ISLAND VIC is a 1976 passenger vessel (inspected). The Coast Guard has recorded 85 inspections since 1984, most recently in January 2024, along with 190 deficiencies — 6 with no resolution recorded —, 3 operational controls and 1 casualty investigation in 2003.
Records from 1984 to 2024. Most recent: inspection, 2 January 2024.
- Built
- 1976
- Last inspected
- 2 January 2024
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 190 recorded · 6 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 1 investigation · 2003
Identity
578747
WDH5316
49011
Flag
UNITED STATES
366511000, 367319280, 369127000 (licence lapsed)
Maury page id
psix-49011
Inspections, by type
…with no type recorded21
Years with a record
32 calendar years (1984–2024)
The 85 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Tonnage as PSIX records it94 - Regulatory (Subpart C or D), Gross Ton
64 - Regulatory (Subpart C or D), Net Ton
64 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
WDH5316MMSI 366511000 · expired · compulsorily equipped · granted 11 June 2014, cancelled 17 August 2024
WDE2018MMSI 367319280 · expired · compulsorily equipped · granted 23 October 2007, cancelled 26 May 2018
WDA8142MMSI 369127000 · expired · compulsorily equipped · granted 8 May 2002, cancelled 14 July 2012
WYF7143MMSI not assigned · expired · compulsorily equipped · granted 13 February 1997, cancelled 17 March 2007
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 85
2 January 2024
Administrative Inspection
Administrative · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 7844508
17 July 2017
Deficiency Check · Examination of Repairs · Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6208622
13 June 2017
In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6173270
16 May 2017
Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6148219
15 March 2017
In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 6104602
8 August 2016
In-Service Inspection · Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5967340
2 May 2016
Type not recorded
No type recorded · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5894466
10 August 2015
Welding Related Inspections Qualification Testing · Internal Structural Exam · Deficiency Check · Drydock Exam · Examination of Repairs
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 5211500
19 June 2014
COI Inspection · Deficiency Check
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 4892955
4 June 2012
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4333774
30 May 2012
Administrative Inspection
Administrative · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4329594
30 January 2012
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4234719
18 January 2012
Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4227510
10 January 2012
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4222151
3 January 2012
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4217636
30 December 2011
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4216075
30 December 2011
In-Service Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4216101
23 December 2011
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4213129
30 September 2011
Type not recorded
No type recorded · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 4160640
12 November 2010
COI Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3889685
27 September 2010
Examination of Repairs · Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Marine Safety Unit Saint Thomas · USCG Southeast District (CGD-SE) · Activity 3860442
3 September 2010
Damage Survey
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3841069
15 December 2009
Deficiency Check · Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3651175
7 November 2008
Hull Examination · Internal Structural Exam
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3364075
7 November 2008
Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 3371991
20 July 2007
Deficiency Check · COI Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2998566
16 October 2006
Deficiency Check · Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2801691
23 August 2006
Hull Examination · Internal Structural Exam · Load Line/Change of Employment
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2734827
19 October 2005
Annual Inspection · Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2518032
20 October 2004
Annual Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 2224950
22 July 2004
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2141190
14 May 2004
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 2068908
21 July 2003
Re-Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1852691
1 May 2003
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1784138
25 March 2003
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1762909
25 March 2003
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1813046
5 December 2002
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1714726
24 October 2002
Damage Survey
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1695977
31 August 2001
Initial Certification
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1480968
9 May 2000
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1049373
30 June 1997
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1114454
9 December 1996
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1377894
4 September 1996
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1251823
22 August 1996
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 201966
22 August 1996
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 757658
9 May 1996
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1083763
21 December 1995
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1402162
31 October 1995
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1462439
17 March 1995
Examination of Repairs
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1438283
25 January 1995
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1134024
30 June 1994
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1136405
16 June 1994
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1423960
1 October 1993
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 845749
4 August 1993
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 34980
12 July 1993
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1154367
2 July 1993
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 846626
10 June 1993
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1389664
7 April 1993
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 840705
24 February 1993
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1407110
28 January 1993
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 827450
7 December 1992
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 962185
14 July 1992
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 946304
22 June 1992
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 948803
13 June 1992
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1270606
12 June 1992
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 959427
11 June 1992
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1269806
5 November 1991
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1251934
24 September 1991
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1248744
11 June 1991
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1246310
14 May 1991
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1239865
29 January 1990
Drydock Extension
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 917795
6 October 1989
Administrative
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1329633
22 September 1989
Damage Survey
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 897539
1 May 1989
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1203313
6 March 1989
Excursion Permit
Administrative · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1198134
11 May 1988
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1044216
7 March 1988
Hull Examination
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1044215
19 August 1987
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1005719
11 May 1987
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1005926
12 May 1986
Credit Drydock · COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 998426
27 December 1985
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1303579
15 November 1985
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 995708
18 July 1985
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1291350
17 June 1985
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1287304
10 December 1984
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1284710
Deficiency record · 190
Construction/Loadline › Hull › Bottom Plating
Issued 20 July 2017
No resolution recorded
Work List: 3 holes found in bottom plating in way of starboard rudder. Crop and renew plate.
