← All vessels
VIKING STARSHIP
Passenger (Inspected) · Passenger Ship class · Built 1970s · USCG Northeast District (CGD-NE) · Other hulls named VIKING STARSHIP
VIKING STARSHIP is a 1977 passenger vessel (inspected). The Coast Guard has recorded 115 inspections since 1985, most recently in April 2026, along with 361 deficiencies, 1 operational control and 2 casualty investigations between 2019 and 2024.
Records from 1985 to 2026. Most recent: inspection, 8 April 2026.
- Built
- 1977
- Last inspected
- 8 April 2026
- Documentation
- Valid · documentation file of 10 September 2026
- Inspections
- 115
- Deficiencies
- 361 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 2 investigations · 2019–2024
Identity
585704
WDH8814
49315
Flag
UNITED STATES
367661740
Maury page id
psix-49315
Inspections, by type
…with no type recorded18
Years with a record
38 calendar years (1985–2026)
The 115 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)117.4 ft × 25.0 ft × 7.0 ft
Registered tonnagegross 98 / net 66
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBLOUNT MARINE CORP · WARREN, RI, UNITED STATES · built 1977
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portMONTAUK, NY
Trade endorsementsCoastwise, unrestricted, Fishery
DocumentationValid · issued 24 March 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it98 - Regulatory (Subpart C or D), Gross Ton
66 - Regulatory (Subpart C or D), Net Ton
66 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDH8814MMSI 367661740 · active · compulsorily equipped · granted 11 April 2025, expires 17 March 2035
WDB6375MMSI 366923420 · expired · compulsorily equipped · granted 4 February 2004, cancelled 5 March 2014
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 115
8 April 2026
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8344906
20 January 2026
Internal Structural Exam · Vessel Attendance · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8299392
5 February 2025
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8070425
30 September 2024
Examination of Repairs · Damage Survey · Administrative Inspection · Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 8011748
30 September 2024
Type not recorded
No type recorded · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8011850
5 September 2024
Type not recorded
No type recorded · USCGC RAZORBILL (WPB 87332) · USCG Heartland District (CGD-H) · Activity 7997335
4 April 2024
Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7889521
8 February 2024
Drydock Exam · Administrative Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7853532
22 January 2024
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7852649
14 March 2023
Administrative Inspection · Plan Review "T" Boat
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7650710
22 November 2022
Deficiency Check · DAPI Audit · Re-Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7580487
25 June 2022
Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7499705
25 March 2022
Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7411307
9 February 2022
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7390889
2 February 2022
Plan Review "T" Boat
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7389569
12 July 2021
In-Service Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7257098
24 November 2020
Administrative Inspection · Deficiency Check · Examination of Repairs · Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7100650
16 January 2020
Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6885094
18 November 2019
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6841896
28 October 2019
Plan Review "T" Boat
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6843514
10 October 2019
Deficiency Check · Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6831935
15 August 2019
Examination of Repairs
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6785113
12 August 2019
Type not recorded
No type recorded · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6811009
20 November 2018
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6571778
17 September 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6542248
7 February 2018
Hull Examination · Internal Structural Exam · Deficiency Check · Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6353622
30 November 2017
In-Service Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6311383
21 November 2017
COI Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6294321
21 February 2017
Type not recorded
No type recorded · USCGC ALBACORE (WPB 87309) · USCG Northeast District (CGD-NE) · Activity 6282046
13 December 2016
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6056125
26 February 2016
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5843481
2 February 2016
Examination of Repairs
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5811960
17 November 2015
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5764103
9 June 2014
Examination of Repairs
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 4883954
17 December 2010
Examination of Repairs · Drydock Exam · Deficiency Check · Internal Structural Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3912480
30 November 2010
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3900087
19 February 2010
Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3734908
17 December 2009
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3651660
22 January 2009
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3395397
6 January 2009
Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3386336
3 February 2008
Type not recorded
No type recorded · USCGC CHINOOK (WPB 87308) · USCG Heartland District (CGD-H) · Activity 3142322
26 November 2007
COI Inspection · Deficiency Check · MTSA/ISPS Verification · MARPOL Annex V Examination
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3104226
30 October 2006
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2810831
13 October 2005
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2513094
16 December 2004
Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2259698
24 November 2004
Drydock Extension
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2247298
3 November 2004
Deficiency Check · In-Service Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2235509
21 October 2004
MTSA Verification · Annual Inspection
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 2219986
26 January 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1997744
6 January 2004
Deficiency Check
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1976677
24 November 2003
Annual Inspection · MARPOL Annex V Examination
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1953201
11 September 2003
Deficiency Check
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1902631
20 May 2003
Examination of Repairs · Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1788730
27 November 2002
MARPOL Annex V Examination · COI Inspection
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1709543
20 November 2002
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1704179
7 February 2002
Re-Inspection · MARPOL Annex V Examination
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1475228
28 January 2002
Examination of Repairs
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1481743
8 June 2001
Excursion Permit
Administrative · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1065762
15 March 2001
Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1066819
9 February 2001
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1462212
12 January 2001
Administrative
Administrative · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1058693
17 November 1999
MARPOL Annex V Examination · COI Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1384312
26 August 1999
Excursion Permit
Administrative · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1121582
17 August 1999
Type not recorded
No type recorded · USCGC NORTHLAND (WMEC 904) · Activity 1512918
13 August 1999
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 65183
30 May 1999
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 45474
10 February 1999
Re-Inspection · MARPOL Annex V Examination · Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1473037
3 February 1999
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1473358
26 April 1998
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 793348
11 December 1997
Administrative
Administrative · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1113954
10 December 1997
MARPOL Annex V Examination · Deficiency Check · Re-Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 777407
24 November 1997
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1428861
28 July 1997
Administrative
Administrative · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 784053
28 July 1997
Administrative
Administrative · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1122440
11 June 1997
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 80995
22 January 1997
Deficiency Check
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1104185
16 December 1996
Deficiency Check · Hull Examination
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1100240
27 November 1996
MARPOL Annex V Examination · COI Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 874093
12 September 1996
Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 953837
20 July 1996
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 59841
20 July 1996
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 214422
6 March 1996
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1421084
1 December 1995
Deficiency Check · Examination of Repairs
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1358980
7 July 1995
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1186263
10 May 1995
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1344654
9 March 1995
COI Inspection
Physical examination · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1382922
16 December 1994
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1450922
30 March 1994
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1171688
11 March 1994
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1448511
25 September 1993
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 74110
10 March 1993
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1143266
31 March 1992
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 958302
6 January 1992
COI Inspection · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1269083
15 January 1991
Deficiency Check · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 931278
11 January 1991
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1234140
10 April 1990
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1231089
21 March 1990
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 932801
3 January 1990
COI Inspection · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 918358
20 December 1989
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1215295
1 November 1989
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1286846
6 September 1989
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1200040
2 February 1989
COI Inspection · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1038088
19 April 1988
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1339965
12 April 1988
Deficiency Check · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 889280
7 March 1988
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1028795
28 April 1987
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1327339
31 March 1987
Hull Examination
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1019340
13 March 1987
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1322553
12 September 1986
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1000260
1 July 1986
Excursion Permit
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1294627
4 June 1986
Excursion Permit
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1303543
12 May 1986
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 995754
31 January 1986
Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1293402
31 January 1986
Credit Drydock
Administrative · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1293403
15 May 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1290210
Deficiency record · 361
09 - Working and Living Conditions › 092 - Working Conditions › Danger areas
Issued 8 April 2026
Resolved
