← All vessels
PRINCESS BRITTNEY
PRINCESS BRITTNEY is a 1956 freight ship. The Coast Guard has recorded 11 inspections since 1999, most recently in February 2024, along with 49 deficiencies and 7 operational controls.
Records from 1999 to 2024. Most recent: inspection, 26 February 2024.
- Built
- 1956
- Last inspected
- 26 February 2024
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 49 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
5145996 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
XUMM9
488314
Flag
BELIZE
—
Maury page id
psix-488314
Inspections, by type
…with no type recorded7
Years with a record
4 calendar years (1999–2024)
The 11 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.
Documentation record
Tonnage as PSIX records it154 - Convention (Subpart B), Net Ton
154 - Regulatory (Subpart C or D), Net Ton
294 - Convention (Subpart B), Gross Ton
291 - Regulatory (Subpart C or D), Gross Ton
154 - Regulatory (Subpart C or D), Net Ton
294 - Convention (Subpart B), Gross Ton
291 - Regulatory (Subpart C or D), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 11
26 February 2024
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7870273
16 October 2002
Administrative Inspection
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1690548
4 October 2002
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1684627
19 June 2002
Deficiency Check · Administrative Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1633296
18 February 2002
Damage Survey · Administrative Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1487164
8 December 2001
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 293378
6 April 1999
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 730600
8 March 1999
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 171011
8 March 1999
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 211021
8 March 1999
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 767733
22 January 1999
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 424220
Deficiency record · 49
Pollution Prevention/Response › Prevention Equipment
Issued 19 June 2002
Resolved
Properly repair Marine Sanitation system and provide report when overboard valve can be properly sealed/closed so as to avoid direct overboard discharge. LEGACY COMPONENT DESC: Sewage System Valve
Fire Fighting › Structural Fire Protection - General
Issued 19 June 2002
Resolved
Make proper and perminent repairs to engine room overhead where leaking from galley on deck above. LEGACY COMPONENT DESC: Accommodation Space Protection
Deck/Cargo › Holds/Tanks
Issued 19 June 2002
Resolved
Remove patch and make proper repairs to piping inside cargo hold (overhead) on stbd side midships.
Deck/Cargo › Holds/Tanks
Issued 19 June 2002
Resolved
Remove dead end wiring located in cargo hold stbd side aft overhead.
Personnel › Certificates/Documents/Licenses
Issued 19 June 2002
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Personnel › Manning/Qualifications › Minimum Safe Manning
Issued 19 June 2002
Resolved
Man vessel in accordance with safe manning certificate prior to departure.
Engineering › Fuel Oil Service System
Issued 22 February 2002
Resolved
Make permenant repairs to #1 and #2 center, and #3 starboard fuel tanks. USCS drilled holes to access tank. LEGACY COMPONENT DESC: Tank
Engineering › Freshwater System (cylinder head cooling)
Issued 22 February 2002
Resolved
Make permenant repair to fresh water cylinders in engine room. LEGACY COMPONENT DESC: Storage Tank
Engineering
Issued 22 February 2002
Resolved
Make permenant repairs to engine room bulkhead in way of cargo hold.
Engineering › Freshwater System (jacketwater cooling)
Issued 22 February 2002
Resolved
Make repairs to generator cooling water piping LEGACY COMPONENT DESC: Piping
Engineering › Fuel Oil Storage/Transfer System
Issued 22 February 2002
Resolved
Make repairs to the valve to the Day Tank. Valve is leaking. LEGACY COMPONENT DESC: Valve
Engineering
Issued 22 February 2002
Resolved
Provide a Surveyors Report that all repairs have been made and to the proper repair or Main Engine and Generator.
Documentation › Certificates/Documents
Issued 18 February 2002
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Personnel › Certificates/Documents/Licenses
Issued 18 February 2002
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Construction/Loadline › Structures
Issued 18 February 2002
Resolved
Fwd bulkhead of cargo hold port side has a hole in corner where wire runs through. LEGACY COMPONENT DESC: Transverse Bulkhead
Fire Fighting › Emergency Fire Pumps
Issued 18 February 2002
Resolved
Provide and demonstrate operation of emergency fire pump.
Construction/Loadline › Hull
Issued 18 February 2002
Resolved
Properly repair side shell where sewage overboard valve is located. LEGACY COMPONENT DESC: Side Shell
Engineering › Diesel Engine (propulsion-direct drive)
Issued 18 February 2002
Resolved
Due to vessel having main engine problems, vessel is required to have tug assistance when entering and departing Port of Miami.
