Records from 1985 to 2025. Most recent: inspection, 17 September 2025.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 17 September 2025
Resolved
Tighten up loose light in aft space.
Due 17 October 2025
Resolved 9 June 2026
Resolution: Light secured.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 17 September 2025
Resolved
Put double clamps on genset exhaust hose in lazarette.
Due 17 October 2025
Resolved 10 June 2026
Resolution: Double hse clamps installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 September 2025
Resolved
Install bilge pick up in lazarette.
Due 17 October 2025
Resolved 9 June 2026
Resolution: Bilge pick up installed.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 17 September 2025
Resolved
There is bad pitting on the watertight bulkhead in the lazarette. Clean up, determine extent of damage. Provide repair plan.
Due 17 October 2025
Resolved 9 June 2026
Resolution: Insert welded into bulkhead.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 17 September 2025
Resolved
Try to install double hose clamps on raw water lines on main engine systems.
Due 17 October 2025
Resolved 9 June 2026
Resolution: Clamps installed in ER.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 17 September 2025
Resolved
Remove old labels on distribution panel.
Due 17 October 2025
Resolved 9 June 2026
Resolution: Labels removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 September 2025
Resolved
Secure bilge alarm in tank room.
Due 17 October 2025
Resolved 9 June 2026
Resolution: Bilge alarm properly mounted.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 17 September 2025
Resolved
Fill vacant holes in watertight bulkhead in fwd tank room.
Due 17 October 2025
Resolved 9 June 2026
Resolution: Holes properly filled.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 17 September 2025
Resolved
Repair piping in #2 void.
Due 17 October 2025
Resolved 9 June 2026
Resolution: Piping repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 17 September 2025
Resolved
Segregate child life jax from adult life jax and provide labelling.
Due 17 October 2025
Resolved 9 June 2026
Resolution: Jackets segregated.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 17 September 2025
Resolved
Refresh Fire Safety Plan
Due 17 October 2025
Resolved 9 June 2026
Resolution: FSP refreshed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 17 September 2025
Resolved
Tighten fire extinguisher bracket outside engine room.
Due 17 October 2025
Resolved 10 June 2026
Resolution: Bracket tightened.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 17 September 2025
Resolved
Install proper gauge on fire pump. Required pressure is 50 PSI.
Due 17 October 2025
Resolved 9 June 2026
Resolution: Gauge installed and tested.
05 - Radio Communications › N/A - No Subsystem › Functional requirements
Issued 17 September 2025
Resolved
Provide FCC safety Radio Certificate.
Due 17 October 2025
Resolved 9 June 2026
Resolution: Cert provided.
05 - Radio Communications › N/A - No Subsystem › Functional requirements
Issued 17 September 2025
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 17 October 2025
Resolved 16 January 2026
Resolution: The vessel O/O provided copy of station license.
05 - Radio Communications › N/A - No Subsystem › Functional requirements
Issued 17 September 2025
Resolved
Provide FCC Marine Radio Operator Certificates for each radio operator.
Due 17 October 2025
Resolved 2 February 2026
Resolution: Received operators permit.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 17 September 2025
Resolved
Waste receptacles must be constructed of noncombustible materials with no openings in the sides or bottoms.
Due 17 October 2025
Resolved 9 June 2026
Resolution: Proper waste receptacles provided.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 17 September 2025
Resolved
Contact USCG prior to operating in 2026 to schedule drills with crew (NLT 01 July)
Due 1 July 2026
Resolved 9 June 2026
Resolution: Proper drills completed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 July 2020
Resolved
Audible bilge alarm would not silence after testing. Repair bilge alarm.
Due 13 July 2020
Resolved 13 July 2020
Resolution: Received documentation from Bristol Marine. Bilge alarms are now funtioning properly.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 13 July 2020
Resolved
Operator could not provide proof that fireboy engine shut off and over ride system worked. Provide proof of testing to satisfaction of MI.
Due 27 July 2020
Resolved 14 July 2020
Resolution: Received correspondence from Firesafe. Shut off and override were tested at annual inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 13 July 2020
Resolved
Life buoy light did not have non corrosive clip attached. Provide clip.
Due 27 July 2020
Resolved 27 July 2020
Resolution: Clip provided
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 13 July 2020
Resolved
Jacket water temp indicator not working on stbd engine. Repair/replace gauge.
Due 27 July 2020
Resolved 27 July 2020
Resolution: Indicators repaired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 13 July 2020
Resolved
Ensure all flexible hoses for vital systems have double clamps.
Due 27 July 2020
Resolved 27 July 2020
Resolution: Double clamps provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 13 July 2020
Resolved
Provide directions on how to open cabinet for life jax on first deck.
Due 27 July 2020
Resolved 27 July 2020
Resolution: Appropriate directions provided.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 13 July 2020
Resolved
REpair/replace flame screen on stbd fuel vent.
Due 27 July 2020
Resolved 27 July 2020
Resolution: Flame screen replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 13 July 2020
Resolved
Replace gauge on fire pump.
Due 27 July 2020
Resolved 27 July 2020
Resolution: Gauge replaced.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 13 July 2020
Resolved
Plug holes in bulkhead in way of ladder well leading to ER. Bulkhead is a vapor barrier to ER.
Due 27 July 2020
Resolved 27 July 2020
Resolution: Holes properly filled .
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 July 2020
Resolved
REmove loose gear in bilge in tank room. Flotsam a hazard to bilge pumping arrangements.
Due 27 July 2020
Resolved 27 July 2020
Resolution: Bilge emptied out.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 June 2019
Resolved
01 Flexible hose joint on port side PTO bulging; 02 flexible hose joints on starboard side forward keel coolers failing. Effect repairs as necessary.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 July 2019
Resolved 14 June 2019
Resolution: All cooling hoses on keel coolers and fire pump replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 June 2019
Resolved
Bilge Pump would not provide suction when tested. Effect repairs.
