MAURY USCG vessel records
← All vessels

MALANA

MALANA is a 1977 freight barge. The Coast Guard has recorded 80 inspections since 1985, most recently in September 2011, along with 130 deficiencies and 2 casualty investigations in 2011.

Records from 1985 to 2011. Most recent: inspection, 6 September 2011.

Built
1977
Last inspected
6 September 2011
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

This record may be incomplete: the most recent inspection recorded for this vessel was 15 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 6 September 2011
…with no type recorded34
Operational controls None recorded without a removal date
Years with a record 23 calendar years (1985–2011)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

Flag
UNITED STATES
Maury page id
psix-49325

Documentation record

Tonnage as PSIX records it3202 - Dead Weight, Ton
3202 - Regulatory (Subpart C or D), Gross Ton
3202 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 2

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

MR GILBERT Towing Vessel · MISLE 138306 · 6 September 2011 · activity 4198618ELIZABETH C Towing Vessel · MISLE 132860 · 6 July 2011 · activity 4093677

Inspection history · 80

6 September 2011 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4198618
6 July 2011 Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4093677
15 August 2007 Load Line/Change of Employment
Administrative · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 3033976
18 February 2007 Damage Survey · Examination of Repairs
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2874622
13 September 2006 Internal Structural Exam
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2864251
3 May 2006 Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2831937
29 June 2005 Annual Inspection
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2550845
21 April 2005 MTSA Verification
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 2366479
30 January 2004 Hull Examination · Internal Structural Exam · Annual Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1997901
2 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1957681
19 March 2003 Annual Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1758646
19 March 2002 Administrative Inspection · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1490207
7 January 2002 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1476200
5 December 2001 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1387231
9 September 2001 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1408855
21 April 2001 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1370131
10 April 2001 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 48228
4 January 2001 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 661239
22 December 2000 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 168211
5 December 2000 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1055580
20 November 2000 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1361841
15 December 1999 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1408421
28 April 1999 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1390898
13 January 1999 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 810277
18 December 1998 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1390897
13 April 1998 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 125662
3 February 1998 Re-Inspection · MARPOL Annex V Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1422969
12 August 1997 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1119551
19 March 1997 Damage Survey · Deficiency Check · Examination of Repairs
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1099150
13 February 1997 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1110122
13 January 1997 Drydock Extension
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1099477
10 January 1997 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1439809
18 December 1996 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1363892
3 April 1996 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1449913
15 January 1996 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1374500
21 December 1994 MARPOL Annex V Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1458209
3 February 1994 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1354566
22 December 1993 Re-Inspection · Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1472398
26 April 1993 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 486103
2 February 1993 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 827290
30 December 1992 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1140745
26 August 1992 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 504549
29 February 1992 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 959807
31 January 1992 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1412415
22 November 1991 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 937186
27 April 1991 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 904167
12 January 1991 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 912368
10 September 1990 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 446768
16 March 1990 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 922888
21 February 1990 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 922173
2 March 1989 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 485093
19 January 1989 Hull Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1345155
9 February 1988 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1327385
9 February 1988 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1334446
17 December 1987 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 513769
11 December 1987 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 534968
30 October 1987 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 509823
29 October 1987 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 517870
10 March 1987 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1330630
5 February 1987 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 444579
20 January 1987 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1007549
18 January 1987 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 485850
12 January 1987 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 460198
10 November 1986 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 488675
8 November 1986 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 470446
8 October 1986 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 459642
2 September 1986 Examination of Repairs
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1317889
5 August 1986 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 539346
10 July 1986 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 509245
9 July 1986 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 437818
22 March 1986 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 455069
21 March 1986 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 484100
10 February 1986 Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 985780
8 January 1986 Excursion Permit
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 988783
9 December 1985 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 457612
7 December 1985 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 471911
15 June 1985 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 540323
28 March 1985 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 469553
1 March 1985 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1287932
22 January 1985 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 979095

