MAURY USCG vessel records
← All vessels

MISS CHRIS

MISS CHRIS is a 1976 passenger vessel (inspected). The Coast Guard has recorded 25 inspections since 2016, most recently in July 2026, along with 61 deficiencies — 1 with no resolution recorded — and 1 operational control.

Records from 2016 to 2026. Most recent: inspection, 20 July 2026.

Built
1976
Last inspected
20 July 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 20 July 2026
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WYL8180
Flag
UNITED STATES
Maury page id
psix-48975

Documentation record

Registered dimensions (L × B × D)76.9 ft × 22.2 ft × 7.6 ft
Registered tonnagegross 70 / net 47
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGULF CRAFT · PATTERSON, LA, UNITED STATES · built 1976
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portCAPE MAY, NJ
Trade endorsementsCoastwise, unrestricted, Fishery, Recreational
DocumentationValid · issued 5 March 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it0 - Dead Weight, Ton
31 - Displacement, Ton
70 - Regulatory (Subpart C or D), Gross Ton
47 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 25

20 July 2026 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8442361
8 June 2026 Annual Inspection · Deficiency Check · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8378575
2 June 2025 Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8166966
15 May 2025 Annual Inspection · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8137108
4 February 2025 Internal Structural Exam · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8074025
22 May 2024 Annual Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7917309
8 August 2023 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7763422
28 April 2023 Annual Inspection · Plan Review "T" Boat · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7677542
25 April 2023 Inclining Experiment
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7675577
13 February 2023 Examination of Repairs · Internal Structural Exam · Plan Review "T" Boat · Drydock Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7636211
2 February 2023 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7631173
28 July 2022 Plan Review "T" Boat
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7519520
10 May 2022 COI Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7445231
8 February 2022 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7392563
9 November 2020 Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7086272
28 September 2020 Deficiency Check · COI Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7054120
14 November 2019 Administrative Inspection · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6855883
9 October 2019 Deficiency Check · Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6831611
28 November 2018 Drydock Exam · Internal Structural Exam
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6572140
15 October 2018 Annual Inspection · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6561221
13 November 2017 Annual Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6306514
20 September 2017 In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6271983
20 September 2017 Deficiency Check · Examination of Repairs · Damage Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6340611
2 December 2016 Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6051749
20 October 2016 Annual Inspection · DAPI Audit · Deficiency Check
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6020713