Action required: 17 - Rectify deficiencies prior to departure
Due 6 July 2019
Resolved 14 June 2019
Resolution: Strainers on bilge inlets were clogged. Replaced all strainers
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 June 2019
Resolved
Hydraulic hoses in lazarette have napkins tied to them to contain leaks to fittings. Repair as necessary.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 July 2019
Resolved 23 June 2020
Resolution: Leaks addressed. Napkins removed.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 6 June 2019
Resolved
Forward bulkhead in lazarette has corrosion at the bilge. Clean off corrosion, determine the amount of wastage to bulkhead and submit repair plan as necessary.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 July 2019
Resolved 27 July 2020
Resolution: Corrosion within limits.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 6 June 2019
Resolved
Generator water pump leaking. Effect repairs.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 July 2019
Resolved 23 June 2020
Resolution: Repairs affected to satisfaction of MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 6 June 2019
Resolved
Machinery gauges were not functioning as designed. Effect repairs or replace as necessary.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 July 2019
Resolved 23 June 2020
Resolution: New gauge panels installed on bridge.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 6 June 2019
Resolved
Navigational chart not up to date. Update or replace with most up-to-date chart.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 July 2019
Resolved 23 June 2020
Resolution: Updated charts provided.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 11 September 2018
Resolved
The vessel is currently broadcasting (1) Improper Zero Length and Beam,(2) improper Ship Type. This vessel should be using 60 per the official encoding guide vice just using 6.
Condition: Invalid
Action required: 705 - Other - as specified
Due 11 October 2018
Resolved 27 July 2020
Resolution: AIS inputs corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 June 2018
Resolved
Fire/bilge piping found w/small weep in way of flex hose. Location of specific leak must be identified and hose must be resecured with 2 hose clamps to ensure no leaking is occuring.
Action required: 10 - Deficiency Rectified
Due 26 June 2018
Resolved 27 July 2020
Resolution: Received picture of section of piping with hose removed and with hose reinstalled with sufficient overlap to prevent leaking.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 13 June 2018
Resolved
Certificate of registration missing from the vessel. Provide proof of application and documentation for registration.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 June 2018
Resolution: Received proof of application and documentation for the vessel.
01 - Certificates & Documentation › 012 - Crew Certificates › Certificate for medical care
Issued 13 June 2018
Resolved
Pending pre-employment tests for multiple crew members. Provide proof of negative test results.
Action required: 705 - Other - as specified
Resolved 13 June 2018
Resolution: Received proof of negative test results for crewmembers in question.
Communications › Radio Communications › VHF Radiotelephone
Issued 14 June 2016
Resolved
Program VHF-FM with MMSI from FCC station license
Action required: 705 - Other - as specified
Due 31 August 2016
Resolved 4 October 2016
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 14 June 2016
Resolved
Provide fixed rack to secure co2 bottles.
Action required: 705 - Other - as specified
Due 14 July 2016
Resolved 14 July 2016
Electrical › Lighting (service) › Conductor
Issued 14 June 2016
Resolved
Properly install bow light wiring into junction boxes with j-box strain relief.
Action required: 705 - Other - as specified
Due 14 July 2016
Resolved 14 July 2016
Communications › Alarms/Indicators › High Water Alarm
Issued 14 June 2016
Resolved
Verify proper operation of port water temp gauge and stbe reduction gear pressure gauge.
Action required: 705 - Other - as specified
Due 31 August 2016
Resolved 4 October 2016
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 14 June 2016
Resolved
Install welded patches over holes in sewage tank. Keep toilets sercured until fixed
Action required: 705 - Other - as specified
Due 14 July 2016
Resolved 14 July 2016
Resolution: Epoxy patches were installed over the leaking sections of tank.
Navigation › Piloting/Steering › US Coast Pilot
Issued 18 June 2014
Resolved
Acquire Coast Pilot and Light List.
Action required: 705 - Other - as specified
Due 17 July 2014
Resolved 20 June 2014
Resolution: Revelant portions of the Coast Pilot and Light List were printed and provided.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 18 June 2014
Resolved
Replace battery with approved type.
Action required: 705 - Other - as specified
Due 25 June 2014
Resolved 20 June 2014
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 18 June 2014
Resolved
Repair exhaust system prior to carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 June 2014
Resolved 20 June 2014
Resolution: Exhaust system patch welded as temporary repair.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 18 June 2014
Resolved
Replace plastic portions of fuel sounding piping.
Action required: 705 - Other - as specified
Due 17 July 2014
Resolved 21 July 2014
Resolution: Metal piping installed.
Construction/Loadline › Hull › Stiffener
Issued 18 June 2014
Resolved
Renew compression post port side of the engine room.
Action required: 705 - Other - as specified
Due 17 July 2014
Resolved 21 July 2014
Resolution: Deficiency approved for repair after operating season. Special note added.
Engineering › Fuel Oil Service System › Valve
Issued 18 June 2014
Resolved
Renew leaking fuel valve stbd.
Action required: 705 - Other - as specified
Due 17 July 2014
Resolved 21 July 2014
Resolution: Valve stem packing gland was tightened to stop the leaking.
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 June 2014
Resolved
Remove dead ended wiring in E/R by power panels.
Action required: 705 - Other - as specified
Due 17 July 2014
Resolved 20 June 2014
Resolution: Wiring removed.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 18 June 2014
Resolved
Tighten port engine belt guard.
Action required: 705 - Other - as specified
Due 25 June 2014
Resolved 20 June 2014
Resolution: Belt guard firmly fixed to engine.
Electrical › Electric Generation Source (service) › Overcurrent Device
Issued 18 June 2014
Resolved
Provide over current protection on main battery bank for smaller conductors.
Action required: 705 - Other - as specified
Due 17 July 2014
Resolved 21 July 2014
Resolution: 25 A over current protection installed.
Construction/Loadline › Structures › Superstructure
Issued 18 June 2014
Resolved
Renew safety glass stbd side of main cabin.
