MAURY USCG vessel records
← All vessels

FRIO HELLENIC

Built
1998
Last inspected
29 July 2022
Documentation
No record in the NVDC file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 4 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Refrigerated Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 29 July 2022
Operational controls None recorded without a removal date
Years with a record 2 calendar years (2021–2022)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9081679
491103
Flag
PANAMA
Maury page id
psix-491103

Documentation record

Tonnage as PSIX records it9997 - Convention (Subpart B), Gross Ton
11072 - Dead Weight, Metric Ton
5567 - Convention (Subpart B), Net Ton
17592 - Displacement, Metric Ton
9997 - Simplified, Gross Ton
5567 - Simplified, Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
The full record for this vessel

Behind this panel: 5 inspections, each with its date, unit and type; 11 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; no NVDC documentation record for this Official Number. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report

A report is not offered for this hull. Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 5

29 July 2022 PSC A
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7519423
12 July 2022 Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7504804
28 March 2022 PSC B
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7413480
19 December 2021 Administrative Inspection · PSC B
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7370303
3 December 2021 Deficiency Check · MARPOL Annex VI Survey · PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7361649

Deficiency record · 11

07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 28 March 2022 Resolved
The function of the detection system shall be periodically tested to the satisfaction of the Administration by means of equipment producing hot air at the appropriate temperature, smoke or aerosol particulates having the approriate range of density, or particle size, or other phenomena associated with incipient fires to which the detector is designed to respond. Crew unable to properly test smoke detectors. Crew used electronics cleaning spray; vessel has requisition for proper smoke test spray from 10JAN2022 indicating crew has not conducted proper monthly testing in past 03 months. 74 SOLAS (97) II-2/13.1.3
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2022
Resolved 12 July 2022
Resolution: Recieved class report attesting to repairs.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 28 March 2022 Resolved
All access openings in bulkheads at ends of enclosed superstructures shall be fitted with doors of steel or other equivalent material, permanently and strongly attached to the bulkhead, and framed, stiffened and fitted so that the whole structure is of equivalent strength to the un-pierced bulkhead and weathertight when closed. The means for securing these doors weathertight shall consist of gaskets and clamping devices or other equivalent means and shall be permanently attached to the bulkhead or to the doors themselves, and the doors shall be so arranged that they can be operated from both sides of the bulkhead. Watertight doors in emergency escape routes from steering gear room and engine room to aft deck showed daylight through gaskets when dogged down. ILLC 66 Ch II. Reg 12(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2022
Resolved 12 July 2022
Resolution: Recieved class report attesting to repairs.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 19 December 2021 Resolved
All waste recepticles shall be constructed of non-combustible materials with no openings on the sides or bottom. psco observed a significant number of large plastic trash bags full of oily rags and residue on the incinerator flat.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 19 December 2021
Resolved 21 December 2021
Resolution: Vessel provided receipt of removal of oily rags and waste to shoreside.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 19 December 2021 Resolved
The oil record book part 1 shall be completed on each occasion, on a tank to tank basis whenever any of the following machinery space operations take place; collection and disposal of oil residues (sludge). PSCO noted FO/LO sludge and sludge tanks were emptied and recorded as one tank, which does not accurately account for the amount removed from each tank.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 19 December 2021
Resolved 28 March 2022
Resolution: SEC JAXX PSCOs reviewed Class DNV report onboard during inspection, verified requirements have been satisfied.
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 19 December 2021 Resolved
the oil record book shall be in the form specified in appendix III to this annex. PSCO found weekly soundings of the incinerator sludge tank were not recorded since September 20th 2021 in the oil record book as required.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 19 December 2021
Resolved 28 March 2022
Resolution: SEC JAXX PSCOs reviewed Class DNV report onboard during inspection, verified requirements have been satisfied.
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 19 December 2021 Resolved
the condition of the ship and its equipment shall be maintained to conform with the provisions of the present convention, to ensure that the ship in all respects will remain fit to proceed to sea without presenting an unreasonable threat of harm to the marine environment. Master states that the incinerator is not used, and PPSCO observed modifications to associated piping between incinerator and incinerator sludge tank. Incinerator is noted as means of disposal for oily waste on IOPP for A and in Garbage Management Plan.
Condition: Placed in Improper Service
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 19 December 2021
Resolved 28 March 2022
Resolution: SEC JAXX PSCOs reviewed Class DNV report onboard during inspection, verified requirements have been satisfied.
14 - Pollution Prevention › 141 - MARPOL Annex I › Pumping, piping and discharge arrangements
Issued 19 December 2021 Resolved
in a ship which oil fuel is used the arrangements for the storage, distribution, and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons onboard. PSCO observed 02 fuel valves in the purifier room without handles as designed.
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 19 December 2021
Resolved 28 March 2022
Resolution: SEC JAXX PSCOs reviewed Class DNV report onboard during inspection, verified requirements have been satisfied.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 19 December 2021 Resolved
The machinery, boilers, and other pressure vessels, associated piping and fittings shall be of a design and construction adequate for the service for which they are intended, and shall be so installed and protected to reduce to a minimum and danger to persons onboard, with due regard to moving parts, hot surfaces, and other hazards. PSCO observed generator #4 crank case oil vent collecting oil in a plastic bottle.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 19 December 2021
Resolved 28 March 2022
Resolution: SEC JAX PSCOs reviewed Class DNV report onboard during inspection, verified requirements have been satisfied.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 19 December 2021 Resolved
The company should ensure that all personnel involved in the company safety management system have an adequate understanding of the relevant rules, reegulations, codes, and guidlines. Following discovery of deficiencies #2 and #3, recommend internal ISM audit
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 19 December 2021
Resolved 28 March 2022
Resolution: SEC JAX PSCOs reviewed Class DNV report onboard during inspection, verified requirements have been satisfied.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 3 December 2021 Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ONBOARD. PSCO OBSERVED FUEL AND OIL LEAK FROM OIL PURIFIER FLAT RUNNING DOWN THE SKIN OF THE SHIP AS WELL AS FUEL AND OIL POOLING UNDER GENERATORS. 74SOLAS(20con)1/11
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 December 2021
Resolved 7 December 2021
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 3 December 2021 Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ONBOARD. PSCO OBSERVED DOUBLER WELDED ONTO FIRE LINE IMMEDIATELY AFTER FIRE PUMP. 74SOLAS(20con)1/11
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 3 December 2021
Resolved 7 December 2021

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.