Renew engine room emergency exit signage with new glow in the dark reflective lettering
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 April 2026
Resolved
Repair exhaust lagging on starboard side MDE outboard of elbow.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 20 January 2026
Resolved
Repair broken window on starboard main deck
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 February 2025
Resolved
REPLACE LAGGING ON MDE EXHAUST.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 5 February 2025
Resolved
PROPERLY MOUNT AND PLACE COVERS ON ELECTRICAL OUTLETS IN FWD BERTH AND FWD ACCOMODATION AREAS.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 5 February 2025
Resolved
REPLACE BATTERY IN FLOATLIGHT.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 September 2024
Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. Received report that the vessel's stbd shaft is broken and they are transiting from Montauk, NY to Goodison Shipyard in North Kingstown, RI for repairs. Prior to carrying passenger or cargo, complete repairs and conduct a sea trial to the satisfaction of the Coast Guard Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 4 April 2024
Resolved
Provide spanner wrenches at P/S fire stations.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 4 April 2024
Resolved
Provide ships bell
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 4 April 2024
Resolved
Renew fire extinguisher showing required recharge.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 February 2024
Resolved
A vessel must be fitted with ground tackle necessary for the vessel to be safely anchored or moored. Renew the identified wasted anchor winch support frames to the satisfaction of the attending marine inspector.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 8 February 2024
Resolved
Each window must be capable of withstanding the maximum load from wave and wind conditions expected due to its location on the vessel. Replace 02 cracked windows on the stbd side main deck fwd. 46 CFR 177.1020
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 8 February 2024
Resolved
There must be no protrusions in means of escape that could cause injury, ensnare clothing, or damage life jackets. Crop and renew wasted longitudinal located at aft escape hatch in berthing area.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 8 February 2024
Resolved
The cognizant OCMI may require that a vessel undergo any additional inspection deemed reasonable and necessary to determine that the vessel is suitable for the service in which they are employed. Clean and descale overhead area adjacent to and outboard of aft berthing hatch and make available for inspection.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 8 February 2024
Resolved
Footholds, handholds, and ladders must be suitable for use in emergency conditions, of rigid construction, and permanently fixed in position. Crop and renew escape ladder upper rung in aft berthing area.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 8 February 2024
Resolved
Each door or hatch used as a means of escape, must be capable of being opened by one person in both light and dark conditions. The method of opening a means of escape must be obvious, rapid, and of adequate strength. The location of the door handle inside of the aft escape hatch is not obvious in dark conditions and no emergency lighting is provided at the starboard outboard escape hatch.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 8 February 2024
Resolved
All escape hatches and other emergency exits used as means of escape must be marked on both sides in clearly legible letters at least 50 millimeters (2 inches) high: “EMERGENCY EXIT, KEEP CLEAR”. The stbd outboard emergency escape hatch from the berthing area is not marked.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 February 2024
Resolved
The name of the vessel and hailing port must be marked on some clearly visible exterior part of the stern of the vessel. No name or hailing port is visible on the stern.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 December 2022
Resolved
Decommissioned 07 adult PFDs but vessel had extras onboard and remain above the passenger carrying capacity. Deficiency issued and cleared.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 8 December 2022
Resolved
Replace port generator cover
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 December 2022
Resolved
Replace battery box cover straps
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 December 2022
Resolved
Repair air compressor cover and repair loose electrical connections
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 8 December 2022
Resolved
Replace port side fire hose prior to carriage of passengers
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 December 2022
Resolved
Repair port side forward facing spotlight cover and bulb
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 8 December 2022
Resolved
Replace broken window on port side in main cabin and aft door
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 December 2022
Resolved
Replace light switch cover in space aft of wheelhouse
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 8 December 2022
Resolved
Replace belt guard on starboard generator
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 December 2022
Resolved
Hardwire pump in lazarette as discussed with vessel rep.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 9 June 2022
Resolved
A vessel must be fit with ground tackle necessary for the vessel to be safely anchored or moored. During the 2022 drydock the vessel was issued the following worklist item; crop and renew to good metal wasted gunwale and anchor foundation members in way of the bow sprit. Vessel made temporary repairs. Due to the unavailability of a stainless steel welder at the ship yard, the vessel is authorized to complete permanent repairs in it's homeport within the next 30 days.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 February 2022
Resolved
Remove dead end electrical wire in enginroom overhead.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 9 February 2022
Resolved
Have all fire extinguishers serviced.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 14 January 2021
Resolved
Replace belt guards on both Gensets.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 14 January 2021
Resolved
Relabel bilge manifold.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 14 January 2021
Resolved
Replace expired hydrostatic release (Hammer) for Cat1 EPIRB.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 14 January 2021
Resolved
Label engine room vent closures.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 14 January 2021
Resolved
Replace or repair life floats on vessels roof. Several life floats had cracks into the polystyrene.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 14 January 2021
Resolved
Replace wood paneling where the water lights are mounted. Wood is rotten and can no longer support brackets.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 14 January 2021
Resolved
Several windows in passenger cabin are cracked. Discrepancy de
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 January 2021
Resolved
Both MDE air intake hoses to the turbo were not correctly attached (hanging by a string/attached by a single hose clamp or wire.) Attach turbo air intake hose correctly.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 14 January 2021
Resolved
Port side lamp in E/R missing guard. Replace.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 14 January 2021
Resolved
Fire pump gauge would not read beyond 25psi. Require replacement and operational test of fire pump to achieve 60psi.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 24 November 2020
Resolved
The fixed bilge piping system had a constant drip in a section of pipe near the bilge manifold. The area of pipe around the leak was corroded and a small hole had developed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 November 2020
Resolved
The engine room bilges had an excessive amount of oily water in them. Issued a 14 day requirement to pump and clean engine room bilges.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 November 2020
Resolved
Vessel's stbd side exhaust had a significant leak. Repair exhaust leak.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 November 2019
Resolved
Vessel had 02 fire hoses, when tested both leaked throughout the hose and were found un-serviceable. Replaced fire hoses with two, used, fire hoses conforming to UL19 IAW CFR.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 18 November 2019
Resolved
Bilge suction pipe in passenger compartment must be fitted with a suitable strainer. Strainer on bilge suction piping was found wasted.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 November 2019
Resolved
Provide spanner wrenches at each fire station that will fit the fire hose installed.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 18 November 2019
Resolved
The manufacturer's instructions for onboard maintenance of survival craft must be onboard vessels greater than 65 feet.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 18 November 2019
Resolved
Each survival craft must be inspected monthly using the manufacturer's instructions.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 18 November 2019
Resolved
Receptacle outlets must be installed to prevent improper connection. Outlet in the overnight accommodations was found with a broken plug piece lodged into it and the cover for the recepticle broken.
11 - Life Saving Appliances › N/A - No Subsystem › Operation of Life Saving Appliances
Issued 18 November 2019
Resolved
Verify and prove painter length is 100' after painter was found deteriorated due to exposure to the elements.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 18 November 2019
Resolved
life floats were set up to deploy in clusters where one life float was attached to a painter line and the intent was to connect 2 other life float lines, however there were no lines connecting the life floats together for this type of set up
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 October 2019
Resolved
Complete but simple instructions for the operation of the system must be located in a conspicuous place at or near the all pull boxes, stop valve controls and in the CO2 storage room. Vessel did not have accurate operating instructions at the operating station. Ensure accurate operation instructions are posted at the operating station. 46 CFR 181.20-15(d)
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 10 October 2019
Resolved
The owner or managing operator shall submit drawings, sketches, or written specifications describing the details of any proposed alterations to the cognizant [name withheld] alterations must be approved by the OCMI before work is started. Marine Inspector discovered unapproved electrical outlets installed in overnight accommodations. Remove permanently or provide plans of installation to this office for approval. 46 CFR 176.700(b)
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 10 October 2019
Resolved
All portable fire extinguishers installed on a vessel shall be of an approved type. Numerous portable fire extinguishers on board were not mounted with an approved mounting bracket. Mount portable fire extinguishers with proper brackets.
46 CFR 181.30-5
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 10 October 2019
Resolved
All escape hatches shall be marked on both sides "Emergency Exist, Keep Clear". Engine room escape was not labeled from the inside. Label appropriately. 46 CFR 185.30-15
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 10 October 2019
Resolved
Machinery, and fuel tank spaces shall be separated from the accommodation spaces by watertight and/or vapor tight bulkheads of steel plate and or equivalent construction. Wasted steel bulkhead penetrations found within the engine room emergency escape. Repair bulkhead to original.
46 CFR 182.35-1(a)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 October 2019
Resolved
Dry pipe exhausts are permissible if suitably insulated. Both port and starboard engine exhaust piping missing sections of insulation. Reinstall insulation. 46 CFR 182.20-20
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 10 October 2019
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Starboard generator wiring found loose. Properly secure wiring on generator.
