
PROVIDE AN ADDITIONAL 3 RED AND 3 ORANGE COAST GUARD APPROVED HAND HELD DISTRESS SIGNALS.
Electrical
Issued 14 June 1996
Resolved
REMOVE WIRE NUTS AND PROPERLY CRIMP ELECTRICAL CONNECTIONS UNDER WHEELHOUSECONSOLE.
Engineering
Issued 14 June 1996
Resolved
INSTALL 30X30 WIRE MESH FLAME SCREEN IN THE FUEL TANK VENT LINE.
Lifesaving
Issued 14 June 1996
Resolved
REMOVE FROM VESSEL OR PROVE PROPER OPERATION OF EPIRB.
Construction/Loadline
Issued 14 June 1996
Resolved
PROVE PROPER OPERATION OF THE BELT DRIVEN BILGE/FIRE PUMP.
Engineering
Issued 14 June 1996
Resolved
INSTALL PROPER 30X30 WIRE MESH FLAME SCREEN IN THE FUEL TANK VENT LINE.
Construction/Loadline
Issued 14 June 1996
Resolved
MAKE PERMANENT REPAIRS TO THE PORT QUARTER SIDE SHELL AS MARKED AND DISCUSSED.
Electrical
Issued 14 June 1996
Resolved
REMOVE ALL WIRE NUTS AND PROPERLY WIRE CRIMP ALL ELECTRICAL CONNECTIONS UNDER THE WHEELHOUSE CONSOLE.
Construction/Loadline
Issued 14 June 1996
Resolved
CROP AND RENEW AS ORIGINAL THE FOUR BILGE STRINGERS AND ONE SIDE SHELL STRINGER IN THE LAZARETTE AS MARKED.
Electrical
Issued 14 June 1996
Resolved
REMOVE ALL WIRE NUTS AND PROPERLY CONNECT ELECTRICAL CONNECTIONS ON THE HOTWATER HEATER. IN ADDITION, PROPERLY DEAD END ALL LOOSE WIRES AND REPLACE PROTECTIVE FRONT COVER.
Engineering
Issued 14 June 1996
Resolved
DOUBLE CLAMP THE EXHAUST WATER FEED LINES ON BOTH MDE'S.
Construction/Loadline
Issued 14 June 1996
Resolved
MAKE BOTH MSD THROUGH HULL FITTINGS AVAILABLE FOR INSPECTION.
Construction/Loadline
Issued 14 June 1996
Resolved
CAP THE UNUSED FOREPEAK BILGE SUCTION LINE WHERE PASSING THROUGH THE COLLISION BULKHEAD.
Construction/Loadline
Issued 14 June 1996
Resolved
CROP AND RENEW AS ORIGINAL THE THREE BILGE STRINGERS IN THE FORWARD VOID ASMARKED.
Accommodation/Occupational Safety
Issued 14 June 1996
Resolved
REMOVE FROM VESSEL OR INSULATE AND RESECURE THE MAIN CABIN HEATER EXHAUST PIPE WHERE PASSING THROUGH THE MAIN DECK.
Construction/Loadline
Issued 14 June 1996
Resolved
GRIND SMOOTH FOREPEAK HATCH COAMING.
Construction/Loadline
Issued 14 June 1996
Resolved
REMOVE BOTH PORT AND STARBOARD EXHAUST BAFFLES AND PROVE SIDE SHELL THICKNESS BEHIND BAFFLE SIDE SHELL PLATE.
Construction/Loadline
Issued 14 June 1996
Resolved
CROP AND RENEW AS ORIGINAL THE DECK STRINGER JUST FORWARD OF THE FOREPEAK HATCH WHERE MARKED.
Construction/Loadline
Issued 14 June 1996
Resolved
CROP TO GOOD METAL AND RENEW THE HOLED AREA OF THE STARBOARD BOW AS MARKED AND DISCUSSED. THE INSERT IS TO BE A MINIMUM OF 18X18 WITH RADIUSED CORNERS AND EXTEND FROM THE STEM AFT. A USCG MARINE INSPECTOR SHALL WITNESS FIT-UP PRIOR TO FINAL INSTALLATION.
Construction/Loadline
Issued 14 June 1996
Resolved
REMOVE ALL BONDO, INSIDE AND OUT, ON THE PORT QUARTER SO AS TO MAKE THE AREA AVAILABLE FOR FURTHER INSPECTION.