Construction/Loadline › Hull › Bottom Plating
Issued 17 July 2017
Resolved
Work List: Crop and renew wasted metal on both aft corners of vessel. Expose internal baffles and transom plate in stern void until good metal is reached and crop and renew wasted plate as needed.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 17 July 2017
No resolution recorded
Work list: Replaced wasted railing port side midship
Engineering › Bilge Water Management System › Piping
Issued 17 July 2017
Resolved
Work List: Replace wasted bilge pickup piping in port side lazarette.
Construction/Loadline › Hull › Transverse Frame
Issued 17 July 2017
Resolved
Work List: Crop and renew wasted angle beams in space aft of superstructure, second to aft bay, keel stiffeners.
Construction/Loadline › Hull › Bracket
Issued 17 July 2017
No resolution recorded
Work List: Replace pad eyes on vessel bulwarks aft where ramp safety chains attach due to elongation of pad eye holes.
Construction/Loadline › Hull › Bracket
Issued 17 July 2017
No resolution recorded
Work List: Replace ramp hinges
Construction/Loadline › Hull › Stiffener
Issued 17 July 2017
Resolved
Work List: Replace wasted transverse flat bar stiffeners on ramp.
Construction/Loadline › Hull › Transverse Frame
Issued 17 July 2017
Resolved
Work List: Replace wasted flange on transverse support in way of starboard rudder support assembly in starboard lazarette.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 17 July 2017
No resolution recorded
Work List: Provide specifications on existing and replacement shafts, propellers, and bearings.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 17 July 2017
No resolution recorded
Work List: Provide information for repowering, including HP. RPM and Weight for both existing and replacement engines.
Engineering › Bilge Water Management System › Not Operational
Issued 13 June 2017
Resolved
Demonstrate proper operation of bilge system to include all bilge pickups, manifold labelling, and crew knowledge prior to carrying passengers or cargo.
Communications › Alarms/Indicators › Bilge Alarm
Issued 13 June 2017
Resolved
Demonstrate proper operation of all bilge high level alarms prior to carrying passengers or cargo.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 13 June 2017
Resolved
Remove excess oil from all bilge wells prior to carrying passengers or cargo.
Engineering › Bilge Water Management System › Interface Detector
Issued 15 March 2017
Resolved
Remove excess oil and water in engine room bilge and show proper operation of bilge high level alarm. High level alarm was found disabled in the "off" position.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 15 March 2017
Resolved
Provide current registration or documentation.
Communications › Radio Communications › EPIRB
Issued 15 March 2017
Resolved
Provide current NOAA EPIRB registration.
Fire Fighting › Fire Main › Condition
Issued 15 March 2017
Resolved
Crop and renew fire main where bolt slug is inserted.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 15 March 2017
Resolved
Provide complete and current first aid kit.
Electrical › Lighting (emergency) › Battery Operated Lantern
Issued 15 March 2017
Resolved
Show proper operation of port emergency lighting,
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 15 March 2017
Resolved
Replace starboard outboard engine exhaust lagging.
Electrical › Electric Supply System (service) › Battery Installation
Issued 15 March 2017
Resolved
Provide cover for battery box.
Electrical › Electric Supply System (service) › Battery Installation
Issued 15 March 2017
Resolved
Remove excess batteries or provide battery box.
Lifesaving › Lifefloat › Paddle
Issued 15 March 2017
Resolved
Provide and secure paddles for all life floats.
Engineering › Shafting/Propeller Arrangements › Stern Tube Lubrication/Sealing
Issued 15 March 2017
Resolved
Slow excess water ingress from port shaft packing.