Action required: 705 - Other - as specified
Due 17 July 2014
Resolved 21 July 2014
Resolution: New glass installed in 03 windows.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 18 June 2014
Resolved
Perform drills and prove underway operations of vessel.
Action required: 705 - Other - as specified
Due 18 June 2014
Resolved 20 June 2014
Resolution: Underway drills and vessel operation satisfactorily witnessed.
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 18 June 2012
Resolved
Remove old sewage piping from void #2. Ensure that all through bulkhead valves are closed and the handles are removed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 July 2012
Resolved 19 July 2012
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 18 June 2012
Resolved
Replace small worn rubber section of sewage piping just inside scuttle to void #2.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 July 2012
Resolved 19 July 2012
Electrical › Electric Generation Source (service) › Panelboard
Issued 18 June 2012
Resolved
Replace/repair gauges on port & starboard engine and generator.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 18 July 2012
Resolved 19 July 2012
Construction/Loadline › Hull › Side Shell
Issued 18 June 2012
Resolved
Seal or blank 1" through-hull starboard side of engine room.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 18 July 2012
Resolved 19 July 2012
Communications › Radio Communications › VHF Radiotelephone
Issued 26 March 2009
Resolved
PROVIDE A VALID RADIO SAFETY CERTIFICATE.
Action required: 705 - Other - as specified
Due 30 June 2009
Resolved 21 July 2009
Navigation › Piloting/Steering › Compass Deviation Table
Issued 26 March 2009
Resolved
PROVIDE AN UPDATED COMPASS DEVIATION TABLE.
Action required: 705 - Other - as specified
Due 30 June 2009
Resolved 21 July 2009
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 26 March 2009
Resolved
REMOVE ALL TOOLS AND LOOSE GEAR AND MAKE VESSEL READY FOR SEA.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 June 2009
Fire Fighting › Ventilation Systems › Ducts
Issued 26 March 2009
Resolved
INSTALL STOP DEVICES ON ALL ENGINE ROOM VENT CLOSURES.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 June 2009
Documentation › Certificates/Documents › Stability Letter
Issued 26 March 2009
Resolved
POST STABILITY LETTER AND COI ON THE VESSEL.
Action required: 705 - Other - as specified
Due 30 June 2009
Resolved 22 June 2009
Documentation › Logs/Records › Logbook (official)
Issued 26 March 2009
Resolved
PROVIDE A SHIPS LOG AND TRAINING LOG.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 June 2009
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 26 March 2009
Resolved
INSTALL ADDITIONAL RAIL COURSES ON 01 DECK AFT SAFETY RAILS.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 June 2009
Documentation › Certificates/Documents › Proof of Consortium Enrollment (DAPI)
Issued 21 November 2007
Resolved
Ensure a current copy of drug consortium enrollment form is onboard vessel
Due 30 November 2007
Resolved 28 January 2008
Resolution: MI cleared during DD activity#3137386
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 21 November 2007
Resolved
Ensure valid Certificate of Documentation is maintained onboard at all times for inspection.
Due 30 November 2007
Resolved 28 January 2008
Resolution: MI cleared during DD activity#3137386
Documentation › Certificates/Documents › Stability Letter
Issued 21 November 2007
Resolved
Provide valid stability letter for vessel, and post behind glass in pilothouse.
Due 30 November 2007
Resolved 30 July 2008
Resolution: Received fax copy of Stab Letter
Documentation › Certificates/Documents › Certificate of Inspection
Issued 21 November 2007
Resolved
Take down old Certificate of Inspection in pilothouse and replace it with new one.
Due 30 November 2007
Resolved 28 January 2008
Resolution: MI cleared during DD activity#3137386
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 21 November 2007
Resolved
Vessels capacity is reduced to no more than 146 total persons until an additional (12) adult lifejackets are provided onboard.
Action required: 705 - Other - as specified
Resolved 10 April 2008
Resolution: O/O provided receipt for purchase of 12 new jackets.
Lifesaving › Visual Distress Signals (General) › Not on Board
Issued 21 November 2007
Resolved
Provide three new orange smoke flares onboard vessel.
Due 30 November 2007
Resolved 28 January 2008
Resolution: MI cleared during DD activity#3137386
Engineering › Bilge Water Management System › Manifold
Issued 21 November 2007
Resolved
Relabel bildge manifold in machinery space, to ensure all crew are familiar with bildge piping system.
Due 30 November 2007
Resolved 28 January 2008
Resolution: MI cleared during DD activity#3137386
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 21 November 2007
Resolved
Remount float switch in lazarette.
Due 30 November 2007
Resolved 28 January 2008
Resolution: MI cleared during DD activity#3137386
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 21 November 2007
Resolved
Provide strainers for all bilge suctions that do not currently have them.
Due 30 November 2007
Resolved 28 January 2008
Resolution: MI cleared during DD activity#3137386
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 21 November 2007
Resolved
Provide new asprin and eyewash for first aid kit.
Due 30 November 2007
Resolved 28 January 2008
Resolution: MI cleared during DD activity#3137386
Engineering › Bilge Water Management System › Not Operational
Issued 4 November 2005
Resolved
Prove proper operation of the fixed bilge system prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 November 2005
Resolution: As seen by attending Marine Inspector.
Lifesaving › Hand Flares › Expired
Issued 4 November 2005
Resolved
Provide 3 hand red flares prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 November 2005
Resolution: As seen by attending Marine Inspector.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 4 November 2005
Resolved
Provide one adult lifejacket.
Due 19 November 2005
Resolved 14 November 2005
Resolution: As seen by attending Marine Inspector.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 4 November 2005
Resolved
Apply retroreflective material and stencil vessel name on one adult lifejacket.
Due 19 November 2005
Resolved 14 November 2005
Resolution: As seen by attending Marine Inspector.
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 November 2005
Resolved
Eliminate indoor extension cords used outdoors, ensure indoor cords are UL listed.