46 CFR 183.01-15(a)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 August 2019
Resolved
Properly install/demonstrate operational readinesss of new shaft assembly
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 August 2019
Resolved
Reinstall as original port side intermediate cutlass bearing
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 15 August 2019
Resolved
Reinstall as original local start wiring for port/stbd. generators
02 - Structural Conditions › N/A - No Subsystem › Permanent means of access
Issued 15 August 2019
Resolved
Properly install ladder to machinery space
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 15 August 2019
Resolved
Stitch weld eroded fairing plate aft. transom
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 20 November 2018
Resolved
Replace 01 ring life buoy on port side. 46CFR180.70
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 20 November 2018
Resolved
Replace/fix emergency lighting in overnight accommodation spaces- 46CFR183.432
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 20 November 2018
Resolved
Secure and attach life float lights properly. 46CFR180.175
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 20 November 2018
Resolved
Provide lights on PFDs that are equipped properly. 46CFR180.75
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 17 September 2018
Resolved
Vsl is broadcasting greater than expected vessel length, Vsl is broadcasting no static draft information and Vsl is not broadcasting an AIS Ship Type
Construction/Loadline › Hull › Hull Plating
Issued 7 February 2018
Resolved
Crop & Renew wasted aft deck (P & S), where UT readings are below .187
Construction/Loadline › Hull › Hull Plating
Issued 9 January 2018
Resolved
Conduct permanent repairs to all doublers as directed
Construction/Loadline › Hull › Hull Plating
Issued 9 January 2018
Resolved
Conduct permanent repairs to aft deck as directed
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 9 January 2018
Resolved
Conduct permanent repairs to MSD tank as directed
Construction/Loadline › Hull › Longitudinal Frame
Issued 9 January 2018
Resolved
Repair as original aft outboard longitudinal below port MDE overboard in lazarette
Construction/Loadline › Hull › Bracket
Issued 9 January 2018
Resolved
Reinstall as original barcket that supports port MDE exhaust in aft lazarette
Construction/Loadline › Hull › Bottom Plating
Issued 14 December 2017
Resolved
Conduct temp. reapirs to failed hull in aft passenger accomodation space
Construction/Loadline › Hull › Bottom Plating
Issued 14 December 2017
Resolved
Conduct temp. reapirs to failed hull in machinery space
Construction/Loadline › Hull › Hull Plating
Issued 14 December 2017
Resolved
Conduct temp. reapirs to failed transom plating
Construction/Loadline › Hull › Hull Plating
Issued 14 December 2017
Resolved
Conduct temp. repiars incurred while departing dry dock to the shell plate iwo of the first intermediate inboard longitudinal frame from the chine at the #3 aft port transverse frame, located in the aft passenger sleeping accommodations space
Construction/Loadline › Hull › Bottom Plating
Issued 8 December 2017
Resolved
Conduct UT's as directed in Focsle space
Construction/Loadline › Hull › Bottom Plating
Issued 7 December 2017
Resolved
Conduct UT's as directed 6in. on center, Port side MDE, outboard, fwd. to aft blkhed. of machinery space.
Construction/Loadline › Hull › Bottom Plating
Issued 7 December 2017
Resolved
Conduct UT's as directed 12in. on center, Port side MDE, outboard, fwd. to aft blkhed. of machinery space.
Construction/Loadline › Hull › Bottom Plating
Issued 7 December 2017
Resolved
Conduct UT's as directed 6in. on center, bottom plate of lazarette
Construction/Loadline › Hull › Bottom Plating
Issued 7 December 2017
Resolved
Conduct UT's as directed 6in. on center, bottom plate of lazarette
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 7 December 2017
Resolved
Make available for inspetion aft ballast tank
Construction/Loadline › Hull › Stringer
Issued 7 December 2017
Resolved
Conduct permanent repairs to fractured transverse frame in bay 2, port side of fwd. accomodation space
Construction/Loadline › Hull › Weld
Issued 7 December 2017
Resolved
Repair cracked weld, 01 deck, stbd. side
Construction/Loadline › Hull › Weld
Issued 7 December 2017
Resolved
Conduct permanent repairs pax. rail, 01 deck, stbd. side
Engineering › Bilge Water Management System › Strainer
Issued 7 December 2017
Resolved
Conduct permanenet repairs to bilg pick up in aft passenger bunk room space
Construction/Loadline › Hull › Side Shell
Issued 7 December 2017
Resolved
Conduct UT's as directed fwd. passenger space, thinned plate identified during close up
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 30 November 2017
Resolved
Install new Cutlass bearings Port/Starboard fore and aft
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 30 November 2017
Resolved
Provide survey reports for Shafts, port shaft found worn by line entanglement, starboard shaft found with multiple horizontal fractures
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 30 November 2017
Resolved
Properly light and make available for inspection all spaces
Construction/Loadline › Hull › Side Shell
Issued 30 November 2017
Resolved
Open and make available for inspection over board port exhaust for MDE at shell plate
Electrical › Lighting (service) › Lighting Fixture
Issued 27 November 2017
Resolved
Replace guards on all lighting fixtures in berthing areas.
Lifesaving › Lifefloat › Serviceable
Issued 21 November 2017
Resolved
Recondition or replace life floats
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 21 November 2017
Resolved
relabel ring bouys
Lifesaving › Lifefloat › Paddle
Issued 13 December 2016
Resolved
Label all paddles
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 13 December 2016
Resolved
Relabel ring buoys
Electrical › Lighting (service) › Lighting Fixture
Issued 13 December 2016
Resolved
install globes on light fixtures in berthing
Fire Fighting › Means of Escape › Handrails/Handholds
Issued 31 January 2011
Resolved
Prior to overnight passengers, repair or replace the wasted ladder railing to aft berthing.
Construction/Loadline › Hull › Longitudinal Frame
Issued 28 January 2011
Resolved
Port aft E/R outboard of exhaust, crop and renew wasted main deck longitudinal.
Construction/Loadline › Structures › Deck Plating
Issued 28 January 2011
Resolved
Properly insert wasted main deck under galley sink.
Engineering › Bilge Water Management System › Pump
Issued 28 January 2011
Resolved
Repair bilge pump mounting bracket.
Construction/Loadline › Structures › Superstructure
Issued 28 January 2011
Resolved
Replace window starboard side aft of door on pilot station
Construction/Loadline › Structures › Superstructure
Issued 30 November 2010
Resolved
Replace cracked windows at port aft control station and #8 Stbd aft main deck at next dry dock.
Communications › Radio Communications › EPIRB
Issued 30 November 2010
Resolved
Replace EPIRB Hydrostatic realese prior to carrying passengers.
Communications › Alarms/Indicators › Bilge Alarm
Issued 30 November 2010
Resolved
Repair lazarette high water alarm.
Documentation › Markings/Placards › Warning Signs
Issued 30 November 2010
Resolved
Relable sign for maximum passengers allowed on upper deck.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 17 December 2009
Resolved
Renew COD.
Lifesaving › Lifefloat › Float Free
Issued 17 December 2009
Resolved
Organize lifefloat arrangement as discussed to prevent tangling.
Electrical › Lighting (emergency) › Lighting Fixture
Issued 17 December 2009
Resolved
Repair emergency lighting in berthing area prior to allowing passengers below deck or sailing overnight.
Communications › Alarms/Indicators › Fire Alarm
Issued 17 December 2009
Resolved
Provide/install minimum two smoke U/L approved detectors in berthing prior to allowing passengers below deck or sailing overnight.
Electrical › Electrical Distribution System (service) › Junction Box
Issued 17 December 2009
Resolved
Permanently install freezers with breaker/cabling/junction box IAW 46 CFR Part 183, as discussed. They were found plugged into receptacle, with temporary drop cords, wired into berthing area lighting circuit.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 17 December 2009
Resolved
Provide maintenance and general housekeeping in engine room as discussed. Repair electrical connections, lighting, deck plating, clean up excessive dirt and oil, etc. MUCH PROGRESS must be made in this area for certificate to remain valid.
Lifesaving › Lifejacket/PFD (Type I) › Lights
Issued 22 January 2009
Resolved
Provide 77 PFD Lights. Vessel not permitted to carry more than 43 PERSONS on a route beyond the limited CW NMT 20 miles from safe refuge.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 22 January 2009
Resolved
Paint draft marks on hull.
Documentation › Certificates/Documents › FCC SSL
Issued 22 January 2009
Resolved
Correct call sign on FCC safety radiotelephony cert.
Lifesaving › Lifejacket/PFD (Type I) › Lights
Issued 22 January 2009
Resolved
Install PFD lights on 120 Adult PFDS and 12 Child PFDs. Insure these are most readily available and well marked for ocean route service.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 22 January 2009
Resolved
Clean medicine chest and replace all worn & outdated materials. (Present a clean and complete first-aid kit to the attending inspector upon return to vessel to clear requirements!)
