Records from 1982 to 2004. Most recent: inspection, 5 October 2004.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 56
5 October 2004
Administrative Inspection
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 2214159
31 May 2001
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1065884
12 April 2001
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1061741
16 June 2000
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1054359
10 May 2000
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1424916
30 April 1999
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1127620
30 April 1999
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1130212
12 June 1998
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1473185
5 June 1998
Examination of Repairs
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 793192
28 April 1998
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 789857
28 January 1998
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1408041
30 August 1997
Excursion Permit
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 785179
2 May 1997
COI Inspection · Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1457445
24 June 1996
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 760527
23 June 1996
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 203268
23 June 1996
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 226350
10 May 1996
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1414665
13 June 1995
Deficiency Check
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 876813
3 May 1995
Hull Examination · COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1450973
18 April 1995
Inclining Experiment
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1374255
8 June 1994
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1473263
21 September 1993
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1438099
20 May 1993
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 112985
20 May 1993
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 170955
20 May 1993
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 676768
3 April 1993
Examination of Repairs · Damage Survey
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1146144
1 April 1993
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 179758
11 January 1993
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1382514
23 July 1992
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1410743
10 June 1992
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 646668
8 June 1992
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 103296
21 November 1991
Re-Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 937187
4 September 1991
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 940408
28 January 1991
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1227476
28 August 1990
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 921296
1 August 1990
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1215929
25 June 1990
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1242106
13 January 1990
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 916828
9 January 1990
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1233637
5 September 1989
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 892709
4 August 1988
COI Inspection
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1344587
22 April 1988
Hull Examination
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1195217
7 April 1988
Examination of Repairs
Physical examination · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1036711
16 October 1987
Re-Inspection · Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1018841
14 July 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1017133
2 May 1987
Hull Examination
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1334000
23 April 1987
Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1315392
12 February 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1017011
5 August 1986
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1321528
23 October 1985
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1303490
19 December 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 977898
10 August 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 978999
3 May 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1280417
4 April 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1280240
20 March 1984
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 972475
8 September 1982
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1275303
Fire Fighting
Issued 2 May 1997
Resolved
REPAIR/REPLACE #5 FIRE STATION HANDLE.
Condition: Unknown
Due 2 May 1997
Resolved 20 May 1997
Electrical
Issued 2 May 1997
Resolved
MAKE REPAIRS TO WIRING ON FWD MAST HEAD LIGHTING.
Condition: Unknown
Due 2 May 1997
Resolved 20 May 1997
Electrical
Issued 2 May 1997
Resolved
REPAIR BOAT DECK LIGHT.
Condition: Unknown
Due 13 May 1997
Resolved 20 May 1997
Fire Fighting
Issued 2 May 1997
Resolved
PROVE PROPER OPERATION OF FIRE MONITOR.
Condition: Unknown
Due 2 May 1997
Resolved 20 May 1997
Construction/Loadline
Issued 2 May 1997
Resolved
REPAIR LEAK AND LABEL MANIFOLD BILGE PUMP.
Condition: Unknown
Due 13 May 1997
Resolved 20 May 1997
Engineering
Issued 2 May 1997
Resolved
LABEL ALL FUEL CUTOFFS IN ENGINE ROOM AND RECONNECT OUTSIDE E/R.
Condition: Unknown
Due 13 May 1997
Resolved 20 May 1997
Engineering
Issued 2 May 1997
Resolved
REMOVE OR REPAIR OLD FUEL REACH ROD SHUTOFFS ON MAINDECK.
Condition: Unknown
Due 2 May 1997
Resolved 20 May 1997
Engineering
Issued 2 May 1997
Resolved
REPLACE/REPAIR PORT P/V RELIEF VALVE.
Condition: Unknown
Due 2 May 1997
Resolved 20 May 1997
Engineering
Issued 2 May 1997
Resolved
OPEN/CLEAN AND PROVIDE FOR INSPECTION OF BOTH AIR RECEIVERS.
Condition: Unknown
Due 13 May 1997
Resolved 20 May 1997
Construction/Loadline
Issued 2 May 1997
Resolved
PROPERLY INSTALL GASKET IN WATERTIGHT DOOR LEADING INTO ENGINE ROOM.
Condition: Unknown
Due 2 May 1997
Resolved 20 May 1997
Construction/Loadline
Issued 2 May 1997
Resolved
REPAINT FWD DRAFT MARKS.
Condition: Unknown
Due 2 May 1997
Resolved 20 May 1997
Fire Fighting
Issued 2 May 1997
Resolved
RE-CHARGE SCBA BOTTLE.
Condition: Unknown
Due 13 May 1997
Resolved 20 May 1997
Electrical
Issued 2 May 1997
Resolved
REMOVE DEAD END WIRES FROM ENGINEERING SPACES.
Condition: Unknown
Due 2 May 1997
Resolved 20 May 1997
Accommodation/Occupational Safety
Issued 2 May 1997
Resolved
SECURE LOOSE DECK BOARDS IN E/R PASSAGEWAY AND DECK PLATES IN ENGINEROOM.