Navigation
Issued 26 June 1995
Resolved
RENEW STEERING CABLE IN THE LAZARETTE FROM PORT BULKHEAD TO CHAINS.
Accommodation/Occupational Safety
Issued 26 June 1995
Resolved
PROVE PROPER OPERATION OF 32V EMERGENCY LIGHT IN THE ACCOMODATION SPACE._x001C_ _x001C_ _x001C_ _x001C_
Documentation
Issued 26 June 1995
Resolved
PROVIDE COPIES OF VALID FCC RADIOTELPHONY CERTIFICATE AND OPERATION LICENSEWHEN RECIEVED FROM FCC.
Construction/Loadline
Issued 1 June 1994
Resolved
PROVIDE ORIGINAL HULL SCANTLINGS FOR BOTTOM, SIDESHELL, AND DECK PLATING.
Electrical
Issued 1 June 1994
Resolved
REPLACE THE FLEXIBLE CORD USED FOR POWERING THE INSTALLED HOT AIR FURNACE WITH APPROVED CABLE TO PROVIDE FOR PERMANENT INSTALLATION.
Construction/Loadline
Issued 1 June 1994
Resolved
INSTALL CHECK VALVES IN THE OVERBOARD DRAIN LINES ON THE PORT AND STARBOARDOVERBOARD DRAIN LINES._x001C_ _x001C_ _x001C_
Deck/Cargo
Issued 1 June 1994
Resolved
REPAIR CLOSURE LATCH ON THE LAZARETTE DECK VENT._x001C_ _x001C_ _x001C_ _x001C_
Documentation
Issued 1 June 1994
Resolved
PROVIDE PROOF OF A PRE-EMPLOYMENT DRUG TESTING PROGRAM.
Electrical
Issued 1 June 1994
Resolved
PROPERLY SECURE THE ELECTRICAL OUTLET INSTALLED ON THE BULKHEAD OUTBOARD _x001C_ OF THE INSTALLED HOT AIR FURNACE._x001C_ _x001C_ _x001C_
Engineering
Issued 1 June 1994
Resolved
REMOVE FOR INSPECTION, PORT AND STARBOARD ENGINE ACCESS HATCHES, MAIN DECK.
Engineering
Issued 1 June 1994
Resolved
REMOVE ENGINEROOM AIR INTAKE VENT COVERS, PORT AND STARBOARD.
Engineering
Issued 1 June 1994
Resolved
CROP TO GOOD METAL AND RENEW, WASTED AREA IN WAY OF STARBOARD ENGINEROOM AIR INTAKE VENT (FORWARD SIDE).
Construction/Loadline
Issued 1 June 1994
Resolved
CONDUCT GAUGINGS OF MAIN DECK, AFTER 30 FEET, IN PRESENCE OF COAST GUARD MARINE INSPECTOR.
Construction/Loadline
Issued 1 June 1994
Resolved
CONDUCT GAUGINGS OF FORE DECK, IN PRESENCE OF COAST GUARD MARINE INSPECTOR.
Construction/Loadline
Issued 1 June 1994
Resolved
CONDUCT GAUGINGS OF MAINDECK, IN WAY OF PORT AND STARBOARD ENGINE ACCESS HATCHES, IN PRESENCE OF COAST GUARD MARINE INSPECTOR.
Construction/Loadline
Issued 1 June 1994
Resolved
CONDUCT GAUGINGS OF SIDE SHELL IN WAY OF PORT AND STARBOARD EXHAUST BAFFLES, IN PRESENCE OF COAST GUARD MARINE INSPECTOR.
Construction/Loadline
Issued 1 June 1994
Resolved
CONDUCT GAUGINGS OF HULL, DECK AND INTERNALS AS DIRECTED BY ATTENDING COASTGUARD MARINE INSPECTOR.
Construction/Loadline
Issued 1 June 1994
Resolved
FOREPEAK: CROP AND RENEW #2 (FROM TOP) SIDESHELL LONGITUDINAL BETWEEN FRAMES #2 AND #3, STARBOARD SIDE.
Construction/Loadline
Issued 1 June 1994
Resolved
FOREPEAK: CROP AND RENEW #2 (FROM TOP) SIDE SHELL LONGITUDINAL BETWEEN FRAMES #2 AND #3, PORT SIDE.
Construction/Loadline
Issued 1 June 1994
Resolved
FOREPEAK: CROP AND RENEW ROUND BAR STIFFENER BETWEEN #3 FRAME AND COLLISION BULKHEAD PORT SIDE.