Fire Fighting › Fire Pumps › Power Source
Issued 22 November 2016
Resolved
CG-835s issued 08NOV16 and due 15NOV16 were not rectified. Vessel is prohibited from carrying passengers or cargo until CG-835s #'s 1, 3, 4, 7, 13, & 16 are corrected.
Documentation › Certificates/Documents › Stability Letter
Issued 9 November 2016
Resolved
During inspection it was noted that vessel regularly carries additional vehicles of lesser weight, and regularly utilizes the ballast tank to control trim due to draft restrictions. Prior to due date, submit to USCG MSC request for resolution by amending current stability letter based on previous calculations or submitting procedures for new stability calculations to reflect intended vsl operation
Fire Fighting › Fire Pumps › Power Source
Issued 8 November 2016
Resolved
Replace belt and demonstrate operation of port inboard fire pump.
Engineering › Diesel Engine (propulsion-reduction gear) › Exhaust Manifold
Issued 8 November 2016
Resolved
Replace missing exhaust lagging on port outboard main engine.
Accommodation/Occupational Safety › Ventilation › General
Issued 8 November 2016
Resolved
Repair or replace louver on port exhaust.
Accommodation/Occupational Safety › Ventilation › General
Issued 8 November 2016
Resolved
Close openings and show integrity of port engine room exhaust ducts.
Electrical › Lighting (service) › Lighting Fixture
Issued 8 November 2016
Resolved
Replace missing globes and guards on engine room lighting fixtures.
Electrical › Electric Generation Source (service) › Generator Cable
Issued 8 November 2016
Resolved
Make generator battery charging cable permanent installation.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 8 November 2016
Resolved
Properly secure portable air compressor on starboard side of engine room.
Communications › Radio Communications › EPIRB
Issued 8 November 2016
Resolved
Complete EPIRB testing log for tests every 30 days.
Communications › Public Address System › Loudspeaker
Issued 8 November 2016
Resolved
Show proper operation of loud hailer/public address system.
Documentation › Markings/Placards › Garbage Placard
Issued 8 November 2016
Resolved
Replace garbage placard with current one.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 8 November 2016
Resolved
Provide current certificate of documentation on board. Currently vessel as an expired COD and email eveidence of submission for a new one.
Fire Fighting › Fire Pumps › Gears
Issued 8 November 2016
Resolved
Replace clutch and show proper operation of starboard side inboard fire pump.
Fire Fighting › Fire Main › Condition
Issued 8 November 2016
Resolved
Repair pinhole in bilge/fire manifold. Make permanent repairs to starboard bilge/fire manifold. Crop to good metal and renew.
Communications › Alarms/Indicators › Bilge Alarm
Issued 8 November 2016
Resolved
Show proper operation of bilge high level alarms.
Operations/Management › Drills/Instruction › Abandon Ship
Issued 8 November 2016
Resolved
Demonstrate fire and man overboard drills to attending USCG inspector.
Engineering › Lubricating Oil Service System › Gauge
Issued 8 August 2016
Resolved
Pilothouse gauges for RPM, L/O Pressure and J/W temp not functioning. Until functioning, maintain a manned engine space.
Engineering › Fuel Oil Storage/Transfer System › Ventilation
Issued 8 August 2016
Resolved
Replace flame screens on fuel vents with 30 x 30 mesh.
Construction/Loadline › Hull › Bottom Plating
Issued 10 August 2015
Resolved
Crop and renew wasted and holed bottom plating starboard side mid-ship.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 10 August 2015
Resolved
Recondition bent propeller blades.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 10 August 2015
Resolved
Refit port inboard shaft bearing where backed out.
Construction/Loadline › Hull › Side Shell
Issued 10 August 2015
Resolved
Crop and renew port aft side shell where wasted and holed.
Construction/Loadline › Structures › Scupper
Issued 10 August 2015
Resolved
Fore Peak: Crop and renew wasted and holed piping port and starboard sides as identified.
Construction/Loadline › Structures › Scupper
Issued 10 August 2015
Resolved
Crop and renew wasted and holed drain piping starboard side forward and port side forward and aft.
Deck/Cargo › Ballast › Piping
Issued 10 August 2015
Resolved
Crop and renew wasted and holed ballast piping in the #2 center void compartment
Engineering › Bilge Water Management System › Piping
Issued 10 August 2015
Resolved
Crop and renew all identified bilge piping where wasted and holed.