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 22 January 2009
Resolved
Mark vessel's NAME and PORT on all ringbuoys.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 22 January 2009
Resolved
Replace worn sun-rotted 60' line for ringbuoy.
Lifesaving › Lifejacket/PFD (Type I) › Lights
Issued 22 January 2009
Resolved
Provide PFD lights for all 156 adult and all child PFDs aboard. Vessel is restricted to not more than 120 persons on routes beyond 20 miles from a harbor of safe refuge until this requirement is met.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 22 January 2009
Resolved
Provide 144 adult PFD type I for a total of 300 adult and 30 child aboard vessel. Vessel restricted to Not More Than 150 passengers 156 total persons until this requirement is satisfied
Stability › Weathertight Integrity › General
Issued 6 January 2009
Resolved
Replace the 3 cracked windows in the pilot house, the one port side fwd most window and the two front windows to the port side, as discussed with the Coast Guard Inspector.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 6 January 2009
Resolved
Provide valid COI onboard prior to carrying passengers.
Electrical › Lighting (service) › Lighting Fixture
Issued 26 November 2007
Resolved
Install diffuser on deck light fwd port side of the passenger accommodations.
Electrical › Electric Generation Source (service) › Generator
Issued 26 November 2007
Resolved
Remount gauge panel for diesel prime movers on Port & Stbd SS GenSets.
Electrical › Electrical Distribution System (service) › Conductor
Issued 26 November 2007
Resolved
Secure electrical cables with permanent mounting clamps to aft bhd of aft berthing space.
Accommodation/Occupational Safety › Heating › Metal Protection
Issued 26 November 2007
Resolved
Repair protective casing for oil fired hot air heater.
Electrical › Electrical Distribution System (service) › Switchboard
Issued 26 November 2007
Resolved
Provide a dielectric mat for the deck in front of the main switchboard.
Lifesaving › Lifejacket/PFD (Type I) › Lights
Issued 26 November 2007
Resolved
On Oceans routes the vessel is limited to not more than 121 total persons of which not more than 24 may be children or persons weighing less than 90# until the full compliment of required life jackets with lights is properly aboard the vessel.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 26 November 2007
Resolved
On Limited Coastwise routes the vessel is limited to not more than 179 total persons of which not more than 38 maybe children or persons weighing less than 90# until the full compliment of required life jackets is properly aboard the vessel.
Electrical › Electrical Distribution System (service) › Wiring
Issued 30 October 2006
Resolved
Remove dead end wires in engine room in the way of the fire pump.
Engineering › Generator (propulsion-electric) › Heating Element Circuitry
Issued 30 October 2006
Resolved
Provide Air Intake protective screen for SS Generator.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 30 October 2006
Resolved
Replace worn ladder rungs leading to engine room.
Engineering › Generator (propulsion-electric) › Wiring
Issued 30 October 2006
Resolved
Secure gauge panels on SSGEN's back into place.
Engineering › Steering Gear System › Fastener
Issued 30 October 2006
Resolved
Replace four bolts on STBD side steering cylinders foundation in laz. space that are too short.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 30 October 2006
Resolved
Repair lifejacket storage box to prevent water from getting in.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 30 October 2006
Resolved
Permanantly repair cracked frame in forward berthing compartment.
Lifesaving › Lifefloat › Painter
Issued 30 October 2006
Resolved
Re-arrange lifefloat set-up to the direction of NVIC 1-83
Lifesaving › Lifefloat › Platform
Issued 30 October 2006
Resolved
Patch and repair worn areas on lifefloats.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 30 October 2006
Resolved
Replace worn stantions on main deck passenger space. (from the bow # 4+5 on port side and #5 on starboard side).
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 30 October 2006
Resolved
Replace two cracked windows on port side main deck.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 13 October 2005
Resolved
Vessel is missing 149 adult life jackets. Vessel is restricted to 151 total persons on a LCW (or shorter) route. Vessel is in compliance for 120 pax on oceans route. Restriction is in effect until owner proves vessel has added 149 life jackets.
Owner wants this to remain in effect until life jackets provided.
Lifesaving › Lifejacket/PFD (Type I) › Storage
Issued 13 October 2005
Resolved
Relabel life jacket storage boxes to reflect how many and if lighted. Child and adult should be separated and labeled separately.
Electrical › Lighting (service) › Lighting Fixture
Issued 13 October 2005
Resolved
Provide cages for all lighting fixtures below deck.
Lifesaving › Lifefloat › Markings
Issued 13 October 2005
Resolved
Relabel life float with vessel name and max persons. (the top one on the port side)
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 5 November 2004
Resolved
Provide 50% of crew with Redcross CPR/First-aid training.
Operations/Management › Drills/Instruction › Fire
Issued 5 November 2004
Resolved
Update emergency instructions to fit vessel lay-out.
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 21 October 2004
Resolved
Provide 28 lifejackets, limited to 272 passengers until corrected.
Lifesaving › Lifejacket/PFD (General) › Lights
Issued 21 October 2004
Resolved
Provide 57 lifejacket lights, limited to 63 passengers oceans.
Electrical › Lighting (service) › Lighting Fixture
Issued 21 October 2004
Resolved
Provide covers for engine room lights. Need portective globes on all lights below main deck.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 21 October 2004
Resolved
Provide eye wash for first aid kit.
Navigation › Piloting/Steering › Tide/Tidal Current Tables
Issued 21 October 2004
Resolved
Provide tide and curretn tables.
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 21 October 2004
Resolved
Lock MSD overboard discharge valve in the closed position.
Operations/Management › Drills/Instruction
Issued 24 November 2003
Resolved
Provide proof that fire and man overboard drills are logged and conducted monthly per 46 CFR 122.520 and 122.524. LEGACY COMPONENT DESC: Fire
Operations/Management › Equipment Service/Testing
Issued 24 November 2003
Resolved
Log/conduct monthly EPIRB tests. LEGACY COMPONENT DESC: EPIRB
Lifesaving › Lifebuoys
Issued 24 November 2003
Resolved
Amidships port and starboard life rings must have SOLAS approved retro-tape.
Lifesaving › Lifebuoys
Issued 24 November 2003
Resolved
Approved repairs or replacement of both port life rings needed.
Lifesaving › Buoyant Apparatus
Issued 24 November 2003
Resolved
Repair with approved repair material all 10 lifefloats. LEGACY COMPONENT DESC: Lifefloats
Lifesaving › Buoyant Apparatus
Issued 24 November 2003
Resolved
Lifefloats must be separated as to not stick to one another. LEGACY COMPONENT DESC: Lifefloats
Lifesaving › Buoyant Apparatus
Issued 24 November 2003
Resolved
Remove all plastic zipties from lifefloats and paddles with a material easy to remove. LEGACY COMPONENT DESC: Lifefloats
Electrical › Lighting (service)
Issued 24 November 2003
Resolved
Repair light switch at foot of aft berthing compartment. LEGACY COMPONENT DESC: Switch
Engineering
Issued 24 November 2003
Resolved
Remove heat pumps in aft berthing compartment. LEGACY COMPONENT DESC: Heat pumps
Documentation › Certificates/Documents
Issued 24 November 2003
Resolved
Post stability letter. LEGACY COMPONENT DESC: Stability Letter
Documentation › Certificates/Documents
Issued 24 November 2003
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Operations/Management › Passenger Operations
Issued 24 November 2003
Resolved
Ensure voyage plan provided for overnight trips. LEGACY COMPONENT DESC: Voyage Plan
Accommodation/Occupational Safety › Other Accommodation Spaces
Issued 24 November 2003
Resolved
Replace two port side crew cabin windows. LEGACY COMPONENT DESC: Window
Construction/Loadline › Markings
Issued 24 November 2003
Resolved
Mark upper deck passenger limit. LEGACY COMPONENT DESC: Upper Deck Passenger Limit
Lifesaving › Lifejacket/PFD (General)
Issued 24 November 2003
Resolved
Ensure required lifejackets have proper name stenciled. LEGACY COMPONENT DESC: Marking
Construction/Loadline › Hull › Hull Plating
Issued 2 June 2003
Resolved
PROVIDE RESULTS TO COGNIZANT OCMI OF THE FOLLOWING: PROVIDE AVAILABLE EXISTING INFORMATION NOTED ON VESSEL'S COI AND CURRENT HIGH TENSILE STEEL REPAIR PROCEDURES BEING USED TO CG MSC REQUESTING EVALUATION OF HULL & UPDATED HIGH TENSILE STEEL REPAIR PROCEDURES TO UPDATE STATEMENT ON VESSEL'S COI. LEGACY COMPONENT DESC: Bottom Plating
Stability › Watertight Integrity
Issued 12 May 2003
Resolved
Prior to the completion of a Credit Dry Dock Examination and the carriage of passengers, provide specifications for proper repair to vessel hull per statement on COI. LEGACY COMPONENT DESC: Insert
Stability › Watertight Integrity
Issued 12 May 2003
Resolved
Prior to the completion of a Credit Dry Dock Examination and the carriage of passengers, provide details of specifics for high tensile steel repair from noted plans. LEGACY COMPONENT DESC: Inserts
Stability › Watertight Integrity
Issued 12 May 2003
Resolved
Prior to the completion of a Credit Dry Dock Examination and the carriage of passengers, provide current and replacement plate specs, weld proceedures, welders experience and proceedure used. LEGACY COMPONENT DESC: Inserts
Stability › Watertight Integrity
Issued 12 May 2003
Resolved
Prior to the completion of a Credit Dry Dock Examination and the carriage of passengers, demonstrate by NDT (i.e. Dye Penetrant, UT Shearwave) for all hull plates inserted in Tampa Zone, April-May 2003, meet specifications of attending CG marine inspector. LEGACY COMPONENT DESC: Inserts
Electrical › Electrical Distribution System (service)
Issued 26 November 2002
Resolved
Replace broken electrical receptical (4 gang) on aft bulkhead outside of wheelhouse -- use UL -- wet location equipment.