Deficiency record · 130

Construction/Loadline › Structures › Rake
Issued 18 February 2007 Resolved
Submit repair proposal for perm repairs for all damage sustained as a result of collision with barge KAHOKU 17FEB07.
Action required: 705 - Other - as specified
Due 31 March 2007
Resolved 28 March 2007
Construction/Loadline › Structures › Rake
Issued 18 February 2007 Resolved
Perm. repair proposal to be approved by USCG OCMI prior to commencing repairs.
Action required: 705 - Other - as specified
Due 31 March 2007
Resolved 28 March 2007
Construction/Loadline › Structures › Rake
Issued 18 February 2007 Resolved
Perm. repairs to be completed to satisfaction of attending USCG marine inspector and prior to conducting commercial operations.
Action required: 701 - Prior to carriage of passengers/cargo
Due 31 March 2007
Resolved 28 March 2007
Construction/Loadline › Structures › Transverse Bulkhead
Issued 25 February 2004 Resolved
25. PFR Collar bl 17, df 2 [cracked transverse thru port] (drydock) LEGACY COMPONENT DESC: Transverse Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Deck Plating
Issued 18 February 2004 Resolved
1. PFR Holed/pitted flanged plate bottom outboard bilge frame at fr 4 1/2 - Crop and replace in drydock (approx. 5ft x 4ft x 3/8" w/4in flauge)
Condition: Unknown
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Rake
Issued 18 February 2004 Resolved
2. PFR Holed/pitted flanged plate bottom outboard bilge frame at fr 4 - Crop and replace in drydock (approx. 5ft x 4ft x 3/8" w/4in flauge) LEGACY COMPONENT DESC: Rake
Condition: Unknown
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Deck Plating
Issued 18 February 2004 Resolved
3. PFR V & weld broken weld at base vertical support at fr 3, 3rd bottom long deep frame LEGACY COMPONENT DESC: Rake
Condition: Unknown
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Rake
Issued 18 February 2004 Resolved
4. PFR R/W sl 1 fr2 1/2 at vertical thru port along side shell LEGACY COMPONENT DESC: Rake
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Hull › Hull Plating
Issued 18 February 2004 Resolved
5. Hull inserts side shell at fr 1 1/2 (drydock) a .Horizontal crease (not sharp) side shell 8 in below deck at fr 1 ½ b. Hull plate set in aft of fr 1 ½ five feet below deck (approx 2 ft x 3 ft) c. Bottom fr 1 set up at turn of bilge (approx 4ft x 4ft hull plate and 18 in x 24 in d-frame insert
Condition: Damaged By Earlier Event
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Hull › Side Shell
Issued 18 February 2004 Resolved
6. PFR Fr ½ port side 3 ft from side shell, deep frame set up at bottom (drydock) (approx 24 in x 36 in web insert) LEGACY COMPONENT DESC: Rake
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Rake
Issued 18 February 2004 Resolved
7. PFR Port fwd corner at head long, set bottom plate at bottom d-long 3 (drydock) (approx 3ft x 4ft hull insert) LEGACY COMPONENT DESC: Rake
Condition: Unknown
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Rake
Issued 18 February 2004 Resolved
8. PFR Head log vert #3,4,5 set in - crop and replace fwd 1/3 of vertical head long supports (approx 4 ½ft x 2 ½ft x 3/8 in ea) (drydock) LEGACY COMPONENT DESC: Rake
Condition: Unknown
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Rake
Issued 18 February 2004 Resolved
9. PFR Crop and replace bottom long 2 first 8ft from bow LEGACY COMPONENT DESC: Rake
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Transverse Bulkhead
Issued 18 February 2004 Resolved
10. PFR Remove wood and silicone plugs along top centerline bhd (approx 5) LEGACY COMPONENT DESC: Longitudinal Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Rake
Issued 18 February 2004 Resolved
11. PFR Pump out standing water LEGACY COMPONENT DESC: Rake
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Transverse Bulkhead
Issued 18 February 2004 Resolved