Engineering › Bilge Water Management System › Piping
Issued 10 August 2015
Resolved
Crop and renew wasted and holed bilge piping in the center lazerette space where wasted and holed.
Deck/Cargo › Holds/Tanks › Ventilation Intake Trunking
Issued 10 August 2015
Resolved
Make repairs to diamond plate ventilation cover, starboard side main deck where damaged.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 24 July 2014
Resolved
Prove fixed CO2 fire extinguishing system can automatically shut down power ventilation and engines. Also, prove operation of installed time delay, siren and ventilation closures. Provide servicing report.
Engineering › Bilge Water Management System › Pump
Issued 24 July 2014
Resolved
Prove proper operation of bilge pumps; prove secondary bilge / fire pump can pump bilge water overboard.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 24 July 2014
Resolved
Provide copy of NOAA EPIRB registration and place decal on EPIRB.
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 24 July 2014
Resolved
Replace discharged B-II portable fire extinguisher on main deck.
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 24 July 2014
Resolved
Mount portable fire extinguisher in lower forward compartment, port side.
Lifesaving › Lifefloat › Paddle
Issued 24 July 2014
Resolved
Provide 2 paddles for life floats, 4' in length.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 24 July 2014
Resolved
Provide permanent draft marks, starboard side aft.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Remote Pulls
Issued 24 July 2014
Resolved
Replace missing break glass hammer for CO2 system.
Construction/Loadline › Hull › Bottom Plating
Issued 4 June 2012
Resolved
Drydock vessel and make hull ready to assess hull condition.
Construction/Loadline › Hull › Bottom Plating
Issued 4 June 2012
Resolved
Conduct forth Special Periodical Survey for belt gauging; IAW ABS Steel Rules for vessels under 90 mts in precense of a USCG Marine inspector.
Deck/Cargo › Cargo Stowage › General
Issued 4 June 2012
Resolved
Distinctly mark cargo deck with painted lines to indicate the vehicle runways and aisles spaces.
Construction/Loadline › Structures › Deck Plating
Issued 18 January 2012
Resolved
Make proper repairs to the wasted area of the aft stbd deck.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 3 January 2012
Resolved
Properly repair and correct all exhaust leaks located on both port & stbd generators and make ready for inspection.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 3 January 2012
Resolved
Remove all lagging on al 4 MDE; address/correct exhaust leaks due to faulty gaskets and make ready for inspection prior installing lagging.
Engineering › Sea-water System (primary cooling) › Piping
Issued 3 January 2012
Resolved
Replace both port & stbd sides generator's exhaust cooling injection hoses.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 3 January 2012
Resolved
Clean all excess oil that is covering both generators to prevent fires.
Engineering › Bilge Water Management System › Piping
Issued 30 December 2011
Resolved
Properly repair/ correct bilge pump piping water leak.
Operations/Management › Ballast Water Managment › Ballast Water Discharge
Issued 30 December 2011
Resolved
Clean all bilges and Main Diesel engines from oil and debris to prevent fires.
Engineering › Diesel Engine (propulsion-direct drive) › Piping (exhaust)
Issued 30 December 2011
Resolved
Properly repair exhaust leak on MDE # 2, portside prior carrying passengers.
Engineering › Diesel Engine (propulsion-reduction gear) › Block
Issued 3 September 2010
Resolved
Prove proper operation of all 4 MDE to the satisfaction of attending USCG Marine Inspector prior to carrying passengers or cargo.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 3 September 2010
Resolved
Complete USCG annual inspection prior to carrying passengers or cargo.
Construction/Loadline › Hull › Bottom Plating
Issued 3 September 2010
Resolved
Place vessel in dry-dock to address major hull plate wastage and water intrusion through hull.
Construction/Loadline › Structures › Deck Plating
Issued 3 September 2010
Resolved
Complete dry dock inspection for cg marine inspector prior to conducting the annual inspection.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 15 December 2009
Resolved
Provide approved alcohol test kit on-board or within 2 hours reach.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 15 December 2009
Resolved
Proove proper maintenence was performed on lifesaving equipment and make proper entries in log.
Operations/Management › Drills/Instruction › Not Conducted
Issued 15 December 2009
Resolved
Proove that required drills were performed and properly logged.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 15 December 2009
Resolved
Properly insulate all non water jacketed exhaust piping.
Engineering › Bilge Water Management System › Strainer
Issued 15 December 2009
Resolved
Provide proper strainers for all bilge suctions.