Due 19 November 2005
Resolved 14 November 2005
Resolution: As seen by attending Marine Inspector.
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 November 2005
Resolved
Mount AC amp meter.
Due 19 November 2005
Resolved 14 November 2005
Resolution: As seen by attending Marine Inspector.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 4 November 2005
Resolved
Permanently mount refrigerator to bulkhead.
Due 19 November 2005
Resolved 14 November 2005
Resolution: As seen by attending Marine Inspector.
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 November 2005
Resolved
Properly mount electrical wiring in lazarette.
Due 19 November 2005
Resolved 14 November 2005
Resolution: As seen by attending Marine Inspector.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 4 November 2005
Resolved
Install box connector for freshwater pump in lazarette.
Due 19 November 2005
Resolved 14 November 2005
Resolution: As seen by attending Marine Inspector.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 4 November 2005
Resolved
Update first aid kit.
Due 19 November 2005
Resolved 14 November 2005
Resolution: As seen by attending Marine Inspector.
Accommodation/Occupational Safety › Messroom › Size
Issued 4 November 2005
Resolved
Clean galley.
Due 19 November 2005
Resolved 14 November 2005
Resolution: As seen by attending Marine Inspector.
Electrical › Lighting (service) › Lighting Fixture
Issued 4 November 2005
Resolved
Remove temporary light above ice machine.
Due 19 November 2005
Resolved 14 November 2005
Resolution: As seen by attending Marine Inspector.
Construction/Loadline › Hull › Hull Plating
Issued 18 May 2005
Resolved
Complete credit drydock and internal structural examinations prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 June 2006
Resolution: Per attending MI.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 22 September 2003
Resolved
Provide (5) adult lifejackets, until provided vessel is limited to (145) passengers.
Due 22 October 2003
Resolved 19 August 2004
Construction/Loadline › Penetrations › Pipe Flange
Issued 22 September 2003
Resolved
Cap overboard in engineroom on the stbd side at the foot of the ladder.
Due 22 October 2003
Resolved 19 August 2004
Documentation › Logs/Records › Garbage Recordkeeping
Issued 22 September 2003
Resolved
Start log for man overboard, fire drills and trash disposal.
Due 22 October 2003
Resolved 19 August 2004
Documentation › Certificates/Documents › FCC SSL
Issued 22 September 2003
Resolved
Provide radio station license.
Due 22 October 2003
Resolved 19 August 2004
Engineering › Bilge Water Management System › Not Operational
Issued 22 September 2003
Resolved
Repair high bilge water alarm in in the lazzerette.
Due 22 October 2003
Resolved 19 August 2004
Documentation › Certificates/Documents
Issued 9 January 2002
Resolved
Provide the Stability letter and post it in the pilothouse. LEGACY COMPONENT DESC: Stability Letter
Due 31 July 2002
Resolved 22 August 2002
Documentation
Issued 27 June 2001
Resolved
Provide copy of stability letter to USCG and post a copy in the pilot house.
Condition: Unknown
Action required: 705 - Other - as specified
Due 27 July 2001
Resolved 1 July 2002
Resolution: Reissued w/ COI exam on 1 JULY 2002.
Navigation
Issued 27 June 2001
Resolved
Provide a 200mm (7.9 inch) bell in accordance with Inland Navigation Rules.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Documentation
Issued 27 June 2001
Resolved
Provide a copy of FCC Station License and Marine Operator's Permit. Vesselis restricted to operating not more than 1000 ft. from land until provided.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Electrical
Issued 27 June 2001
Resolved
Remove improperly wired (speaker wire) water pump operating indicator lighton aft galley bulkhead or renew with proper boat cable and reinstall light bulb.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2001
Accommodation/Occupational Safety
Issued 27 June 2001
Resolved
Replace missing door knob/lockset for engine room door.
Condition: Unknown
Due 27 June 2001
Resolved 1 July 2001
Electrical
Issued 27 June 2001
Resolved
Remove all non-UL "Christmas" lights and associated extension cords.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Lifesaving
Issued 27 June 2001
Resolved
Mark vessel's name on Life Ring Buoy at operating station and renew lifeline and floating water-light line with line that is dark in color or UV resistant, buoyant, and non-kinking.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Lifesaving
Issued 27 June 2001
Resolved
Remove 20" Life Ring Buoy from vessel. Or replace with 24".
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Engineering
Issued 27 June 2001
Resolved
Prove proper operation of fuel shut off.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Lifesaving
Issued 27 June 2001
Resolved
Place Life Jacket donning placards on main deck and move placards in heads to a more conspicuous location on second deck.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Fire Fighting
Issued 27 June 2001
Resolved
Service Portable Fire Extinguishers and provide copy of servicing report toUSCG.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Electrical
Issued 27 June 2001
Resolved
Install cover on controller for electric pump in lazerette.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Construction/Loadline
Issued 27 June 2001
Resolved
Install bilge high level alarms in spaces with through hull penetrations such as engine room and lazerette.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Electrical
Issued 27 June 2001
Resolved
Provide proper power distribution for multiple DC electrical loads which are improperly taken off of main engine starter solenoids. Requires the installation of fuse protection and possibly a DC distribution panel._x001C_ Also provide electrical plans for this installation.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Electrical
Issued 27 June 2001
Resolved
Provide plans for approval of all changes to AC electrical generation and distribution; including generator, cables, distribution panel, isolation switch, and load calculations.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Resolution: Not required. Change was only made to the genset. Replacement genset installed sat. & properly protected.
Electrical
Issued 27 June 2001
Resolved
Provide a drip shield for main AC distribution panel
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Electrical
Issued 27 June 2001
Resolved
Provide 600 volt rated matting and a non-conducting grab bar in front of main AC electrical distribution panel in engine room.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Resolution: Grab bar not req.