13. PFR Collar bl l1, df 3 ½ [cracked transverse thru port] (drydock) LEGACY COMPONENT DESC: Transverse Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Transverse Bulkhead
Issued 18 February 2004 Resolved
14. PFR Collar bl l1, df 2 ½ [cracked transverse thru port] (drydock) LEGACY COMPONENT DESC: Transverse Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Rake
Issued 18 February 2004 Resolved
15. PFR V & weld cracked weld bl 9, df 2 ½ LEGACY COMPONENT DESC: Rake
Condition: Unknown
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Rake
Issued 18 February 2004 Resolved
16. PFR R/W broken weld bl 8, df 2 ½ LEGACY COMPONENT DESC: Rake
Condition: Unknown
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Rake
Issued 18 February 2004 Resolved
17. PFR R/W bracket bl 9, df 3 ½ LEGACY COMPONENT DESC: Rake
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Transverse Bulkhead
Issued 18 February 2004 Resolved
18. PFR Collar bl 6, df 2 [cracked transverse thru port] (drydock) LEGACY COMPONENT DESC: Transverse Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Rake
Issued 18 February 2004 Resolved
19. PFR V/W dl 1, fr 2 as marked LEGACY COMPONENT DESC: Rake
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Transverse Bulkhead
Issued 18 February 2004 Resolved
20. PFR V/W bl 11, df 1 1/2 as marked [cracked transverse thru port] LEGACY COMPONENT DESC: Transverse Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Transverse Bulkhead
Issued 18 February 2004 Resolved
21. PFR Collar bl 11, df 1 [cracked transverse thru port] (drydock) LEGACY COMPONENT DESC: Transverse Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Transverse Bulkhead
Issued 18 February 2004 Resolved
22. PFR V/W bkts bl 9 & 10, df 1 LEGACY COMPONENT DESC: Transverse Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 18 February 2004 Resolved
23. PFR R/W vert weld at base 1st vert, fr 1 LEGACY COMPONENT DESC: Longitudinal Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Transverse Bulkhead
Issued 18 February 2004 Resolved
24. PFR R/W bottom dl 2 at bl 12 as marked [cracked transverse thru port] LEGACY COMPONENT DESC: Transverse Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Transverse Bulkhead
Issued 18 February 2004 Resolved
26. PFR Collar bl 16, df 2 [cracked transverse thru port] (drydock) LEGACY COMPONENT DESC: Transverse Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
27. PFR R/W bracket bl 13 & 14, df 2 LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
28. PFR V/W thru port crack bl 17, df 2 ½ LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
29. PFR R/W as marked at base vert support @ dl 2, df 3 LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
30. PFR R/W cracked bottom thru ports @ bl 13, 14, 15 and df 3 LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
31. PFR R/W cracked bottom thru ports - bl 15, df 3 ½ - bl 17, df 4 - bl 16, df 4 LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
32. PFR R/W dl 2, fr 4 at base vert support as marked
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 18 February 2004 Resolved
33. PFR R/W cracked thru port bl 17, df 4 ½
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 18 February 2004 Resolved
34. PFR Holed d-long 3 at aft bhd bottom bracket - Crop and replace aft most 5ft (drydock)
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Rake
Issued 18 February 2004 Resolved
35. STBD FWD RAKE # 8 and 9 head log vert frames, counting from stbd side shell found set up at bottom and bottom plate in way (drydock) a. crop and replace btm 1/3 each (approx 4 ft x 2 ft x 3/8 in each) LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
36. SFR #4, 5, 6 head log vert frames, counting from c/l found set in (drydock) a. crop and replace fwd 1/3 each (approx 3 ft x 4 ft x 3/8 in each)
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
37. #1 PUMP Bottom aft 2 bays heavily scaled - chip and muck out for inspection (drydock)