Deficiency record · 61

07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 8 June 2026 Resolved
Vessels described by 46 CFR 175.110(c) must have an interconnected fire detection system in compliance with § 181.450 installed in all enclosed areas where passengers and crew have routine access, including accommodation spaces and machinery spaces. Installed fire detection system reported inoperable. The following requirements shall be met while fire detection system is inoperable: - CCTV in engine room shall be monitored by the crew while vessel is underway with passengers - A crewmember shall make rounds of the engine room every 30 minutes while the vessel is underway and log completion of the rounds in the vessel logbook Permanent repairs to the fire detection shall be made within 14 days. 46 CFR 181.405
Action required: 705 - Other - as specified
Due 22 June 2026
Resolved 11 June 2026
Resolution: New fire detection panel installed and tested
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 8 June 2026 Resolved
Each survival craft and rescue boat on a vessel must be in good working order and ready for immediate use before the vessel leaves port and at all times when the vessel is underway. Center, foward life floats basket found broken. Port side life floats is degraded. Repair/replace lifefloats to satisfaction of MI. 46 CFR 185.700
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 July 2026
Resolved 11 June 2026
Resolution: Foward basket repaired and port side life float replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 8 June 2026 Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartment. Small leak was identified on bilge piping for engine room. Repair leak to satisfaction of MI. 46 CFR 182.25-1 (OLD T)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 July 2026
Resolved 11 June 2026
Resolution: Piping repaired and testing.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 8 June 2026 Resolved
A weathertight door with permanent watertight coamings must be provided for each opening located in a deck house. Starboard side weathertight door is missing lower closure device . Install closure device to satisfaction of MI. 46 CFR 171.124 (OLD S)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 July 2026
Resolved 11 June 2026
Resolution: New closure device installed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 8 June 2026 Resolved
One length of fire hose shall be provided for each fire hydrant required. Port side fire hose was found holed. Hose was replaced with new hose. 46 CFR 181.15-10 (OLD T)
Action required: 10 - Deficiency Rectified
Resolved 8 June 2026
Resolution: Hose replaced with new spare
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 May 2025 Resolved
Have nozzle that has a 1/2 inch solid stream orifice or a combination nozzle by the Commandant iaw 162.027-6 of this Chapter. The nozzle must be bronze or another material that has a strength and corrosion resistance properties equal to those of bronze. The current nozzles on both the port and starboard side fire hoses are made of plastic. Replace with ones made of bronze or a material of equal strength and durability. 46 CFR 181.15-10(d)(2) "OLD T"
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 June 2025
Resolved 4 June 2025
Resolution: Received evidence that o/o installed new nozzles meeting regs, see photos. all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 May 2025 Resolved
All wiring and cables shall be suitable for marine service and for the particular installation used. Dead-end wires were found above the port-side generator. Remove dead-end wires to the satisfaction of the attending Marine Inspector (MI). 46 CFR 183.10-20(a) "OLD T"
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 June 2025
Resolved 25 June 2025
Resolution: Received photos detailing that they tagged the dead-end wires and placed wire loom and protection on the existing wires for the fenders
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 May 2025 Resolved
If 1 1/2 inch diameter fire hose is used, each length of hose must: (1) Be lined commercial fire hose that conforms to Underwriters' Laboratories, Inc. The fire hose on the starboard side was found to have holes and was leaking. Replace the hose to satisfaction of attending MI.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 29 May 2025
Resolved 29 May 2025
Resolution: Replaced fire hose
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 15 May 2025 Resolved
Except as otherwise provided in this section, it shall be the duty of the master to prepare and post emergency checkoff list in conspicuous place accessible to crew & passengers. No emergency instructions were available. 46 CFR 185.20-1(a) "OLD T"
Condition: Design Flaw
Action required: 10 - Deficiency Rectified
Due 29 May 2025
Resolved 29 May 2025
Resolution: Added emergency instructions
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 22 May 2024 Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances. Vessel has cracked gusset in the bilge two frames aft of the collision bulkhead. Repair to satisfaction of Marine Inspector (MI). Provide repair proposal prior to commencing work.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 June 2024
Resolved 5 June 2024
Resolution: Vessel welded crack.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 May 2024 Resolved
Except as provided otherwise in this subpart, all electrical equipment including motors, generators, controllers, distribution panels, etc., shall be dripproof protected. 220 V panel in second void aft of collision bulkhead is severely worn/holed. Repair/replace to satisfaction of MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 June 2024
Resolved 12 June 2024
Resolution: Installed new 220v hualer box/panel.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 22 May 2024 Resolved
The minimum capacity of the power fire pump shall be 50 gallons per minute at a pressure of not less than 60 pounds per square inch at the pump outlet. The pump outlet shall be fitted with a pressure gage. Fire pump pressure only reached 50 psi on gauge. Repair to satisfaction of MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 June 2024
Resolved 4 June 2024
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 22 May 2024 Resolved
A battery charger intended for connection to a commercial supply voltage shall employ a transformer of the isolating type. An ammeter that is readily visible shall be included in the battery charger circuit. Port and starboard battery banks wired in series do not have ammeter in the charging circuit. Install ammeter to satisfaction of MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 June 2024