Communications › Radio Communications
Issued 26 November 2002
Resolved
Make emergency broadcast placard vessel specific. LEGACY COMPONENT DESC: VFH Radiotelephone
Lifesaving › Lifebuoys
Issued 26 November 2002
Resolved
Restencil name on stbdside ringbuoy. LEGACY COMPONENT DESC: Markings (ship name/port)
Electrical › Electrical Distribution System (service)
Issued 26 November 2002
Resolved
Remove numerous dead ended wires under bridge console. Cap and label spares. LEGACY COMPONENT DESC: Wiring
Accommodation/Occupational Safety › Occupational Safety
Issued 26 November 2002
Resolved
Replace broken pilothouse window.
Electrical › Electrical Distribution System (emergency)
Issued 26 November 2002
Resolved
Repair wiring for emergency batteries in pilothouse. LEGACY COMPONENT DESC: Wiring
Electrical › Electric Supply System (service)
Issued 26 November 2002
Resolved
Provide a box for the port battery in the pilothouse. LEGACY COMPONENT DESC: Battery Installation
Accommodation/Occupational Safety › Occupational Safety
Issued 26 November 2002
Resolved
Replace broken windows in accomodation spaces.
Accommodation/Occupational Safety › Heating
Issued 26 November 2002
Resolved
Install a 15 second purge cycle for the oil burner. (Air pumps must operate prior to ignition). LEGACY COMPONENT DESC: Burners
Electrical › Lighting (service)
Issued 26 November 2002
Resolved
Correct improper splices for 120 VAC deck lighting, upper deck lighting wiring near rails. (use splice boxes for the connections).
Fire Fighting › Fire Hoses
Issued 26 November 2002
Resolved
Provide fire hoses and nozzles.
Accommodation/Occupational Safety › Medical/First Aid
Issued 26 November 2002
Resolved
Renew aspirin/eyewash for first aid kit. LEGACY COMPONENT DESC: Medicine Chest
Construction/Loadline › Structures
Issued 26 November 2002
Resolved
Repair leaking deck drain in engine room. LEGACY COMPONENT DESC: Deck Plating
Construction/Loadline › Hull
Issued 20 November 2002
Resolved
No passenger are permitted onboard until item TR2 of this activity is completed sat.
Construction/Loadline › Hull
Issued 20 November 2002
Resolved
Sand blast entire laz to varify good metal and affect permenant repairs IWO temp repairs made during Nov of 2002 to main deck.
Documentation › Certificates/Documents
Issued 7 February 2002
Resolved
Post curent COI and stability letter. LEGACY COMPONENT DESC: Certificate of Inspection
Personnel › Certificates/Documents/Licenses
Issued 7 February 2002
Resolved
Port current licenses & FCC radio operator permits. Provide proof of current licenses. LEGACY COMPONENT DESC: License, Master
Documentation
Issued 7 February 2002
Resolved
Post SPV decal.
Navigation › Piloting/Steering
Issued 7 February 2002
Resolved
Provide corrected charts, US Coast Pilot, CG Light list, tide tables & tidal current tables IAW 46 CFR 184.420. LEGACY COMPONENT DESC: Marine Charts
Lifesaving
Issued 7 February 2002
Resolved
Renew EPIRB Battery. Vessel restricted to no farther than 3 nm from shore until corrected.
Lifesaving
Issued 7 February 2002
Resolved
Properly install EPIRB. Vessel restricted to no more than 3 nm from shore until completed.
Lifesaving
Issued 7 February 2002
Resolved
Register EPIRB. Vessel restricted to no farther than 3 nm from shore until corrected.
Lifesaving › Buoyant Apparatus
Issued 7 February 2002
Resolved
Provide 2 paddles for lifefloats. Maximum passenger capacity reduced by 10 adults until corrected.
Lifesaving › Lifejacket/PFD (Type I)
Issued 7 February 2002
Resolved
Separate and mark location of child lifejackets. LEGACY COMPONENT DESC: Storage
Lifesaving › Lifebuoys
Issued 7 February 2002
Resolved
Provide floatable lifeline for stbd ringbuoy IAW 46 CFR 180.70. LEGACY COMPONENT DESC: Buoyant Lifeline
Lifesaving › Lifebuoys
Issued 7 February 2002
Resolved
Restencil vessel name on port and starboard ringbuoys. LEGACY COMPONENT DESC: Markings (ship name/port)
Documentation › Markings/Placards
Issued 7 February 2002
Resolved
Mark upperdeck passenger limit IAW stability letter. LEGACY COMPONENT DESC: Capacity Marking
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 7 February 2002
Resolved
Install bracket for bridge fire extinguisher. LEGACY COMPONENT DESC: Mounting Bracket
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 7 February 2002
Resolved
Provide tamper resitient seals for 3 BII fire extinguishers.
Fire Fighting › Portable CO2 Fire Extinguisher
Issued 7 February 2002
Resolved
Service portable fire extinguishers. LEGACY COMPONENT DESC: Service
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 February 2002
Resolved
Remove extension cords from under bridge console.
Electrical › Electrical Distribution System (service) › Wiring
Issued 7 February 2002
Resolved
Enclose wirenuts on bridge or change type of connection.
Fire Fighting › Fire Pumps
Issued 7 February 2002
Resolved
Provide pressure gauge for fire pump. LEGACY COMPONENT DESC: Pressure
Lifesaving › Buoyant Apparatus
Issued 7 February 2002
Resolved
Repair cracked lifefloat, top forward one is cracked.
Electrical › Electrical Distribution System (service)
Issued 7 February 2002
Resolved
Hardwire or install receptacle for stbd freezer in accomodation space. Remove extension cord. LEGACY COMPONENT DESC: Wiring
Electrical › Lighting (emergency)
Issued 7 February 2002
Resolved
Repair/renew emergency light in forward accomodation space. Vessel may not carry passengers in this compartment until complete. LEGACY COMPONENT DESC: Battery Operated Lantern
Fire Fighting › Fire Hoses › Connections
Issued 7 February 2002
Resolved
Provide nozzle for firehose.
Unknown
Issued 9 February 2001
Resolved
REPLACE ALL MAIN DECK WEATHERTIGHT DOOR'S GASKETS.
Lifesaving
Issued 17 November 1999
Resolved
PROVIDE 12 PFD WATERLIGHTS FOR CHILDRENS PFDs. NO CHILDREN PERMITED ON OCEANS ROUTE UNTIL CLEARED.
Lifesaving
Issued 17 November 1999
Resolved
PROVIDE SIX ADULT PFDs. MAXIMUM PASSENGER AND CREW LIMITED TO 294 ON LIMITED COASTWISE ROUTE.
Lifesaving
Issued 10 February 1999
Resolved
REPAIR CRACKED WINDOWS.