Engineering
Issued 27 June 2001
Resolved
Mount fuel filter for generator, reduce length of USCG A1 fuel hose to lessthan 30 inches, and provide valves at engine and fuel tank for servicing filter.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Engineering
Issued 27 June 2001
Resolved
Remove potable water hose from generator raw water suction and provide proper connection of AirEquip hose to the generator.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Electrical
Issued 27 June 2001
Resolved
Install guards & globes and renew broken Edison fixtures for lights in engine room.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Construction/Loadline
Issued 27 June 2001
Resolved
Provide dogs for forward hatch.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Construction/Loadline
Issued 27 June 2001
Resolved
Renew gaskets for all main deck hatches.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Lifesaving
Issued 27 June 2001
Resolved
All items to be cleared to the satisfaction of the attending USCG Marine Inspector prior to returning the vessel to service.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Lifesaving
Issued 27 June 2001
Resolved
Replace ships service air receiver with one constructed to ASME U or UM standards.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Resolution: "um" stamp found on plate. A/R found sat.
Construction/Loadline
Issued 27 June 2001
Resolved
Renew improper 4 inch x 3 ft. and 5 inch x 3 ft. inserts in way of transom and side shell corners on port and stbd sides. New inserts must measure atleast 18 inches by 3 ft. with rounded corners except that lower corners, where a butt joint on old seam may be relief cut.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Electrical
Issued 27 June 2001
Resolved
Remove extension cords and provide proper power distribution for bar and 2 forward office spaces on main deck.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Construction/Loadline
Issued 27 June 2001
Resolved
In void #2, remove temp bolted patch on port side forward and renew with 18" x 18" welded insert.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Resolution: This should not have been required. Plate was a blank over a mounting for a fathometer sending unit.
Construction/Loadline
Issued 27 June 2001
Resolved
Renew fore peak bulkhead in way of PVC sewage penetrations, improper fiberglass repair, and old bilge pipe flange due to severe corrosion.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Construction/Loadline
Issued 27 June 2001
Resolved
In void #2, renew longitudinal plate stiffeners next to keel due to exfoliation corrosion - all bays on port side and bays 3, 4, 5, & 6 on stbdside.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Resolution: re-examined after cleaning...only one needed replacement.
Electrical
Issued 27 June 2001
Resolved
In void #2, remove heat tape from water lines.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Electrical
Issued 27 June 2001
Resolved
In void #2, Remove extension cords from overhead.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Construction/Loadline
Issued 27 June 2001
Resolved
Remove unused copper lines running from void #2 through void #3 into engineroom and plug affected bulkheads.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Construction/Loadline
Issued 27 June 2001
Resolved
Renew improper 2 & 1/2 inch by 2ft. 9 inch insert in way of #2 void hatch on main deck and renew 2 improperly cut and repaired frames. Insert must be at least 18 inches x 2 ft. 9 inches. Frames sections must be offset andat least 18 inches long.
Condition: Unknown
Due 27 July 2001
Resolved 1 July 2002
Accommodation/Occupational Safety
Issued 3 August 1999
Resolved
Make MSD system available for inspection
Condition: Unknown
Due 3 September 1999
Resolved 1 July 2002
Documentation
Issued 3 August 1999
Resolved
Provide copy of Senior Deckhand designation letter in accordance with _x001C_ NVIC 1-91.
Condition: Unknown
Due 3 August 1999
Resolved 3 August 1999
Accommodation/Occupational Safety
Issued 3 August 1999
Resolved
Hardwire/mount masserator in comp#2 or remove.
Condition: Unknown
Due 3 August 1999
Resolved 3 August 1999
Electrical
Issued 3 August 1999
Resolved
Mount electrical box outlet in comp#2
Condition: Unknown
Due 3 August 1999
Resolved 3 August 1999
Accommodation/Occupational Safety
Issued 3 August 1999
Resolved
Provide bullhorn or PA system for vessel in accordance with 46 CFR 121.610.
Condition: Unknown
Due 3 August 1999
Resolved 3 August 1999
Accommodation/Occupational Safety
Issued 3 August 1999
Resolved
Update contents of first aid kit in accordance with 46 CFR 160.041.
Condition: Unknown
Due 3 August 1999
Resolved 3 August 1999
Navigation
Issued 3 August 1999
Resolved
Mount anchor light atop vsl IAW nav rules
Condition: Unknown
Due 3 August 1999
Resolved 3 August 1999
Engineering
Issued 3 August 1999
Resolved
Recondition starboard raw water exhaust cooling pump
Condition: Unknown
Due 3 September 1999
Resolved 1 July 2002
Construction/Loadline
Issued 3 August 1999
Resolved
Remove mooring lines from accom space or instal guards
Condition: Unknown
Due 3 September 1999
Resolved 1 July 2002
Resolution: Not required.
Accommodation/Occupational Safety
Issued 3 August 1999
Resolved
mount MSD raw water supply pump
Condition: Unknown
Due 3 September 1999
Resolved 1 July 2002
Electrical
Issued 3 August 1999
Resolved
wiring throughout vessel requires wire ties every 24" on horiz runs & every3ft on vert runs. must be mtl in engine room. Ties require crimp type connectors at splices.
Condition: Unknown
Due 3 September 1999
Resolved 1 July 2002
Construction/Loadline
Issued 3 August 1999
Resolved
Clean & make available weldment atop port sea-chest and 1" accom heating line joint at lower end of 3" pipe in front of inboard forward mount for port engine.
Condition: Unknown
Due 3 September 1999
Resolved 1 July 2002
Electrical
Issued 3 August 1999
Resolved
Cover battery box behind generator
Condition: Unknown
Due 3 September 1999
Resolved 1 July 2002
Accommodation/Occupational Safety
Issued 3 August 1999
Resolved
Cap-off 1/2" pot water lines from comp#2 to Engine Room
Condition: Unknown
Due 3 August 1999
Resolved 3 August 1999
Lifesaving
Issued 3 August 1999
Resolved
Double clamp all (MSD, fire piping, bige piping, raw water, and engine water exhaust ) flex hose
Condition: Unknown
Due 3 September 1999
Resolved 1 July 2002
Engineering
Issued 3 August 1999
Resolved
Replace flex hose on engine keel coolers
Condition: Unknown
Due 3 September 1999
Resolved 1 July 2002
Resolution: new hoses fitted.