Condition: Unknown
Due 13 May 1997
Resolved 20 May 1997
Accommodation/Occupational Safety
Issued 2 May 1997
Resolved
PERMANMENTLY INSTALL HOT WATER HEATER TANK, LOCATED IN ENGINE ROOM PASSAGEWAY.
Condition: Unknown
Due 2 May 1997
Resolved 20 May 1997
Engineering
Issued 2 May 1997
Resolved
INSTALL GUARDS ON SIGHT GLASSES FOR EXPANSION TANKS.
Condition: Unknown
Due 13 May 1997
Resolved 20 May 1997
Electrical
Issued 2 May 1997
Resolved
PROPERLY LABEL ALL INDICATORS ON ALARM PANELS.
Condition: Unknown
Due 20 May 1997
Resolved 20 May 1997
Electrical
Issued 2 May 1997
Resolved
INSTALL GROUND DETECTION LIGHTS ON #2 MAIN BUS SWITCH BOARD.
Condition: Unknown
Due 20 May 1997
Resolved 20 May 1997
Deck/Cargo
Issued 2 May 1997
Resolved
PROVE PROPER OPERATION PORT ANCHOR RELEASE AND WINDLESS.
Condition: Unknown
Due 13 May 1997
Resolved 20 May 1997
Engineering
Issued 2 May 1997
Resolved
REPAIR/REPLACE OR REMOVE S/S GENERATOR STOP CONTROLS FROM NAVIGATION BRIDGE.
Condition: Unknown
Due 2 May 1997
Resolved 20 May 1997
Engineering
Issued 2 May 1997
Resolved
DEMONSTRATE PROPER OPERATION OD MDE REMOTE SHUTDOWNS FROM NAVIGATION BRIDGE.
Condition: Unknown
Due 2 May 1997
Resolved 20 May 1997
Electrical
Issued 2 May 1997
Resolved
PROPERLY SECURE WIRING ON ALL INSTRUMENT PANELS.
Condition: Unknown
Due 2 May 1997
Resolved 20 May 1997
Engineering
Issued 2 May 1997
Resolved
DOUBLE NUT STBD SHAFT PACKING RING.
Condition: Unknown
Due 13 May 1997
Resolved 20 May 1997
Engineering
Issued 2 May 1997
Resolved
PROPERLY INSTALL BOTH MDE STARTER OIL FILLS.
Condition: Unknown
Due 13 May 1997
Resolved 20 May 1997
Electrical
Issued 2 May 1997
Resolved
ENSURE PROPER OPERATION/ILLUMINATION OF ALL EMERGENCY LIGHTING IN ENG ROOM.
Condition: Unknown
Due 20 May 1997
Resolved 20 May 1997
Electrical
Issued 10 May 1996
Resolved
PROVE PROPER OPERATION OF AFT GENERATOR OVERSPEED TRIPPING MECHANISM.
Condition: Unknown
Due 13 May 1996
Resolved 8 August 1996
Accommodation/Occupational Safety
Issued 10 May 1996
Resolved
PROVE PROPER OPERATION OF STARTING AIR RECIEVERS' (P&S) SAFETY PRESSURE RELIEF VALVES AND ASSOCIATED GUAGES.
Condition: Unknown
Due 13 May 1996
Resolved 8 August 1996
Documentation
Issued 3 May 1995
Resolved
A PERMANENT STABILITY LETTER IS TO BE PLACED ON BOARD BASED ON THE INCLINE CONDUCTED 18APR95.
Condition: Unknown
Due 3 May 1995
Resolved 3 May 1995
Deck/Cargo
Issued 3 May 1995
Resolved
PLANS APPROVED BY THE MSC ARE TO BE PROVIDED FOR THE ALTERATIONS COMPLETED TO THE LIQUID MUD TANKS IN APRIL 1995.
Condition: Unknown
Due 3 May 1995
Resolved 3 May 1995
Electrical
Issued 1 August 1990
Resolved
REPAIR AND REMOUNT DOOR TO AIR CONDITIONER COMPRESSOR MOTOR CONTROLLER LOCATED IN STARBOARD DECK STORES SPACE.
Condition: Unknown
Due 1 August 1990
Resolved 1 August 1990
Construction/Loadline
Issued 1 August 1990
Resolved
INSTALL SUITABLE GASKETS IN COVERS FOR ENGINEROOM POWERED EXHAUST VENTS.
Condition: Unknown
Due 1 August 1990
Resolved 1 August 1990
Engineering
Issued 1 August 1990
Resolved
PROVIDE MEANS OF OPERATIONALLY TESTING BOTH AIR RECEIVER RELIEF VALVES OR REPLACE WITH RELIEF VALVES SET AT LESS THAN MAXIMUM AIR COMPRESSOR DISCHARGE PRESSURE OF 200 PSI AND OPERATIONALLY TEST.
Condition: Unknown
Due 1 August 1990
Resolved 1 August 1990
Documentation
Issued 1 August 1990
Resolved
PROPERLY MARK LOAD LINE DECK REFERENCE MARK.