Construction/Loadline
Issued 10 February 1999
Resolved
MAKE PERMANENT REPAIR IWO TEMPORARY REPAIR TO WASTED SECTION OF AFT BHD OF MACHINERY SPACE, STBD SIDE APROX 1 1/2' FROM BOTTOM.
Unknown
Issued 3 February 1999
Resolved
REPLACE 2 MISSING DOGS ON LAZARETTE DECK HATCH.
Unknown
Issued 3 February 1999
Resolved
PROVIDE PLANS DETAILING ALTERATIONS TO MSD SYSTEM AND FIRE DAMPER ASSEMBLIES.
Lifesaving
Issued 26 April 1998
Resolved
POST EMERGENCY BROADCAST PLACARD NEXT TO R/T EQUIPMENT.
Lifesaving
Issued 26 April 1998
Resolved
CLEAN PETROLEUM PRODUCT OUT OF BILGE IN LAZ. NO PASSENGERS FOR HIRE UNTIL CLEARED.
Lifesaving
Issued 26 April 1998
Resolved
REMOVE THE 15 5 GALLON CONTAINERS OF OIL/HYD FLUID STORED IN E/R BILGES. NO PASSENGERS FOR HIRE UNTIL CLEARED.
Lifesaving
Issued 26 April 1998
Resolved
SECURE WATER HEATER, STBD SIDE, E/R.
Electrical
Issued 26 April 1998
Resolved
SECURE BREAKER PANEL COVER, E/R, STBD SIDE IWO AFT E/R ENTRANCE.
Lifesaving
Issued 26 April 1998
Resolved
SECURE COFFEE POT IN GALLEY.
Lifesaving
Issued 26 April 1998
Resolved
SECURE SMALL REFRIGERATOR IN GALLEY.
Electrical
Issued 26 April 1998
Resolved
REMOVE EXTENSION CORD SERVING SMALL REFRIGERATOR IN GALLEY.
Construction/Loadline
Issued 26 April 1998
Resolved
CROP AND RENEW WASTED VERTICAL STRENGTH MEMBERS, STBD SIDE LAZ BEHIND TANK.
Lifesaving
Issued 26 April 1998
Resolved
RENEW/PLUG PERFORATED ELBOW ON VENT PIPE SERVING OIL FIRED FURNACE, MAIN DECK PASSENGER CABIN.
Electrical
Issued 26 April 1998
Resolved
PROPERLY WIRE SPOTLIGHT FASTENED TO STERNLIGHT MAST. REMOVE EXTENSION CORDW/FEMALE END CUT OFF AND SPLICED IN USED NOW. IT EXTENDS DOWN 2 DECKS (VIAA LADDER WELL AND A VENT SHAFT) TO E/R WHERE IT PLUGS INTO AN OUTLET SOMEWHERE IN E/R.
Lifesaving
Issued 26 April 1998
Resolved
PROPERLY INSTALL COVER ON OIL FIRED FURNACE. INSPECTOR FOUND GLOVES, CANDYBAR, LURES, DEBRIS INSIDE OF COVER AND FILTER AREA.
Electrical
Issued 26 April 1998
Resolved
REMOVE DEADENDED WIRING IN STORAGE SPACE, STBD SIDE, MAIN DECK PASSENGER CABIN, IWO STBD ENTRANCE.
Fire Fighting
Issued 26 April 1998
Resolved
PROVIDE 2 B-II EXTINGUISHERS. FOUND 2 DISCHARGED. NO PASSENGERS FOR HIRE UNTIL CLEARED.
Electrical
Issued 26 April 1998
Resolved
RENEW LIGHT SWITCH SERVING LIGHTS IN FWD PASSENGER COMPT.
Lifesaving
Issued 26 April 1998
Resolved
REMOVE EXTENSION CORD SERVING SMALL REFRIDGERATOR IN FWD PASSENGER COMPT.
Lifesaving
Issued 26 April 1998
Resolved
REMOVE/PERMANENTLY SECURE REFRIDGERATOR AND SMALL FREEZER IN FWD PASSENGER COMPT.
Lifesaving
Issued 26 April 1998
Resolved
REMOVE PROPANE TANK, 5 GALLON OIL CONTAINERS, AND PAINT FROM FWD PASSENGER COMPT. NO PASSENGERS FOR HIRE UNTIL CLEARED.
Electrical
Issued 26 April 1998
Resolved
LABEL ALL BREAKERS/SWITCHES IN E/R.
Lifesaving
Issued 26 April 1998
Resolved
INSTALL GUARD OVER PULLEY, PORT GEN SET.
Construction/Loadline
Issued 26 April 1998
Resolved
CLEAN OIL FROM BILGES IN E/R. NO PASSENGERS FOR HIRE UNTIL CLEARED.
Engineering
Issued 26 April 1998
Resolved
RENEW/REMOUNT LAGGING OVER EXHAUST SYS IN LAZ.
Construction/Loadline
Issued 26 April 1998
Resolved
PERMANENTLY REPAIR (STOP DRILL AND WELD) CRACK IN BULKHEAD, STBD SIDE FOC'SLE WHERE BULKHEAD MEETS MAIN DECK.
Lifesaving
Issued 26 April 1998
Resolved
RENEW PRESSURE GAGE ON AIR TANK, STBD SIDE, E/R.
Lifesaving
Issued 26 April 1998
Resolved
PROPERLY ROUTE SIGHT TUBE ON TANK, PORTSIDE, IWO THE 3 PUMPS OUTBOARD OF PORT GEN SET.
Electrical
Issued 26 April 1998
Resolved
REMOVE WIRENUTS FROM WIRING ON PORT MDE AND THROUGHOUT VESSEL.
Electrical
Issued 26 April 1998
Resolved
INSTALL GLOBES AND METAL GUARDS ON ALL INCANDESENT LIGHTS THROUGHOUT VESSEL.
Electrical
Issued 26 April 1998
Resolved
REMOVE DEAD ENDED WIRING IN E/R.
Lifesaving
Issued 26 April 1998
Resolved
REMOVE DROP LIGHTS FROM VESSEL.
Engineering
Issued 26 April 1998
Resolved
MAKE PERMANENT MOUNTING BRACKETS FOR AIR FILTERS ON BOTH MDE'S. STRING NOWIN USE IS INSUFFICIENT.
Unknown
Issued 26 April 1998
Resolved
RENEW/PROVIDE AND INSTALL NEW HANDLES ON ALL VALVES IN E/R. NUMEROUS MISSING/BROKEN.
Lifesaving
Issued 26 April 1998
Resolved
REMOVE TEMPORARY COOLING FAN WHICH IS TIED TO OVERHEAD AND PLUGGED INTO LIGHT FIXTURE, E/R FWD.
Fire Fighting
Issued 10 December 1997
Resolved
PROVIDE A PROPER BRACKET FOR THE SECOND FIRE EXTINGUISHER IN THE MACHINERY SPACE.
Accommodation/Occupational Safety
Issued 10 December 1997
Resolved
REPAIR BROKEN WINDOWS IN DECKHOUSE.
Accommodation/Occupational Safety
Issued 10 December 1997
Resolved
RESECURE LADDER TO MACHINERY SPACE.
Lifesaving
Issued 10 December 1997
Resolved
PROVIDE SATISFACTORY PFD LIGHTS FOR AT LEAST 120 ADULT & 12 CHILD SIZE PFDSIAW OCMI,NY LTR DTD 01SEP89. TOTAL PERSONS ON OCEANS ROUTE LIMITED TO NMT60 ADULTS & 6 CHILDREN.
Lifesaving
Issued 27 November 1996
Resolved
VESSELS TOTAL POB REDUCED TO A MAXIMUM OF 30 UNTIL REQ #17 IS CLEARED.
Lifesaving
Issued 27 November 1996
Resolved
PROVIDE AND INSTALL A 406 EPIRB PRIOR TO DEPARTING ON ANY OCEANS ROUTE.
Lifesaving
Issued 27 November 1996
Resolved
7 OF THE 10 L/Fs NEED REPAIR. THE OUTER COVERING OF 7 NEED REPAIR. RENEW LINE SECURING WEBBING/NETTING ON THE 6 OF THEM THAT NEED RENEWING.
Lifesaving
Issued 27 November 1996
Resolved
RENEW/REPAIR THE ONE FLOATING WATER LIGHT THAT IS INOP.
Electrical
Issued 27 November 1996
Resolved
RENEW MISSING ELECTRICAL CONNECTION BOX COVER OVER PORT MDE.