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 15 December 2009
Resolved
Provide donning placards for life jackets.
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 15 December 2009
Resolved
Repair all failed retro reflective tape on life jackets. Vessel is restricted to 72 passengers until complete.
Construction/Loadline › Hull › Side Shell
Issued 15 December 2009
Resolved
Make proper repairs to port side wasted hull plating after providing approved repair proposal.
Construction/Loadline › Hull › Bottom Plating
Issued 15 December 2009
Resolved
Clean engine room bilges and make ready for inspection of interior hull plating.
Fire Fighting › Fire Pumps › Pressure
Issued 15 December 2009
Resolved
Ensure PSI on fire pump meets 181.10-1(c) of Old T regs. Witness operational test.
Lifesaving › Hand Flares › Not on Board
Issued 20 July 2007
Resolved
Provide 2 missing orange smoke flares.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 20 July 2007
Resolved
Provide mechanical means of securing rescue ladder to railing.
Operations/Management › Drug and Alcohol Testing › Testing, Random
Issued 16 October 2006
Resolved
Provide evidence of crew enrolled in random drug testing program.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 16 October 2006
Resolved
Provide missing service generator machinery guard.
Engineering › Diesel Engine (propulsion-direct drive) › Crankshaft
Issued 16 October 2006
Resolved
Repair bridge inoperative RPM gauge.
Lifesaving › Lifefloat › Lifeline
Issued 16 October 2006
Resolved
Service lifefloats as to repair rotted lifelines
Lifesaving › Embarkation Appliances/Stations › Steps
Issued 16 October 2006
Resolved
Provide lightweight rescue platform (aluminum ladder vs Steel) for man overboard.
Lifesaving › Embarkation Appliances/Stations › Handholds
Issued 16 October 2006
Resolved
Provide missing rescue bow hook.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 12 September 2006
Resolved
Vessel to conduct annual exam prior to carriage of passengers upon returning to homeport.
Fire Fighting › Portable CO2 Fire Extinguisher › Mounting Bracket
Issued 23 August 2006
Resolved
Replace all wasted fire extinguisher brackets. Have Fire Systems serviced.
Engineering › Bilge Water Management System › Piping
Issued 23 August 2006
Resolved
Vessel to prove proper operation of fwd bilge suction valve.
Documentation › Safety/Response Plans/Programs › General Arrangement Plans
Issued 23 August 2006
Resolved
Prior to departing Santo Domingo vessel rep t email photos of all closed man hole covers. Repairs to three holes in main deck, and proper installation of all man/port hole covers as listed on worklist.
Personnel › Training › First Aid/CPR
Issued 19 October 2005
Resolved
Provide evidence of CPR course for crew.
Construction/Loadline › Structures › Superstructure
Issued 19 October 2005
Resolved
Renew broken stbd window in pilothouse.
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 19 October 2005
Resolved
Provide operational lifefloat light.
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 19 October 2005
Resolved
Provide lifejacket donning placard on 2nd floor.
Fire Fighting › Fire Pumps › Power Source
Issued 19 October 2005
Resolved
Stencil fire pump activation switch on deck.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 20 October 2004
Resolved
Renew defective light on stbd lifering at wheel house.
Operations/Management › Drug and Alcohol Testing › Employee Coverage
Issued 20 October 2004
Resolved
Provide random drug testing documentation.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 20 October 2004
Resolved
Renew defective stbd nav light.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 20 October 2004
Resolved
Stencil engineroom remote fuel shutdowns properly.
Engineering › Bilge Water Management System › Interface Detector
Issued 20 October 2004
Resolved
Renew defective light on high bilge water alarm in pilothouse.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 20 October 2004
Resolved
RENEW DEFECTIVE STBD RUNNING LIGHT.
Construction/Loadline › Structures › Deck Plating
Issued 22 July 2004
Resolved
Crop and renew deck plate sections of 5' x 12' x 3/8" at main cargo deck.
Construction/Loadline › Hull › Side Shell
Issued 22 July 2004
Resolved
Crop and renew section of port side shell 8' x 10'. By CO2 room.
Construction/Loadline › Hull › Hull Plating
Issued 22 July 2004
Resolved
Crop and renew the two aft corners on the rudder room. Crop and renew to new insert of 3' x 4'.
Electrical › Electric Generation Source (service) › Generator
Issued 21 July 2003
Resolved
Demonstrate proper operation of both generators overspeed shutdowns to satisfaction of attending marine inspector.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 21 July 2003
Resolved
Provide new frecuency meter.
