13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 May 2021
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations.
Starboard side coupling to drive train experienced sheering of a bolt while underway. Vessel is not permitted to carry passengers until coupling and bolts are intact and attending marine inspectors witness satisfactory underway trial.
46CFR182.200
701c
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 July 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 May 2021
Resolved
Each life ring buoy must be marked with Type II retroflection tape.
Life ring did not have retroflection tape.
46CFR185.604(h)
50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 June 2021
Resolved 6 July 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 27 May 2021
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements without exceeding its designed limitations.
Vessels exhaust coolant water is leaking on the stbd side of the engine. Unauthorized repair made to area.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 June 2021
Resolved 6 July 2021
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 27 May 2021
Resolved
Each vessel must be equipped with a public address system.
Vessels bullhorn was not on the vessel during the inspection.
46CFR184.610(a)
50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 June 2021
Resolved 6 July 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 May 2021
Resolved
Each connection to a conductor or terminal part must be made within an enclosure.
STBD nav light wiring requires an enclosure at wiring connectors.
46CFR183.340(g)
50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 June 2021
Resolved 6 July 2021
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 27 May 2021
Resolved
Movement of the vessel shall be under the direction and control of a master or licensed mate at all times.
2nd masters license has expired. Rectify prior to 2nd master operating vessel.
46CFR185.304
705c
Action required: 705 - Other - as specified
Resolved 6 July 2021
01 - Certificates & Documentation › 012 - Crew Certificates › Certificate for medical care
Issued 27 May 2021
Resolved
The manning requirements for a particular vessel is determined by the OCMI.
50% of manning indicated on COI is required to be CPR certified.
46CFR15.501
50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 June 2021
Resolved 6 July 2021
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 14 May 2021
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 July 2021
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 12 August 2019
Resolved
VESSEL MUST CARRY A FIRST AID KIT APPROVED UNDER 46CFR160.041 OR A KIT WITH EQUIVALENT CONTENTS. THE FIRST AID KIT ON BOARD THE VESSEL DID NOT MEET THE REQUIREMENTS.
46CFR184.710
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 August 2019
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 12 August 2019
Resolved
VESSELS ON RIVER ROUTES MUST CARRY 03 RED HAND FLARES AND 03 ORANGE SMOKE SIGNALS. THE ORANGE SMOKE SIGNALS ONBOARD WERE EXPIRED.
**VESSEL IS NOT PERMITTED TO OPERATE IN LIMITED/RESTRICTED VISIBILITY UNTIL PROPER DISTRESS SIGNALS ARE ONBOARD.**
46CFR180.68
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 August 2019
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 6 November 2018
Resolved
CROP/RENEW TRANSVERSE/LONGITUDINAL STIFFENERS AND BOTTOM PLATING IN THE ENGINE ROOM VOID SPACE.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 June 2019
Resolution: All required framing/stiffeners have been cropped/renewed, as has the bottom plating.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 November 2018
Resolved
CROP/RENEW TO GOOD METAL, THE PATCHED PORTION OF THE BILGE SUCTION PIPING IN THE SNACK BAR VOID.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 June 2019
Resolution: The section of bad piping was cropped and renewed with new piping, secured by normaconnect grip-clamps. Photo uploaded.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 6 November 2018
Resolved
CROP/RENEW THE BULKHEAD/FRAMING IWO THE DOORWAYS FOR THE TOILET/STORAGE SPACES ON THE MAIN DECK TO ENSURE WATERTIGHT INTEGRITY OF THE HULL.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 June 2019
Resolution: Deck plating and associated deteriorated metal was cropped and renewed.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 6 November 2018
Resolved
CROP/RENEW ENGINE ROOM BULKHEADS TO GOOD METAL IVO OF DECK/SUPERSTRUCTURE JOINT.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 June 2019
Resolution: material cropped and renewed.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 30 July 2018
Resolved
STRUCTURAL MEMBERS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION. THERE WERE NUMEROUS TRANSVERSE AND LONGITUDINAL STIFFENERS THAT HAVE SEPARATED FROM THE HULL PLATING. VESSEL TO BE HAULED FOR DRYDOCK INSPECTION/REPAIRS IN NOVEMBER 2018.