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 18 February 2004 Resolved
38. #1 P V/W crack at base vert spt 2, bhd 5 (approx 8 in cr) LEGACY COMPONENT DESC: Longitudinal Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
39. #1 P R/W cracked at base vert spt as marked, dl 1, fr 7 LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Hull › Bottom Plating
Issued 18 February 2004 Resolved
40. #1 P Standing water - pump out
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 18 February 2004 Resolved
41. #1 P R/W cracked weld - c/l bhd, fr 7 ½ as marked LEGACY COMPONENT DESC: Longitudinal Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
42. #1 P R/W at base vert spt bl 6, fr 8 as marked LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
43. #1 P R/W base vert spt fr 7, bl 12 as marked LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
44. #1 P R/W diagonal at base vert spt bl 18, fr 7 LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
45. #2 P V/W bl 5, fr 13 at base vert spt as marked LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
46. #3 P Fractured bottom long at bl 10, fwd bhd 20 - crop and replace approx 4ft (4 in x 6 in x 3/8" angle) LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 18 February 2004 Resolved
47. #3 P R/W diagonal at base vertical spt bl 5, df 22 LEGACY COMPONENT DESC: Longitudinal Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
48. #3 P R/W diagonal at base vert spt bl 5, df 23 LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
49. #3 P R/W diagonal at base vert spt bl 5, df 24 LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
50. #3 P R/W diagonal at base vert spt bl 18, df 23 LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Hull › Bottom Plating
Issued 18 February 2004 Resolved
51. # 4 P Clean bilge with fresh water due to excessive slime.
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Deck Plating
Issued 18 February 2004 Resolved
52. #4 P Replace section of catwalk grate at base ladder (approx 4ft x 6ft) LEGACY COMPONENT DESC: Deck Plating
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Hull › Side Shell
Issued 18 February 2004 Resolved
53. # 5 P Side shell set in btwn fr 30 ½ - 31, sl 1-3 (drydock) a. crop and replace approx 4ft x 6 ft hull plate LEGACY COMPONENT DESC: Side Shell
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 18 February 2004 Resolved
54. #5 P Wrap weld base diagonal supports a. bl 6, df 32 b. bl 6, df 33 c. bl 6, df 34 LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 18 February 2004 Resolved
55. #5 P R/W deep frame flange welds at base vert spt b l6, df 34
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
56. #5P R/W vert weld at base vert spt bl 12, df 32 LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Hull › Side Shell
Issued 18 February 2004 Resolved
57. #1S Sideshell vert frames 7, 8, 9 set in btwn sl 1-3 - reinspect during drydock
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 18 February 2004 Resolved
58. #1S Sl 4 at bhd 5 set in - crop and replace 6 ft (drydock)
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 18 February 2004 Resolved
59. #1S Crop and replace brackets # 5, 6 at bhd 10
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
60. #2S Crop and replace bkt #2 @ bhd 15
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Hull › Bottom Plating
Issued 18 February 2004 Resolved
61. #4S Take UT readings along "A" strake btm plating (drydock)
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Hull › Bottom Plating
Issued 18 February 2004 Resolved
61. #4S Take UT readings along "A" strake btm plating (drydock)
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Hull › Bottom Plating
Issued 18 February 2004 Resolved
62. #4S Take UT reading along aft-most bay athwartships (btm plate & intervals) (drydock) LEGACY COMPONENT DESC: Bottom Plating
