SEDCO 706 is a 1976 mobile offshore drilling unit. The Coast Guard has recorded 26 inspections since 1984, most recently in August 1991, along with 64 deficiencies.

Records from 1984 to 1991. Most recent: inspection, 2 August 1991.

Built
1976
Last inspected
2 August 1991
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

Flag
UNITED STATES
—
Maury page id
psix-48839

Inspections, by type

…with no type recorded7
Years with a record 8 calendar years (1984–1991)
The 26 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 35 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Offshore class in Maury's sources begin in 1978.

Documentation record

Tonnage as PSIX records it7674 - Regulatory (Subpart C or D), Gross Ton
6545 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 26

2 August 1991 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 648426
30 November 1990 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1244009
12 September 1990 Drydock Extension
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1211601
6 September 1990 Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 900316
6 September 1990 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1240783
11 June 1990 Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 910357
24 January 1990 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1230603
26 September 1989 Deficiency Check · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 909137
22 May 1989 Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1200099
13 March 1989 Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1348126
23 February 1989 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1195497
22 July 1988 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1036815
25 May 1988 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1195543
29 March 1988 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 990509
24 February 1988 Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1336416
7 January 1988 Administrative
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1010359
27 November 1987 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1334242
6 November 1987 Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1004078
1 October 1987 COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1012917
21 August 1987 Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1002735
22 April 1986 Deficiency Check · Credit Drydock
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1302735
26 February 1986 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 988233
6 November 1985 Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 992112
16 September 1985 COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1297695
22 March 1985 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1290660
18 December 1984 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1284746