Electrical › Electric Generation Source (service) › Generator
Issued 21 July 2003
Resolved
Repair Oil intake pipping and secure minor oil leak underneath STBD generator.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 21 July 2003
Resolved
Provide wood handle bar on main switchboard.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 21 July 2003
Resolved
Provide UV resistant life line"black"
Lifesaving › Buoyant Apparatus
Issued 21 July 2003
Resolved
Provide two paddles per lifefloat.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 21 July 2003
Resolved
Provide 2003 copy of tide and current tables.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 21 July 2003
Resolved
Provide 2003 copy of light list.
Navigation › Piloting/Steering › Local Notices to Mariners
Issued 21 July 2003
Resolved
Provide latest copies of the notices to mariners.
Fire Fighting › Fire Pumps
Issued 24 October 2002
Resolved
Replace fire pumps seals, pumps are severely leaking. LEGACY COMPONENT DESC: Seals
Engineering › Diesel Engine (propulsion-direct drive)
Issued 24 October 2002
Resolved
Provide evidence that fuel lines from the filter to the engines are USCG approved hoses. If Evidence is not provided hoses must be replaced by 15 JAN 02 LEGACY COMPONENT DESC: Fuel Hoses
Engineering › Generator (propulsion-electric)
Issued 24 October 2002
Resolved
Repair leak on the port side generator fuel filter. Prior to 15 JAN 02. LEGACY COMPONENT DESC: Filter
Engineering › Steering Gear System
Issued 24 October 2002
Resolved
Provide evidence that hydraulic hoses for the steering system are USCG approved hoses. If Evidence is not provided hoses must be replaced by 15 JAN 02 LEGACY COMPONENT DESC: Hydraulic hoses
Construction/Loadline › Hull
Issued 24 October 2002
Resolved
Replace damaged plating in bow, port side of the A-Strake. LEGACY COMPONENT DESC: Bottom Plating
Lifesaving › Lifejacket/PFD (General)
Issued 31 August 2001
Resolved
Passengers are limited to 140 until 9 lifejackets are installed that meet either 46 CFR 160.055, 160.002, or 160.005. Provide a faxed copy of the shipment receipt to [phone withheld]. LEGACY COMPONENT DESC: Quantity
Lifesaving › Lifejacket/PFD (General)
Issued 31 August 2001
Resolved
Install lifejacket lockers on bow that adequately hold 72 lifejackets. LEGACY COMPONENT DESC: Storage
Personnel › Training
Issued 31 August 2001
Resolved
Provide evidence that master has completed dangerous cargo handeling training prior to carying hazardous cargo. LEGACY COMPONENT DESC: Cargo Safety
Lifesaving
Issued 9 December 1996
Resolved
NO LATER THAN 11 MARCH, 1997, INSTALL ON BOARD IN A FLOAT FREE ARRANGEMENT,A FCC ACCEPTED, CATAGORY 1, 406MHz EPIRB.
Construction/Loadline
Issued 16 June 1994
Resolved
REPAIR 3/8" DIAMETER HOLE IN AFTER ENGINE ROOM BULKHEAD APPROXIMATELY 6' OUTBOARD OF CENTERLINE NEAR OVERHEAD. ENGINE ROOM TO BE DETERMINED SAFE FOR HOTWORK BY SHIPYARD COMPETENT PERSON PRIOR TO COMMENCING WORK.
Electrical
Issued 16 June 1994
Resolved
REINSTALL BOTTOM COVER PLATE ON CONDUIT JUNCTION BOX IN SEWAGE SPACE.
Lifesaving
Issued 16 June 1994
Resolved
PROPERLY MARK PORT AND STARBOARD EMERGENCY FUEL SHUT OFF VALVES.
Electrical
Issued 16 June 1994
Resolved
RENEW ARMORED ELECTRICAL CABLE OVER PORT, OUTBOARD MAIN ENGINE.
Construction/Loadline
Issued 16 June 1994
Resolved
CROP OUT AND RENEW 18" X 6" SECTION OF RUB RAIL AND 18" X 18" SECTION OF SIDE SHELL, PORT SIDE APPROXIMATELY 1' FORWARD OF AFTER BULKHEAD-PORT, FORWARD BALLAST TANK.
