Records from 2017 to 2026. Most recent: inspection, 5 January 2026.
Inspection history · 17
5 January 2026
Bulk Liquid Transfer Monitor
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8290559
4 September 2025
Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8213502
24 September 2024
MTSA Verification · Periodic Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7851594
1 August 2024
Drydock Exam · Cargo Tank Internal · Hull Examination · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7946772
22 August 2023
Annual Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7686258
25 October 2022
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7483008
20 July 2022
Drydock Exam · Deficiency Check · Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7483370
27 August 2021
MTSA Verification · COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7283023
16 March 2021
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7157950
14 October 2020
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7077263
29 September 2020
In-Service Inspection · Plan Review "T" Boat · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7067640
13 January 2020
Periodic Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6889062
7 January 2020
Deficiency Check · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6884726
2 August 2019
Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6733965
16 October 2018
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6534130
3 November 2017
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6293689
19 July 2017
Drydock Exam · Examination of Repairs · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6212352
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 4 September 2025
Resolved
Each vessel must have a stability letter issued by the Coast Guard before the vessel is placed into service. This letter sets forth conditions of operation. Replace gasket on cover to steering space to make watertight.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 September 2025
Resolved 30 October 2025
Resolution: Operator provided photos of replaced gasket.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 4 September 2025
Resolved
AIS must be maintained in effective operating condition, which includes, the accurate input and upkeep of all AIS data fields. AIS found with wrong call sign, fixed on the spot.
Action required: 10 - Deficiency Rectified
Due 4 September 2025
Resolved 4 September 2025
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 22 August 2023
Resolved
Where firefighting equipment is not required, but is
installed, the equipment and its installation must be of
an approved type. Port designated Fire pump does not
automatically provide pressure when switched on and
needs to be manually increased at hydraulic pressure
valve control unit.
46 CFR 34.01-5
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 September 2023
Resolved 8 September 2023
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 22 August 2023
Resolved
The boundary bulkheads and decks separating the
accommodations and control stations from cargo, and
machinery spaces and from galleys, main pantries and
storerooms other than small service lockers shall be of
“A” Class Construction. Identified compromised
penetrations in A-class boundary in E/R bulkhead
electrical, E/R to weather deck electrical, and broken
stay plates in MCT from bridge to cargo deck.
46 CFR 32.57-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 September 2023
Resolved 8 September 2023
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Health protection, medical care?)
Issued 22 August 2023
Resolved
Each EAP education program must include at least the
following elements: display and distribution of
informational material; display and distribution of a
community service hot-line telephone number for
crewmember assistance. Vessel posted EAP info and
hotline on vessel.
46 CFR 16.401
Action required: 10 - Deficiency Rectified
Due 22 August 2023
Resolved 22 August 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 October 2022
Resolved
All lifesaving appliances and arrangements on tank vessels must be in accordance with Subchapter W (Lifesaving Appliances and Arrangements) of this chapter. Each vessel must carry lifebuoys approved under approval series 160.050. Each buoy is fitted with a grab line around the outside periphery. One of the vessel's three lifebuoys was missing the grab line.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 November 2022
Resolved 27 October 2022
Resolution: Vessel provided a new life ring fitted with grab line.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 October 2022
Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery must be at least equivalent to the standards established by the ABS Steel Vessel Rules. Vessel to prove proper operation of overspeed and loss of lube oil pressure shutdowns on main engines.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 November 2022
Resolved 2 November 2022
Resolution: Witnessed testing of engine shutdowns, all sat.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 25 October 2022
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 November 2022
Resolved 16 November 2022
Resolution: Received official FCC station license
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 25 October 2022
Resolved
Bulkheads and decks that separate control spaces from adjacent spaces must be "A" class construction. Repair ROXTEC Multi-Cable Transit leading from cargo deck to wheelhouse.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 November 2022
Resolved 27 October 2022
Resolution: Vessel crewmembers repaired the wire penetration block.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 25 October 2022
Resolved
All lifesaving appliances and arrangements on tank vessels must be in accordance with Subchapter W (Lifesaving Appliances and Arrangements) of this chapter. Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. The painter line of the inflatable buoyant apparatus was not connected to the hydrostatic release unit.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 25 October 2022
Resolved 25 October 2022
Resolution: Vessel crewmembers correctly attached the painter line to the HRU.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 September 2020
Resolved
All automated vital systems must have DVTPs and PSTPs. Provide DVTPs and PSTPs for the newly installed thottles.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 February 2021
Resolved 8 April 2021
Resolution: Recieved copey of DVTP from operator.