Deficiency record · 64

Unknown
Issued 26 September 1989 Resolved
REPAIR THE GENERAL ALARMS IN THE PORT SIDE EXTERIOR BY WELDING SHOP, MUD PIT ROOM, MUD PUMP ROOM, CEMENT ROOM AND SACK ROOM. (REQUIREMENT WAS TO BECOMPLETED BY 26OCT89).
Condition: Unknown
Due 8 December 1989
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Unknown
Issued 26 September 1989 Resolved
REPAIR PORT DRILLING WATER PUMP DISCHARGE FLANGE. (REQUIREMENT WAS TO BE COMPLETED BY 26OCT89).
Condition: Unknown
Due 26 September 1989
Resolved 26 September 1989
Unknown
Issued 26 September 1989 Resolved
REPAIR PORT AND STARBOARD MAIN DECK, PUMP ROOM AND CAGE ELEVATOR DOORS. (REQUIREMENT WAS TO BE COMPLETED BY 26OCT89).
Condition: Unknown
Due 26 September 1989
Resolved 26 September 1989
Unknown
Issued 26 September 1989 Resolved
HAVE HYDROSTATIC RELEASES FOR #1 AND #2 LIFERAFTS SERVICED. (REQUIREMENT WAS TO BE COMPLETED BY 26OCT89).
Condition: Unknown
Due 26 September 1989
Resolved 26 September 1989
Unknown
Issued 26 September 1989 Resolved
NON-SKID THE HELO DECK. (REQUIREMENT WAS TO BE COMPLETED BY 26OCT89).
Condition: Unknown
Due 26 September 1989
Resolved 26 September 1989
Unknown
Issued 26 September 1989 Resolved
PROVIDE APPROVED FIRE CONTROL PLANS AND APPROVED HAZARDOUS LOCATION PLANS.
Condition: Unknown
Due 26 September 1989
Resolved 26 September 1989
Unknown
Issued 26 September 1989 Resolved
PROVIDE FOUR (4) CEMENT/BULK TANK RELIEF VALVES SET AT 40 PSI. (REQUIREMENT WAS TO BE COMPLETED BY 26OCT89).
Condition: Unknown
Due 26 September 1989
Resolved 26 September 1989
Unknown
Issued 26 September 1989 Resolved
PROVIDE TWO (2) SERVICED LIFERAFTS FOR STATIONS #3 AND #4. (REQUIREMENT WAS TO BE COMPLETED BY 26OCT89).
Condition: Unknown
Due 26 September 1989
Resolved 26 September 1989
Unknown
Issued 13 March 1989 Resolved
TEST REVERSE POWER RELAY ON #1, #2 AND #3 DIESEL GENERATORS. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
REPLACE TYPE "SO" CABLE ON BLOWER IN ELECTRICIAN'S PHONE BOOTH IN ENGINE ROOM. ( REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
REPAIR EMERGENCY LIGHT OVER SOUND POWERED PHONE BOOTH IN ENGINE ROOM. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
REPAIR THE INOPERATIVE ELEVATOR INTERLOCK IN THE FLOOR ACCESS TO THE STARBOARD AFT ELEVATOR. ( REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
CHECK ALL EYS FITTINGS ON THE DRILL FLOOR AND POUR ALL THOSE THAT REQUIRE POURING. ( REQUIRMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
REPAIR SHIPS SERVICE LIGHTING ELECTRICAL CONNECTOR ON UPPER SHALE SHAKER DECK. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
POUR THE EYS FITTING FOR THE COMPRESSOR AND THE 480 RECEPTICAL ON THE LOWERSHALE SHAKER/MUD PIT DECK. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
REPAIR THE EXPLOSION PROOF JUNCTION BOX ON THE GENERAL ALARM BELL IN THE LOWER SHALE SHAKER/MUD PIT DECK. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
SERVICE ALL LOOSE WIRES AND BARE WIRE ENDS IN ENGINE ROOM ALARM PANEL JUNCTION BOX. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
REPAIR OR REPLACE THE THREE (3) WASTED CAPS ON THE WATER LOCKERS IN LIFE BOAT NUMBER 3. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
REFILL THE AIR BOTTLES IN LIFE BOAT NUMBER 4. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
PROVIDE CONDENSED MILK FOR ALL FOUR LIFE BOATS PRIOR TO ANY INTERNATIONAL VOYAGE.
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
INSTALL BREAKER OR BLANK COVER IN CKT 70 BREAKER PANEL OF SCR ROOM IN EMPTY SPACE. (REQUIRMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
INSTALL CRANKCASE FAIL SELECTOR CAPS ON #2 AND #3 DIESEL GENERATORS. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
REPAIR LOW OIL TEMP LIGHT LIGHT ALARM ON #1 AND #3 DIESEL GENERATOR. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