Electrical
Issued 27 November 1996
Resolved
REMOVE EXTENSION CORDS ON COFFEE POT AND REFRIDGERATOR IN GALLEY.
Electrical
Issued 27 November 1996
Resolved
LABEL ALL BREAKERS IN BOX IN WHEEL HOUSE BELOW 2 MAIN BREAKER BOXES.
Lifesaving
Issued 27 November 1996
Resolved
REPAIR OR REPLACE 88 ADULT PFD'S. CARRIAGE OF TOTAL PERSONS RESTRICTED TO 212.
Lifesaving
Issued 27 November 1996
Resolved
SECURE COOLER ON UPPER DECK.
Navigation
Issued 27 November 1996
Resolved
PROVIDE AND INSTALL UL1104 APPROVED RUNNING LIGHTS ON VSL.
Lifesaving
Issued 27 November 1996
Resolved
PROVIDE AND INSTALL LIFEJACKET PLACARD FOR ALL TYPES OF PFD'S ABOARD.
Electrical
Issued 27 November 1996
Resolved
REMOVE DEADENDED WIRING IN E/R. (P/S, FWD)
Electrical
Issued 27 November 1996
Resolved
SECURE LOOSE LIGHT FIXTURE IN E/R. (P/S, FWD)
Electrical
Issued 27 November 1996
Resolved
LABEL ALL CKT BREAKERS IN ALL BREAKER BOXES IN E/R.
Electrical
Issued 27 November 1996
Resolved
REMOVE DEADENDED WIRING FM OLD RADAR ON TOP OF WHEEL HOUSE.
Electrical
Issued 27 November 1996
Resolved
BLANK OFF HOLES IN 24 VOLT BREAKER BOX, P/S, FWD, E/R.
Construction/Loadline
Issued 27 November 1996
Resolved
RENEW TANK TOP ON TANK BTW GENERATORS IN E/R.
Electrical
Issued 27 November 1996
Resolved
PROPERLY SECURE HANDLE ON LIGHT SWITCH ON FWD BLKHD IN AFT BUNK ROOM.
Electrical
Issued 27 November 1996
Resolved
HARDWIRE EMERGENCY LIGHTING FIXTURE IN FWD BUNKROOM.
Lifesaving
Issued 27 November 1996
Resolved
SECURE FREEZER, REFRIDGERATOR, COFFEE POT, AND MICROWAVE OVEN IN GALLEY.
Lifesaving
Issued 27 November 1996
Resolved
PROVIDE AND INSTALL EMERGENCY BROADCAST PLACARD.
Electrical
Issued 6 March 1996
Resolved
PROVE PROPER OPERATION OF EMERGECY LIGHTING IN FWD AND AFT BERTHING SPACES.
Accommodation/Occupational Safety
Issued 6 March 1996
Resolved
PROPERLY SECURE FREEZER IN FWD BERTHING.
Fire Fighting
Issued 6 March 1996
Resolved
PROCURE AND INSTALL VALVE HANDLES WHERE MISSING FROM BILGE FIRE SYSTEM.
Electrical
Issued 6 March 1996
Resolved
CLEAN BATTERY TERMINALS ON MAIN ENGINE START BATTERIES (BANK OF 4).
Documentation
Issued 6 March 1996
Resolved
SHOW PROOF OF COMPLIANCE WITH THE CHEMICAL TESTING REQUIREMENTS OF 46 C.F.R. PART 16.
Lifesaving
Issued 6 March 1996
Resolved
PROCURE AT A MINIMUM ELEVEN (11) CHILDRENS LIFE JACKETS TO MAINTAIN AT LEAST 30 CHILDRENS LIFE JACKETS.
Electrical
Issued 6 March 1996
Resolved
REMOVE BARE BULB DROP LIGHT FROM TOP OF #2 (PORT) GENERATOR.
Electrical
Issued 6 March 1996
Resolved
INSTALL LIGHT COVERS IN STEERING ROOM.
Electrical
Issued 6 March 1996
Resolved
PROPERLY LABEL ALL BREAKERS AND BREAKER PANELS.
Electrical
Issued 6 March 1996
Resolved
INSTALL LIGHT COVER IN AFT BERTHING.
Electrical
Issued 6 March 1996
Resolved
INSTALL LIGHT SWITCH COVER IN AFT BERTING, PORT AFT OVERHEAD.
Electrical
Issued 6 March 1996
Resolved
INSTALL LIGHT SWITCH HANDLE, BOTH BERTHING ROOMS.
Electrical
Issued 6 March 1996
Resolved
PROPERLY INSTALL SUPPLY WIRE TO ELECTRIC BLOWER IN AFT BERTHING AND LABEL BLOWER SWITCH.
Electrical
Issued 6 March 1996
Resolved
REMOVE ALL UNUSED WIRES THROUGHOUT VESSEL.
Accommodation/Occupational Safety
Issued 6 March 1996
Resolved
FIND SEWAGE LEAK IN STEERING COMPARTMENT AND EFFECT REPAIRS.
Lifesaving
Issued 6 March 1996
Resolved
LABEL LIFE JACKET LOCKERS WITH NUMBER OF ADULT AND NUMBER OF CHILDREN'S LIFE JACKETS.
Lifesaving
Issued 6 March 1996
Resolved
RENEW EPIRB BATTERY.
Lifesaving
Issued 6 March 1996
Resolved
RENEW 3 EACH RING BUOYS.
Construction/Loadline
Issued 1 December 1995
Resolved
AT NEXT U.S. PORT; FOUR BOTTOM PLATE INSERTS TO BE EXAMINED WITH VESSEL AFLOAT.
Lifesaving
Issued 7 July 1995
Resolved
INSTALL PERMANENT PROTECTIVE GUARDS FOR PERSONNEL AROUND STBD SSDG CRANKSHAFT PULLEY.
Lifesaving
Issued 7 July 1995
Resolved
INSTALL PERMANENT PROTECTION FOR PERSONNEL AROUND BOTH MDE VIBRATION DAMPERS.
Accommodation/Occupational Safety
Issued 7 July 1995
Resolved
MAKE PERMANENT REPAIRS TO PROPERLY SECURE MSD PUMPS TO MOUNTINGS AND INSTALL WIRING USING APPROPRIATE GROMMET OR "BX" CLAMP.
Construction/Loadline
Issued 10 May 1995
Resolved
CLEAN/REMOVE RUST SCALE AND OLD PAINT FROM ALL INTERNAL MEMBERS AND FLOOR BOARD SUPPORTS IN THE VICINITY OF THE LADDER INTO THE FORWARD BUNK COMPARTMENT AND MAKE THE SAME AVAILABLE FOR INSPECTION.
Engineering
Issued 10 May 1995
Resolved
COMPLETE INSTALLATION OF SHIP SERVICE GENERATOR KEEL COOLER.
Engineering
Issued 10 May 1995
Resolved
UPON COMPLETION OF INSTALLATION OF KEEL COOLER REMOVE SSG RAW WATER DUPLEX STRAINER AND BLANK OFF RAW WATERLINE AT THE SEA VALVE.
Lifesaving
Issued 9 March 1995
Resolved
REPAIR PERSONNEL SAFETY COVER AROUND AIR COMPRESSOR DRIVE BELTS.
Electrical
Issued 9 March 1995
Resolved
INSTALL BLANK COVER OR BLANK CIRCUIT BREAKER AT OPENING IN 115V AC CIRCUIT BREAKER PANEL IN ENGINE ROOM.
Lifesaving
Issued 9 March 1995
Resolved
INSTALL SAFETY COVERS ON BOTH MAIN DIESEL ENGINE TIMING MARK OPENINGS AT FLYWHEEL BELL HOUSINGS.
Lifesaving
Issued 9 March 1995
Resolved
INSTALL PERSONNEL PROTECTION AROUND BOTH MAIN DIESEL ENGINE VIBRATION DAMPERS.
Lifesaving
Issued 9 March 1995
Resolved
PROVIDE SEPARATE AND MARKED STOWAGE FOR CHILD LIFE PRESERVERS.
Lifesaving
Issued 9 March 1995
Resolved
INSTALL PERSONNEL GUARD AROUND STARBOARD DIESEL GENERATOR CRANKSHAFT PULLEY.
Fire Fighting
Issued 9 March 1995
Resolved
RENEW EMERGENCY FUEL SHUT OFF VALVE LABEL.