Resolved 5 June 2024
Resolution: Vessel installed 2 new battery charges with amp meters.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 22 May 2024 Resolved
When a deck scuttle serves as a means of escape, it must not be less than 455 millimeters (18 inches) in diameter and must be fitted with a quick acting release and a holdback device to hold the scuttle in an open position. Deck scuttle for emergency exit from engine room cannot be opened from inside the space and does not have a hold back device. Install hatch opening and hold back devices to satisfaction of MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 June 2024
Resolved 7 June 2024
Resolution: Vessel installed opening device and chain on deck scuttle.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 22 May 2024 No resolution recorded
Except as provided in paragraphs (c) and (d) of this section and in § 170.200, the owner of a vessel must conduct a stability test of the vessel and calculate its vertical and longitudinal centers of gravity and its lightweight displacement. Vessel is currently undergoing three modifications. Vessel passenger restrictions are as follows until new stability test is completed after modifications: Exposed routes: Upper deck limited to 10 passengers. Main deck limited to 100 passengers. 110 total passengers. Partially Protected routes: Upper deck limited to 23 passengers. Main deck limited to 100 passengers. 123 total passengers.
Action required: 705 - Other - as specified
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 28 April 2023 Resolved
Each disposable hydrostatic release unit must be marked with an expiration date of two years after the date on which the unit is installed. EPIRB hydrostatic release expired October 2022. Trips with passengers limited to 3nm offshore until hydrostatic release is renewed to the satisfaction of the attending inspector. 46 CFR 185.740(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 1 May 2023
Resolution: replaced
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo ports and other similar openings
Issued 28 April 2023 Resolved
All vessels shall be provided with a satisfactory arrangement for draining any watertight compartments. Pin hole leak was found on starboard bilge overboard between hull and positive valve. Repair hole to the satisfaction of attending inspector. 46 CFR 182.25-1(a) "OLD-T"
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 May 2023
Resolution: welded
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 28 April 2023 Resolved
Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. No instructions for donning were posted. Post instructions to the satisfaction of attending inspector. 46 CFR 185.516
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 5 May 2023
Resolution: posted
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 28 April 2023 Resolved
Each child size life jacket must be stowed in a location that is appropriately marked and separated from adult life jackets so the child size life jackets are not mistaken for adult life jackets. Child life jacket stowage on port side top deck did not contain child sized life jackets. Relabel stowage to the satisfaction of the marine inspector. 46 CFR 180.78
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 May 2023
Resolved 5 May 2023
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 March 2023 Resolved
The owner or managing operator shall notify the cognizant OCMI as far in advance as possible whenever a vessel is...to undergo...alterations affecting the safety of the vessel, together with the nature of any...alterations contemplated. Two smaller generators (port and starboard)replaced the single generator (located at the centerline) that used to be on the vessel. Plan review conducted by the Marine Safety Center (MSC) is required for the 02 new generators. Once obtained, email the Project Number from the MSC to SDB. If the plans are approved by the MSC, contact SDB to schedule a Marine Inspector(s) to attend the vessel to operationally test the 02 generators.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 May 2023
Resolution: Plan review and verification complete.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 13 February 2023 Resolved
Each vessel must meet the applicable requirements in Subchapter S of this chapter. There have been weight changes since the purchase of the vessel, such as installation of 02 generators and changing the sewage tank. Submit a record of weight changes to the Marine Safety Center to determine if a new stability test is required. Cite: 46 CFR 177.13-1 "OLD T"
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 April 2023
Resolved 1 May 2023
Resolution: submitted
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 2 February 2023 Resolved
A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural exam at least once every two years. [name withheld] missed their DD/ISE date 30NOV2022. Must complete a DD/ISE prior to carrying passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 2 February 2023
Resolved 1 May 2023
Resolution: DD/ISE complete and credit given
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 10 May 2022 Resolved
MI observed all life floats that were daisy chained between each other were not long enough. when deployed the life float would be in contact with each other. Require VSL to make the connecting lines longer. 46cfr180.137(e)(3) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2022
Resolved 13 May 2022
Resolution: Life float connecting line were replace with longer line.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 10 May 2022 Resolved
MI observed a water light on the life float seal failed and took on water. Require VSl to replace seal. 46cfr180.175(d) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2022
Resolved 18 May 2022
Resolution: Waterlight has been replaced.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 10 May 2022 Resolved
MI observed no hatches at captive chains. Require VSL to attach captive chain to all hatches. 46cfr179.360(b) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2022
Resolved 1 June 2022
Resolution: o/o installed chain to all sctuttles.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 May 2022 Resolved
MI observed fuel shutoffs were not labeled. Require VSl to label the fuel shutoffs. 46cfr185.608 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2022
Resolved 13 May 2022
Resolution: Fuel shutoffs are not labeled.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 10 May 2022 Resolved