Fire Fighting
Issued 16 June 1994
Resolved
HAVE 7 B-II AND 1 B-I PORTABLE FIRE EXTINGUISHERS SERVICED BY AN ACCEPTED FACILITY.
Fire Fighting
Issued 16 June 1994
Resolved
RENEW BRACKETS FOR AFT PORT AND STARBOARD DRY CHEMICAL FIRE EXTINGUISHERS IN PASSENGER AREA.
Fire Fighting
Issued 16 June 1994
Resolved
RENEW BRACKET FOR 1 BII CARBON DIOXIDE EXTINGUISHER IN ENGINE ROOM.
Engineering
Issued 16 June 1994
Resolved
RENEW EXHAUST INSULATION IMMEDIATELY AFTER EXHAUST MANIFOLDS ON ALL FOUR (4) MAIN ENGINES.
Construction/Loadline
Issued 16 June 1994
Resolved
PROPERLY SCALE AND PRESENT FOR INSPECTION BOTTOM AND SIDE PLATING, LONGITUDINAL AND TRANSVERSE FRAMES IMMEDIATELY ADJACENT TO BOTH PORT AND STARBOARD MAIN ENGINE EXHAUST TUBES.
Lifesaving
Issued 10 June 1993
Resolved
Install drip proof covers over battery boxes in machinery space.
Electrical
Issued 10 June 1993
Resolved
Properly dead end or remove dead end wiring below operating station in pilot house.
Navigation
Issued 10 June 1993
Resolved
Have magnetic compass calibrated and provide proper compass deviation card.
Documentation
Issued 7 April 1993
Resolved
Provide the Coast Guard Marine Safety Center with calculations demonstrating that the vessel has adequate stability for 129 passengers andcrew.
Construction/Loadline
Issued 11 June 1992
Resolved
Repair leak in wheelhouse located on port side, bottom of window._x001C_ _x001C_ _x001C_ _x001C_
Electrical
Issued 11 June 1992
Resolved
Renew electrical wiring for mast navigational lights.
Fire Fighting
Issued 11 June 1992
Resolved
Provide proper hanger for firemain piping above port/stbd inboard MDE's.
Engineering
Issued 11 June 1992
Resolved
PROVE PROPER OPERATION OF ALL ENGINE THROTTLES FOR PROPER ADJUSTMENT.
Engineering
Issued 11 June 1992
Resolved
PROVE PROPER OPERATION OF ALL ENGINE TACHOMETERS ON THE BRIDGE.
Lifesaving
Issued 11 June 1992
Resolved
Make permanent repairs to rescue ladder. Make rails wide enough for anyoneto be able to safely and easily get down between.
Fire Fighting
Issued 11 June 1992
Resolved
Provide proper brackets for all fire extinguishers on the vessel.
Accommodation/Occupational Safety
Issued 11 June 1992
Resolved
Provide grills over port/stbd deck drains in fwd passeger area._x001C_ _x001C_ _x001C_ _x001C_
Documentation
Issued 11 June 1992
Resolved
Provide copy of the International Rules of the Road._x001C_ _x001C_ _x001C_ _x001C_
Navigation
Issued 11 June 1992
Resolved
Provide stern light that has 135 deg. arc of visibility._x001C_ _x001C_ _x001C_ _x001C_
Accommodation/Occupational Safety
Issued 11 June 1992
Resolved
Replace port side deck drain beneath the bridge wing in way of fwd pax area.
Electrical
Issued 11 June 1992
Resolved
Remove antenna and antenna lead no longer in service on the pilot house._x001C_ _x001C_ _x001C_ _x001C_
Accommodation/Occupational Safety
Issued 11 June 1992
Resolved
Crop and renew upper ladder step in pilot house.
Accommodation/Occupational Safety
Issued 11 June 1992
Resolved
Renew deck drain pipe on stbd side of pilot house.
Electrical
Issued 11 June 1992
Resolved
Renew electrical wiring to port/stbd navigational sidelights._x001C_ _x001C_ _x001C_ _x001C_
Electrical
Issued 11 June 1992
Resolved
properly install VHF-FM antenna so as to eliminate loose hanging wire._x001C_ _x001C_ _x001C_ _x001C_
Fire Fighting
Issued 11 June 1992
Resolved
Repair leak on the port main fire pump.
Fire Fighting
Issued 11 June 1992
Resolved
Repair leak on port fire main pump.