Condition: Unknown
Due 1 August 1990
Resolved 1 August 1990
Navigation
Issued 1 August 1990
Resolved
MAKE PERMANENT REPAIRS TO FRACTURED WELDS AT GUSSETS REINFORCING THE UPPER RUDDER POST GUIDES.
Condition: Unknown
Due 1 August 1990
Resolved 1 August 1990
Electrical
Issued 1 August 1990
Resolved
REMOVE DEADEND WIRES AT NUMEROUS LOCATIONS THROUGHOUT VESSEL.
Condition: Unknown
Due 1 August 1990
Resolved 1 August 1990
Navigation
Issued 5 September 1989
Resolved
CALIBRATE RUDDER ANGLE INDICATOR FOR FORWARD AND AFT WHEELHOUSE STEERING STATIONS.
Condition: Unknown
Due 5 September 1989
Resolved 5 September 1989
Navigation
Issued 5 September 1989
Resolved
PREPARE MAGNETIC STEERING COMPASS CORRECTION CARD.
Condition: Unknown
Due 5 September 1989
Resolved 5 September 1989
Construction/Loadline
Issued 5 September 1989
Resolved
MAKE PERMANENT REPAIRS TO FRACTURE IN WAY OF MAIN DECK AND SIDESHELL OF PORT BALLAST TANK (FR54) AT THE NEXT GAS FREEING BUT NOT LATER THAN 10 FEB 90.
Condition: Unknown
Due 5 September 1989
Resolved 5 September 1989
Electrical
Issued 5 September 1989
Resolved
RENEW DIRECTORY FOR ENGINE ROOM LIGHTING PANEL.
Condition: Unknown
Due 5 September 1989
Resolved 5 September 1989
Unknown
Issued 20 March 1984
Resolved
THE FOLLOWING DEFICIENCIES ARE FOR THE POINT CONCEPTION, DN576825.
Condition: Unknown
Due 20 March 1984
Resolved 20 March 1984
Construction/Loadline
Issued 20 March 1984
Resolved
ENSURE PROPER OPERATION OF ALL REACH RODS AND LABEL THEIR FUNCTION ALONG- SIDE.
Condition: Unknown
Due 20 March 1984
Resolved 20 March 1984
Navigation
Issued 20 March 1984
Resolved
MAKE PERMANENT REPAIRS TO EXISTING HYDRAULIC LINES STARBOARD SIDE, RUDDER COMPARTMENT.
Condition: Unknown
Due 20 March 1984
Resolved 20 March 1984
Electrical
Issued 20 March 1984
Resolved
RENEW SWITCH FOR BILGE PUMP.
Condition: Unknown
Due 20 March 1984
Resolved 20 March 1984
Construction/Loadline
Issued 20 March 1984
Resolved
INSTALL THE PROPER SIZE GASKET FOR THE WATERTIGHT DOORS TO THE ENGINE ROOM TO ENSURE WATRTIGHT INTEGRITY.
Condition: Unknown
Due 20 March 1984
Resolved 20 March 1984
Construction/Loadline
Issued 20 March 1984
Resolved
AT NEXT DRYDOCK EXAMINATION CROP AND RENEW THE THREE AFTERMOST SIDESHELL AND UNDERDECK LONGITUDIALS IN THE CHAIN LOCKER PORT SIDE.
Condition: Unknown
Due 20 March 1984
Resolved 20 March 1984
Documentation
Issued 20 March 1984
Resolved
RENEW THE VESSEL'S CERTIFICATE OF DOCUMENTION.
Condition: Unknown
Due 20 March 1984
Resolved 20 March 1984
Unknown
Issued 20 March 1984
Resolved
RENEW THE FLAME SCREENS FOR THE FUEL OIL TANK VENTS (USING 1 EACH 30 X 30 MESH OR 2 EACH 20 X 20 MESH).
Condition: Unknown
Due 31 March 1984
Resolved 20 March 1984
Navigation
Issued 20 March 1984
Resolved
MAKE PERMANENT REPAIRS IN WAY OF TEMPORARY REPAIR ON NON-FOLLOW UP STEERINGSYSTEM.
Condition: Unknown
Due 20 March 1984
Resolved 20 March 1984
Electrical
Issued 20 March 1984
Resolved
INSTALL PROTECTIVE GLOBES AND CAGES ON ALL LIGHTS WITHOUT THEM.
Condition: Unknown
Due 31 March 1984
Resolved 20 March 1984
Navigation
Issued 20 March 1984
Resolved
AT NEXT DRYDOCK EXAMINATION REWELD THE BRACES FOR THE STARBOARD RUDDER SUPPORT.
Condition: Unknown
Due 31 August 1984
Resolved 20 March 1984
Construction/Loadline
Issued 20 March 1984
Resolved
MAKE NECESSARY REPAIRS TO THE PORT AND STARBOARD ENGINE ROOM HATCHWAYS TO ENSURE THE WATERTIGHT INTEGRITY.
Condition: Unknown
Due 31 March 1984
Resolved 20 March 1984