Engineering
Issued 3 August 1999
Resolved
Clean generator, repair gov solenoid
Condition: Unknown
Due 3 August 1999
Resolved 3 August 1999
Construction/Loadline
Issued 15 June 1999
Resolved
PROVIDE A STOP VALVE AT THE WATERTIGHT BHD PENETRATION FOR THE PVC SANITATION PIPING IWO THE FWD HEAD/MSD.
Condition: Unknown
Due 31 August 1999
Resolved 1 July 2002
Electrical
Issued 16 July 1998
Resolved
PROVIDE COVER ON POWER PANEL
Condition: Unknown
Due 24 July 1998
Resolved 28 July 1998
Electrical
Issued 16 July 1998
Resolved
NUMEROUS DEAD ENDED CABLES THROUGHOUT ENGINE ROOM
Condition: Unknown
Due 24 July 1998
Resolved 28 July 1998
Electrical
Issued 16 July 1998
Resolved
INSTALL CAGES OVER ENGINE ROOM LIGHT GLASS FIXTURES
Condition: Unknown
Due 24 July 1998
Resolved 28 July 1998
Lifesaving
Issued 16 July 1998
Resolved
MISSING ENGINE TO ALT GUARD PROTECTIVE COVERS
Condition: Unknown
Due 4 August 1998
Resolved 4 August 1998
Electrical
Issued 16 July 1998
Resolved
INSTALL ELECTRICAL CONN'S ON GEN TACH DRIVE WIRING
Condition: Unknown
Due 4 August 1998
Resolved 4 August 1998
Documentation
Issued 16 July 1998
Resolved
DRILL AND TRAINING LOG NOT MAINTAINED
Condition: Unknown
Due 16 July 1998
Resolved 16 July 1998
Engineering
Issued 16 July 1998
Resolved
REVERSE PIN AND USE NEW COTTER PIN FOR ENGINE TRANSMISSION LINKAGE CONNECTION TO TRANSMISSION SELECTOR VALVE ASSY.
Condition: Unknown
Due 4 August 1998
Resolved 4 August 1998
Electrical
Issued 16 July 1998
Resolved
SHORE TIE TO SHIPS POWER PANEL NOT HARD WIRED PROPERLY
Condition: Unknown
Due 24 July 1998
Resolved 28 July 1998
Electrical
Issued 16 July 1998
Resolved
REMOVE NUMEROUS EXTENSION CORDS FROM GALLEY EQUIPMENT
Condition: Unknown
Due 16 July 1998
Resolved 16 July 1998
Construction/Loadline
Issued 16 July 1998
Resolved
MOUNT ENGINE ROOM BILGE PUMP PROPERLY
Condition: Unknown
Due 4 August 1998
Resolved 4 August 1998
Lifesaving
Issued 16 July 1998
Resolved
WATERLIGHT OPERATIONAL BUT HOUSING CRACKED VOIDING WATERTIGHT CAPABILITY.
Condition: Unknown
Due 24 July 1998
Resolved 28 July 1998
Electrical
Issued 16 July 1998
Resolved
REMOVE VISE GRIP FROM GEN GOVERNOR CONTROL ASSY. SHOW PROPER OPERATION OF GOVERNOR SPEED CONTROL.
Condition: Unknown
Due 4 August 1998
Resolved 4 August 1998
Electrical
Issued 16 July 1998
Resolved
PROVIDE ELECTRICAL COVER FOR GEN MAIN FEED BOX AND INSTALL BOX CONNECTORS
Condition: Unknown
Due 4 August 1998
Resolved 4 August 1998
Lifesaving
Issued 26 May 1998
Resolved
PROCURE APPROVED DISTRESS SIGNALS WITH GOOD EXPIRATION DATE.
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Documentation
Issued 26 May 1998
Resolved
PROVE COMPLIANCE WITH FCC REGULATIONS (OPERATOR'S PERMIT AND SAFETY CERTIFICATE).
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Fire Fighting
Issued 26 May 1998
Resolved
INSTALL ONE PORTABLE FIRE EXTINGUISHER IN ACCOM. SPACE ON SECOND DECK.
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Lifesaving
Issued 26 May 1998
Resolved
PROVE PROPER OPERATION OF WATERLIGHT FOR RING BOUY.
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Lifesaving
Issued 26 May 1998
Resolved
REPLACE TWO CONDEMNED LIFE JACKETS.
Condition: Unknown
Due 26 July 1998
Resolved 26 May 1998
Electrical
Issued 26 May 1998
Resolved
REPLACE SHIPS WIRING WITH APPROVED MARINE CABLE.
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Lifesaving
Issued 26 May 1998
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Lifesaving
Issued 26 May 1998
Resolved
PROPERLY MOUNT ALL GALLEY EQUIPMENT.
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Electrical
Issued 26 May 1998
Resolved
PROVE PROPER OPERATION OF 3 AMP BATTERY CHARGER.
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Lifesaving
Issued 26 May 1998
Resolved
PROPERLY LABEL STOWAGE COMPARTMENT FOR CHILDREN'S LIFEJACKETS.
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Lifesaving
Issued 26 May 1998
Resolved
PROVE PROPER MAINT. OF LOGBOOKS IAW 46CFR 185.520.
Condition: Unknown
Due 26 May 1998
Resolved 26 May 1998
Accommodation/Occupational Safety
Issued 29 April 1997
Resolved
CLEAN AND SANITIZE ALL DISHES, GLASSWARE AND HORIZONTAL SURFACES IN GALLEY TO REMOVE MOUSE/RAT CONTAMINATION.