Accommodation/Occupational Safety
Issued 11 June 1992
Resolved
Make permanent repairs to the two broken seats located on stbd. side of theupper passenger deck. Until this time the vessel is limited to 124 passengers.
Electrical
Issued 11 June 1992
Resolved
Prove proper operation of RPM gauge on stbd. generator.
Construction/Loadline
Issued 11 June 1992
Resolved
Crop and renew deck inserts on main deck over the main engines.
Engineering
Issued 11 June 1992
Resolved
Provide proper mount for stbd inboard MDE Morse control.
Electrical
Issued 11 June 1992
Resolved
Remove dead end wire cable located at aft bulkhead of the fwd passenger_x001C_ area.
Lifesaving
Issued 11 June 1992
Resolved
Provide guards on pulley assemblies for fire pumps and generators.
Electrical
Issued 11 June 1992
Resolved
Install globes and guards on all engineroom lighting.
Engineering
Issued 11 June 1992
Resolved
Renew exhaust lagging as needed on port outboard engine.
Accommodation/Occupational Safety
Issued 11 June 1992
Resolved
Replace all broken windows in pilothouse.
Construction/Loadline
Issued 11 June 1992
Resolved
Properly label the homeport and name of vessel on the stern._x001C_ _x001C_ _x001C_ _x001C_
Electrical
Issued 11 June 1992
Resolved
Remove dead end wiring from on top of pilot house roof.
Documentation
Issued 24 September 1991
Resolved
VESSEL IS LIMITED TO 350 TOTAL PERSONS UNTIL SUCH IME AS A STABILITY TEST IS COMPLETED FOR THE NUMBER OF PASSENGERS THE PORTS AUTHORITY INTENDS TO CARRY.
Fire Fighting
Issued 11 June 1991
Resolved
REPAIR MAIN DECK PORT AND STARBOARD FIREPLUGS SO HOSE DOES NOT KINK AT STATION WHILE UNDER PRESSURE.
Engineering
Issued 11 June 1991
Resolved
MAKE ADJUSTMENTS TO BRIDGE ENGINE CONTROLS AND PROVE PROPER OPERATION.
Fire Fighting
Issued 11 June 1991
Resolved
PROVIDE A BRACKET OR OTHER SUFFICIENT TIE DOWN DEVICE FOR THE B-V DRY CHEMICAL EXTINGUISHER ON THE MAIN DECK IAW 46CFR 181.30-12.
Electrical
Issued 11 June 1991
Resolved
BLANK OFF ALL OPENINGS IN CIRCUIT BREAKER PANELS WHERE BREAKERS HAVE BEEN REMOVED AND LABEL ALL INSTALLED BREAKERS FOR THEIR PROPER SERVICE.
Navigation
Issued 11 June 1991
Resolved
PROVE PROPER OPERATION OF INSTALLED AIR HORN.
Lifesaving
Issued 11 June 1991
Resolved
INSTALL NEW 100 FOOT PAINTER AND WEAKLINK ON BOTH PORT AND STARBOARD FLOAT FREE BOUYANT APPARATUS STATIONS IN ACCORDANCE WITH 46CFR 180.20-1.
Electrical
Issued 11 May 1987
Resolved
REPLACE MISSING GLOBES AND GLOBE GUARDS IN ENGINE ROOM
Construction/Loadline
Issued 12 May 1986
Resolved
RENEW PORT SIDE BULWARK BRACKETS # 9 AND 11
Engineering
Issued 12 May 1986
Resolved
RENEW VENT FORWARD OF REMOTE FUEL OIL SHUTOFF VALVES.
Engineering
Issued 12 May 1986
Resolved
RENEW VENT ON AFTER SIDE OF ENGINEROOM HATCH.
Construction/Loadline
Issued 12 May 1986
Resolved
RENEW WASTED TOW RAIL.
Engineering
Issued 12 May 1986
Resolved
RENEW MAIN ENGINES EXHAUST INSULATION.
Construction/Loadline
Issued 12 May 1986
Resolved
COMPLETE INSTALLATION OF HAND RAILS ON MAIN DECK.
Fire Fighting
Issued 12 May 1986
Resolved
REPAIR PORT FIRE PUMP.
Construction/Loadline
Issued 12 May 1986
Resolved
REPAIR ENGINEROOM HATCH.
Casualty record · 1
25 March 2003Routine · role: Cargo Recipient · activity 1813046
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Recorded names · 1
ISLA GRANDE (2003). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.