Construction/Loadline
Issued 1 June 1994
Resolved
FOREPEAK: CROP AND RENEW COLLISION BULKHEAD STIFFENER (FORWARD SIDE).
Construction/Loadline
Issued 1 June 1994
Resolved
FOREPEAK: PROVIDE GAUGINGS FOR LOWER 1/3 OF COLLISION BULKHEAD OR, CROP TOGOOD METAL AND INSERT.
Construction/Loadline
Issued 1 June 1994
Resolved
FOREPEAK: CROP AND RENEW UPPER 5 FOOT OF #3 STARBOARD SIDE SHELL FRAME.
Construction/Loadline
Issued 1 June 1994
Resolved
AFT PEAK. CROP AND RENEW THIRD LONGITUDINAL FROM PORT SIDE, BETWEEN BULKHEAD AND FIRST TRANSVERSE FRAME.
Deck/Cargo
Issued 1 June 1994
Resolved
FOREPEAK: PROVIDE GASKET, AND PROVE WATERTIGHT INTEGRITY OF FOREPEAK HATCH.
Engineering
Issued 1 June 1994
Resolved
CROP LAST 2 FEET OF PORT AND STARBOARD ENGINE EXHAUST BAFFLES. (EXTERIOR SIDE SHELL AFT).
Construction/Loadline
Issued 1 June 1994
Resolved
PROVIDE COPY OF LAST VESSEL GAUGINGS.
Construction/Loadline
Issued 1 June 1994
Resolved
PROVIDE EVIDENCE OF ORIGINAL SCANTLINGS.
Construction/Loadline
Issued 1 June 1994
Resolved
FOREPEAK: REMOVE WATER AND DEBRIS OUT OF FOREPEAK BILGE TO FACILITATE INSPECTION.
Engineering
Issued 1 June 1994
Resolved
PULL PORT AND STARBOARD PROPELLOR SHAFTS FOR INSPECTION.
Engineering
Issued 1 June 1994
Resolved
REPLACE PORT AND STARBOARD AFT STRUT BEARINGS.
Construction/Loadline
Issued 1 June 1994
Resolved
MID-BODY: MAKE AVAILABLE FOR INSPECTION, BILGE AREA IN WAY OF CREW BERTHING.
Accommodation/Occupational Safety
Issued 1 June 1994
Resolved
MID BODY: STOW LOOSE GEAR AND MAKE AVAILABLE FOR INSPECTION, BILGE AREA INWAY OF PASSENGER SEATING COMPARTMENT, MIDSHIP.
Construction/Loadline
Issued 1 June 1994
Resolved
ENGINEROOM: PERMANENTLY MOUNT BILGE ALARM, AFT BULKHEAD IN ENGINEROOM.
Deck/Cargo
Issued 1 June 1994
Resolved
CROP TO GOOD METAL AND RENEW, DECK AREA IN WAY OF PASSENGER COMPANIONWAY. DECK WASTED THRU, VISIBLE FROM THE ENGINEROOM.
Electrical
Issued 1 June 1994
Resolved
ENGINEROOM: PROVIDE METAL WIRE TIES, MINIMUM EVERY 18", FOR ALL ENGINEROOMWIRE BUNDLES IN THE OVERHEAD.
Construction/Loadline
Issued 1 June 1994
Resolved
AFT PEAK. CROP TO GOOD METAL AND RENEW, PORT AND STARBOARD "L" GIRDER BETWEEN AFT BULKHEAD AND FIRST TRANSVERSE FRAME.
Construction/Loadline
Issued 1 June 1994
Resolved
PROVIDE CONTINUOUS WELD FOR RENEWED LONGITUDINALS (CURRENTLY SPOT WELDED).
Construction/Loadline
Issued 1 June 1994
Resolved
GAUGE OR CROP TO GOOD METAL AND INSERT, LOWER 3 FOOT OF AFT BULKHEAD.
Engineering
Issued 1 June 1994
Resolved
CROP TO GOOD METAL AND INSERT, PORT AND STARBOARD ENGINE EXHAUST PIPING, CURRENTLY TEMPORARILY REPAIRED WITH SPOT WELDING AND DOUBLERS.