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Hull › Bottom Plating
Issued 18 February 2004 Resolved
63. STBD AFT RAKE (SAR) UT readings for btm longs and stiffeners, btm plating from side shell inboard to centerline, from fwd bhd aft one bay (drydock) LEGACY COMPONENT DESC: Bottom Plating
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Transverse Bulkhead
Issued 18 February 2004 Resolved
64. SAR Crop and replace holed sections of transverse deep frames as marked (drydock)
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Hull › Side Shell
Issued 18 February 2004 Resolved
65. SAR UT btm long's #1, 2 & 3 counting from side shell full length (drydock) LEGACY COMPONENT DESC: Side Shell
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Hull › Longitudinal Frame
Issued 18 February 2004 Resolved
66. SAR UT lower deep frames at turn of the bilge in first & 2nd bay (drydock)
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Superstructure
Issued 18 February 2004 Resolved
67. SAR UT/replace gussets in way of access ladder (drydock) LEGACY COMPONENT DESC: Superstructure
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Hull › Bottom Plating
Issued 18 February 2004 Resolved
68. SAR Stern log frames 13 & 15 set in, plus btm & vert hull plate in way - inspect at drydock LEGACY COMPONENT DESC: Hull Plating
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 18 February 2004 Resolved
69. SAR UT fwd bulkhead from btm up 3 ft LEGACY COMPONENT DESC: Longitudinal Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 18 February 2004 Resolved
70. SAR UT side longs from fwd bulkhead to stern log (drydock) LEGACY COMPONENT DESC: Longitudinal Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Hull › Bottom Plating
Issued 18 February 2004 Resolved
71. PORT AFT RAKE (PAR) UT readings for btm longs and stiffeners, btm plating from side shell inboard to centerline, from fwd bhd aft one bay (drydock) LEGACY COMPONENT DESC: Bottom Plating
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Transverse Bulkhead
Issued 18 February 2004 Resolved
72. PAR Port aft corner set in & bracket tripped (repair in drydock) a. Crop and replace (approx 2ft x 3ft x 3/8in bkt, 3 1/2ft x 5ft corner shell) LEGACY COMPONENT DESC: End Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Hull › Side Shell
Issued 18 February 2004 Resolved
73. PAR Side shell set in btwn stern log to two frames fwd - reinspect during drydock LEGACY COMPONENT DESC: Side Shell
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 18 February 2004 Resolved
74. PAR UT fwd bulkhead from btm up 3 ft LEGACY COMPONENT DESC: Longitudinal Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Transverse Bulkhead
Issued 18 February 2004 Resolved
75. PAR UT btm long's & deep transverse frame in first bay aft of fwd bhd (drydock) LEGACY COMPONENT DESC: Transverse Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Structures › Transverse Bulkhead
Issued 18 February 2004 Resolved
76. PAR UT centerline bhd - lower 2 ft LEGACY COMPONENT DESC: Transverse Bulkhead
Due 18 March 2004
Resolved 26 May 2004
Construction/Loadline › Hull › Longitudinal Frame
Issued 30 January 2004 Resolved
12. PFR Bottom d-frame collar at thru port bl 11, df 3 (drydock) LEGACY COMPONENT DESC: Rake
Due 18 March 2004
Resolved 26 May 2004
Documentation › Certificates/Documents › Coastwise Load Line Certificate
Issued 19 March 2002 Resolved
Prior to operating vessel provide current Load Line Certificate.
Action required: 17 - Rectify deficiencies prior to departure
Due 29 March 2002
Resolved 26 March 2002
Resolution: ABS Surveyor extended Load Line to 26AUG02 pending issue of new permanent certificate.
Deck/Cargo › Ballast › Vents
Issued 19 March 2002 Resolved
Demonstrate proper operation of all ballast tank vent closure devices.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 22 March 2002
Construction/Loadline › Hull
Issued 5 December 2001 Resolved