Engineering
Issued 18 February 2002
Resolved
Clean out engineroom of all oil in bilge and provide receipts. Wipe down engineroom completely. LEGACY COMPONENT DESC: Housekeeping
Engineering › Fuel Oil Service System
Issued 18 February 2002
Resolved
Permanently and properly repair fuel line going through fwd bulkhead of engineroom. LEGACY COMPONENT DESC: Piping
Documentation
Issued 8 December 2001
Resolved
Provide licenses for officers, specifically Chief Mate. All officers must apply for Cambodian License or Certificate of recognition per administration.
Electrical
Issued 8 December 2001
Resolved
Install electrical mating below electrical switchboard.
Navigation
Issued 8 December 2001
Resolved
Correct and update all navigation charts.
Electrical
Issued 8 December 2001
Resolved
Install explosive proof light covers located in the engineroom.
Electrical
Issued 8 December 2001
Resolved
Place a chain & lock on the overboard sewage discharge valve.
Lifesaving
Issued 8 December 2001
Resolved
Stencil max. capacity number on rescue boat.
Navigation
Issued 8 December 2001
Resolved
Provide updated deviation table.
Fire Fighting
Issued 8 December 2001
Resolved
Update fire plan to show location of international shore connection.
Fire Fighting
Issued 22 January 1999
Resolved
Prior to loading, bunkering, and sailing, relocate fireman's outfit to the satisfaction of class. _x001C_ _x001C_ x
Lifesaving
Issued 22 January 1999
Resolved
Prior to loading, bunkering and sailing, secure all O2, propane and other tanks scattered on deck. (ILO-147)
Fire Fighting
Issued 22 January 1999
Resolved
Prior to loading, bunkering and sailing, have class to address fire stationlocations and lack of accessability, and lack of storage boxes.
Lifesaving
Issued 22 January 1999
Resolved
Prior to loading, bunkering, and sailing, provide owner written (company) instructions to the master requiring crew training policies and procedures.(STCW)
Documentation
Issued 22 January 1999
Resolved
Prior to loading, bunkering, and sailing, provide a licensed deck officer and chief engineer in accordance with the vessel's safe manning certificate. (STCW)
Lifesaving
Issued 22 January 1999
Resolved
Prior to loading, bunkering and sailing, provide vessel familiarization andbasic safety training for crew. (STCW 95 VI/1 A-VI/1)
Fire Fighting
Issued 22 January 1999
Resolved
Prior to departure/loading, prove adequate pressure from main fire pump. (CCSSC 3.4)
Documentation
Issued 22 January 1999
Resolved
Prior to loading/departure, provide training manual and safety equipment maintenance manual in crew's language. (CCSSC 3.13)
Lifesaving
Issued 22 January 1999
Resolved
Prior to loading/departure, provide all emergency instructions and muster lists in crew's language. (CCSSC 4.6)
Navigation
Issued 22 January 1999
Resolved
Prior to departure/loading, provide current editions of charts with corrections. (CCSSC 6.1.2.16)
Navigation
Issued 22 January 1999
Resolved
Prior to departure/loading, provide applicable Notice to Mariners. (CCSSC 6.1.2.16)
Navigation
Issued 22 January 1999
Resolved
Prior to departure/loading, prove proper operation of the ship's whistle. (COLREGS 72)
Accommodation/Occupational Safety
Issued 22 January 1999
Resolved
Prior to departure/loading, provide Class Report addressing forward berthing. (ILO-147)
Construction/Loadline
Issued 22 January 1999
Resolved
Prior to departure/loading, provide steel battens for cargoe
Fire Fighting
Issued 22 January 1999
Resolved
Prior to loading, bunkering and sailing, conduct satisfactory fire drill and abandon ship drill in presence of Coast Gurad inspector.
Accommodation/Occupational Safety
Issued 22 January 1999
Resolved
Prior to departure/loading, have class society address lack of secondary means of escape from engine room. (CCSSC 3.16)
Lifesaving
Issued 22 January 1999
Resolved
Prior to departure/loading, porvide all lifejackets with approved waterlights. (CCSSC 4.11 (3)
Lifesaving
Issued 22 January 1999
Resolved
Prior to loading/departure, provide all equipment for rescue boat IAW the LSA Code. (CCSSC 4 & LSA Code)
Documentation
Issued 22 January 1999
Resolved
Prior to departure/loading, provide fire control plan in language of the crew. (CCSSC 3.13)
Lifesaving
Issued 22 January 1999
Resolved
Prior to loading, bundering and sailing, provide rescue boat launching apparatus in accordance with the LSA Code.
Navigation
Issued 22 January 1999
Resolved
Prior to loading, bunkering, and sailing, provide rudder angle indicator atemergency steering flat (CCSSC 2.35)
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.