Documentation
Issued 27 July 1993
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Lifesaving
Issued 13 May 1993
Resolved
PRIOR TO CARRYING PASSENGERS, THE MASTER SHALL CONDUCT EMERGENCY DRILLS INCLUDING MAN OVERBOARD, FIRE, FLOODING, LOSS OF PROPULSION AND ABANDON SHIP WITH ALL NORMALLY ASSIGNED VESSEL CREWMEMBERS.
Construction/Loadline
Issued 13 May 1993
Resolved
ON OR BEFORE NEXT DRYDOCKING, MAKE AVAILABLE FOR INSPECTION BY A COAST GUARD MARINE INSPECTOR, INTERNALS OF FOREPEAK, CREW'S COMPARTMENT, ENGINE- ROOM AND LAZARETTE BILGES SO AS TO DETERMINE THE EXTENT WASTAGE OF SUSPECT BILGE STRINGERS.
Lifesaving
Issued 13 May 1993
Resolved
CONDUCT EMERGENCY DRILLS INCLUDING MAN OVERBOARD, FIRE, FLOODING, LOSS OF PROPULSION AND ABANDON SHIP WITH ALL NORMALLY ASSIGNED VESSEL CREWMEMBERS IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Construction/Loadline
Issued 13 May 1993
Resolved
PRIOR TO OPERATING BEYOND PROTECTED WATERS, REPAIR/REPLACE AND PROVIDE RETAINING DEVICES FOR FOREPEAK, FORWARD COMPARTMENT, ENGINE ROOM AND LAZARETTE HATCHES AND TO PROVE WATERTIGHT TO THE SATISFACTION OF AN ATTENDING COAST GUARD MARINE INSPECTION.
Lifesaving
Issued 13 May 1993
Resolved
RESTENCIL NAME OF VESSEL AND CAPACITY OF PERSONS ON ALL FOUR OF THE VESSEL'S LIFEFLOATS IN ACCORDANCE WITH 46 CFR 180.20-5.
Engineering
Issued 13 May 1993
Resolved
REINSTALL EXHAUST LAGGING ON OUTBOARD BANK STARBOARD MAIN ENGINE AND INBOARD BANK PORT MAIN ENGINE AND THE SHIP'S SERVICE GENERATOR.
Electrical
Issued 22 March 1990
Resolved
LIFE FLOAT WATER LITE BATTERIES SPRING TERMINAL TYPE VICE SCREW TERMINAL TYPE. PROVIDE PROPER SCREW TERMINAL BATTERIES.
Lifesaving
Issued 22 March 1990
Resolved
VESSEL MISSING 2 CHILD AND THREE ADULT LIFE PRESERVERS.
Lifesaving
Issued 22 March 1990
Resolved
PROVIDE EPIRB FOR VESSEL PRIOR TO OPERATING IN EXCESS OF 20 MILE ROUTE.
Lifesaving
Issued 22 March 1990
Resolved
TWO LIFE FLOATS NOT SECURED TO PAINTER AND WEAK LINK. PROPERLY SECURE LIFEFLOAT.
Construction/Loadline
Issued 22 March 1990
Resolved
CAPTIVE CHAIN FOR FOREPEAK MANHOLE COVER NOT SECURED TO VESSEL HULL. PROPERLY SECURE MAN HOLE COVER CAPTIVE CHAIN TO VESSEL.
Construction/Loadline
Issued 21 July 1989
Resolved
D-2 REPLACE STERN COMPARTMENT HATCH COAMING.
Accommodation/Occupational Safety
Issued 21 July 1989
Resolved
D-3 PLUG UNUSED SEA VALVES FOR MSD FROM PREVIOUS SYSTEM.
Construction/Loadline
Issued 21 July 1989
Resolved
D-4 REPLACE DETERIORATED SUPPORT MEMBERS IN FORWARD COMPARTMENT AS MARKED.
Construction/Loadline
Issued 21 July 1989
Resolved
D-1 REPLACE SUPPORTS FOR BULKHEAD HULL AS MARKED IN STERN COMPARTMENT.
Construction/Loadline
Issued 3 April 1989
Resolved
MAKE PERMANENT REPAIRS TO WASTED PORT LIGHTS
Construction/Loadline
Issued 3 April 1989
Resolved
REPAIR WASTED HATCH COMBING FOR ATF STEERING HATCH
Construction/Loadline
Issued 17 October 1984
Resolved
RENEW 2' X 2' OF CORRODED MAIN DECK AND 1 UNDERDECK STIFFNER LOCATED BELOW PORT AFT BITT ABOVE TRANSOM AT PORT UPPER CORNER.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.