Records from 1999 to 2024. Most recent: inspection, 18 October 2024.
Documentation record
Registered dimensions (L × B × D)38.0 ft × 12.0 ft × 2.5 ft
Registered tonnagegross 9 / net 7
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTHOMAS BOAT WORKS · SLIDELL, LA, UNITED STATES · built 1999
Hull materialAluminum
PropulsionGasoline Engine
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 31 July 2026 · expires 31 August 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it9 - Simplified, Gross Ton
7 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 19
18 October 2024
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8011752
28 September 2023
Drydock Exam · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7786824
29 September 2022
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7552525
23 August 2021
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7277174
10 July 2020
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7002933
21 August 2019
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6777785
10 July 2018
COI Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6448592
17 July 2017
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6208590
29 July 2016
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5952426
30 July 2012
Deficiency Check · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4377610
15 November 2010
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3891904
18 October 2010
Annual Inspection · DAPI Audit
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3859466
30 June 2008
COI Inspection · Hull Examination · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3246624
1 May 2003
Annual Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1838411
29 April 2002
COI Inspection
Physical examination · MIDET EAST BANK DETAIL · USCG Heartland District (CGD-H) · Activity 1609755
30 April 2001
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1395709
1 May 2000
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1361449
17 August 1999
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 778301
8 April 1999
Hull Examination · Initial Construction-Excluding Oversight · Initial Certification
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1397131
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 August 2019
Resolved
Electrical equipment on a vessel must be installed and maintained to:(b) Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Found electrical terminal loose and hanging from installed wires. MI heard arcing and sparking coming from inside console. Install new electrical terminal IAW manufactures recommendations. Clean up wiring and remove all dead-end wires IAW 46CFR183.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 21 August 2019
Resolved 27 August 2019
Resolution: Electrical equipment replaced and tested to the statisfaction of the attending USCG Marine Inspector.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 17 July 2017
Resolved
Missing 25 Serviceable type I adult PFD, vessel restricted to carrying 38 passengers until faulty PFD's are replaced.
Action required: 705 - Other - as specified
Resolved 19 July 2017
Resolution: Owner provided proof of new lifejackets.
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 29 July 2016
Resolved
Vessel does not have hailing port markings on stern.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 August 2016
Resolved 9 August 2016
Resolution: Vsl rep sent pic of the hailing port markings on the stern of the vessel.
Engineering › Bilge Water Management System › Pump
Issued 30 July 2012
Resolved
Bilge pump is not (UL) approved.
Action required: 705 - Other - as specified
Due 30 August 2012
Resolved 7 August 2012
Resolution: UL approved bilge pump installed.
Engineering › Bilge Water Management System › Pump
Issued 30 July 2012
Resolved
Bilge pump and float switch is not properly secured.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 August 2012
Resolved 7 August 2012
Resolution: Pump and float switch permantely mounted.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 18 October 2010
Resolved
All components of the DAPI checklist failed. Need a visit by the DAPI auditor so that the company can come up to speed with the requirements.
Action required: 705 - Other - as specified
Due 26 November 2010
Resolved 15 November 2010
Resolution: Cleared by SECTOR DAPI.
Documentation
Issued 8 April 1999
Resolved
POST STABILITY LETTER WHEN RECEIVED FROM OCMI._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 April 1999
Resolved 8 April 1999
Documentation
Issued 8 April 1999
Resolved
PROVIDE FCC STATION LISENCE AND SAFETY RADIOTELEPHONY CERTIFICATE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 April 1999
Resolved 8 April 1999
Fire Fighting
Issued 8 April 1999
Resolved
REPLACE ONE B-I WITH B-II TO BRING TOTAL TO 1 B-I AND 4 B-II ONBOARD._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 April 1999
Resolved 8 April 1999
Electrical
Issued 8 April 1999
Resolved
REWIRE COURTESY LIGHTS AND NAVIGATION LIGHTS IAW WITH AMPACITY CHART FROM SUBCHAPTER "T"._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 8 April 1999
Resolved 8 April 1999