Prior to operating, make temporary repairs to 8 in crack in #1 STBD void sideshell plating IWO FR #7 btwn sideshell long #4 (FR top). LEGACY COMPONENT DESC: Side Shell
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 5 December 2001
Resolved 6 December 2001
Construction/Loadline › Hull
Issued 5 December 2001 Resolved
Make permanent repairs to 8 in crack in #1 STBD void sideshell hull plating IWO FR #7 btwn sideshell long #4 (FR top). LEGACY COMPONENT DESC: Side Shell
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 25 January 2002
Resolved 25 January 2002
Construction/Loadline
Issued 21 April 2001 Resolved
Affect perminant repairs to pump room bottom plate. Location: Bottom platein way of bottom longs 1-10 & 12-15, aprox 7 ft from forward bulkhead. Comply with HONMS ltr 16711 dated 09MAR01.
Condition: Unknown
Due 21 April 2001
Resolved 21 April 2001
Construction/Loadline
Issued 20 November 2000 Resolved
Found four inches of water throughout ballast water pumproom, required vessel rep to remove the water to complete the examination of this space, IAW 46 CFR 91.25-10.
Condition: Unknown
Due 20 November 2000
Resolved 20 November 2000
Electrical
Issued 18 December 1998 Resolved
Prove proper operation of SSDG overspeed trip.
Condition: Unknown
Due 13 January 1999
Resolved 13 January 1999
Unknown
Issued 19 March 1997 Resolved
PROVIDE COPY OF ABS SPECIAL SURVEY (CLASS & LOADLINE) REPORT COVERING THE DRYDOCKING AND REPAIR OF VESSEL, CONDUCTED 19MAR97 - 06JUN97.
Condition: Unknown
Due 19 March 1997
Resolved 19 March 1997
Engineering
Issued 15 January 1996 Resolved
PROPERLY INSTALL, ON THE SERVICE GENERATOR, A REACH ROD FOR THE FUEL OIL SHUT-OFF VALVE, TO OPERATE FROM OUTSIDE OF THE GENERATOR CONTAINER.
Condition: Unknown
Due 15 January 1996
Resolved 15 January 1996
Navigation
Issued 15 January 1996 Resolved
REPAINT THE NAVIGATION LIGHT SCREENS FLAT BLACK.
Condition: Unknown
Due 15 January 1996
Resolved 15 January 1996
Engineering
Issued 15 January 1996 Resolved
REMOVE OR PROPERLY SECURE THE EXHAUST PIPE THAT IS NOT BEING USED.
Condition: Unknown
Due 15 February 1996
Resolved 15 February 1996
Electrical
Issued 15 January 1996 Resolved
PROPERLY COVER THE OPEN SPACES IN ALL THE ON DECK ELECTRICAL POWER PANELS.
Condition: Unknown
Due 15 February 1996
Resolved 15 February 1996
Construction/Loadline
Issued 15 January 1996 Resolved
PROPERLY REPAINT ALL THE VESSEL MARKINGS ON THE HULL.
Condition: Unknown
Due 15 January 1996
Resolved 15 January 1996
Engineering
Issued 15 January 1996 Resolved
REPAIR THE EXHAUST LEAK ON THE SERVICE GENERATOR.
Condition: Unknown
Due 15 January 1996
Resolved 15 January 1996
Construction/Loadline
Issued 15 January 1996 Resolved
REPLACE THE GASKETS IN ALL THE VOID MANHOLE COVERS AS NEEDED.
Condition: Unknown
Due 15 January 1996
Resolved 15 January 1996
Electrical
Issued 15 January 1996 Resolved
PROPERLY MARK THE SWITCHES IN ALL THE ON DECK ELECTRICAL PANEL BOXES.
Condition: Unknown
Due 15 January 1996
Resolved 15 January 1996
Construction/Loadline
Issued 21 December 1994 Resolved
MAKE OPERATIONAL ALL DOGS TO THE FORWARD WATERTIGHT DOOR AND PROVE WATER TIGHT.
Condition: Unknown
Due 21 December 1994
Resolved 21 December 1994
Construction/Loadline
Issued 22 December 1993 Resolved
REPAINT VESSEL HULL MARKINGS_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 January 1994
Resolved 3 January 1994
Construction/Loadline
Issued 22 December 1993 Resolved
MAKE REPAIRS TO THE FWD RAKE PORT SIDE AS FOLLOWS: FAIR IN AND PART CROP AND RENEW THE 3RD AND 4TH VERTICAL SIDE STIFFENERS AS COUNTED FROM THE AFT BULKHEAD WHERE BUCKLED AND TORN.
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Construction/Loadline
Issued 22 December 1993 Resolved
REMOVE ALL STANDING WATER AND MUD IN VOIDS AND FWD RAKE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 January 1994
Resolved 3 January 1994
Construction/Loadline
Issued 22 December 1993 Resolved
