Records from 2016 to 2026. Most recent: inspection, 8 June 2026.
Documentation record
Registered dimensions (L × B × D)48.1 ft × 15.7 ft × 6.7 ft
Registered tonnagegross 45 / net 33
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderDELTA MARINE INDUSTRIES · SEATTLE WA, UNITED STATES · built 1977
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portHOMER, AK
Trade endorsementsCoastwise, unrestricted, Fishery, Registry
DocumentationValid · issued 1 April 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it45 - Regulatory (Subpart C or D), Gross Ton
33 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 24
8 June 2026
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8395333
16 March 2026
Examination of Repairs
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8327446
21 May 2025
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8141177
25 March 2025
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 8099666
26 July 2024
Type not recorded
No type recorded · Maritime Safety & Security Team Seattle (91101) · Activity 7967943
20 May 2024
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7916118
30 May 2023
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7701834
24 April 2023
Internal Structural Exam · Administrative Inspection · Drydock Exam · Examination of Repairs
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7674988
12 September 2022
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7557056
24 May 2022
Annual Inspection · DAPI Audit · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7467180
24 August 2021
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7295465
3 May 2021
COI Inspection · Deficiency Check · DAPI Audit · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7188174
7 April 2021
Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7170503
30 April 2020
DAPI Audit · Annual Inspection · In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6952316
20 February 2020
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6912532
3 October 2019
In-Service Inspection · Administrative Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6827490
17 May 2019
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6676296
25 March 2019
Examination of Repairs · Drydock Exam · Administrative Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6642849
8 September 2018
Type not recorded
No type recorded · USCGC NAUSHON (WPB 1311) · USCG Arctic District (CGD-A) · Activity 6536422
10 April 2018
Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6389759
15 May 2017
Annual Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6146675
27 April 2017
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 6198375
5 May 2016
COI Inspection
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 5869864
29 February 2016
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 5824246
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 20 May 2024
Resolved
Vsl is equiped with an electric and fixed bilge system. Laz electric bilge pump is inoperable. Fix bilge pump could not take suction in Laz. Ensure both systems are operational. CG026
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 May 2024
Resolution: repaired, both systems tested sat
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 20 May 2024
Resolved
Vsl only had 1 serviceable fire bucket. Vsl is required 3.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 May 2024
Resolution: vessel now has 04 serviceable fire buckets
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 20 May 2024
Resolved
Ensure laz hatch is secured to vsl.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 May 2024
Resolution: laz hatch was attached to vsl
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 20 May 2024
Resolved
Conduct drills.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 May 2024
Resolution: fire and abandon ship drills sat
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 24 April 2023
Resolved
Forward wasted deck - submit repair proposal for approval and make approved repairs prior to credit drydock. 11MAY23 Changed to def. Required to be corrected by 18MAY23
Action required: 705 - Other - as specified
Resolved 30 May 2023
Resolution: repaired
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 3 May 2021
Resolved
Lazarette high water alarm needs to have a visual indicator at the helm station.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 May 2021
Resolved 10 May 2021
Resolution: installed
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 May 2021
Resolved
Vessel needs to have on-board 03 2.5gal fire buckets onboard with line attached.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 May 2021
Resolved 10 May 2021
Resolution: onboard
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 May 2021
Resolved
Guards or an effective protection area needs to be installed for both the port and starboard main engine belts.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 May 2021
Resolved 10 May 2021
Resolution: installed
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 3 May 2021
Resolved
The sewage overboard valve is to be properly secured while inside of 3NM.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 May 2021
Resolved 10 May 2021
Resolution: secured
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 May 2019
Resolved
Prove proper operation of engine driven fixed bilge pump from all suction points
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 May 2019
Resolved 12 June 2019
Resolution: Engine driven bilge pump tested by filling lazerette bilge pocket with water. Test satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 May 2019
Resolved
Install strainer on bilge suction piping in center hold
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 May 2019
Resolved 12 June 2019
Resolution: Strainer installed and inspected satisfactory.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 17 May 2019
Resolved
Label remote fuel shutoff covers
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 May 2019
Resolved 12 June 2019
Resolution: Fuel shut off valve covers marked.
Electrical › Electrical Distribution System (service) › Wiring
Issued 10 April 2018
Resolved
Dead end wiring must be removed or placed in a junction box.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2018
Resolved 17 May 2019
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 10 April 2018
Resolved
Vessel's grabline was weathered and inserviceable.
Action required: 10 - Deficiency Rectified
Resolved 25 March 2019
Resolution: Vessel replaced lifering on site.
Electrical › Electric Supply System (service) › Battery Charger
Issued 10 April 2018
Resolved
Vessel's battery leads need to be cleaned.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 25 March 2019
Resolution: Vessel cleaned battery leads on site.