MI observed the port engine did not have guards over the fly wheel and alternator. Requiring to put a guard in place of all exposed and hazardous places. 46cfr177.35-15(a) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2022
Resolved 2 June 2022
Resolution: Recieved photo of installed rotating machiary guard
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 10 May 2022 Resolved
Mi observed no amp meter on any of the battery charges. Requiring VSl install amp meter or battery charger with AMP meter. 46cfr183.05-20(f) 50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2022
Resolved 22 June 2022
Resolution: Received photos of install amp meters on both battery chargers.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 May 2022 Resolved
MI observed no interlock switch on switch board preventing the shore tie power from coming on with the generator on line. Require interlocker for switch board to not be able to energize shore power and gen power at the same time. 46cfr183.01-10(a) 50C
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2022
Resolved 17 May 2022
Resolution: Interlock on panel installed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Bulwarks and freeing ports
Issued 10 May 2022 Resolved
Mi observed inside the accommodations area that there were holes/ cut outs made in the framing, allowing water in and possible trapping it in the accommodation area. Require VSl permanently seal those cut outs that will make it water tight not allowing water inside the accommodations area. 46cfr177.13-1 50C
Action required: 50 - Rectify deficiencies w/in 30 days
Due 9 June 2022
Resolved 1 June 2022
Resolution: openings are sealed with adhesive and screws.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 8 February 2022 Resolved
To maintaina valid Certificate of Inspection you must complete your annual inspection within the periods specified in 176.500(b)(1) and your Certificate of Inspeciton must be endorsed. Per 46 CFR 176.502, vessel shall not carry passengers until a satisfactory annual inspection is compeleted.
Action required: 705 - Other - as specified
Due 8 February 2022
Resolved 10 May 2022
Resolution: completed coi/new to zone inspection
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 28 September 2020 Resolved
All observed unsafe practices and hazardous situations be corrected. Hydraulic non-metallic piping for steering failed. Replace piping. 46 CFR 176.25-50 (Cite not listed in MISLE)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 October 2020
Resolution: Hydraulic hoses replaced meeting SAE J-1942 standard.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 28 September 2020 Resolved
Each vessel operating on an oceans route in warm water be provided life floats for 100% total persons on board. One 25-person life float unsatisfactory. Replace life float. Vessel is restricted to 75 total persons on board.
Action required: 705 - Other - as specified
Resolved 9 November 2020
Resolution: Replaced with a 22-man lifefloat. Manning will be reduced by 3 total persons.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 28 September 2020 Resolved
An adult life jacket must be provided for each person. One life jacket unsatisfactory. Replace life jacket. Full carriage of passengers is dependent on correction of item #2.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 October 2020
Resolved 6 October 2020
Resolution: Life jacket replaced.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 28 September 2020 Resolved
Vessel's current route requires an EPIRB. EPIRB battery is expired. Replace battery. Vessel is restricted to not more than 3 NM offshore until replaced.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 October 2020
Resolved 7 October 2020
Resolution: EPIRB and hydrostatic release replaced. Proof of registration provided.
09 - Working and Living Conditions › 092 - Working Conditions › Guards - fencing around dangerous machinery parts
Issued 28 September 2020 Resolved
Suitable guards shall be installed in way of all exposed machinery. Starboard engine PTO missing guard. Install guard.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 October 2020
Resolved 13 October 2020
Resolution: Machinery guard installed.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 28 September 2020 Resolved
All electrical installations shall be to the satisfaction of the [name withheld] room lighting receptacle junction box is loose; repair junction box. Operator console has dead-end wires; terminate properly. 46 CFR 183.01-15 (Cite not listed in MISLE)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 October 2020
Resolved 9 November 2020
Resolution: Corrected.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 28 September 2020 Resolved
Radio installations shall be in accordance with 47 CFR 80. Vessels over 20 meters require a Bridge-to-Bridge Certificate. Obtain certificate. 46 CFR 184.25-1 and 47 CFR 80.1001
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 October 2020
Resolved 6 October 2020
Resolution: Certificate issued by FCC technician.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 22 October 2019 Resolved
A vessel must carry adequate and up-to-date charts and Coast Guard Light List. Vessel did not maintain up-to-date chart corrections or light list. Provide chart corrections and light list.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 November 2019
Resolved 14 November 2019
Resolution: 14NOV2019: Master submitted pictures of updated charts w/ corrections, light list, and notice to mariners. Cleared 01 deficiency 01 deficiency remians
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 21 October 2019 Resolved
A penetration in a watertight bulkhead must be made watertight. Observed hydraulic line penetration through the collision bulkhead. Provide proof that the penetration is watertight.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 November 2019
Resolved 22 October 2019
Resolution: Master provided proof that the sealant used for the penetration was 3M 5200, which is CG approved.
05 - Radio Communications › N/A - No Subsystem › MF/HF Radio installation
Issued 21 October 2019 Resolved
Vessels operated beyond 20 nautical miles but not more than 100 nautical miles from the nearest land must be equipped with a VHF-DSC radiotelephone installation and a MF-DSC frequency transmitter. Both the vessel's VHF radios lacked DSC capability, as well as the SSB radio. Install 02 VHF-DSC radios and 01 MF-DSC radio. 47 CFR 80.905(a)(1) & (2).
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 November 2019
Resolved 27 November 2019
Resolution: Master submitted pictures of 02 new DSC capable VHF radios, and 01 new DSC capable VHF radio. FCC Radio technician certified radios were properly installed, and new Station Lincense was issued.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 15 October 2018 Resolved