REPAIR THE SUPPORT FRAMES LOCATED AROUND THE MAIN DECK HOUSE STRUCTURE AS MARKED, AND AS FOLLOWS: (ALL FRAMES ARE COUNTED FM FWD BACK) ON STBD SIDE- CROP AND RENEW (C&R) #3, ARC AND REWELD #5 AND #11. ON PORT SIDE- CROP AND RENEW (C&R) #6, #8, #14 & #15, ARC AND REWELD #5, #10, & #11.
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Construction/Loadline
Issued 22 December 1993 Resolved
MAKE REPAIRS IN THE #1 STBD VOID AS FOLLOWS: FAIR IN AND PART CROP AND RENEW (C&R) THE FWD BULKHEAD ALONG THE OUTBOARD SIDE WHERE BUCKLED NEAR SIDE LONGITUDINAL #4 FM OVHD. FAIR IN AND PART C&R THE BOTTOM WEB BRACKETS #1 AND #2 FROM THE FWD BULKHEAD ALONG THE OUTBOARD SIDE WHERE ALSO BUCKLED.
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Construction/Loadline
Issued 22 December 1993 Resolved
MAKE REPAIRS TO THE STBD AFT RAKE CORNER AS FOLLOWS- PART CROP AND RENEW (C&R) THE VERTICLE FRAME ON STERN, PART C&R THE UNDER DECK LONGITUDINAL, RENEW THE CORNER BRACKET, AND PART C/R THE 1ST VERTICLE SIDE SHELL STIFFENER AS COUNTED FROM THE STERN ALONG THE SIDE SHELL.
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Construction/Loadline
Issued 22 December 1993 Resolved
ARC AND REWELD IN AFT RAKE, STBD SIDE, WELDS FRACTURED ON STERN LOG BRACKETS #7, & #8 AS COUNTED FROM THE SIDE SHELL._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Construction/Loadline
Issued 22 December 1993 Resolved
ARC AND REWELD IN AFT RAKE STBD SIDE, THE FRACTURED WELD LOCATED WHERE THE 6TH STERN LOG BRACKET FROM THE CENTERLINE BULKHEAD TIES TO THE UNDER DECK LONGITUDINAL.
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Construction/Loadline
Issued 22 December 1993 Resolved
MAKE REPAIRS IN THE #1 PORT VOID AS FOLLOWS: PART CROP AND RENEW THE 4TH VERTICLE SIDE SHELL STIFFENER FROM THE FWD BULKHEAD, WHERE IT CROSSES THE 4TH AND 5TH SIDE LONGITUDINALS AS COUNTED FROM THE OVERHEAD.
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Construction/Loadline
Issued 22 December 1993 Resolved
ARC AND REWELD IN AFT RAKE PORT SIDE WHERE 2ND UNDER DECK FRAME FROM STERN TIES TO CENTERLINE BULKHEAD.
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Construction/Loadline
Issued 22 December 1993 Resolved
ARC AND REWELD IN AFT RAKE PORT SIDE WHERE 4TH UNDER DECK FRAME FROM STERN TIES TO THE CENTERLINE BULKHEAD.
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Construction/Loadline
Issued 22 December 1993 Resolved
CROP OUT AND PART RENEW THE STERN LOG BRACKETS #12, #13, AND #14 WHERE BUCKLED, LOCATED IN THE AFT RAKE PORT SIDE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Construction/Loadline
Issued 22 December 1993 Resolved
ARC AND REWELD THE FRACTURED WELD IN THE AFT RAKE PORT SIDE WHERE THE 2ND PILLAR FROM STERN NEAREST THE CENTERLINE BULKHEAD TIES TO THE UNDER DECK.
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Construction/Loadline
Issued 22 December 1993 Resolved
MAKE PERMANENT REPAIRS TO AFT RAKE PORT CORNER, RENEW SIDESHELL, FRAMES, AND BRACKETS AS DISCUSSED ON 06DEC93. ALL REPAIRS TO BE REVIEWED AND APPROVED PRIOR TO COMMENCING WORK. ALL WORK AND FOLLOW-UP TESTS SHALL BE TOTHE SATISFACTION OF THE ATTENDING MARINE INSPECTOR/COGNIZANT OCMI.
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Construction/Loadline
Issued 22 December 1993 Resolved
ARC AND REWELD IN THE AFT RAKE PORT SIDE TWO PILLARS WHERE THEY TIE TO THE UNDER DECK. PILLARS ARE IN THE CENTER COLUMN, FIRST AND SECOND FROM THE FWDBULKHEAD.
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Construction/Loadline
Issued 22 December 1993 Resolved
MAKE AVAILABLE FOR INSPECTION - #3 STBD WATER BALLAST TANK, #5 STBD WATER BALLAST TANK, AND THE AFTER END OF THE FORWARD RAKE, ALL OF WHICH WERE OBSCURED BY WATER DURING THE INSPECTION PERFORMED ON 06DEC93.
Condition: Unknown
Due 6 January 1994
Resolved 3 January 1994
Construction/Loadline
Issued 22 December 1993 Resolved