Lifesaving
Issued 9 March 1995
Resolved
MAKE ALL LIFEFLOAT PAINTERS, LIFE LINES AND FLOAT LIGHT LANYARDS FREE FROM ENTANGLEMENT AND ENSURE FLOAT FREE INSTALLATION.
Construction/Loadline
Issued 9 March 1995
Resolved
REMOVE EXCESSIVE ACCUMULATION OF OIL FROM ENGINE ROOM BILGES.
Lifesaving
Issued 9 March 1995
Resolved
REPAIR INOPERATIVE FLOAT LIGHT FOR LIFEFLOAT.
Lifesaving
Issued 9 March 1995
Resolved
LIMIT THE VESSEL TO 105 PERSONS ON THE OCEANS ROUTE UNTIL LIFE PRESERVER WATER LIGHTS ARE PLACED ON ALL LIFE RESERVERS. WHEN OPERATING ON THE OCEANS ROUTE THE LIFE PRESERVERS WITHOUT WATER LIGHTS MUST BE STOWED SEPARATELY AND NOT USED.
Accommodation/Occupational Safety
Issued 9 March 1995
Resolved
PROPERLY SECURE MARINE SANITATION DEVICE PUMPS TO MOUNTINGS AND INSTALL WIRING USING APPROPRIATE GROMMET OR "BX" CLAMP.
Lifesaving
Issued 9 March 1995
Resolved
LIMIT THE NUMBER OF CHILDREN TO BE CARRIED ABOARD TO 16 UNTIL ADDITIONAL CHILD LIFE PRESERVERS ARE OBTAINED.
Electrical
Issued 9 March 1995
Resolved
REPLACE MISSING GLOBE FOR LIGHT FIXTURE ABOVE STARBOARD DIESEL GENERATOR.
Electrical
Issued 9 March 1995
Resolved
REMOVE DEAD-ENDED WIRE RUNS FROM ENGINE ROOM.
Engineering
Issued 9 March 1995
Resolved
INSTALL PROTECTIVE LAGGING ON BARE EXHAUST PIPING FOR BOTH DIESEL GENERATORS.
Lifesaving
Issued 9 March 1995
Resolved
REMOVE PLASTIC OIL CONTAINERS FROM ENGINE ROOM DECKS AND BILGES.
Electrical
Issued 16 December 1994
Resolved
Install light bulbs, globes and guards in fixtures in bunk room prior to carrying overnight passengers.
Lifesaving
Issued 16 December 1994
Resolved
Prior to carrying passengers on oceans route provide approved lights on allrequired life jackets.
Fire Fighting
Issued 16 December 1994
Resolved
Provide two additional properly serviced B-II fire extingushers prior to carrying passengers.
Lifesaving
Issued 30 March 1994
Resolved
PROVIDE RINGS FOR EMERGENCY ESCAPE LADDER FROM FORWARD BERTHING AREA.
Electrical
Issued 30 March 1994
Resolved
PROVIDE BOX FOR BATTERY ON BRIDGE.
Accommodation/Occupational Safety
Issued 6 January 1992
Resolved
REPLACE BROKEN WINDOWS ON DECKHOUSE.
Lifesaving
Issued 6 January 1992
Resolved
REPLACED LINE IN 1 RING BUOY.
Electrical
Issued 6 January 1992
Resolved
REPAIRED STRAIN RELIEF ON FEEDER WIRE TO DOMESTIC HOT WATER HEATER.
Fire Fighting
Issued 6 January 1992
Resolved
REPLACED WORN/WASTED HOSE STATION VALVE HANDLES.
Lifesaving
Issued 6 January 1992
Resolved
REPLACED 8 FAILED BATTERY OPERATED PFD LIGHTS.
Fire Fighting
Issued 6 January 1992
Resolved
RECHARGED ONE BII CO2.
Electrical
Issued 6 January 1992
Resolved
COVERED UNUSED SPACES IN FACE OF DISTRIBUTION PANEL BY INSTALLING SPARE BREAKERS.
Electrical
Issued 6 January 1992
Resolved
REPAIR WASTED KICK PIPE IN FWD TWO PORTSIDE HEADS.
Accommodation/Occupational Safety
Issued 15 January 1991
Resolved
REPLACED 2 BROKEN WINDOWS DAMAGED BY FISHING GEAR AND I PILOT HOUSE WINDOW.
Fire Fighting
Issued 15 January 1991
Resolved
HYDRO-TESTED AND RECHARGED BII EXT.
Lifesaving
Issued 15 January 1991
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Lifesaving
Issued 15 January 1991
Resolved
RENEWED EPIRB BATTERY.
Lifesaving
Issued 15 January 1991
Resolved
REPLACED DEFECTIVE PFD LIGHTS, BROKEN PADDLE AND WATERLIGHT BATTERIES.
Lifesaving
Issued 3 January 1990
Resolved
PROVIDED 150 ADULT PFD'S.
Lifesaving
Issued 3 January 1990
Resolved
RENEWED PENDANTS ON LIFEFLOATS.
Lifesaving
Issued 3 January 1990
Resolved
RENEWED RING BUOY.
Lifesaving
Issued 2 February 1989
Resolved
REPLACE DETERIORATED LIFE LINES ON LIFE FLOATS.
Fire Fighting
Issued 2 February 1989
Resolved
PROVIDE PRESSURE GAGE ON FIRE MAIN.
Lifesaving
Issued 2 February 1989
Resolved
PROVIDE INDIVIDUAL WATER LIGHTS FOR ALL PFD'S ABOARD.
Accommodation/Occupational Safety
Issued 12 April 1988
Resolved
REPLACE DOOR LATCH ON EMERGENCY ESCAPE FROM ENGINE ROOM.
Electrical
Issued 12 April 1988
Resolved
COVER UNUSED SECTIONS OF BRIDGE ELECTRICAL LIGHTING PANEL.
Engineering
Issued 12 April 1988
Resolved
INSTALL FLAME SHIELDS ON MAIN ENGINE FUEL FILTERS.
Lifesaving
Issued 12 April 1988
Resolved
REPLACE RING BUOY ON BRIDGE.
Lifesaving
Issued 12 April 1988
Resolved
MAKE PRMANENT REPAIRS TO LIFE PRESERVE STORAGE BOXES.
Lifesaving
Issued 12 April 1988
Resolved
PROVIDE INDIVIDUAL WATER LIGHTS FOR ALL PFDS ABOARD.
Lifesaving
Issued 12 April 1988
Resolved
REPAIR ONE WATER LIGHT FOR LIFE FLOATS.
Lifesaving
Issued 12 April 1988
Resolved
RENEW WORN LIFELINES ON LIFEFLOATS.
Lifesaving
Issued 12 April 1988
Resolved
LABEL # AND TYPE OF LIFE PRESERVERS STORED IN EACH BOX.
Electrical
Issued 12 April 1988
Resolved
REPLACE MISSING RECEPTACLE COVERS IN GALLEY.
Electrical
Issued 28 April 1987
Resolved
PROVIDE GLOBES AND GUARDS FOR ALL LIGHT FIXTURES IN ENGINEROOM.
Construction/Loadline
Issued 28 April 1987
Resolved
REPAIR WINDOWS IN SEATING/ACCOMMODATION AREA.
Electrical
Issued 28 April 1987
Resolved
PROVIDE LAGGING FOR STARBOARD GENERATOR EXHAUST.
Electrical
Issued 28 April 1987
Resolved
PROVIDE RETRO-FIT FOR FLAME GUARDS ON GENERATOR FUEL OIL FILTERS.
Electrical
Issued 28 April 1987
Resolved
REPLACE LIGHT FIXTURE FOR FISHING DECK LIGHT ON AFTER MAST BY STERNLIGHT.
Electrical
Issued 28 April 1987
Resolved
PROVE PROPER OPERATION OF PORT GENERATOR.
Lifesaving
Issued 15 May 1985
Resolved
PROVIDE 6 DAY/6 NIGHT DISTRESS FLARES.
Accommodation/Occupational Safety
Issued 15 May 1985
Resolved
REPAIR/RENEW ALL BROKEN WINDOWS IN THE VESSELS WHEELHOUSE.
Casualty record · 2
12 August 2019Routine · role: Involved in a Marine Casualty · activity 6811009
30 September 2024Routine · role: Involved in a Marine Casualty · activity 8011850
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.