Condition: Unknown
Due 9 May 1997
Resolved 20 May 1997
Accommodation/Occupational Safety
Issued 29 April 1997
Resolved
CERTIFY THAT VESSEL IS RAT/MOUSE/VERMIN-FREE. NOT TO OPERATE WITH PASSENGERS UNTIL THIS REQUIREMENT IS CORRECTED.
Condition: Unknown
Due 9 May 1997
Resolved 20 May 1997
Construction/Loadline
Issued 29 April 1997
Resolved
REMOVE ANTIFREEZE/COOLANT FROM ENGINE ROOM BILGES, PROVIDE HAZMAT RECEIPT FROM DISPOSAL FACILITY.
Condition: Unknown
Due 9 May 1997
Resolved 20 May 1997
Electrical
Issued 29 April 1997
Resolved
REMOVE DEAD-END WIRING IN E/R PANELBOX.
Condition: Unknown
Due 9 May 1997
Resolved 20 May 1997
Navigation
Issued 29 April 1997
Resolved
PROVE PROPER OPERATION OF VESSEL'S RADAR.
Condition: Unknown
Due 9 May 1997
Resolved 20 May 1997
Lifesaving
Issued 22 April 1996
Resolved
RENEW RETROREFLECTIVE TAPE ON 9 CHILD LIFE PRESERVERS.
Condition: Unknown
Due 26 April 1996
Resolved 13 May 1996
Lifesaving
Issued 22 April 1996
Resolved
REPLACE RING BUOY WITH ORANGE COLORED IN SEVICABLE CONDITION.
Condition: Unknown
Due 26 April 1996
Resolved 26 April 1996
Lifesaving
Issued 22 April 1996
Resolved
POST EMERGENCY CHECK-OFF LIST AND LIFE JACKET DONNING PROCEDURES.
Condition: Unknown
Due 10 May 1996
Resolved 13 May 1996
Fire Fighting
Issued 22 April 1996
Resolved
MOUNT ALL FIRE EXTINGUISHERS IN APPROVED BRACKETS.
Condition: Unknown
Due 26 April 1996
Resolved 26 April 1996
Electrical
Issued 22 April 1996
Resolved
REPLACE COVERS ON LIGHT FIXTURES IN BOTH SECOND DECK HEADS AND PORT SIDE HEAD ON MAIN DECK.
Condition: Unknown
Due 10 May 1996
Resolved 26 April 1996
Lifesaving
Issued 22 April 1996
Resolved
REPLACE 19 ADULT AND 1 CHILD LIFE PRESERVER. PERSONS ON BOARD LIMITED TO 140 ADULTS AND 6 CHILDREN.
Condition: Unknown
Due 26 April 1996
Resolved 13 May 1996
Electrical
Issued 22 April 1996
Resolved
REPLACE COVER OVER GENERATOR ELECTRICAL COMPONENTS.
Condition: Unknown
Due 26 April 1996
Resolved 26 April 1996
Engineering
Issued 22 April 1996
Resolved
REPAIR PORT ENGINE THROTTLE CONTROL ON BRIDGE.
Condition: Unknown
Due 10 May 1996
Resolved 26 April 1996
Lifesaving
Issued 22 April 1996
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 26 April 1996
Resolved 26 April 1996
Lifesaving
Issued 22 April 1996
Resolved
CONDUCT AND LOG DRILLS AND CREW TRAINING.
Condition: Unknown
Due 22 April 1996
Resolved 22 April 1996
Lifesaving
Issued 22 April 1996
Resolved
POST EMERGENCY BRAODCAST PLACARD.
Condition: Unknown
Due 26 April 1996
Resolved 26 April 1996
Lifesaving
Issued 22 April 1996
Resolved
PROVIDE WATERTIGHT, BRIGHTLY COLORED, PROPERLY LABELED CONTAINER FOR DISTRESS SIGNALS.
Condition: Unknown
Due 26 April 1996
Resolved 26 April 1996
Electrical
Issued 1 May 1995
Resolved
INSTALL LIGHTING FIXTURES IN ENGINE COMPARTMENT.
Condition: Unknown
Due 1 May 1995
Resolved 1 May 1995
Electrical
Issued 1 May 1995
Resolved
PLUG/BLANK OFF OPEN PORTS IN FACE OF CIRCUIT BREAKER BOX AT TOP OF E/R LADDER.
Condition: Unknown
Due 1 May 1995
Resolved 1 May 1995
Electrical
Issued 1 May 1995
Resolved
REMOVE ALL HOUSEHOLD LAMP WIRE FROM STEERING COMPARTMENT AND GALLEY.
Condition: Unknown
Due 1 May 1995
Resolved 1 May 1995
Lifesaving
Issued 1 May 1995
Resolved
REPAIR LADDER LEADING INTO #4 COMPARTMENT.
Condition: Unknown
Due 1 May 1995
Resolved 1 May 1995
Lifesaving
Issued 1 May 1995
Resolved
TOTAL PERSONS IS REDUCED TO 140 ADULTS UNTIL 18 LIFEJACKETS HAVE BEEN REPLACED.
Condition: Unknown
Due 1 May 1995
Resolved 1 May 1995
Lifesaving
Issued 1 May 1995
Resolved
PROVIDE CHEMICAL TESTING PROGRAMS REQUIREMENTS.
Condition: Unknown
Due 1 May 1995
Resolved 1 May 1995
Lifesaving
Issued 26 April 1994
Resolved
VSL IS RESTRICTED TO VOYAGES OF NO MORE THAN "30 MINUTES AWAY FROM DOCK." VSL SHALL PROVIDE VISUAL DISTRESS SIGNALS AS REQUIRED BY 46CFR180.35
Condition: Unknown
Due 12 May 1994
Resolved 12 May 1994
Lifesaving
Issued 26 April 1994
Resolved
VSL MAY NOT CARRY MORE THAN 10 CHILDREN ON ANY VOYAGE. VSL SHALL PROVIDE AN ADDITIONAL 6 CHILD PFD'S AS REQUIRED BY THE CERTIFICATE OF INSPECTION.