REPAIR OR RENEW BALLAST SEA CHEST MANUAL CONTROL BOX ON PORT SIDE IN PUMP ROOM. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
HAVE #44 DRY CHEMICAL EXTINGUISHER SERVICED AND CHECK ALL OTHER CARTRIDGE OPERATED DRY CHEMICAL EXTINGUISHERS TO ENSURE THEY HAVE NOT BEEN DISCHARGEDAND CORRECT IMPROPER SAFETY SEALS. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
RENEW IMPROPERLY SPLICED TELEPHONE CORD ON DRILLER'S CONSOLE. (REQUIREMENTWAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
REPLACE STARBOARD BRACKET FOR THE COMPENSATION BALL ON THE MAGNETIC COMPASS AND RE-CALIBRATE.
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
PROVIDE DOCUMENTATION THAT THE BULBS IN THE NAVIGATION LIGHTS ARE CORRECT OR REPLACE WITH A19/100 WATT BULBS. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
REPLACE THE ROTTED LINES CONNECTING WATER LIGHTS, SMOKES AND LINES FOR THE RING LIFE BUOY. (REQUIREMENT WAS TO BE COMPLIED BY 03APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
MAKE THE GENERAL ALARM BELL IN THE STARBOARD FORWARD COLUMN AT THE 100 FOOTLEVEL OPERABLE. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
INSTALL COVER TO THE OPEN PRESSURE SWITCH (120 VOLT) ON THE POTABLE WATER PRESSURE TANK IN THE STARBOARD FORWARD COLUMN AT THE 100 FOOT LEVEL. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
COVER OPEN BREAKER SLOT IN LIGHT PANEL L102. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
PRIOR TO VESSEL GETTING UNDERWAY OR BEING TOWED, REPAIR NOT UNDER COMMAND LIGHTS. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89).
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Unknown
Issued 13 March 1989 Resolved
REPLACE THE MISSING LIGHT SCREEN ON THE PORT SIDE LIGHT. (REQUIREMENT WAS TO BE COMPLIED BY 13APR89)
Condition: Unknown
Due 13 March 1989
Resolved 13 March 1989
Construction/Loadline
Issued 22 July 1988 Resolved
MAKE PERMANENT REPAIRS TO THE STARBOARD FORWARD COLUMN C-1, AT THE 80 FOOT WATERLINE OUTBOARD. CROP AND RENEW DAMAGED SHELL PLATE; APPROX. 8'HIGH X 4'WIDE, RENEW DAMAGED STIFFENER AND VERTICAL STIFFENERS & RENEW CRACKED WELDSIN AREA.
Condition: Unknown
Due 22 July 1988
Resolved 22 July 1988
Construction/Loadline
Issued 6 November 1987 Resolved
REINSTALL THE #9 PORT BALLAST TANK SECONDARY BALLAST PUMP (PLUGER).
Condition: Unknown
Due 6 November 1987
Resolved 6 November 1987
Navigation
Issued 6 November 1987 Resolved
REPAIR THE THRUSTER UNIT SHAFT SEALS (JOHN CRANE) ON THRUSTERS ONE AND THREE AT THE NEXT DRYDOCKING/HULL SURVEY.
Condition: Unknown
Due 6 November 1987
Resolved 6 November 1987
Fire Fighting
Issued 1 October 1987 Resolved
REPAIR THE REMOTE CONTROL IN THE ENGINE RM. AND THE PAINT LOCKER FOR THE FIXED CO2 SYSTEM.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Construction/Loadline
Issued 1 October 1987 Resolved
REPAIR THE SECONDARY DEBALLAST SYSTEM FOR THE #4 CAISSON.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Engineering
Issued 1 October 1987 Resolved
SUBMIT PROPOSAL ADDRESSING THE SEAL LEAK PROBLEM TO #1 & #3 THRUSTERS (ADDRESS PRECAUTIONARY MEASURES BEING TAKEN, WHY REPAIR IS NOT NECESSARY IN THE IMMEDIATE FUTURE, AND PLAN OF ACTION FOR REPAIR).
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Electrical
Issued 1 October 1987 Resolved
INSTALL CORROSION RESISTANT LINER FOR THE BATTERY USED FOR EMERGENCY GENERATOR START.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Lifesaving
Issued 1 October 1987 Resolved
PROVIDE TWO BUOYANT ROCKETS, PROPER SIZE, FOR THE LINE THROWING APPARATUS.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Construction/Loadline
Issued 1 October 1987 Resolved
PROVIDE A CURRENT ABS ENDORSED LOADLINE CERTIFICATE.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Lifesaving
Issued 1 October 1987 Resolved
RELEASE ALL FOUR LIFEBOATS AND OPERATE IN THE WATER.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Engineering