46CFR176.802(a)(1)
Action required: 705 - Other - as specified
Resolved 23 June 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 30 July 2018
Resolved
MACHINERY INSTALLATIONS SHALL BE OF A SUITABLE TYPE AND DESIGN FOR THEIR INTENDED USE. COOLING WATER PIPING FOR THE MAIN ENGINE HAD SOFT PATCHES, DEMONSTRATING THAT THE ORIGINAL DESIGN OF SAID PIPING HAD BECOME INEEFECTIVE, THEREFORE NOT SUITABLE FOR USE.
46CFR182.05-1(a)
Action required: 705 - Other - as specified
Resolved 23 June 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 30 July 2018
Resolved
ALL VESSELS SHALL HAVE A SATISFACTORY MEANS OF DRAINING ALL WATERTIGHT COMPARTMENTS. THE VESSELS BILGE PIPING HAD A SOFT PATCH ON THE PIPING, LOCATED IN THE THID VOID SPACE BACK FROM THE BOW.
46CFR182.25-1(a)
Action required: 703 - Prior to bunkering operations
Resolved 23 June 2019
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 30 July 2018
Resolved
ALL SHIPS SHALL HAVE LIGHTING MEETING THE REQUIREMENT OF THE INTERNATIONAL AND INLAND NAVIGATION RULES. THE VESSELS NAVIGATIONAL LIGHTS WERE NOT FUNCTIONING. VESSEL RESTRICTED TO DAY TIME OPERATIONS.
46CFR183.420
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 August 2018
Resolution: Vessel operator provided pictures of the navigational lights in operational condition.
Documentation › Certificates/Documents › Stability Letter
Issued 23 August 2017
Resolved
Post Stability letter with amendment for passenger weight.
Due 25 September 2017
Resolved 14 September 2017
Resolution: Cleared, planning to conduct another stability test within the next couple of months.
Operations/Management › Drills/Instruction › Not Conducted
Issued 23 August 2017
Resolved
Provide evidence of crew training
Due 25 September 2017
Resolved 14 September 2017
Resolution: Provided log of drills.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 23 August 2017
Resolved
Post EAP information and hotline numbers.
Due 25 September 2017
Resolved 14 September 2017
Resolution: Posted required information.
Communications › Radio Communications › VHF Radiotelephone
Issued 23 August 2017
Resolved
Post emergency broadcast placard.
Due 25 September 2017
Resolved 14 September 2017
Resolution: Posted placard.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 23 August 2017
Resolved
Provide burn gel, aspirin, and eyewash.
Due 25 September 2017
Resolved 14 September 2017
Resolution: Replaced required supplies.
Engineering › Bilge Water Management System › Pump
Issued 23 August 2017
Resolved
Prove proper operation of fixed bilge pump.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 August 2017
Resolution: Received requested documentation via video and photograph attesting to proper operation of substitute portable power pump at 31GPM (exceeded req 10GPM).
Engineering › Bilge Water Management System › Pump
Issued 23 August 2017
Resolved
Prove proper operation of fixed bilge pump.
Due 15 September 2017
Resolved 14 September 2017
Resolution: Vessel hired a technician to examine bilge system, and clear the lines. Proved proper operation to attending CG MI's.
Engineering › Bilge Water Management System › Not Operational
Issued 20 June 2016
Resolved
Prove proper operation of bilge pump.
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 June 2016
Resolved 22 June 2016
Resolution: Vessel provided written statement attesting to the proper operation of bilge pump along with pictures showing before and after.
Fire Fighting › Remote Fuel Shutoff › General
Issued 20 June 2016
Resolved
Properly label f/o cutoff valves
Action required: 705 - Other - as specified
Due 5 July 2016
Resolved 22 June 2016
Resolution: Operator provided pictures of properly labeled f/o cutoff valves.
Operations/Management › Drills/Instruction › Not Conducted
Issued 20 June 2016
Resolved
Conduct man overboard and fire drill
Action required: 701 - Prior to carriage of passengers/cargo
Due 22 June 2016
Resolved 23 June 2016
Resolution: Operator provided proof that fire and abandon ship drills were condcuted.
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 20 June 2016
Resolved
Provide accurate instructions for bilge system.
Action required: 705 - Other - as specified
Due 5 July 2016
Resolved 22 June 2016
Resolution: Operator provided instructions that shall be posted on the vessel at all times.