Condition: Unknown
Due 26 April 1994
Resolved 26 April 1994
Electrical
Issued 23 April 1992
Resolved
PROPERLY REWIRE POWER SUPPLY CABLE TO AIR CONDITIONER FORWARD USING APPROVED TYPE CABLE AND MAKING PERMANENT JUNCTIONS._x001C_
Condition: Unknown
Due 23 April 1992
Resolved 23 April 1992
Electrical
Issued 23 April 1992
Resolved
PROPERLY FASTEN EMERGENCY LIGHTING POWER CABLES IN THE OVERHEAD THROUGHOUT THE VESSEL._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 23 April 1992
Resolved 23 April 1992
Navigation
Issued 23 April 1992
Resolved
OBTAIN COMPLETE SET OF NOTICES TO LOCAL MARINERS AND UPDATE ALL CHARTS.
Condition: Unknown
Due 23 April 1992
Resolved 23 April 1992
Electrical
Issued 23 April 1992
Resolved
PROPERLY MOUNT SWITCHES AND BREAKERS AT ENTRANCE TO ENGINE ROOM IN ELECTRICAL BOX. _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 23 April 1992
Resolved 23 April 1992
Lifesaving
Issued 23 April 1992
Resolved
REMOUNT LIFERING BUOY OUTSIDE PILOT HOUSE ON MAIN DECK._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 23 April 1992
Resolved 23 April 1992
Electrical
Issued 23 April 1992
Resolved
REMOVE OF MAKE PROPER CONNECTIONS ON CABLES SUPPLYING POWER TO HEATING BLOWERS THROUGHOUT VESSEL._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 23 April 1992
Resolved 23 April 1992
Construction/Loadline
Issued 15 March 1991
Resolved
PERMANENTLY SHUT OFF OVERBOARD DISCHARGE PIPE IN LAZARETTE ON STARBOARD SIDE.
Condition: Unknown
Due 15 March 1991
Resolved 15 March 1991
Lifesaving
Issued 23 April 1990
Resolved
PROVIDE 18 ADULT PFD'S. VESSEL LIMITED TO CARRYING 220 TOTAL PERSONS ONBOARD UNTIL COMPLETED.
Condition: Unknown
Due 23 April 1990
Resolved 23 April 1990
Lifesaving
Issued 23 April 1990
Resolved
PROVIDE 3 HAND RED AND 3 ORANGE SMOKE FLARES.
Condition: Unknown
Due 23 April 1990
Resolved 23 April 1990
Navigation
Issued 23 April 1990
Resolved
PROVIDE UPDATED TIDE AND CURRENT TABLES.
Condition: Unknown
Due 23 April 1990
Resolved 23 April 1990
Construction/Loadline
Issued 12 June 1989
Resolved
RESTORE WATERTIGHT INTEGRITY TO DECK AREA JUST INBOARD OF GANGWAY (STBD) (FORWARD) ON MAIN DECK WHERE HEATER PIPING PENETRATES; AND TO THE SMALL HOLE ADJACENT TO THE HEATER PIPING.
Condition: Unknown
Due 12 June 1989
Resolved 12 June 1989
Navigation
Issued 12 June 1989
Resolved
PROVIDE PROPER LIGHT BULBS FOR THE PORT AND STBD NAVIGATION LIGHTS.
Condition: Unknown
Due 12 June 1989
Resolved 12 June 1989
Fire Fighting
Issued 12 June 1989
Resolved
STENCIL NAME OF VESSEL ON FIRE AXE.
Condition: Unknown
Due 12 June 1989
Resolved 12 June 1989
Engineering
Issued 12 June 1989
Resolved
INSTALL SAFETY GUARD ON PORT ENGINE NEAR FIRE/BILGE PUMP FOR SAFETY ON PERSONNEL.
Condition: Unknown
Due 12 June 1989
Resolved 12 June 1989
Lifesaving
Issued 12 June 1989
Resolved
PROVIDE 138 ADULT PFD'S AND 14 CHILD PFD'S.
Condition: Unknown
Due 12 June 1989
Resolved 12 June 1989
Lifesaving
Issued 12 June 1989
Resolved
PROVIDE SEPARATE STOWAGE SPACE, WITH APPROPRIATE MARKING, FOR ALL CHILDS PFD'S.
Condition: Unknown
Due 12 June 1989
Resolved 12 June 1989
Accommodation/Occupational Safety
Issued 12 June 1989
Resolved
REDUCE CAPACITY OF PASSENGERS TO A TOTAL OF OF 110 PASSENGERS; 100 ADULTS AND 10 CHILDREN, UNTIL THE REQUIRED AMOUNT OF ADULT AND CHILDS PFD'S ARE PROVIDED ON BOARD.
Condition: Unknown
Due 12 June 1989
Resolved 12 June 1989
Fire Fighting
Issued 12 June 1989
Resolved
PROVIDE/INSTALL REQUIRED NUMBER OF PORTABLE FIRE EXTINGUISHERS IN THE ACCOMODATION SPACES.
Condition: Unknown
Due 12 June 1989
Resolved 12 June 1989
Engineering
Issued 12 June 1989
Resolved
MOUNT AND MAKE PERMANENT THE REMOTE SHUTDOWNS FOR THE PORT AND STBD ENGINES.
Condition: Unknown
Due 12 June 1989
Resolved 12 June 1989
Construction/Loadline
Issued 12 June 1989
Resolved
REPAIR PENETRATION OF THE WATERTIGHT (COLLISION) BULKHEAD AND RESTORE WATERTIGHT INTEGRITY TO COLLISION BULKHEAD.
Condition: Unknown
Due 12 June 1989
Resolved 12 June 1989
Construction/Loadline
Issued 12 June 1989
Resolved
PROVIDE MEANS TO PUMP OUT FOREPEAK.
Condition: Unknown
Due 12 June 1989
Resolved 12 June 1989