Issued 1 October 1987 Resolved
INSTALL AUDIBLE ALARM FOR THE LOW WATER CUT OUT FOR THE TWO PARKER HOT WATER HEATERS AS PER 46CFR63.05-90.
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Deck/Cargo
Issued 1 October 1987 Resolved
REPLACE PRESSURE RELIEF VALVES FOR BULK CHEMICAL TANKS #3 & #4, WITH VLAVESTHAT HAVE HAND RELIEF MECHANISMS; AND MAKE THOSE VALVES READY FOR PRESSURE TEST AT OR BELOW THE TANKS MAWP (40PSI).
Condition: Unknown
Due 1 October 1987
Resolved 1 October 1987
Electrical
Issued 6 November 1985 Resolved
COMPLETE WIRING ON DRILL FLOOR AND THROUGH A-60 BULKHEAD AFT SIDE DECKHOUSE
Condition: Unknown
Due 6 November 1985
Resolved 6 November 1985
Deck/Cargo
Issued 6 November 1985 Resolved
PROVIDE A COPY OF ANNUAL CRANE REPORT
Condition: Unknown
Due 6 November 1985
Resolved 6 November 1985
Construction/Loadline
Issued 6 November 1985 Resolved
GET ANNUAL LOADLINE CERTIFICATE EXAMINATION BY ABS
Condition: Unknown
Due 6 November 1985
Resolved 6 November 1985
Lifesaving
Issued 6 November 1985 Resolved
REPLACE PORT SCRAMBLE NET
Condition: Unknown
Due 6 November 1985
Resolved 6 November 1985
Unknown
Issued 6 November 1985 Resolved
REPAIR AND TEST H2S GAS DETECTION SYS
Condition: Unknown
Due 6 November 1985
Resolved 6 November 1985
Electrical
Issued 16 September 1985 Resolved
RELABEL ALL ELECTRICAL JUNCTION BOXES. CORRECTED(24OCT85)
Condition: Unknown
Due 16 September 1985
Resolved 16 September 1985
Electrical
Issued 16 September 1985 Resolved
COMPLETE WIRING TO DERRECK, DRILL FLOOR, AND THROUGH A-60 BULKHEAD AFT SIDEOF DECKHOUSE. COMPLETE PRIOR TO CONDUCTION DRILLING OPERATIONS. CORRECTED(06NOV85)
Condition: Unknown
Due 16 September 1985
Resolved 16 September 1985
Electrical
Issued 16 September 1985 Resolved
TEST THE AIR PURGE SYSTEM FOR DRILLERS CONSOLE AND DRILL FLOOR. COMPLETE PRIOR TO ANY DRILLING OPERATIONS. CORRECTED(24OCT85)
Condition: Unknown
Due 16 September 1985
Resolved 16 September 1985
Fire Fighting
Issued 16 September 1985 Resolved
PROVIDE ADDITIONAL GENERAL ALARM BELLS IN PORT AND STARBOARD FOWARD COLUMNS AT THRUSTER POD LEVEL. CORRECTED(04OCT85)
Condition: Unknown
Due 16 September 1985
Resolved 16 September 1985
Engineering
Issued 16 September 1985 Resolved
CONDUCT OPERATIONAL TEST TO #3 THRUSTER UNIT. CORRECTED(04OCT85)
Condition: Unknown
Due 16 September 1985
Resolved 16 September 1985
Construction/Loadline
Issued 16 September 1985 Resolved
TEST WEATHER TIGHT SEALS TO ALL 8 ANCHOR SPILL PIPES. CORRECTED(24OCT85)
Condition: Unknown
Due 16 September 1985
Resolved 16 September 1985
Deck/Cargo
Issued 16 September 1985 Resolved
PROVIDE A COPY OF THE ANNUAL CRANE REPORT. CORRECTED(24OCT85)
Condition: Unknown
Due 16 September 1985
Resolved 16 September 1985
Construction/Loadline
Issued 16 September 1985 Resolved
GET ANNUAL ABS ENDORSEMENT TO LOADLINE CERTIFICATE. CORRECTED(24OCT85)
Condition: Unknown
Due 16 September 1985
Resolved 16 September 1985
Electrical
Issued 16 September 1985 Resolved
ALL ARMORED CABLES LEADING INTO THRUSTER PODS ARE TO BE PROPERLY GROUNDED. CORRECTED(24OCT85)
Condition: Unknown
Due 16 September 1985
Resolved 16 September 1985
Electrical
Issued 16 September 1985 Resolved
BATTERY BOXES MUST BE LINED WITH A CORROSION RESISTANT LINER. CORRECTED(24OCT85)
Condition: Unknown
Due 16 September 1985
Resolved 16 September 1985
Electrical
Issued 16 September 1985 Resolved
ALL BATTERIES MUST BE CHOCKED TO PREVENT MOVEMENT IN BATTERY BOXES. CORRECTED(24OCT85)
Condition: Unknown
Due 16 September 1985
Resolved 16 September 1985
Unknown
Issued 16 September 1985 Resolved
REPAIR AND TEST H2S GAS DETECTION SYSTEM. CORRECTED(24OCT85)
Condition: Unknown
Due 16 September 1985
Resolved 16 September 1985
Lifesaving
Issued 16 September 1985 Resolved
REPLACE PORT SCRAMBLE NET. CORRECTED(24OCT85)
Condition: Unknown
Due 16 September 1985
Resolved 16 September 1985

Ownership record