A vessel of more than 65 feet must carry a minimum of three life buoys. Ring life buoy mounted outside of wheelhouse is unserviceable. Replace ring life buoy with one approved IAW 46 CFR 160.050.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2018
Resolved 15 November 2018
Resolution: New life ring purchased (160.150) and installed with vessel's name permanently marked.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 October 2018 Resolved
Electrical installations on vessels shall be such that the safety of paasengers, crew, and vessel from electrical hazards will be assured. Identified dead end cable STBD side engine room from electrical panel. Remove dead end cable.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2018
Resolved 15 November 2018
Resolution: Dead-end cable was removed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 15 October 2018 Resolved
Auxiliary machinery shall be suitable in type and design for the purpose intended. Identified plastic zip ties being used as a bracket. Install permanent bracket to secure generator exhaust outlet.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2018
Resolved 15 November 2018
Resolution: Permanent bracket was installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 October 2018 Resolved
Propulsion machinery shall be suitable for operation at constant marine load. Identified loose shaft packing bolts on STBD main engine. Tighten shaft packing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2018
Resolved 15 November 2018
Resolution: Shaft packing bolts were tightened.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 15 October 2018 Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel. Identified corrosion around access to sewage discharge valve on fantail. Submit repair proposal for review and approval.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 November 2018
Resolved 15 November 2018
Resolution: Temporary repair made. Permanent repairs to be made during drydock.
Communications › Radio Communications › EPIRB
Issued 13 November 2017 Resolved
Replace expired hydrostatic release for EPIRB.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 November 2017
Resolved 16 November 2017
Resolution: Received receipt of purchased EPIRB HRU. [name withheld] stated installed.
Electrical › Electrical Distribution System (service) › Wiring
Issued 13 November 2017 Resolved
Replace wiring to fresh water pump.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 November 2017
Resolved 17 November 2017
Resolution: Received e-mailed pictures of corrected wiring.
Lifesaving › Lifefloat › Float-free Link
Issued 13 November 2017 Resolved
Reconfigure weak-link on both painters for float-free arrangement.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 November 2017
Resolved 17 November 2017
Resolution: Received pictures via text message of properly installed float-free link.
Lifesaving › Lifejacket/PFD (General) › Condition
Issued 13 November 2017 Resolved
Repair 07 adult lifejackets and replace 01 adult lifejacket.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 13 November 2017
Resolved 30 January 2018
Resolution: Reapired and new lifejacket on board witnessed by MI.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 13 November 2017 Resolved
Re-stencil 02 liferings on main deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 November 2017
Resolved 31 January 2018
Resolution: Corrected and witnessed by MI.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 13 November 2017 Resolved
Replace flexible fuel line hose to generator.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 12 December 2017
Resolved 30 January 2018
Resolution: Repaired properly.
Engineering › Fuel Oil Service System › Piping
Issued 13 November 2017 Resolved
Install clamps to fuel lines to fuel pump on generator.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 November 2017
Resolved 30 January 2018
Resolution: Repaired properly.
Engineering › Steering Gear System › Rudder
Issued 13 November 2017 Resolved
Repair rudder installation to make rudder stops effective.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 12 December 2017
Resolved 25 October 2019
Resolution: Vessel's rudder shows no evidence of damage, therefore inspectors deemed the current rudder stops strong & effective, meeting 46 CFR 182.610
Construction/Loadline › Hull › Transverse Frame
Issued 20 September 2017 Resolved
Make permanent repairs to weld fractures found under stbd rudder bracing at frames. Crop/renew frame work. Send written repair proposal prior to starting work. Make rounds to inspect cracked welds prior to getting underway and upon return from sea. Log rounds/imspections in log book.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 8 January 2018
Resolved 9 February 2018
Resolution: Repairs tested and inspected satisfactory.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 20 October 2016 Resolved
Vessel must have 02 alcohol test stripes on board. Vessel must be able to test within 2 hours of incident.
Condition: Invalid
Action required: 705 - Other - as specified
Due 27 October 2016
Resolved 24 October 2016
Resolution: Owner provided pictures of new testing stripes.
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 20 October 2016 Resolved
Passenger count on top deck must be marked.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 October 2016
Resolved 27 October 2016
Resolution: Upper deck passenger count was labeled.
Stability › Watertight Integrity › General
Issued 20 October 2016 Resolved
Hydraulic line penetration through collision bulkhead must be watertight.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 October 2016
Resolved 27 October 2016
Resolution: Crew sealed the bulkhead penetration.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 20 October 2016 Resolved
Lifejacket stowage must be marked.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 October 2016
Resolved 27 October 2016
Resolution: Crew labeled PFD stowage.
Engineering › Diesel Engine (propulsion-electric) › Crankshaft
Issued 20 October 2016 Resolved
Alternator belt on port side engine must be replaced.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 October 2016
Resolved 27 October 2016
Resolution: Belt was renewed.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 20 October 2016 Resolved
Hotstart junction box on port engine must be replaced.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 October 2016
Resolved 27 October 2016
Resolution: The junction box cover was replaced.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.