14 - Pollution Prevention › 141 - MARPOL Annex I › Retention of oil on board
Issued 13 January 2020
Resolved
Nothing limits MI from inspections/testing. Fractured welds on containment outboard STBD cargo pump shall be repaired prior to cargo ops.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 January 2020
Resolution: Welds on containment repairer to as built spec.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 13 January 2020
Resolved
Each fire pump shall be capable of deliverying 75 psi. Pumps only produced 22 & 40 psi.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 27 January 2020
Resolution: Hydralic flow addjucted to prime movers by vendor. Fire pumps both produced 80 psi.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 13 January 2020
Resolved
Fire hoses shall be tested to a minimum 100 psi annually. Provide proof of testing.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 27 January 2020
Resolution: Both fire hoses replaced with new with testing certs for 400 psi.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 13 January 2020
Resolved
Each fire hose nozzle approved under 162.027 shall be provided with low velocity applicator. Provide fog applicator for both fire nozzles.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 27 January 2020
Resolution: New varinozzles purchased and placed in serivce.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 13 January 2020
Resolved
All fire detection systems must be inspected/tested annually. Provide certificate of testing.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 January 2020
Resolved 27 January 2020
Resolution: Annual serivcing perforomed by Breakwater International.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 7 January 2020
Resolved
To maintain a valid Certificate of Inspection, you must complete your annual and periodic inspections in 31.10-17(a) and (b) and your Certificate of Inspection must be endorsed. Vessel failed to complete required Annual/Periodic inspection. Vessel must complete a satisfactory Annual/Periodic inspection prior to carrying cargo.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 January 2020
Resolved 13 January 2020
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 8 November 2017
Resolved
repair all hydrolic leaks in eng room
Action required: 705 - Other - as specified
Due 31 December 2017
Resolved 8 February 2018
Resolution: REPAIRED
Fire Fighting › Semiportable CO2 Fire Extinguishers › Condition
Issued 8 November 2017
Resolved
provide current service report
Action required: 705 - Other - as specified
Due 9 December 2017
Resolved 9 November 2017
Resolution: RECIEVED NEW FIRE SERVICING REPORT
Engineering › Freshwater System (jacketwater cooling) › Piping
Issued 19 July 2017
Resolved
Pressure test both port and starboard keel coolers.
Action required: 705 - Other - as specified
Due 19 August 2017
Resolved 2 August 2017
Construction/Loadline › Hull › Weld
Issued 19 July 2017
Resolved
Repair underfilled weld on stbd strut.
Action required: 705 - Other - as specified
Due 19 August 2017
Resolved 2 August 2017
Engineering › Steering Gear System › Hydraulic Hose
Issued 19 July 2017
Resolved
Repair hydraulic leaks on anchor and steering lines under bridge console.
Action required: 705 - Other - as specified
Due 19 September 2017
Resolved 2 August 2019
Resolution: The hydraulic system was renew in its entirety.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 19 July 2017
Resolved
Repair stbd aft deck railing.
Action required: 705 - Other - as specified
Due 19 August 2017
Resolved 17 August 2017
Construction/Loadline › Hull › Hull Plating
Issued 19 July 2017
Resolved
Conduct hull and structure gauging required of 30 year old tank vessels.
Action required: 705 - Other - as specified
Due 19 August 2017
Resolved 15 August 2017