REMOVE THE SCALE RESTING ON THE SCREEN FOR THE VENT VALVE LOCATED ON #5 STBD WATER BALLAST TANK._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 6 January 1994
Resolved 3 January 1994
Construction/Loadline
Issued 22 December 1993 Resolved
FREE UP ALL WTD'S, FREE PORTS, ACCESS HATCH COVERS, REPLACE OR REPAIR ALL DEFECTIVE CLOSING DEVICES, AND REPLACE GASKETS AS NEEDED. CHAULK TEST OR HOSE TEST TO PROVE INTEGRITY IN THE PRESENCE OF A MARINE INSPECTOR._x001C_ _x001C_
Condition: Unknown
Due 22 December 1993
Resolved 22 December 1993
Electrical
Issued 30 December 1992 Resolved
RENEW BATTERY FOR STERNLIGHT PRIOR TO VESSEL GETTING UNDERWAY.
Condition: Unknown
Due 30 December 1992
Resolved 30 December 1992
Electrical
Issued 30 December 1992 Resolved
INSTALL A COVER FOR THE BATTERY BOX LOCATED NEXT TO THE PORT RUNNING LIGHT.
Condition: Unknown
Due 30 December 1992
Resolved 30 December 1992
Electrical
Issued 30 December 1992 Resolved
AFTER GENERATOR IS OVERHAULED AND RE-INSTALLED ON VESSEL, PROVE PROPER OPERATION OF LOW LUBE OIL PRESSURE SHUTDOWN, HIGH WATER TEMPERATURE SHUTDOWN, AND OVERSPEED SHUT DOWN MECHANISMS.
Condition: Unknown
Due 30 December 1992
Resolved 30 December 1992
Construction/Loadline
Issued 31 January 1992 Resolved
RENEW AS ORIGINAL HATCH COVERS TO FWD RAKE PORT & STBD AND RENEW OR REPAIR AS ORIGINAL HATCH COVERS AND COMBINGS TO #1 P AND #2 P VOIDS.
Condition: Unknown
Due 31 January 1992
Resolved 31 January 1992
Construction/Loadline
Issued 31 January 1992 Resolved
PROVIDE COVERS FOR BALLAST TANK VENTS #3 PORT & STBD AND #5 PORT & STBD.
Condition: Unknown
Due 31 January 1992
Resolved 31 January 1992
Electrical
Issued 12 January 1991 Resolved
PROVIDE INDEXES FOR THE OUTLET BOXES PORTSIDE FORWARD IN THE GENERATOR CONTAINER.
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Navigation
Issued 12 January 1991 Resolved
SHOW AUTOMATIC OPERATION OF THE STERN NAVIGATION LIGHT.
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Electrical
Issued 12 January 1991 Resolved
MAKE WATERTIGHT THE ELECTRICAL OUTLET PANEL FOR THE REEFER (CONTAINERS) PORT SIDE AFT.
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Documentation
Issued 12 January 1991 Resolved
SHOW PROOF OF THE ANNUAL ABS LOADLINE ENDORSEMENT.
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Electrical
Issued 12 January 1991 Resolved
PROVIDE A FUEL OIL SHUTDOWN ON THE EXTERIOR OF THE CONTAINER GENERATOR _x001C_ BOX AND PROVIDE APPROPRIATE MARKINGS.
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Construction/Loadline
Issued 12 January 1991 Resolved
FRESHEN ALL HULL MARKINGS.
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Electrical
Issued 12 January 1991 Resolved
REMOVE THE WATER AND BLOCK THE BATTERIES IN THE BATTERY BOXES, PROVIDE SOLDER WIRE CONNECTIONS AND SEAL THE WIRES.
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Construction/Loadline
Issued 21 February 1990 Resolved
EFFECT PERM. REPAIRS TO PORT FORWARD BALLAST TANK DIRECTLY BELOW TANK VENT.INVOLVED IS 2 FRAMES, 1 LONG, AND SHELL PLATING, AT A MINIMUM.
Condition: Unknown
Due 21 February 1990
Resolved 21 February 1990
Unknown
Issued 2 September 1986 Resolved
MAKE PERMANENT REPAIRS TO CENTERLINE BULKHEAD IN WAY OF FRAMES 15 THROUGH 20 IN NO. 3 STARBOARD BALLAST TANK AT THE NEXT SCHEDULED DRYDOCK.
Condition: Unknown
Due 2 September 1986
Resolved 2 September 1986
Construction/Loadline
Issued 22 January 1985 Resolved
RENEW OR FAIR AS ORIGINAL BUCKLED HEADLOG BRACKETS AND ADJOINING HULL PLATEIN THE PORT AND STARBOARD BOW RAKE VOID TANKS PRIOR TO COMPLETING NEXT DRYDOCK EXAMINATION AND NOT LATER THAN 30 AUGUST 1985.
Condition: Unknown
Due 22 January 1985
Resolved 22 January 1985

Casualty record · 2

6 July 2011Routine · role: Involved in a Marine Casualty · activity 4093677
6 September 2011Routine · role: Involved in a Marine Casualty · activity 4198618
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.